首页

> 期刊论文知识库

首页 期刊论文知识库 问题

基桩质量检测方案探究论文

发布时间:

基桩质量检测方案探究论文

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 地基基础工程的质量检测。 地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 砌体结构工程检测。 砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

桩基础由于具有抗震性能好,沉降量小和承载力高、可以解决特殊地基土的承栽力的优点,越来越受到人们的青睐。桩基工程质量控制是建筑工程质量控制的重要环节也是技术难度较大的一个环节,质量检测是桩基工程质量控制的必要手段,检测结果是桩基工程质量验收的科学依据。因此,按照“安全适用、经济合理”的原则合理选择桩基类型,科学施工桩基以及对桩基础进行全过程质量检测十分重要。一、桩基工程质量检测内容(一)成孔质量检测在灌注桩的施工中,成孔质量的好坏直接影响到混凝土浇注后的成桩质量,桩孔的孔径偏小则使得成桩的侧摩阻力、桩尖端承载力减少,整桩的承载能力降低;桩孔上部扩径将导致成桩上部侧阻力增大,而下部侧阻力不能完全发挥,同时单桩的混凝土浇注量增加;桩孔偏斜在一定程度上改变了桩竖向承载受力特性,削弱了基桩承载力的有效发挥;桩底沉渣过厚使得桩长减少,对于端承桩则直接影响桩尖的端承能力。(二)桩的承载力检测(1)桩基是埋入地下的隐蔽工程,其质量较难控制,特别是就地灌注桩,更易出现影响桩基安全使用的各种质量问题。单桩的极限承载力,迄今也还不能象结构工程那样,单纯通过理论计算予以确定,因为桩的承载力与桩型、桩材、成桩工艺以及地层土特性等众多复杂的因素有关。因此在较重大的工程,要求通过一定数量的静荷载压桩试验来确定桩的承载力,作为设计的依据。(2)现在对桩基承载力的检测,常用的方法有静载荷试验、高应变法检测。高应变法属于动测法的一种,其适用范围受一定的限制,在进行灌注桩的竖向抗压承载力检测时,应具有现场实测经验和本地区相近条件下的可靠对比验证资料;对于大直径扩底桩和Q~s曲线具有缓变形特征的大直径灌注桩,不宜采用本方法进行竖向抗压承载力检测。虽然静载荷试验比高应变法费用高、所耗实验时间长,有时受场地限制等原因,但是静载荷试验仍然是检测基桩承载力最直接、最准确、最可靠的方法。(3)为保证静载试验结果的准确性,所有试验仪器仪表必须经过计量部门检定合格,并在有效期内使用。当采用压力表测定油压时,为保证测量精度,其精度等级应优于或等于0.4级,不得使用1.5级压力表控制加载。当油路工作压力较高时,有时出现爆裂、接头漏油、油泵加压不足造成千斤顶出力受限、压力表线性度变差等情况,所以应选用耐压高、工作压力大和量程大的、油泵和压力表,且试验设备在最大加载时的压力不应该超过规定工作压力的80%。(4)静载试验在所有试验设备安装完毕之后,应进行一次系统检查。其方法是对试桩加一较小的荷载进行预压,其目的是消除整个量测系统和被检桩本身由于安装、桩头处理等人为因素造成的间隙而引起的非桩身沉降;排除千斤顶和管路中之空气;检查管路接头、阀门等是否漏油等。如一切正常,卸载至零,待百分表显示的读数稳定后,并记录百分表初始读数,即可开始进行正式加载。(5)静载试验应保证有足够的荷载反力,试验过程应及时补压,以使真实反映每级荷载作用下的桩顶沉降。为控制检测质量,加载到最后一级,监理人员要到现场见证签字。(6)当桩身存在水平整合型缝隙、桩端有沉查或吊脚时,在较低竖向荷载时常出现本级荷载沉降超过上一级荷载对应沉降5倍的陡降,当缝隙闭合或桩端与硬持力层接触后,随着持载时间或荷载增加,变形梯度逐渐变缓;当桩身强度不足桩被压断时,也会出现陡降,但与前相反,随着沉降增加,荷载不能维持甚至大幅降低。所以,出现陡降后不宜立即卸荷,而应使桩下沉量超过40mm,以大致判断造成陡降的原因。(三)桩的完整性检测工程实践证明,常用的低应变动测方法对桩身完整性的检测,能较为可靠地发现一定深度范围内基桩的质量问题(如裂缝、夹泥、缩颈、离析等)及其严重程度。随着检测技术的发展,现行技术己能对传统的静载荷试验不能直接说明的桩身完整性问题作出定性分析,并据此对桩进行分类,便于现问题,为基础处理提供依据。二、工程实例某建筑,檐高,建筑面积,框剪结构。基础设计采用钢筋混凝土灌注桩承台基础,钻孔灌注桩数量240根,桩径φ600mm,有效桩长25.5m,。设计要求单桩竖向极限承载力Qu=2200kN。本次工程实践中针对场地环境和地质条件,主要采取单桩静载荷试验法和低应变反射波法进行桩基检测。(一)单桩静载荷试验检测(1)方法加载及观测系统试验采用慢速维持荷载法(锚桩法)。由槽钢及锚桩组成反力系统,通过反力系统由液压油泵及千斤顶施加荷载至桩顶,对桩顶施加竖向压力。荷载逐级加在桩顶上,放置在千斤顶上的荷重传感器时刻显示桩顶所受荷载大小。桩身产生变形沉降时,通过放置在桩头对称分布的电子位移传感器随时记录各级荷载作用下桩身的沉降量。(2)分级加载阶段试验加载分为10级进行,每级加载量相等,每级加荷值为220kN,其中第一级按2倍分级荷载加荷。(3)变形观测每级加荷后,间隔5、10、15min各测读一次变形,一个小时以后,每30分钟测读一次直至达到稳定标准。(4)沉降相对稳定标准每一小时的沉降不超过0.1mm,并连续出现两次,已达到相对稳定,可加下一级荷载。(5)终止加载条件:当出现下列情况:①在某级荷载作用下,桩的沉降量为前一级荷载作用下沉降量的5倍。②某级荷载作用下.桩的沉降量大于前一级荷载作用下沉降量的2倍,且经过24h尚未达到相对稳定标准。③已达到反力系统的最大反力。④)已满足设计或委托方委托的最大加荷值时,可终止加载。(6)卸载与卸载沉降观测每级卸载值为每级加载值的2倍,每级卸载后隔15分钟测读一次残余沉降,读2次后,隔30分钟再读一次,即可卸下一级荷载,全部卸载后,隔3h再读1次残余沉降量。(二)低应变检测本次工程实践中共对工程桩中的48根桩进行了低应变动力测试。检测系统是由武汉岩海公司生产的RS-1616K(S)基桩动测仪,加速度传感器力棒组成。(1)检测方法首先,在桩顶放置一只加速度传感器,由RS一1616K(S)基桩动测仪接受锤击过程中产生的加速度信号,在屏幕显示实测波形每根桩布采集点一个每点采集4锤信号。(2)曲线分析采用瞬态时域分析法将存储在磁盘上的测试信号在时域内进行处理,根据应力波反射等价地将实测速度信号通过时域由频域辅助,分析不同部位的反射信号,据此分析每根桩的桩身完整性。(三)检测结果分析(1)单桩静载荷试验该工程基础工程桩采用钻孔灌注桩,总桩数为240根,进行了单桩竖向抗压静载荷试验三组。检测位置由监理指定,符合随机抽检原则检测比例满足规程要求。IV-S1、III-S1和l-S1号试桩,最终荷载均为2200KN,最终变形分别为6.83mm、8.72mm和5.43mm,最终沉降量较小,沉降差异不大。(2)低应变检测该楼基础钻孔灌注桩总数为240根,本次低应变检测数量为48根,检测数量及比例符合规范要求。根据低应变实测曲线分析,波速在3700~4000m/s之间波形较规则,桩底反射清晰,未发现严重缺陷,均达到I、II类桩标准,其中I类桩45根,占93.7%;II类桩3根,占6.3%,成桩质量良好。百年大计质量第一,百层大厦基础第一。桩基的质量不容忽视,而桩基的质量不仅仅是施工企业自己干出来的,如果没有严格执法、执规的检测单位按照法规严格约束,就不可能有规范、合格的质量保证。所以,桩基检测单位、检测人员必须遵守职业道德,达到技术能力和水平,规范管理、科学管理才有约束力和公平公正性。更多关于工程/服务/采购类的标书代写制作,提升中标率,您可以点击底部官网客服免费咨询:

桩基础质量检测论文

建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 地基基础工程的质量检测。 地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 砌体结构工程检测。 砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文

桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words

公路工程地质信息 (一)强夯法处理液化地基的施工管理 江苏北部(如徐州、宿迁等)地区广泛分布废黄河泛滥沉积物,一般以亚砂土、亚粘土—细砂为主,埋层浅,地下水位高,天然地基承载力低,在地震作用下易产生液化现象。地基液化是引起构筑物破坏的主要形式,同时该地区又受到我省主要的地震危险带—郯庐地震带的影响,因此在该地区国道主干线京福、徐宿、连徐、宁宿徐、沂淮等高速公路建设中不可避免的遇到大面积液化地基处理问题。根据《公路工程抗震设计规范》(JTJ004—89),对高速公路必须进行液化地基处理,这是减轻地震灾害的根本性措施。因此,如何控制和管理好处理液化地基的施工,做到既经济有效又安全可靠,对保证高速公路建成后的正常运营、减轻地震灾害具有重大现实意义。 1 液化地基的国内外研究概况 地基液化分析与处理一直是土动力学的主要研究课题之一。液化一词最早见于1920年的《动力冲填坝》用来说明卡拉弗拉斯冲填坝的毁坏。1936年Casagrande首先给出了砂土液化的判别方法——临界孔隙比法。上世纪50年代,各国学者对砂土液化进行了广泛研究,主要包括:砂土液化的机理,砂土液化的预估方法,砂土液化的地基处理等。 所谓液化是指由于孔隙水压增加及有效应力降低而引起粒状材料(砂土、粉土甚至包括砾石)由固态转变成液态的过程。影响液化的因素有:①颗粒级配,包括粘粒、粉粒含量,平均粒径d50;②透水性能;③相对密度;④结构;⑤饱和度;⑥动荷载,包括振幅、持时等。 我国《工业与民用建筑抗震设计规范》(TJ11—78)根据1971年以前8次大地震的数据,参考美国、日本的有关研究成果给出了以临界标准贯入击数为指标的砂土液化判别公式。现行规范《建筑抗震设计规范》(GBJ11—89)通过对海城、唐山地震的系统研究,结合国外大量资料,对原规范进行了修改,采用了两步评判原则,并对临界标贯击数公式进行了修改,使之更符合实际。在国标《岩土工程勘察规范》(GB50021—94)中,对此又进行了补充,给出了液化比贯入阻力临界值和液化剪切波速临界值公式,用来进行液化判别。在公路工程中,基本上沿用上术两步评判原则,采用了临界标贯击数判别方法,并根据公路工程中的研究成果,给出了临界标贯击数的计算公式。这些规范在我国工程界得到了广泛应用。 2 高等级公路可液化地基处理方案的确定。 液化地基处理恰当与否,关系到整个工程的质量、投资和进度。因此其重要性已越来越多地被人们所认识。对于高速公路这样大面积处理可液化土而言,强夯法和干振碎石桩法是首选的处理手段。当全液化地基路段较长,需处理面积大,公路沿线外缘较近范围内无村庄,无重要构造物时,强夯法是比较理想的地基处理方法。 强夯法处理地基是20世纪60年代末Menard技术公司首先创立的,该方法将80…400kN重锤从落距6—40m处自由落下,给地基以冲击和振动,从而提高地基土的强度并降低其压缩性。强夯法常用来加固碎石、砂土、粘性土、杂填土、湿隐性黄土等各类地基土。由于其具有设备简单、施工速度快、适用范围广、节约三材、经济可行、效果显著等优点,经过20多年来的应用与发展,强夯法处理地基受到各国工程界的重视,并得以迅速推广,取得了较大的经济效益和社会效益。 由于强夯处理的对象(即地基土)非常复杂,一般认为不可能建立对各类地基土均适合的具有普遍意义的理论,但对地基处理中经常遇到的几种类型土,还是有规律可循的。实践证明,用强夯法加固地基,一定要根据现场的地质条件和工程作用要求,正确选用强夯参数,一般通过试验来确定以下强夯参数: (1)有效加固深度:有效加固深度既是选择地基处理方法的重要依据,又反映了处理效果。 (2)单击夯击能:单击夯击能等于锤重×落距。 (3)最佳夯击能:从理论上讲,在最佳夯击能作用下,地基土中出现的孔隙水压力达到土的自重压力,这样的夯击能称最佳夯击能。因此可根据孔隙水压力的叠加值来确定最佳夯击能。在砂性土中,孔隙水压力增长及消散过程仅为几分钟,因此孔隙水压力不能随夯击能增加而叠加,可根据最大孔隙水压力增量与夯击次数关系来确定最佳夯击能。 夯点的夯击次数,可按现场试夯得到的夯击次数和夯沉量关系曲线确定,应同时满足下列条件:(①夯坑周围地面不应发生过大隆起;②不因夯坑过深而发生起锤困难;③每击夯沉量不能过小,过小无加固作用。夯击次数也可参照夯坑周围土体隆起的情况予以确定,就是当夯坑的竖向压缩量最大,而周围土体的隆起最小时的夯击数。对于饱和细粒土,击数可根据孔隙水压力的增长和消散来决定,当被加固的土层将发生液化时的击数即为该遍击数,以后各遍击数也可按此确定。 (4)夯击遍数:夯击遍数应根据地基土的性质确定,地基土渗透系数低,含水量高,需分3—4遍夯击,反之可分两遍夯击,最后再以低能量“搭夯”一遍,其目的是将松动的表层土夯实。 (5)间歇时间:所谓间歇时间,是指相邻夯击两遍之间的时间间隔。Menard指出,一旦孔隙水压力消散,即可进行新的夯击作业。 (6)夯点布置和夯点间距:为了使夯后地基比较均匀,对于较大面积的强夯处理,夯击点一般可按等边三角形或正主形布置夯击点,这样布置比较规整,也便于强夯施工。由于基础的应力扩散作用,强夯处理范围应大于基础范围,其具体放大范围,可根据构筑物类型和重要性等因素考虑确定。 夯点间距可根据所要求加固的地基土性质和要求处理深度而定。当土质差、软土层厚时应适当增大夯点间距,当软土层较薄而又有砂类土夹层或土夹石填土等时,可适当减少夯距。夯距太小,相邻夯点的加固效应将在浅处叠加而形成硬层,影响夯击能向深部传递。 3 强夯法处理液化地基的质量控制与管理 施工单位选择 对参与施工的强夯施工单位,各施工标段中标单位要先审查其施工资质、信誉和业绩,并附有前业主对该单位的书面评价报告;任何单位不得将强夯分包给个人施工。各中标单位将经初步筛选合格的施工队伍形成书面推荐报告,经驻地监理审核后,上报主管部门,经批准后方可进场。进场后不得再分包或转包,否则,驻地监理工程师将责令分包单位立即退场,损失自负。 施工准备 编写施工组织设计,经驻地监理组审查,监理组提出书面审查意见,报总监代表审批同意方可施工。 施工管理 (1)施工单位要按设计图要求编制夯点编号图,编号图要清晰、规范、科学。 (2)施工单位必须制定严格的安全管理措施,现场操作人员必须戴安全帽,并对施工机械定期作安全检查。在强夯区四周要设置醒目的危险警告标志和安全管理措施,不允许行人和非施工车辆进入强夯区,以确保操作员、过往行人和车辆的安全。 (3)施工单位要对强夯机械进行编号,每台强夯机械必须持有监理组发放的《施工许可证》方可进行强夯施工。 (4)施工单位除在强夯机械上挂《施工许可证》外,还必须挂有《机械操作主要人员》和《施工技术参数》两块醒目的牌子,进行机械操作的主要人员必须挂牌上岗。 (5)施工单位要制定施工要点供现场人员执行。 (6)铺设垫层前要对原地面进行清表并整平,且要按每20米一个断面,每个断面5个规定测点,测量清表后标高。 (7)用水准仪测量垫层铺设前、后的对应测点标高,初步确定垫层厚度,每20米一个断面,每个断面5个规定测点,再按每断面挖1处深坑,进一步确定垫层厚度(控坑必须在测点位置上)。 (8)垫层宽度按每20米一处用钢尺丈量。 (9)按设计要求进行夯点布置,夯点定位布置用钢尺按100%的频率丈量。 (10)夯锤必须过磅称重。夯击能在强夯施工前必须检测,并满足设计要求。每夯击100次,用钢尺量一次夯锤落距。 (11)施工单位必须及时排出夯坑内积水。 (12)主、副、满夯的间隙时间要根据现场情况作必要的调整,但间隙时间必须满足72小时。需要调整间隙时间由现场监理工程师确定。 (13)遇到不需拆迁的高压电线时,施工单位必须安排集中施工的方案,市高指向供电部门申请临时停电。 (14)施工人员要认真做好强夯施工记录,记录要求清楚、真实。 (15)施工人员必须注意观察已处理路段,发现异常情况及时报告驻地监理组和有关部门。 (16)在强夯区内的构造物必须在强夯完成后,才能进行构造物的下部施工。 4 用强夯法处理砂土液化地基的质量检验评定 基本要求 碎石垫层的碎石规格和质量必须符合设计要求。强夯施工必须按夯击点确定的技术参数进行。以各个夯击点的夯击数作为施工控制数值。 实测项目表 表1 强夯法处理砂土液化地基实测项目表 项次 检查 项目规定值 或允许偏差 检查方法和频率 规定分 1 夯击能 不小于设计 1次/工点查施工记录 15 2 夯击次数 符合设计 查施工记录 15 3 垫层厚度 不小于设计 4处/200m 15 4 垫层宽度 不小于设计 4处/200m 15 5 标贯击数 符合设计 2处/工点 20 6 瑞利波 ≥200m/s 1处/工点 20 注:(1)标准贯入试验,按需3点/5000�且不少于3点进行。孔位随机 布置。特殊地段适当加密。 (2)瑞利波法(SSW)按1点/40m,在中心线两侧各15m处交叉布点。 外观鉴定 (1)填筑碎石垫层前必须清表、整平,无明显凸凹点,整平不符合要求扣2分。 (2)夯坑内积水应及时排除,不符合要求扣2分。 (3)夯后场地应平整,无局部隆起,不符合要求扣2分。 分项工程质量等级评定 (1)分项工程评分在85分及以上者为优良;70~85分者为合格;70分以下者为不合格。 (2)若标贯击数、瑞利波不合格时,则该分项工程不合格,可进行加固处理,再重新评定其质量等级。 5 结语 在京福、徐宿、宁宿徐等高速公路液化地基强夯加固的施工实践中,由于建设、监理及施工单位的高度重视,严格按有关质量要求和“施工指导意见”进行控制,尤其对强夯参数的确定都是经反复试验论证后,选择合适的参数指导施工,使强夯法处理液化地基段达到了设计要求,从已建成的高速公路处理路段的工后路基沉降观测看,处理段液化地基强夯加固达到了预期目的。

谈公路工程软基处理中PHC桩检测工作

论文关键词:公路工程软基处理PHC桩试验检测

论文摘 要 :PHC桩应用于公路工程软基处理,已有多个年头,从应用到公路工程建设领域后,对于质量检测工作一直为人们所关注、重视。由于试验检测工作的准确性直接决定了软基处理质量,因此,必须确保试验数据和检测工作的质量。为了达到这一目的,必须对检测工作的各项要求进行了解掌握,下面,本人将结合自身检测工作经验,和大家一起来探讨一下关于PHC桩的各个检测事宜。  PHC桩(预应力砼管桩)在当今公路工程施工建设中,作为主要的软基处理方式之一,并不少见。对于其施工技术的和控制,目前已趋成熟,部、建设部近年来不断对PHC桩相关规范进行更新、修订,使其生产和施工得到了较好控制。然而,对于一名刚刚涉及试验检测工作的技术人员来说,如何对PHC桩进行进场检测,及如何在施打完成后对其进行事后检测,都是初次接触检测工作时必须面对的一个个问题。为了让更多初入行者能更快、更全面掌握PHC桩相关检测事宜,本人结合自身多年试验检测工作经验,从实践和便于监控检测的角度出发,对PHC桩的检测要求和相关检测事宜作一些和归纳。 一、进场质量主要检测要求 管桩无论是委托预制或是直接购买,都要把好原质量关,对于委托的单位或是购买的预制场家均应具备高强预应力管桩加工生产的施工资质,确定厂家前应会同监理、业主等前往实地认真考察,并了解该厂以前生产的产品使用效果,确保是正规的、合格的生产厂家。如果直接购买已有的产品,则在生产场地对产品进行认真论证,反复推敲?,各种证件、手续一应俱全,成品桩的外观应无蜂窝、露筋、裂缝、色感均匀、桩顶处无裂隙,桩径、管壁厚度、桩尖中心线、顶面平整度、桩体弯曲等规范有强制性要求的,必须符合有关要求,管桩起吊中应免受振动、冲撞,确保运至现场的产品是合格的产品。 管桩运到工地后,应对进入工地的所有管桩的规格、型号、尺寸、外观质量、尺寸偏差、管桩堆放及桩身破损情况等进行全面检查,不符合要求的桩禁止使用。应由有资质的检测单位对进入施工场地的管桩进行随机见证抽样检测,检测应符合下列规定: (一)沉桩前,每个厂家生产的每一种桩型随机抽取一节管桩桩节进行破坏性检测,检测项目为预应力钢筋的搞拉强度、钢筋数量、钢筋直径(可检查每延米重量)、钢筋布置、端板材质及厚度、尺寸偏差、外观质量、钢筋保护层厚度等。当抽检结果出现不符合质量要求时,应加倍检测,若再发现不合格的桩节,该批管桩不准使用并必须撤离现场。未经抽检不得施工工程桩。 (二)沉桩过程中每栋物应随机抽查已截下的桩头,进行钢筋数量、钢筋直径、预应力钢筋抗拉强度、钢筋布置、端板尺寸及钢筋保护层厚度的检测,检测数量每单体工程不应小于总管桩数的1%,且不得少于3根。 (三)应对闭口桩尖的钢板厚度、桩尖尺寸、焊缝质量等进行检测,检测数量每栋建筑物不应少于总桩数的1%,且不应少于2个桩尖。 工程桩施工前应按有关规定进行单桩竖向抗压静载荷试验,并应压至破坏。当拟采用高应变法进行单桩竖向抗压承载力的验收检测时,应先对试桩进行高应变检测,再进行单桩竖向静载荷试验并压至破坏,取得可靠的动静对比资料后,方可在验收检测中实施高应变法。对比试验数量不应少于3根,当预估总桩数少于50根时,不应少于2根。 二、单桩静载试验检测要求 当岩土工程条件简单且以压桩力控制桩长或岩石土工程条件简单且有类似经验时,可用工程桩进行单桩竖向抗压静载荷试验,但应按有关规定增加一倍的检测数量,检测应符合下列规定: (一)单栋建筑物每一条件下的桩的试验数量不应少于6根(总桩数少于50根时,不少于4根),其中有3根(总桩数少于50根时为2根)应在大量工程桩施工前进行试验。 (二)岩土工程条件相同的同一场地多栋物,当工程桩条件相同时,每栋建筑物的试验数量不应少于2根,且每一施工单位所施工桩的检测数量不应少于6根。其中每栋建筑物有1根,每个施工单位有3根桩应在大量工程桩施工前进行试验。高层建筑及试验结果离散性较大时,应由设计单位酌情增加试验数量。 (三)除去施工前进行的试验外,余下的试验宜在工程桩施工完成并按桩顶设计标高截桩后随机抽检试验;当基坑开挖较深、坑内试验困难时,也可由设计单位指定桩位,在工程桩施工过程中进行试验。 (四)单栋建筑物某一条件下的桩总数少于30根,且为裙楼、附楼下的次要桩时,至少应进行一根桩的静载荷试验。 (五)当按上述要求进行试验后,在施工正常的情况下,工程桩可不再进行单桩承载力的验收。 (六)不应采用高应变法部分或全部取代上述单桩竖向抗压静载荷试验的检测。所有工程桩应逐根对桩孔内壁进行灯光照射目测或孔内摄影检查,观察孔内是否进土、渗水,有无明显破损、错位、挠曲现象,并作出详细记录,注明发现缺陷的位置以及进土、进水的深度。 三、桩位、垂直度、水平位移的主要检测要求 (一)工程桩的`桩顶标高应进行检验,其偏差不应超过+20mm、-50mm。 (二)开挖基坑中应对工程桩的外露桩头或在桩孔内进行桩身垂直度检测,抽检数量不应少于总桩数的5%,在基坑开挖中如发现土体位移或运行影响桩身垂直度时,应加大检测数量。对倾斜率大于3%的桩不应使用:对倾斜率为1%~2%(含2%)及2%~3%的桩宜分别进行各不少于2根的单桩竖向抗压静载荷试验,并将试验得出的单桩抗压承载力乘以折减系数,作为该批桩的使用依据。载荷试验最大加载最量应为设计要求的单桩极限承载力,试验中可同时进行桩顶水平位移的测量。 四、桩身完整性检测主要要求 工程桩应进行桩身完整性的验收检测。采用低应变法检测时,甲级设计等级的桩基,抽栓数量不应小于总桩数的30%,且不应少于20根。其他桩基抽检数量不应少于总桩数的20%,且不应少于10根。 每个承台下抽检的桩数不应少于1根,且单桩、两桩承台下的桩应全数检测。抗拔桩、以桩身强度控制设计的抗压桩、超过25层的高层建筑基桩及倾斜度大于1%的桩应全数检测。当采用低应变法检测桩身完整性时,应符合以下规定: (一)出现裂缝和缺陷的永久结构的抗拔桩或以承受水平力为主的桩应意在为III类或IV类桩。 (二)桩身的混凝土受损及桩身出现斜裂缝或垂直裂缝的受压桩应判为III类或IV类桩。 (三)桩身出现轻微缺陷的受压桩宜先判为III类桩,最终判定桩的类别时,应挖开浅部的缺陷进行检查核对,结合低应变波形判别评价。挖开检查时,当裂缝长度小于桩截面周长的1/3且为水平裂缝时,可将相似波形的桩改判为II类桩。 五、结束语 总之,作为一名合格的试验检测技术人员,除了要对各种试验检测规程、检测规范的要求做到了如指掌之外,更重要的,要注得自身工作经验和专业技术的提高,因为当一组不合格的数据由于个人经验不足出现误判时,给工程带来的,往往是质量事故的发生。因此,作为质量评判的主要角色,我们必须严阵以待,谨小慎微,认真做好专业经验的培养和检测技能的提高,只有这样,才能为工程建设质量保驾护航。 参考文献: 1.建筑地基与基础施工质量验收规范GB50202-2002[S] 2.卢春华.静压高强度预应力混凝土管桩施工技术[J].科技情报,2005

请继续阅读相关推荐: 毕业论文      应届生求职

毕业论文范文查看下载       查看的论文开题报告      查阅参考论文提纲

查 阅更多的毕业论文致谢     相关毕业论文格式        查阅更多论文答辩

桩基工程质量检测论文

[摘要] 我国经济的不断发展,不仅提高了建筑工程的经济效益同时也大大增加了同行业的竞争力度。因此,提高建筑工程的质量才是提高竞争力的关键,那么建筑工程的检测质量控制也就成为整个工程的重中之重。本位主要分析了建筑工程质量控制的关键要点以及提出了建筑工程质量控制的优化措施。提高工程建筑质量,扩大建筑工程的收益提出一些借鉴思考。

[关键词] 建筑工程;质量控制;关键要点;强化措施

建筑工程行业竞争的激烈促进了建筑工程质量的提高,这是竞争的核心。随着生活的不断发展,建筑工程慢慢的与人民的生活,与社会的发展紧密相关。所以不断提高工程建筑质量确定各项质量指标都满足国家的标准,以保证人们的生命安全,促进国家经济的不断发展。

1建筑工程质量控制的关键要点

建筑安全是建筑过程中最重要的问题,也是施工过程中最需要注意和考虑的问题,严格的建筑工程管理是对建筑质量与安全的考核与负责。

从技术管理入手,不断提高施工技术水平

建筑工程是非常繁琐的工程建筑项目,所需要的工序不仅种类多而且复杂。这就需要有多种施工班组,对建筑施工的现场管理是很艰难的,要确保施工过程中各个环节的管理到位,最重要的就是加强技术管理。建筑是施工过程中技术到位了,就会减少许多不必要的麻烦。首先,加强技术工人技术培训,提供工人技术水平,让施工人员切实按照施工的图纸进行施工,严格按照标准去落实。其次,合理安排建筑工程过程中工程计划,保证各个环节有序稳定的进行;最后就是要做好技术交底与施工工序之间的交接工作,加强技术人员技术技能培训,及时掌握新的技术,以确保每一道工序都能符合标准。在最后交底的时候,一定要注意技术问题,对于工序进行交接时要做好质量检查,确保建筑施工安全提高产品质量。

从材料管理入手,提高材料选择的质量

对于建筑材料的选择,应该对供应原材料的'厂家进行严格的筛选,不仅仅只考虑经济方面,还需要考虑原材料的质量,要把握施工过程中对原材料与资金的使用。对材料的选择应该进行“三检”,要对材料进行层层把关,同时还要避免原材料的浪费,节约材料成本。

切实做好人员管理

在建筑建设过程中,项目工程的管理者是建筑工程施工的核心,建筑工人是工程项目的主力与中坚力量,在建筑施工过程中每个人每个环节对建筑施工都是至关重要,所以各司其职,建立合理科学的奖惩制度是非常必要的,对于出现错误的要进行惩罚,同时还要将工人的工资与建筑工程的质量、效率等因素连接起来,确保建筑工程的质量。

2建筑工程质量控制优化措施

施工的前期准备工作要完善

要保证建筑工程的质量,要从整个工程的前期,中期以及后期进行质量的控制。要从多个方面进行项目前期准备工作,例如在设计、决策环节应保证购入质量到位的建筑用材、设计出可靠、科学的图纸,并制定专门方案加强施工质量监管,要严格把控建筑材料的选择与使用,在提高建筑质量的同时,要在建筑施工前严格进行建筑地实地勘测,对每一个可能对建筑施工产生影响的因素进行考虑,防患未然,避免引起建筑质量问题。建筑施工单位还应该还应该选择科学的施工设施,并且选择优秀的管理者来进行设备维护,选择专业施工队伍来进行建设。

提高对建筑施工的管理与监督

在建筑施工的过程中,严格按照管理要求对施工项目进行监督检查,为建筑施工做好各个环节的安全控制,不管是在建筑材料或者其他方面都要严格按照要求进行,尤其是建筑材料更要严格把关,防止建筑材料出现问题。其次是要加强对建筑施工的监督,要提高建筑施工人员责任感以及专业技能,以保证建筑工程的质量。最后就是要加强对施工技术的管理,要对建筑施工的全局进行把控,确保能够使用正确的施工技术,保证建筑工程质量。

提高施工者的技术能力

要确保建筑施工工程的质量,还需要有专业的技术人员。提高建筑工程施工者的技术能力也是提高建筑工程质量的重要手段。首先,对于整个建筑工程需要一个统筹全局的管理人员,这个管理者必须要具有较强的管理能力,具有较高的技术水平以及丰富的实践经验等等。其次,对于一些施工人员,要加强对施工技术的业务培训,不断提高建筑施工人员的专业技能以及综合素质,确保建筑工程的质量。

完善质量目标责任制

建筑工程施工单位还应该完善自身的质量目标责任机制,就是要对建筑施工的管理负责人、技术负责人以及项目经理等各类负责人的职责进行明确的规定,确保每一个施工环节的质量都有监督控制,责任到人,能够提高施工人员的责任感,促使他们以严谨的态度对待工作,并对所有施工相关人员的质量控制责任加以明确,保证一切质量工作均由专门责任人负责并有相应的标准。例如要保证所有人员都要认真遵循权、责、利原则,要保证每一个施工人员都有相应的科学合理的工作任务,促使他们能够在各自岗位上恪尽职守。同时,还要制定统一的目标,实现各个部门之间的相互监督与配合,从而提高建筑工程的质量。

3结束语

总的来说,对于建筑工程质量控制的关键,要从完善前期施工的准备工作,加强人员的培训与管理,材料的选择,加强对建筑工程的管理与监督以及完善质量目标责任制,从而保证建筑工程的每一个环节都能够得到有效的质量控制,从而保证整个建筑工程的质量,促进建筑行业的可持续发展。

参考文献

[1]范玉柱,刘岩.建筑工程桩基工程施工技术控制要点[J].中外企业家,2015(30).

[2]陈超,王霞.浅谈建筑工程桩基工程质量控制[J].河南建材,2014(01).

[3]陈子龙.如何做好建筑工程的质量控制[J].长春理工大学学报(高教版),2009(03).

[4]王国高.建筑工程施工质量控制问题及对策研究[J].黑龙江科技信息,2013(04).

[5]胡春玲.浅谈建筑工程管理基础上的建筑工程质量控制措施[J].科技与企业,2016(05).

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

谈公路工程软基处理中PHC桩检测工作

论文关键词:公路工程软基处理PHC桩试验检测

论文摘 要 :PHC桩应用于公路工程软基处理,已有多个年头,从应用到公路工程建设领域后,对于质量检测工作一直为人们所关注、重视。由于试验检测工作的准确性直接决定了软基处理质量,因此,必须确保试验数据和检测工作的质量。为了达到这一目的,必须对检测工作的各项要求进行了解掌握,下面,本人将结合自身检测工作经验,和大家一起来探讨一下关于PHC桩的各个检测事宜。  PHC桩(预应力砼管桩)在当今公路工程施工建设中,作为主要的软基处理方式之一,并不少见。对于其施工技术的和控制,目前已趋成熟,部、建设部近年来不断对PHC桩相关规范进行更新、修订,使其生产和施工得到了较好控制。然而,对于一名刚刚涉及试验检测工作的技术人员来说,如何对PHC桩进行进场检测,及如何在施打完成后对其进行事后检测,都是初次接触检测工作时必须面对的一个个问题。为了让更多初入行者能更快、更全面掌握PHC桩相关检测事宜,本人结合自身多年试验检测工作经验,从实践和便于监控检测的角度出发,对PHC桩的检测要求和相关检测事宜作一些和归纳。 一、进场质量主要检测要求 管桩无论是委托预制或是直接购买,都要把好原质量关,对于委托的单位或是购买的预制场家均应具备高强预应力管桩加工生产的施工资质,确定厂家前应会同监理、业主等前往实地认真考察,并了解该厂以前生产的产品使用效果,确保是正规的、合格的生产厂家。如果直接购买已有的产品,则在生产场地对产品进行认真论证,反复推敲?,各种证件、手续一应俱全,成品桩的外观应无蜂窝、露筋、裂缝、色感均匀、桩顶处无裂隙,桩径、管壁厚度、桩尖中心线、顶面平整度、桩体弯曲等规范有强制性要求的,必须符合有关要求,管桩起吊中应免受振动、冲撞,确保运至现场的产品是合格的产品。 管桩运到工地后,应对进入工地的所有管桩的规格、型号、尺寸、外观质量、尺寸偏差、管桩堆放及桩身破损情况等进行全面检查,不符合要求的桩禁止使用。应由有资质的检测单位对进入施工场地的管桩进行随机见证抽样检测,检测应符合下列规定: (一)沉桩前,每个厂家生产的每一种桩型随机抽取一节管桩桩节进行破坏性检测,检测项目为预应力钢筋的搞拉强度、钢筋数量、钢筋直径(可检查每延米重量)、钢筋布置、端板材质及厚度、尺寸偏差、外观质量、钢筋保护层厚度等。当抽检结果出现不符合质量要求时,应加倍检测,若再发现不合格的桩节,该批管桩不准使用并必须撤离现场。未经抽检不得施工工程桩。 (二)沉桩过程中每栋物应随机抽查已截下的桩头,进行钢筋数量、钢筋直径、预应力钢筋抗拉强度、钢筋布置、端板尺寸及钢筋保护层厚度的检测,检测数量每单体工程不应小于总管桩数的1%,且不得少于3根。 (三)应对闭口桩尖的钢板厚度、桩尖尺寸、焊缝质量等进行检测,检测数量每栋建筑物不应少于总桩数的1%,且不应少于2个桩尖。 工程桩施工前应按有关规定进行单桩竖向抗压静载荷试验,并应压至破坏。当拟采用高应变法进行单桩竖向抗压承载力的验收检测时,应先对试桩进行高应变检测,再进行单桩竖向静载荷试验并压至破坏,取得可靠的动静对比资料后,方可在验收检测中实施高应变法。对比试验数量不应少于3根,当预估总桩数少于50根时,不应少于2根。 二、单桩静载试验检测要求 当岩土工程条件简单且以压桩力控制桩长或岩石土工程条件简单且有类似经验时,可用工程桩进行单桩竖向抗压静载荷试验,但应按有关规定增加一倍的检测数量,检测应符合下列规定: (一)单栋建筑物每一条件下的桩的试验数量不应少于6根(总桩数少于50根时,不少于4根),其中有3根(总桩数少于50根时为2根)应在大量工程桩施工前进行试验。 (二)岩土工程条件相同的同一场地多栋物,当工程桩条件相同时,每栋建筑物的试验数量不应少于2根,且每一施工单位所施工桩的检测数量不应少于6根。其中每栋建筑物有1根,每个施工单位有3根桩应在大量工程桩施工前进行试验。高层建筑及试验结果离散性较大时,应由设计单位酌情增加试验数量。 (三)除去施工前进行的试验外,余下的试验宜在工程桩施工完成并按桩顶设计标高截桩后随机抽检试验;当基坑开挖较深、坑内试验困难时,也可由设计单位指定桩位,在工程桩施工过程中进行试验。 (四)单栋建筑物某一条件下的桩总数少于30根,且为裙楼、附楼下的次要桩时,至少应进行一根桩的静载荷试验。 (五)当按上述要求进行试验后,在施工正常的情况下,工程桩可不再进行单桩承载力的验收。 (六)不应采用高应变法部分或全部取代上述单桩竖向抗压静载荷试验的检测。所有工程桩应逐根对桩孔内壁进行灯光照射目测或孔内摄影检查,观察孔内是否进土、渗水,有无明显破损、错位、挠曲现象,并作出详细记录,注明发现缺陷的位置以及进土、进水的深度。 三、桩位、垂直度、水平位移的主要检测要求 (一)工程桩的`桩顶标高应进行检验,其偏差不应超过+20mm、-50mm。 (二)开挖基坑中应对工程桩的外露桩头或在桩孔内进行桩身垂直度检测,抽检数量不应少于总桩数的5%,在基坑开挖中如发现土体位移或运行影响桩身垂直度时,应加大检测数量。对倾斜率大于3%的桩不应使用:对倾斜率为1%~2%(含2%)及2%~3%的桩宜分别进行各不少于2根的单桩竖向抗压静载荷试验,并将试验得出的单桩抗压承载力乘以折减系数,作为该批桩的使用依据。载荷试验最大加载最量应为设计要求的单桩极限承载力,试验中可同时进行桩顶水平位移的测量。 四、桩身完整性检测主要要求 工程桩应进行桩身完整性的验收检测。采用低应变法检测时,甲级设计等级的桩基,抽栓数量不应小于总桩数的30%,且不应少于20根。其他桩基抽检数量不应少于总桩数的20%,且不应少于10根。 每个承台下抽检的桩数不应少于1根,且单桩、两桩承台下的桩应全数检测。抗拔桩、以桩身强度控制设计的抗压桩、超过25层的高层建筑基桩及倾斜度大于1%的桩应全数检测。当采用低应变法检测桩身完整性时,应符合以下规定: (一)出现裂缝和缺陷的永久结构的抗拔桩或以承受水平力为主的桩应意在为III类或IV类桩。 (二)桩身的混凝土受损及桩身出现斜裂缝或垂直裂缝的受压桩应判为III类或IV类桩。 (三)桩身出现轻微缺陷的受压桩宜先判为III类桩,最终判定桩的类别时,应挖开浅部的缺陷进行检查核对,结合低应变波形判别评价。挖开检查时,当裂缝长度小于桩截面周长的1/3且为水平裂缝时,可将相似波形的桩改判为II类桩。 五、结束语 总之,作为一名合格的试验检测技术人员,除了要对各种试验检测规程、检测规范的要求做到了如指掌之外,更重要的,要注得自身工作经验和专业技术的提高,因为当一组不合格的数据由于个人经验不足出现误判时,给工程带来的,往往是质量事故的发生。因此,作为质量评判的主要角色,我们必须严阵以待,谨小慎微,认真做好专业经验的培养和检测技能的提高,只有这样,才能为工程建设质量保驾护航。 参考文献: 1.建筑地基与基础施工质量验收规范GB50202-2002[S] 2.卢春华.静压高强度预应力混凝土管桩施工技术[J].科技情报,2005

请继续阅读相关推荐: 毕业论文      应届生求职

毕业论文范文查看下载       查看的论文开题报告      查阅参考论文提纲

查 阅更多的毕业论文致谢     相关毕业论文格式        查阅更多论文答辩

铁路路基质量检测方法论文

公路路基施工中的常见质量问题及防治措施论文

随着我国经济的快速发展,公路已经成为制约经济发展的一个重要条件,为此各地相继加大的公路工程建设力度,有效的满足了公路项目建设的需求。在公路建设项目当中,路基施工无疑是重中之重,如何做好路基施工提高路基施工水平,是施工单位在施工过程中必须解决的一个问题。而在路基施工当中,稍有不慎就可能产生一些质量问题,比如说

填料适应性差、填筑过程中中线偏位等,如何有效的预防并解决这些问题是保证路基施工质量的关键。这就要求施工单位根据每种病害形成的不同原因,采取针对性的措施,提高措施的成效性,使路基质量能够得到有效的控制。

1. 公路路基施工中的常见质量问题

根据相关研究资料和自身在这一方面的施工经验,笔者认为常见的质量问题如下:

土方路堤填料不符合要求

在路基施工过程中,土方路堤对于填料的质量有着比较高的要求,而在施工当中一些施工单位并没有注意到这一问题,在填料使用之前没有检查填料的质量是否符合要求,导致在填料施工当中所使用的填料适应性很差,一些填料直接影响到了路堤质量,在这种情况下不得不进行重新回填施工。一旦出现这一质量问题,不仅会延误工程的工期,还会导致工程施工成本及投资增加。

填筑过程中中线偏位

在路基施工过程中,一般会先设定一条中线,然后沿着中线进行路基的施工,以保证公路的走向、宽度等符合建设要求。但是在路基施工当中,一些单位为了赶工期、追进度,或者因为人为原因导致导线点遭到破坏,或者说施工测放人员在测量工作中复测品读不够,没有严格按照测量要求设立保护控制桩,导致路基填筑过程中中线偏位严重。一旦发生这一现象,会严重影响到路基施工质量,必须进行返工直到中线位置符合建设要求。

原有斜坡、坑穴、水渠等处理不当

在公路路基施工过程中会遇到一些不适合路基施工的情况,比如说斜坡、坑穴、水渠、填井、墓穴等等,这些地方如果处理不当可能会导致局部沉陷、失稳、滑坡等地质灾害,将直接影响到公路路基施工的质量。此外,斜坡、坑穴、水渠、填井、墓穴等处理不当,可能会给路基留下很多质量隐患,不仅会对路面铺设带来很大的影响,进而对整个公路建设工程的质量造成不利影响。

路基压实度达不到设计要求

路基压实度是保证路基施工质量的一个重要因素,但是在路基施工当中由于作业范围比较大,稍有不慎便可能出现压实度不足的问题。造成路基压实度不足的原因比较复杂,在压实的过程中如何路基质量偏小,或者说压实遍数不够的话,可能会导致压实度不足。此外,在碾压的过程中,如果存在漏压,或者说路基含水量过大,加上填松铺土的厚度太大的话,将会直接影响到压实的效果,进入对压实度产生影响。同时如果所使用的回填土性能不符合填土施工的要求,也会导致路基的压实度不达标。

2公路路基施工中的常见质量的防治

针对路基施工中经常出现的一些质量问题,应该引起施工单位充分的重视,采取一些有效的措施来防治常见病害,切实减少病害对路基质量的不利影响。具体来说应该注意以下几点:

把控好土方路堤填料质量

在选择路基填料的时候施工单位必须详细了解填料的种类、性质和适应性,确保其能够适合路基施工基本需要。在此基础上,再考虑填料的来源及经济性,也就是说要将填料的`性质和适应性作为首先考虑问题的。填料的取料场地确定前及到场填料在卸载之间必须由采集人员与工程试验人员对填料的性质进行详细的检查,检测合格之后方能进场卸料使用。在选择填料的时候应该尽量选择适合路基填料施工的一些材料,一般来说填料根据其性质和适应性可以分为:砂土、砂性土、粉性土、粘性土、碎石质土、砾石、不易风化的石块。一般来说重粘土、黄土类土、淤泥等这些填料由于其强度等方面的原因并不适合路基填料,在施工的过程中应该禁止使用这些材料。同时,在不同路基施工当中对于填料的要求也各不相同,施工单位应该根据路基施工的实际需要选择最合适的填料。

保证填筑过程中中线位置正确

对于中心位置偏离的问题,最好的解决办法就是在施工之前进行导线复测,加固导线点并对其进行一定的保护,直到路基施工结束。为了防止施工过程中人员、机械对中线的位置的不利影响,在施工之前施工人员根据恢复的路线中桩、设计图标、施工工艺及标准等,要明确路基用地界桩、路堤坡脚、边沟、取土沟等重点施工区域的位置装,这样能够保证施工过程中人员机械的作业能到位。此外,还需要在路中心位置一定安全距离设置一 个控制桩,其间隔一般在50m左右,该桩上要详细标明该标号以及填挖高度等施工信息,方便施工人员作业。此外,要重点做好机械施工的控制,在机械施工的过程中施工人员应该在边桩处设置明显的填挖标志,每隔200m就在距离中心桩相对距离的地方设置一个控制桩。对于已经出现的中线偏离的现象,施工人员应该再次进行导线复测,校核导线点的位

置是否正确,然后恢复中心及中心桩的正确位置。

做好斜坡、坑穴、水渠等处理工作

对于施工过程中遇到的斜坡、坑穴、水渠等问题应该引起施工人员充分的重视,做好各项处理措施。因此,如果在路基施工当中遇到斜坡、坑穴、水渠等现象,应该用原地土或者砂性土进行及时的回填,回填以后还要用机械进行夯实和压实,保证期强度和稳定性等符合路基的施工要求。对于可能会影响路基稳定性的炕洞,应该先查明炕洞的形成、深度,然后按照岩溶的处置方法对坑洞进行及时的回填,如果不能采取常规的方法解决的话,可以考虑使用构筑物跨越的方法解决。对于遇到的陷穴,应该组织地质人员详细勘察陷穴水的主要来源、水量及发育情况,根据勘察的结果采取回填、跨越构建等处理方式。

严格按照压实标准进行压实作业

对于路基施工过程中遇到的压实度不足的问题,要求施工单位应该选择压实要求的压路机,并严格控制好压力机的质量及压实遍数,必要的时候可以选择震动压路机配合三轮压路机进行碾压,以保证碾压的均匀性和压实度。在压实的过程中,压路机按照事先制定好的作业计划进行,保证碾压轮迹的重叠、铺筑段落大姐长度符合规范要求,碾压的遍数应该做好记录,并及时提醒作业施工人员。在碾压之前要详细测定路基的含水量,一般在2%左右的时候碾压效果最好,如果因为下雨导致填土松软或者因为干燥起尘,应该先对填土进行风干,或者对干燥填土进行洒水保湿,待其含水量达到碾压要求以后才能进行压实作业。

总之,在路基施工中,如何解决填料适应性差、填筑过程中中线偏位等常见质量问保证路基施工质量的关键。施工单位必须根据每种病害形成的不同原因,采取针对性的措施,提高措施的成效性,使路基质量能够得到有效的控制。

参考文献

[1] 符德,姬高阳,周建伟. 道路工程中路基质量的预防及处治[J]. 科技信息, 2010,(33) .

[2] 张征远,刘维佳,陈宝志. 路基质量通病产生的原因及防治[J]. 中国新技术新产品, 2010,(15) .

[3] 和永生. 浅析影响公路工程路基质量的原因与处理措施[J]. 中国新技术新产品, 2011,(20) .

高速铁路工程测量精度和测量模式论文范文

无论是在学校还是在社会中,大家都写过论文,肯定对各类论文都很熟悉吧,论文一般由题名、作者、摘要、关键词、正文、参考文献和附录等部分组成。那么一般论文是怎么写的呢?下面是我整理的高速铁路工程测量精度和测量模式论文,供大家参考借鉴,希望可以帮助到有需要的朋友。

根据摘要的介绍,我们对于高速铁路测量的现今发展状况有了一个简单的了解,首先,我们要知道,随着现代道路铁路工程的发展,国内外,特别是近几年国内的高速铁路的发展使铁道工程勘测、设计、施工和运营组织都发生了巨大变化。这些变化不仅体现在我们对于铁路工程的发展前景的一个预测,更加体现我们对于铁路发展的当前形势的一个把握,铁路工程的发展来势迅猛,测量工程师们还没来得及做好充分的技术准备,但我们的新的发展模式就已经被需要。迫于形势需要,除借鉴国外已有先进技术外,讨论得比较多的就是提高测量精度。其实除适当提高测量精度外,改进测量方法和流程,降低成本,提高效率,是当前铁路工程测量更为重要的课题。下面,本文就来具体的谈一谈这一内容,从它的问题的出现和解决措施作出一个叙述。

1、各设计院测量工程师的想法——从经济、效率、和质量各方面考虑有如下困难

控制测量每提高一个等级,其经费增长约40%,观测时间成倍增加。就目前情况来看,多数工程项目给予勘测的工期都十分紧张。对于各设计院的测量,有着许多方面的考虑因素,也在不断地解决中,首先,经费问题是一个重要问题,我们必须确保我们的经费被控制在一定的范围内,经费的有效合理的利用和规划对于我们的工程的实施有着非常重要的作用,没有经费的支持,我们的测量工程就不能得到一个很好的发展和顺利进行。

二、三等控制网精度

控制网的精度控制是保证我们的工程准确测量的一个重要方面,也是我们应该注意的方面,我们知道控制网是以对应十几至几十公里的长边为条件的,其密度不能满足铁路测量需要,当进一步用短边加密时,其精度回落到一级导线的精度。

布设高等级控制网除精度要求高外还面临其他难题:如起算联测的一等控制点少,平差、计算不同于低等级控制网,更复杂,要进行天文、重力测量需要更专业的部门来完成,铁路设计院和工程局一般不具备施测能力。这些问题就是需要我们亟待解决的,我们必须明白这些问题的出现原因和解决措施,才能从根本上解决这些问题,并且能够在很大程度上将这些问题控制在我们可以解决以及利用的范围内。

关于建立独立的高速铁路二、三等控制网,不强制闭合到国家等级控制网上的设想因下列原因而不可取:

独立坐标系统一般用于区域性小范围地区,地球面可近似当作平面,不需做高斯投影,长大铁路途经几省,其球面特性不可忽略。

不具备进行高精度天文、重力测量的能力,数百公里控制网呈狭窄线形,其精度不易控制。精度的控制是我们在工程测量过程中一个比较重要的方面,精度的控制也是我们可以切实实施的方面。

已有的各种比例尺地形图及沿途经由的道路、江河、城市、机构等,都是以国家统一大地坐标定位,铁路另辟蹊径,相关关系很难理顺。地形图的测量是以实际的情况来考虑的,同时也是我们对于铁路工程测量的重要途径,我们必须保证,我们对于铁路的测量有着一定的现实基础和研究支撑。

2、关于新测量流程的建议

对于新测量的实施,是我们解决高速铁路工程测量的一个重要方法,为了扭转这种状况,使得图纸上定线放样到实地后消除系统误差,需要改变铁路测量流程如下。

一次布网把原航外控、加密四等控制点、初测导线、定测交点,合并为3~5km一对GPS点或边长500 ~1 000m的导线,做相对精度为1/115~1/2万的一次布网,并对其作五等水准测量。除能消除地形图和实地同名点的系统差外,还有以下主要作用:

简化测量程序,减少测量工作量,我们要将测量的程序尽量的简化,将测量的工作量控制在我们可以掌握和控制的范围内,同时也使得我们对于工程的顺利进行更加有信心,以及实施的措施更加的有效,使得我们对于程序化的流程更加的了解。

勘测、设计、施工都只用一次布网的资料和控制桩,资料简单清晰,差错少。资料的支持是我们对于工程测量的基础保证,同时也是我们对于工程测量设计的一个重要考虑方面,资料的尽量简单化和对程序的简化是保证我们铁路工程顺利进行的重要方面,也是必要的解决方式。

从一次布网控制点直接测设中线,则可改变铁路测量的模式,铁路工程测量精度一直是一个倍受测量工程师关注的问题,但铁路测量从未因精度问题对设计和施工产生过影响。问题都出在测量错误、测量资料处理错误等方面。理清各个测量环节之间的关系,简化测量过程使其更简洁、明晰、规范,以容易控制的内业逐步取代难以控制的外业测量。

坐标控制测设中线具有明显的优越性

直接从一次布网控制点测设中桩,不用长距离,连续转点,避免了误差累积。一个工程的进行必定会伴随着工程误差的出现,如何迅速有效的处理好误差,是我们在工程测量过程中的必要步骤,也是我们应该尽可能避免的一步,我们不能保证零误差,但我们至少可以保证尽可能的减少误差的发生,以及对于误差的解决方案。

可以任何里程切入测量,只要不是改线都不会出现断链。这一特点使得中线测量能够不连续进行,可以先测设桥、隧地段,使地质、桥梁、隧道等专业能及早开展工作。提高航测精度后,还可以只对重点地段测设中桩,一般路基在航测模型上直接量测。

从航测模型量测横纵断面在航测模型上量测横纵断面,国外多家机构进行过研究且已投入使用。国外采用1/3 000~1/5000大比例尺摄影,或初测做小比例尺摄影,定测再做一次大比例尺摄影。国内有许多单位,特别是铁道部属各设计院进行过研究,但因精度达不到《新建铁路工程测量规范》的规定限差而未能进行下去。

3、结论

就如上面介绍的一样,笔者对于铁路工程测量的过程中的测量精度和测量模式的内容作出了一定的总结和看法,铁路工程的实施作为我们现代社会铁路的重要组成部分,同时铁路工程的测量又作为铁路工程实施的重要方面,这几点是息息相关的,同时也是需要我们联合在一起考虑的内容,只有做到了这些方面的准备工作,同时做好了一定的预防措施和误差分析,我们的铁路工程的测量过程中可能出现的.问题就会有一个很好的解决,同时也会使得我国的铁路工程发展的越来越好,我们的铁路工程测量开展的越来越顺利。

1 引言

交通运输业与国家经济的发展有很大的联系, 在高速发展的今天,我国大力发展高铁建设,国家对高速铁路工程测量的要求也不断提高, 对高速铁路测量中应用到的技术要求也越来越高。一般情况下,传统的测量技术都存在一些不足,甚至跟不上时代发展得脚步,因此,这就需要将先进的测量技术应用到高速铁路工程测量中。我国的高速铁路工程测量技术在不断提高,以适应我国高速铁路建设的发展,只有保证了工程测量的精度要求,才能够很好的满足高速铁路发展需求。

2 高速铁路工程测量

高速铁路工程测量的内容

就铁路建设来看,无论是铁路的勘测设计、工程施工,还是项目完成后的验收和维护, 这些都离不开对工程的精密测量工作。工程测量工作需要贯穿于整个高速铁路建设的过程中,其对高铁工程建设具有非常重要的意义。高速铁路工程测量的内容也包含了多个方面,例如对轨道施工的测量、对高速铁路平面高程控制的测量以及对铁路运行维护的测量等。这些测量内容的精确度都是确保高速铁路建设质量的重要依据,所以,铁路工程相关工作人员必须高度重视工程测量问题。

高速铁路工程测量的目的

在高速铁路工程建设过程中, 做的所有工作都是为了确保高铁工程的质量及安全,高速铁路工程测量也不例外。工程测量主要是根据高铁工程的实际情况, 合理设计各级平面高层控制网,然后在精密测量网的控制下,对工程建设中每个施工环节有效实施,最终顺利完成高速铁路的建设。由于高速铁路的建设在各方面的要求都很高,所以,在进行高速铁路工程测量的时候,应该根据铁路工程的实际情况,按照设计的线型对铁路线路进行施工。为了确保轨道的平顺性,精度要控制在毫米级的范围内,来确保在车辆行驶中具有舒适性和安全性。

高速铁路测量技术的要求

轨道是高速铁路的重点建设环节。高铁轨道一般可以分为有砟轨道和无砟轨道。无砟轨道较有砟轨道平顺性以及稳定性要好,轨道的耐久性也随之大幅提升。但应注意的是,无砟轨道对工程基础的质量有非常高的要求, 如果工程基础有沉降等问题,不仅会影响行车安全,甚至造成灾难。这就对工程测量精度提出了极高的要求。另外,对于无砟轨道而言,在施工完毕后,很难对其进行调整,所以,为避免多个环节的误差积累,高铁轨道工程测量必须具有严格的控制网标准。

3 高速铁路工程测量技术存在问题

测量仪器导致的质量问题

在实际铁路工程测量中, 测量仪器的质量问题以及使用不当是导致工程测量数据不准确的一个重要因素, 主要表现在:①测量仪器相对落后,达不到当前工程测量的标准要求。在一些工程施工中,为了节省成本,不能及时的换新的仪器,还在使用比较老式的测量仪器,这样难保证测量精度;②测量人员在使用测量仪器进行工程测量时, 往往凭借自己的经验对工程测量,没能够按照相关的规范来使用仪器,这很可能使测量的数据与实际不符,最终导致铁路工程出现质量问题;③没能按照相关的规定来管理仪器,造成仪器失真。而对于工程测量仪器来说,其管理及保养都需要专业人员来进行,不能让其他人员随意使用或放置,以防仪器失去精度。

未能控制好测量质量

对于高速铁路工程质量监控来说, 它既涉及到铁路工程的质量问题,又涉及到人们的生命和财产安全问题,不仅需要相关部门的监察,更加需要政府的职能监督。政府及社会监理要和相关部门协同进行工程验收, 高铁质量重中之重不可忽视。然而,许多工程监理没能担负起应尽的责任,没有按照监理要求对工程质量进行评估。其次有一些监理人员未使得当的测量仪器进行工程监理,这会很大程度上影响监理质量。

工程测量产生误差

GPS 测量误差

对于高铁工程测量的前两个阶段, 都是需要采用GPS 测量方式,而此种方式很容易出现误差,其误差的来源可以分为以下三类:

(1)与控制段相关的误差,包括星历误差和卫星时钟误差,指的是在卫星传播过程中导航电文的参数值产生误差。

(2)与接收机有关的误差,一般是接收机噪声引起的误差。

(3)与卫星信号有关的误差,指信号受到接收机和卫星之间的传播介质的影响而造成的误差。

CPⅢ控制测量误差

CPⅢ控制网测量方式是采用后方交会全站仪自由设站的形式。误差来源主要是:

(1)由观测值误差产生的自由设站点误差,主要原因是出现了方向观测误差;

(2)两相邻测站在平面位置和高程产生的相对误差;

(3)全站仪测量轨道各点的误差。

4 工程测量问题的解决措施

提高工程测量中的技术创新

我们的社会在不断进步发展, 对于铁路工程测量技术来说,也需要不断的创新。把先进的科学技术运用到工程测量之中,有效的提高铁路工程测量技术水平。科学技术是第一生产力,在一定意义上说,测量技术的提升以及测量标准的提升既能够降低高铁工程测量的花费, 又能够确保高铁工程施工的进度和质量。因此,我国要推动高速铁路工程测量技术的进一步发展与革新,保证我国高速铁路事业顺利发展。

加强对高速铁路工程测量中各项制度的制定与实施

这包含了在高速铁路工程测量取得成果的复测、交接、施工过程等环节上要严格遵守相关的管理办法, 进而使工程测量行为规范起来,确保高铁工程测量成果的质量。如今高速铁路工程建设不断发展, 铁路施工技术要求的精度也在不断增高。对此高铁工程的负责人要把眼光放长远,同时要根据实际发展情况,引进先进、实用的设备仪器,为提高高速铁路工程的测量质量打下一个良好的基础, 为我国的高速铁路工程事业提供推动力量。

要加强对工程测量工作的监督与管理

把高速铁路工程测量的监督工作放到首位。①工作人员必须了解高速铁路工程测量过程中的每一个细节, 遵守相应的标准规范, 施工人员也不能仅仅依赖自己的工作经验来测量。②高铁工程测量工作人员要担负起自身的责任,对测量数据严格把关,并反复审查所得数据,确保数据万无一失。在高速铁路工程测量的数据应用到实际中,必须要再次核实数据,数据的真实有效性是保证铁路工程质量的首要前提,因此,必须将监督工作有效落实。

减弱工程测量误差

GPS 测量误差的减弱措施

卫星时钟造成的误差是系统误差, 它包括时钟的随机误差及频偏、钟差等所产生的误差。对于这种误差往往可以通过差分技术和钟差改正法来减弱。此外还有星历误差,它可采用相位观测量求差法来获取高精度的相对坐标, 从而减弱或消除误差。对于高精度、长距离的测量可以采取精密星历法来削弱。另外,对于整体的星历误差还可以通过轨道改进法、同步求差法等来减弱误差。

要消除与卫星传播有关的误差, 可以通过倾斜因子系数来解决电离层的折射使得码相位测量变长, 载波相位变短的问题,也可以选择一个特定的时间段观测,然后使用同步观测量求差法来消除误差。

可采用差分法来处理与接收站有关的误差, 如果要求高精度定位,可以使用外接频标,给接收站提供高精度的时间标准。或者是在求解的时候把接收机的钟差作为独立未知数处理。

CPⅢ控制误差的减弱

我们不能完全的消除全站仪测量所造成的误差, 只能采取一定的方法来合理的减弱误差, 所测量的轨道各点在竖直方向的不平顺性跟观测高度角是有关的, 观测水平方向与在水平方向的不平顺性有关, 正矢误差与测量距离和误差角度有关,想要减弱正矢误差,就要控制观测距离和观测角度的误差,还要尽量缩小观测距离。

5 结语

工程测量对于工程施工来说是一个非常重要的环节,工程测量精度对工程项目施工质量会有着很大作用。施工前要运用工程测量技术重新核实测量结果, 一旦测量技术出现问题,整个工程可能就会出现严重的质量问题。高速铁路工程施工是一项系统且又复杂的工程项目, 必须保证铁路轨道的平顺性,才能确保高速运行的列车安全稳定运行。因此,对高速铁路工程测量技术要求非常高。想要使高速铁路发展的更好更快,就要继续深入研究工程测量技术,还要加大对高速铁路工程测量的监督力度,在严格的审查制度下,工作人员才会具有高度责任心的工作态度, 并且能够认真完成自己的工程测量任务,进而促进我国高铁工程事业的快速发展。

通常采用环刀法,灌砂法和核子密度仪法等。①环刀法,是一种破坏性的检测方法,适用于不含骨料的细粒土。优点是设备简单操作方便;缺点是受土质限制,当环刀打入土中时,产生的应力使土松动,壁厚时产生的应力较大,因此干密度有所降低。②灌砂法,是一种破坏性检测方法,适用于各类土。优点是测定值精确;缺点是操作较复杂,须经常测定标准砂的密度和锥体重。③核子密度仪法,是一种非破坏性测定方法。能快速测定湿密度和含水量,满足现场快速、无破损的要求,并具有操作方便,显示直观的优点,但应与灌砂法进行对比标定后方可使用。灌砂法灌砂法是利用均匀颗粒的砂去置换试洞的体积,它是当前最通用的方法,很多工程都把灌砂法列为现场测定密度的主要方法。该方法可用于测试各种土或路面材料的密度,它的缺点是:需要携带较多量的砂,而且称量次数较多,因此它的测试速度较慢。采用此方法时,应符合下列规定:(1)当集料的最大粒径小于15mm、测定层的厚度不超过150mm时,宜采用Φ100mm的小型灌砂筒测试。(2)当集料的粒径等于或大于15mm,但不大于40mm,测定层的厚度超过150mm,但不超过200mm时,应用Φ150mm的大型灌砂筒测试。1.仪具与材料(1)灌砂筒:有大小两种,根据需要采用。储砂筒筒底中心有一个圆孔,下部装一倒置的圆锥形漏斗,漏斗上端开口,直径与储砂筒的圆孔相同,漏斗焊接在一块铁板上,铁板中心有一圆孔与漏斗上开口相接,储砂筒筒底与漏斗之间没有开关。开关铁板上也有一个相同直径的圆孔。(2)金属标定罐:用薄铁板制作的金属罐,上端周围有一罐缘。(3)基板:用薄铁板制作的金属方盘,盘的中心有一圆孔。(4)玻璃板:边长约5m~600mm的方形板。(5)试样盘:小筒挖出的试样可用铝盒存放,大筒挖出的试样可用300mm x 500mm x 40mm的搪瓷盘存放。(6)天平或台称:称量10 ~15kg,感量不大于1g。用于含水量测定的天平精度,对细粒土、中粒土、粗粒土宜分别为、、。(7)含水量测定器具:如铝盒、烘箱等。(8)量砂:粒径0.30~ 及~清洁干燥的均匀砂,约2040kg,使用前须洗净、烘干,并放置足够长的时间,使其与空气的湿度达到平衡。(9)盛砂的容器:塑料桶等。(10)其他:凿子、改锥、铁锤、长把勺、小簸箕、毛刷等。2.试验方法与步骤(1)标定筒下部圆锥体内砂的质量①在灌砂筒筒口高度上,向灌砂筒内装砂至距筒顶15mm左右为止。称取装人筒内砂的质量m1 ,准确至1g。以后每次标定及试验都应该维持装砂高度与质量不变。②将开关打开,让砂自由流出,并使流出砂的体积与工地所挖试坑内的体积相当(可等于标定罐的容积),然后关上开关,称灌砂筒内剩余砂质量 m5 ,准确至1g。③不晃动储砂筒的砂,轻轻地将灌砂筒移至玻璃板上,将开关打开,让砂流出,直到筒内砂不再下流时,将开关关上,并细心地取走灌砂筒。④收集并称量留在板上的砂或称量筒内的砂,准确至1g。玻璃板上的砂就是填满锥体的砂m2 。⑤重复上述测量三次,取其平均值。(2)标定量砂的单位质量γ。①用水确定标定罐的容积V,准确至1mL。②在储砂筒中装人砂并称重,并将灌砂简放在标定罐上,将开关打开,让砂流出,在整个流砂过程中,不要碰动灌砂筒,直到砂不再下流时,将开关关闭,取下灌砂筒,称取筒内剩余砂的质量准确至1g。③计算填满标定罐所需砂的质量。④重复上述测量三次,取其平均值。⑤计算量砂的单位质量。(3)试验步骤①在试验地点,选一块平坦表面,并将其清扫干净,其面积不得小于基板面积。②将基板放在平坦表面上。当表面的粗糙度较大时,则将盛有量砂的灌砂筒放在基板中间的圆孔上,将灌砂筒的开关打开,让砂流入基板的中孔内,直到储砂筒内的砂不再下流时关闭开关。取下灌砂筒,并称量筒内砂的质量准确至1g。当需要检测厚度时,应先测量厚度后再进行这一步骤。③取走基板,并将留在试验地点的量砂收回,重新将表面清扫干净。④将基板放回清扫干净的表面上(尽量放在原处),沿基板中孔凿洞(洞的直径与灌砂筒一致)。在凿洞过程中,应注意勿使凿出的材料丢失,并随时将凿出的材料取出装人塑料袋中,不使水分蒸发,也可放在大试样盒内。试洞的深度应等于测定层厚度,但不得有下层材料混人,最后将洞内的全部凿松材料取出。对土基或基层,为防止试样盘内材料的水分蒸发,可分几次称取材料的质量。全部取出材料的总质量为mw ,准确至1g。⑤从挖出的全部材料中取出有代表性的样品,放在铝盒或洁净的搪瓷盘中,测定其含水量(w,以%计)。样品的数量如下:用小灌砂筒测定时,对于细粒土,不少于100g; 对于各种中粒土,不少于500g。用大灌砂筒测定时,对于细粒土,不少于200g;对于各种中粒土,不少于1000g对于粗粒土或水泥、石灰、粉煤灰等元机结合料稳定材料,宜将取出的全部材料烘干,且不少于2000g,称其质量m d,准确至1g。当为沥青表面处治或沥青贯人结构类材料时,则省去测定含水量步骤。6.将基板安放在试坑上,将灌砂筒安放在基板中间(储砂筒内放满砂质量m 1),使灌砂筒的下口对准基板的中孔及试洞,打开灌砂筒的开关,让砂流入试坑内匕在此期间,应注意勿碰动灌砂筒,直到储砂筒内的砂不再下流时,关闭开关。小心取走灌砂筒,并称量筒内剩余砂的质量m4 ,准确到1g。7.如清扫干净的平坦表面的粗糙度不大,也可省去上述②和③的操作。在试洞挖好后,将灌砂筒直接对准放在试坑上,中间不需要放基板。打开筒的开关,让砂流入试坑内。在此期间,应注意勿碰动灌砂筒。直到储砂筒内的砂不再下流时,关闭开关,小心取走灌砂筒,并称量剩余砂的质量m’4 ,准确至1g。8.仔细取出试筒内的量砂,以备下次试验时再用,若量砂的湿度已发生变化或量砂中混有杂质,则应该重新烘干、过筛,并放置一段时间,使其与空气的温度达到平衡后再用。3.计算(1)计算填满试坑所用的砂的质量mb。(2)计算试坑材料的湿密度ρw。(3)计算试坑材料的干密度ρd。(4)水泥、石灰粉、煤灰等无机结合料稳定土,计算干密度ρd。当试坑材料组成与击实试验的材料有较大差异时,可以试坑材料作标准击实,求取实际的最大子密度。4.试验中应注意的问题灌砂法是施工过程中最常用的试验方法之一。此方法表面上看起来较为简单,但实际操作时常常不好掌握,并会引起较大误差;又因为它是测定压实度的依据:故经常是质量检测监督部门与施工单位之间发生矛盾或纠纷的环节,因此应严格遵循试验的每个细节,以提高试验精度。为使试验做得准确,应注意以下几个环节:(1)量砂要规则。量砂如果重复使用,一定要注意晾干,处理一致,否则影响量砂的松方密度。(2)每换一次量砂,都必须测定松方密度,漏斗中砂的数量也应该每次重做。因此量砂宜事先准备较多数量。切勿到试验时临时找砂,又不作试验;仅使用以前的数据。(3)地表面处理要平整,只要表面凸出一点(即使1mm),使整个表面高出一薄层,其体积也算到试坑中去了,会影响试验结果。因此本方法一般宜采用放上基板先测定一次粗糙表面消耗的量砂,按式(6-7)计算填坑的砂量,只有在非常光滑的情况下方可省去此操作步骤。(4)在挖坑时试坑周壁应笔直,避免出现上大下小或上小下大的情形:这样就会使检测密度偏大或偏小。(5)灌砂时检测厚度应为整个碾压层厚,不能只取上部或者取到下一个碾压层中。灌沙法的检测步骤首先要在试验地点选一块平坦表面,其面积不得小于基板面积,并将其清扫干净。将基板放在此平坦表面上,沿基板中孔凿洞,洞的直径100毫米,在凿洞过程中应注意不使凿出的试样丢失,并随时将凿松的材料取出,放在已知质量的塑料袋内,密封。试洞的深度应等于碾压层厚度。凿洞毕,称此袋中全部试样质量,准确至1 克。减去已知塑料袋的质量后即为试样的总质量。然后从挖出的全部试样中取有代表性的样品,放入铝盒,用酒精燃烧法测其含水量。最后将灌砂筒直接安放在挖好的试洞上,这时灌砂筒内应放满砂,使灌砂筒的下口对准试洞。打开灌砂筒开关,让砂流入试洞内。直到灌砂筒内的砂不再下流时,关闭开关,取走灌砂筒,称量筒内剩余砂的质量,准确至1克。试洞内砂的质量=砂至满筒时的质量-灌砂完成后筒内剩余砂的质量-锥体的质量。挖出土的总质量除以试洞内砂的质量再乘以标准砂的密度可计算路基土的湿密度。干密度就等于湿密度/(1+*含水量)压实度就等于土的干密度/土的最大干密度*100%在路基施工过程中,为控制好路基压实质量,提高现场压实机械的工作效率,需要重点做好四方面工作:一是通过试验准确确定不同种类填土的最大干密度和最佳含水量。二是现场控制填土的含水量。实际施工中,填土的含水量是一个影响压实效果的关键指标,路基施工中当含水量过大时应翻松晾晒或掺灰处理,降低含水量;当含水量过低时,应翻松并洒水闷料,以达到较佳的含水量。三是分层填筑、分层碾压。施工前,要先确定填土分层的压实厚度。最大压实厚度一般不超过20厘米。四是加强现场检测控制。填筑路基时,每层碾压完成后应及时对压实度、平整度、中线高程、路基宽度等指标进行质量检测,各项指标符合要求后方能允许填筑上一层填土。核子密度湿度仪法该法是利用放射性元素(通常是 射线和中子射线)测量土或路面材料的密度和含水量。这类仪器的特点是测量速度快,需要人员少。该类方法适用于测量各种土或路面材料的密度和含水量,有些进口仪器可贮存打印测试结果。它的缺点是,放射性物质对人体有害,另外需要打洞的仪器,在打洞过程中使洞壁附近的结构遭到破坏,影响测定的准确性,对于核子密度湿度仪法,可作施工控制使用,但需与常规方法比较,以验证其可靠性。1.仪具与材料(1)核子密度湿度仪:符合国家规定的关于健康保护和安全使用标准,密度的测定范围为~ ,测定误差不大于± ,含水率测量范围为0~ , 测定误差不大于 ± g/cm3 。它主要包括下列部件:① γ 射线源:双层密封的同位素放射源,如铯一137 、钴-60 或镭-226等。②中子源:如镅(241)一铍等。③探测器:γ射线探测器或中子探测器等。④读数显示设备:如液晶显示器。脉冲计数器、数率表或直接读数表。⑤标准板:提供检验仪器操作和散射计数参考标准用。⑤安全防护设备:符合国家规定要求的设备。6.刮平板、钻杆、接线等。(2)细砂:~。(3)天平或台称。(4)其他:毛刷等。2.试验方法与步骤本方法用于测定沥青混合料面层的压实密度时,在表面用散射法测定,所测定沥青面层的层厚应不大于根据仪器性能决定的最大厚度。用于测定土基或基层材料的压实密度及含水量时打洞后用直接透射法测定,测定层的厚度不宜大于20cm. 。1)准备工作(1)每天使用前按下列步骤用标准板测定仪器的标准值:①接通电源,按照仪器使用说明书建议的预热时间,预热测定仪。②在测定前,应检查仪器性能是否正常,在标准板上取34个读数的平均值建立原始标准值,并与使用说明书提供的标准值校对,如标准读数超过使用说明书规定的界限时,应重复此标准的测量,若第二次标准计数仍超出规定的界限时,需视作故障并进行仪器检查。(2)在进行沥青混合料压实层密度测定前,应用核子法对钻孔取样的试件进行标定;测定其他材料密度时,宜与挖坑灌砂法的结果进行标定。标定的步骤如下:①选择压实的路表面,按要求的测定步骤用核子仪测定密度,记录读数;②在测定的同一位置用钻机钻孔法或挖坑灌砂法取样,量测厚度,按规定的标准方法测定材料的密度;③对同一种路面厚度及材料类型,在使用前至少测定15处,求取两种不同方法测定的密度的相关关系,其相关系数应不小于。(3)测试位置的选择①按照随机取样的方法确定测试位置,但与距路面边缘或其他物体的最小距离不得小于30cm。核子仪距其他射线源不得少于10m。②当用散射法测定时,应用细砂填平测试位置路表结构凹凸不平的空隙,使路表面平整,能与仪器紧密接触。③当使用直接透射法测定时,应在表面上用钻杆打孔,孔深略深于要求测定的深度,孔应竖直圆滑并稍大于射线源探头。(4)按照规定的时间,预热仪器。2)测定步骤(1)如用散射法测定时,应将核子仪平稳地置于测试位置上。(2)如用直接透射法测定时,将放射源棒放下插入已预先打好的孔内。(3) 打开仪器,测试员退出仪器2m以外,按照选定的测定时间进行测量,到达测定时间后,读取显示的各项数值,并迅速关机。各种型号的仪器具体操作步骤略有不同,可按照仪器使用说明书进行。3.使用安全注意事项(1)仪器工作时,所有人员均应退到距仪器2m以外的地方。(2)仪器不使用时,应将手柄置于安全位置,仪器应装人专用的仪器箱内,放置在符合核辐射安全规定的地方。(3)仪器应由经有关部门审查合格的专人保管,专人使用。对从事仪器保管及使用的人员,应遵照有关核辐射检测的规定,不符合核防护规定的人员,不宜从事此项工作。传统检测方法存在的问题传统路基压实度的检测方法,无论是环刀法、灌砂法、还是核子测量法均停留在结果检测,与此同时环刀法、灌砂法还属于有损检测不但操作麻烦费时费工,同时还耗费了大量的财物等诸多缺陷。公路的路基压实质量主要由压实系数控制,然而对于高等级铁路和公路,例如铁路客运专线的路基压实质量主要由地基反力系数K30、动态变形模量Evd、变形模量Ev2、孔隙率n、压实系数K控制。在路基压实过程中,为了检测上述指标主要依靠现场“抽样”试验方法。这样的路基质量检验方法在路基质量控制和施工经济性方面寄生了以下不足之处:1)用个别点的检测结果代表全断面的质量,因此不能反映路基全断面压实质量。2)质量控制仅是结果控制,而不是过程控制。3)无法控制超压现象。4)当填料存在不均匀性时,抽样点很难具有代表性。综上所述实时、无损伤路基检测仪成为路基压实度检测的迫切需求,压实度过程检测的研究也成为压路机行业的一大发展方向。 基压实度检测仪ICCC,是由四川瞭望工业自动化控制技术有限公司与西南交通大学共同研发,在精度与稳定性较同类产品都有了本质的提升,该仪器不但能对压实度、振动频率、压路机运行速度及压路区域图做出准确测定,并且以cmv输出(cmv是国际对压实度评定标准的一种参数,通过系数拟合,可以方便显示为用户习惯的任何一种评定参数)同时可以作为压路机自动化,智能化终端平台,为“单机智能化,定点控制,智能机群化”等压路机发展方向提供了可行路径!同时能通过扩展得到用户需求的地面温度,滚筒斜度及各种复杂环境下数据支持。1、安装在作业压路机上,实时显示压路效果,并将效果图转化为直观的压路区域图,以cmv输出真实有效的反应路基压实度质量;2、用于压路效果的验收及质量检测。能够输出打印检测路段的压实度效果图,形象直观的为压实度检测提供数据的支持。相对于传统的优点1、实现了过程无损伤检测,更快速的反应问题,大大提高了施工进程和效率,避免了结果检测带来的人力物力的损失;2、ICCC的储存传输功能为施工进程提供了连续准确的检测数据,为路基压实质量提供了强有力的保障;3、连续、实时、准确的反应了路基断面压实真实质量,避免了以点带面的检测误差;4、简单直观的反应压实质量,ICCC检测仪采用彩色平面图直观并实时的显示路基压实区域内的压实质量。5、操纵简单,利用压实过程中的实时地基反力系数,压路机操作人员可进行路基压压实的过程控制,加强了路基压实质量控制的针对性;6、中文显示、体积小、重量轻、支持压路机专属配件,安装简易;7、设置压路机专属电源接口,实现了可持续不间断的检测。技术参数精度误差:2%(与灌砂法为参照点)显 示:800×600触控LED液晶屏,全中文显示;通信接口:标准网络接口、两个USB,支持U盘数据导出;A / D:24bit,动态范围:整个系统达100dB;直流精度:优于 ;存储容量:标配4GB固态存储(扩展容量可选配);供电方式:支持压路机12/24 V DC供电;工作温度:-10℃~60℃;最大尺寸:218×131×65 mm重 量:公斤防护等级:IP52(防大颗粒灰尘进入,防水淋溅)

地基及桩基检测论文

各类工程的勘察基本要求 房屋建筑和构筑物 房屋建筑和构筑物(以下简称建筑物)的岩土工程勘察,应在搜集建筑物上部荷载、功能特点、结构类型、基础形式、埋置深度和变形限制等方面资料的基础上进行。其主要工作内容应符合下列规定: 1 查明场地和地基的稳定性、地层结构、持力层和下卧层的工程特性、土的应力历史和地下水条件以及不良地质作用等; 2 提供满足设计、施工所需的岩土参数,确定地基承载力,预测地基变形性状; 3 提出地基基础、基坑支护、工程降水和地基处理设计与施工方案的建议; 4 提出对建筑物有影响的不良地质作用的防治方案建议; 5 对于抗震设防烈度等于或大于6 度的场地,进行场地与地基的地震效应评价。 建筑物的岩土工程勘察宜分阶段进行,可行性研究勘察应符合选择场址方案的要求;初步勘察应符合初步设计的要求;详细勘察应符合施工图设计的要求;场地条件复杂或有特殊要求的工程,宜进行施工勘察。 场地较小且无特殊要求的工程可合并勘察阶段。当建筑物平面布置已经确定,且场地或其附近已有岩土工程资料时,可根据实际情况,直接进行详细勘察。 可行性研究勘察,应对拟建场地的稳定性和适宜性做出评价,并应符合下列要求: 1 搜集区域地质、地形地貌、地震、矿产、当地的工程地质、岩土工程和建筑经验等资料; 2 在充分搜集和分析已有资料的基础上,通过踏勘了解场地的地层、构造、岩性、不良地质作用和地下水等工程地质条件; 3 当拟建场地工程地质条件复杂,已有资料不能满足要求时,应根据具体情况进行工程地质测绘和必要的勘探工作; 4 当有两个或两个以上拟选场地时,应进行比选分析。 初步勘察应对场地内拟建建筑地段的稳定性做出评价,并进行下列主要工作: 1 搜集拟建工程的有关文件、工程地质和岩土工程资料以及工程场地范围的地形图; 2 初步查明地质构造、地层结构、岩土工程特性、地下水埋藏条件; 3 查明场地不良地质作用的成因、分布、规模、发展趋势,并对场地的稳定性做出评价; 4 对抗震设防烈度等于或大于6 度的场地,应对场地和地基的地震效应做出初步评价; 5 季节性冻土地区,应调查场地土的标准冻结深度; 6 初步判定水和土对建筑材料的腐蚀性; 7 高层建筑初步勘察时,应对可能采取的地基基础类型、基坑开挖与支护、工程降水方案进行初步分析评价。 初步勘察的勘探工作应符合下列要求: 1 勘探线应垂直地貌单元、地质构造和地层界线布置; 2 每个地貌单元均应布置勘探点,在地貌单元交接部位和地层变化较大的地段,勘探点应予加密; 3 在地形平坦地区,可按网格布置勘探点; 4 对岩质地基,勘探线和勘探点的布置,勘探孔的深度,应根据地质构造、岩体特性、风化情况等,按地方标准或当地经验确定;对土质地基,应符合本节第条~第 条的规定。 初步勘察勘探线、勘探点间距可按表 确定,局部异常地段应予加密。 初步勘察勘探孔的深度可按表 确定。 当遇下列情形之一时,应适当增减勘探孔深度: 1 当勘探孔的地面标高与预计整平地面标高相差较大时,应按其差值调整勘探孔深度; 2 在预定深度内遇基岩时,除控制性勘探孔仍应钻入基岩适当深度外,其他勘探孔达到确认的基岩后即可终止钻进; 3 在预定深度内有厚度较大,且分布均匀的坚实土层(如碎石土、密实砂、老沉积土等)时,除控制性勘探孔应达到规定深度外,一般性勘探孔的深度可适当减小; 4 当预定深度内有软弱土层时,勘探孔深度应适当增加,部分控制性勘探孔应穿透软弱土层或达到预计控制深度; 5 对重型工业建筑应根据结构特点和荷载条件适当增加勘探孔深度。 初步勘察采取土试样和进行原位测试应符合下列要求: 1 采取土试样和进行原位测试的勘探点应结合地貌单元、地层结构和土的工程性质布置,其数量可占勘探点总数的1/4~1/2; 2 采取土试样的数量和孔内原位测试的竖向间距,应按地层特点和土的均匀程度确定;每层土均应采取土试样或进行原位测试,其数量不宜少于6 个。 初步勘察应进行下列水文地质工作: 1 调查含水层的埋藏条件,地下水类型、补给排泄条件,各层地下水位,调查其变化幅度,必要时应设置长期观测孔,监测水位变化; 2 当需绘制地下水等水位线图时,应根据地下水的埋藏条件和层位,统一量测地下水位; 3 当地下水可能浸湿基础时,应采取水试样进行腐蚀性评价。 详细勘察应按单体建筑物或建筑群提出详细的岩土工程资料和设计、施工所需的岩土参数;对建筑地基做出岩土工程评价,并对地基类型、基础形式、地基处理、基坑支护、工程降水和不良地质作用的防治等提出建议。主要应进行下列工作: 1 搜集附有坐标和地形的建筑总平面图,场区的地面整平标高,建筑物的性质、规模、荷载、结构特点、基础形式、埋置深度、地基允许变形等资料; 2 查明不良地质作用的类型、成因、分布范围、发展趋势和危害程度,提出整治方案的建议; 3 查明建筑范围内岩土层的类型、深度、分布、工程特性、分析和评价地基的稳定性、均匀性和承载力; 4 对需进行沉降计算的建筑物,提供地基变形计算参数,预测建筑物的变形特征; 5 查明埋藏的河道、沟浜、墓穴、防空洞、孤石等对工程不利的埋藏物; 6 查明地下水的埋藏条件,提供地下水位及其变化幅度; 7 在季节性冻土地区,提供场地土的标准冻结深度; 8 判定水和土对建筑材料的腐蚀性。 对抗震设防烈度等于或大于6 度的场地,勘察工作应按本规范第 节执行;当建筑物采用桩基础时,应按本规范第 节执行;当需进行基坑开挖、支护和降水设计时,应按本规范第 节执行。 工程需要时,详细勘察应论证地基土和地下水在建筑施工和使用期间可能产生的变化及其对工程和环境的影响,提出防治方案、防水设计水位和抗浮设计水位的建议。 详细勘察勘探点布置和勘探孔深度,应根据建筑物特性和岩土工程条件确定。对岩质地基,应根据地质构造、岩体特性、风化情况等,结合建筑物对地基的要求,按地方标准或当地经验确定;对土质地基,应符合本节第 条~第条的规定。 详细勘察勘探点的间距可按表 确定。 详细勘察的勘探点布置,应符合下列规定: 1 勘探点宜按建筑物周边线和角点布置,对无特殊要求的其他建筑物可按建筑物或建筑群的范围布置; 2 同一建筑范围内的主要受力层或有影响的下卧层起伏较大时,应加密勘探点,查明其变化; 3 重大设备基础应单独布置勘探点,重大的动力机器基础和高耸构筑物,勘探点不宜少于3 个; 4 勘探手段宜采用钻探与触探相配合,在复杂地质条件、湿陷性土、膨胀岩土、风化岩和残积土地区、宜布置适量探井。 详细勘察的单栋高层建筑勘探点的布置,应满足对地基均匀性评价的要求,且不应少于4 个;对密集的高层建筑群,勘探点可适当减少,但每栋建筑物至少应有1 个控制性勘探点。 详细勘察的勘探深度自基础底面算起,应符合下列规定: 1 勘探孔深度应能控制地基主要受力层,当基础底面宽度不大于5m 时,勘探孔的深度对条形基础不应小于基础底面宽度的3 倍,对单独柱基不应小于 倍,且不应小于5m;2 对高层建筑和需作变形计算的地基,控制性勘探孔的深度应超过地基变形计算深度;高层建筑的一般性勘探孔应达到基底下~ 倍的基础宽度,并深入稳定分布的地层; 3 对仅有地下室的建筑或高层建筑的裙房,当不能满足抗浮设计要求,需设置抗浮桩或锚杆时,勘探孔深度应满足抗拔承载力评价的要求; 4 当有大面积地面堆载或软弱下卧层时,应适当加深控制性勘探孔的深度; 5 在上述规定深度内当遇基岩或厚层碎石土等稳定地层时,勘探孔深度应根据情况进行调整。 详细勘察的勘探孔深度,除应符合 条的要求外,尚应符合下列规定: 1 地基变形计算深度,对中、低压缩性土可取附加压力等于上覆土层有效自重压力20%的深度;对于高压缩性土层可取附加压力等于上覆土层有效自重压力10%的深度; 2 建筑总平面内的裙房或仅有地下室部分(或当基底附加压力p0≤0 时)的控制性勘探孔的深度可适当减小,但应深入稳定分布地层,且根据荷载和土质条件不宜少于基底下~ 倍基础宽度; 3 当需进行地基整体稳定性验算时,控制性勘探孔深度应根据具体条件满足验算要求; 4 当需确定场地抗震类别而邻近无可靠的覆盖层厚度资料时,应布置波速测试孔,其深度应满足确定覆盖层厚度的要求; 5 大型设备基础勘探孔深度不宜小于基础底面宽度的2 倍; 6 当需进行地基处理时,勘探孔的深度应满足地基处理设计与施工要求;当采用桩基时,勘探孔的深度应满足本规范第 节的要求。 详细勘察采取土试样和进行原位测试应符合下列要求: 1 采取土试样和进行原位测试的勘探点数量,应根据地层结构、地基土的均匀性和设计要求确定,对地基基础设计等级为甲级的建筑物每栋不应少于3 个; 2 每个场地每一主要土层的原状土试样或原位测试数据不应少于6 件(组); 3 在地基主要受力层内,对厚度大于 的夹层或透镜体,应采取土试样或进行原位测试; 4 当土层性质不均匀时,应增加取土数量或原位测试工作量。 基坑或基槽开挖后,岩土条件与勘察资料不符或发现必须查明的异常情况时,应进行施工勘察;在工程施工或使用期间,当地基土、边坡体、地下水等发生未曾估计到的变化时,应进行监测,并对工程和环境的影响进行分析评价。 室内土工试验应符合本规范第11 章的规定,为基坑工程设计进行的土的抗剪强度试验,应满足本规范第 条的规定。 地基变形计算应按现行国家标准《建筑地基基础设计规范》(GB50007)或其他有关标准的规定执行。 地基承载力应结合地区经验按有关标准综合确定。有不良地质作用的场地,建在坡上或坡顶的建筑物,以及基础侧旁开挖的建筑物,应评价其稳定性。

水泥和地基土的搅拌结合体是水泥土搅拌桩的主要工作原料,每当我们把水泥混入到软性土质中的时候,水泥遇到土中的水就会在水泥颗粒间发生一系列的水化和水解反应,形成水泥水化物并生成凝胶体,这个是水泥土搅拌桩软性土质地基加固过程的核心原理,之后将小土团或土颗粒凝结在一起就会形成一种稳定的结构整体,而且这些水化物自身将继续硬化,最终形成水泥石骨架。与此同时,有些则会与其周围其他具有一定活性的粘土颗粒发生团粒化作用并进行离子交换,通过硬凝反应、碳酸反应最终形成不溶于水的稳定的结晶化合物,进而形成了具有整体性、稳定性的水泥土加固体。通过举例说明在高层建筑地基处理过程中水泥搅拌桩技术的具体运用简述北京某大型写字楼的工程概况。北京某“工”字型的大型写字楼平面布局图,它的主要走向为由南北方向展开,其写字楼东部长约24m,宽约,西部长约,,宽约为15m,该写字楼总高16层,它的总面积大约为871m2。现场勘查资料。在地基加固工程具体施工之前,根据现场相关资料勘查显示:该写字楼处于第四系冲积层的上部,它的主要岩性主要分为粉土、粉砂、细砂、粉质粘土四大类型,具体可以分为12层,它的最大揭穿深度为,如果采用水泥搅拌地基加固法,则它的桩身高度应该位于第2到第9层。与此同时,它的水位埋深为,第2到第8层地基承载力约为110~140kPa,第8到第9层天然地基承载力可达到160~250kPa,同时水泥土搅拌桩的设计置换率m取,并采用三角形布置,桩中心间距为,桩数总量n为1421根,通过加固后的复合地基承载力约为为300kPa,对于附加应力较大的电梯井处,水泥土搅拌桩的桩径采用600mm,以保障局部应力集中和沉降过大。施工过程中的质量检测。在水泥搅拌桩工程的具体实施过程中,我们需要进行严格的质量监督及检测,以确保整个工程的顺利进行,并提高工作效率,节省施工资金。具体的监督、检测如下:1)做好水泥搅拌桩的中心桩位定位工作,使其桩位差严格控制在2cm以下;2)施工前,要严格对整个系统进行检测工作;3)注重水泥的质量及泥浆调配比例;4)采取行和列跳打法,防止桩变形;5)做好已打好桩的标记工作,避免发生漏错;6)四个工作日后,相关部门的工作人员需对打好的水泥桩进行质量复测。对水泥搅拌桩下降程度的观测以及桩基检测。在此项工程的桩基及其上部结构完成施工之后,我们分别对它的沉降度和基桩进行了检测、观测,具体的检测结果如下。在此项工程的桩基及其上部结构完成施工之后,我们分别对其沉降变形度进行了观测、检测。观测得出累计沉降量随着时间的增长,变化并不明显,它的曲线比较平缓,各项数据指标均在控制范围之内。此项写字楼地基加固工程于2009年9月28日开始实施,在施工过程中有两部桩机同时工作,总共工期用时长为20天,在桩基施工结束的4个工作日后,有关部门的相关专业检测人员对其20根桩基进行了静载荷试验检测工作。其中三根试桩的试验结果沉降量随荷增大而增大,并且在荷载为200kPa前时基本上成线性变化,规律比较明显,之后随着荷载的增加,沉降速率虽然有有逐渐增加的趋势但趋势较为平缓,其他试桩沉降量的最大沉降量也只有,其中有两根试桩沉降较小其最大沉降量分别为和,我们通过对20根试桩进行数理统计分析,可以得出复合地基承载力的特征值为,这是满足设计要求的,取芯试验20组,岩芯的无侧限抗压强度,并且最终通过抽检500桩,做低应变动力试验测试结果显示桩桩身完整性较好,总体来讲水泥搅拌桩的加固效应十分的明显,结果让人满意。通过对北京某大型写字楼运用水泥搅拌桩加固地基实际成功案例的描述,我们可以得出一个结论,即在高层建筑地基的施工过程中,水泥土搅拌桩复合型地基完全适用。据国家相关部门专业人士所检测的结果我们可以得到,水泥土搅拌桩复合型地基在高层建筑地基加固过程中具有缩短工期、质量可靠、减少工程资金成本的作用,是一项规范化、高效化、科学化的高层建筑地基处理工作技术,我们应该更加充分、合理的利用好这项技术,以促进城市的发展、社会的进步和国家的繁荣。更多关于工程/服务/采购类的标书代写制作,提升中标率,您可以点击底部官网客服免费咨询:

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

相关百科

热门百科

首页
发表服务