首页

> 期刊发表知识库

首页 期刊发表知识库 问题

污水处理论文题目

发布时间:

污水处理论文题目

需要我 能够得的

结合你的专业特点来写,可以参考相关书籍和论文,去你们学校图书馆看看资料,请教下导师,要联系实际,与现实生活结合

给排水污水处理论文

污水处理厂是从污染源排出的污(废)水,因含污染物总量或浓度较高,达不到排放标准要求或不适应环境容量要求,从而降低水环境质量和功能目标时,必需经过人工强化处理的场所。一般分为城市集中污水处理厂和各污染源分散污水处理厂,处理后排入水体或城市管道。有时为了回收循环利用废水资源,需要提高处理后出水水质时则需建设污水回用或循环利用污水处理厂。

可以,我是搞排水的,我容易吗我,大半夜 的

MECHANICAL PRELIMINARY DESIGN REPORT STADIUM 给排水设计 饮用水和污水 Sanitary Design Water and sewage water 设计基础 - 甲方提供的设计任务书和市政管网综合图 - 建筑专业提供的条件图 - 国家现行的设计规范及有关规定设计简章 Design bases Design Brief and Municipal integrated network drawing offered by the Condition drawings from architectural Current national design codes and related stipulations 给水系统 通过一根DN200的进水管将水引入水表安装在进水管上,离红线1米处供水管在红线内连成环路管网,并接到供应楼的消防水池和给排水水池由环路管网向必需的室外消火栓和绿化带的喷淋器供水 Water supply system For water supply of this project, DN200 water intake pipes are led Water meters are installed on the intake pipes 0 m away from the red The water supply pipes are connected into loop networks in the red line and then led to the fire pool and sanitary water pool in the supply buildings Necessary number of outdoor hydrants and sprinklers for green area will be provided on the loop 设计范围 包括红线内的饮用水,污水,雨水,建筑消防 Design scope Design scope of this project includes water, sewage water, rainwater, fire-protection in the building, and water and sewage water within the red 给排水水池与消防水池分开,容量为100m3 体操馆供水管埋地敷设 Sanitary water pool is separated from fire water pool, volume of sanitary water pool is Water supply pipes for the stadium will be laid in the 用水量标准 - 体育馆: 15升/顾客·日 K=0 - 宾馆: 150升/人·日 K=0 - 餐厅: 50升/顾客·日 K=0 - 工作人员: 25升/人·日 K=0 - 地面冲洗用水: 3升/m2日 - 冷却塔补水量:按用水量的2%计 - 未预见水量: 按日用水量20%计 - 消防用水: 消火栓:室内40升/秒,室外30升/秒,火灾延续时间为3小时; 自动喷洒按22升/秒,火灾延续时间为1小时 卷帘水幕用水5升/秒·米,火灾延续时间为3小时; Water consumption standard - Stadium: 15L/visitor·day K=0 - Hotel: 150L/visitor·day K=0 - Restaurant: 50L/customer·day K=0 - Staff 25L/person·day K=0 - Floor cleaning: 3L/m2·day Make-up water for cooling tower: 2% of the actual cold water Unforeseen water consumption: 20% of the daily water Water for fire protection Hydrant: 40L/s indoor, 30L/s outdoor, fire duration time is 3h; Sprinkler: 22L/s, fire duration time is 1h; Drencher for rolling shutter: 5L/s·m, fire duration time is 3h; 在适当的位置设置饮用水机,在主进口为残障人设置两个饮用水机为此饮用水系统安装循环泵机房 设在地下室的水除了机房当饮用水机不被使用时,应排空,以免水质腐败 在客房和餐厅内设置电热水器,同时亦为热水供应设置循环泵 在更衣间旁设置电热水器,为淋浴和洗盥供应热水 为楼板清洁安装一定数量的水龙头 Some suitable places are supplied with portable water drinking units, two drinking units for disable people are provided at main entrances, for this portable water system, circulating pumps are adopted, the equipment room is located in water treatment center in the When there is no use, portable water will be drained completely to avoid Electric water heaters are installed in guest rooms and restaurant, also hot water circulating pumps will be provided for supplying hot Electric water heaters are installed near the changing and clothing rooms for supplying hot water for shower and Certain number of water taps are installed for floor- 用水量 最大日用水量:200m3/日 最大时用水量:220m3/时 Water consumption demand Maximum daily water consumption: 200m3/day Maximum hourly water consumption: 220m3/hour 却循环系统 冷却水循环系统采用机械循环系统总冷却水用量为460m3/在供应楼顶设置三台超低噪音冷却塔(230 m3/h, 2x 115 m3/h)进水温度37Co,出水温度32Co 补充水量 9,6 m3/补充水由市政供水网直接提供 Cooling water circulation system There are cooling water circulation system in this project, cooling water for the refrigerators adopts mechanical circulation Total water consumption of cooling towers is 460m3/ On roof of the supply building there are 3 ultra-low noise cooling towers (230 m3/h, 2x 115 m3/h), inlet temperature of 37Co, outlet temperature of 32Co, with make-up water of 9,6 m3/ Make-up water of the cooling towers will be supplied directly by the municipal 在消防泵房内有消火栓泵(一个运行,一个备用),喷淋泵(一个运行,一个备用),卷帘雨淋泵(一个运行,一个备用)用于地下车库的泡沫喷淋设备,如报警阀,泡沫压缩罐,化学药剂泵安装在消防设备中心0m3 消防水箱和消防稳压装置分别安装在车库的四面墙 In the fire water pump room, there are hydrant pumps (one operation, one standby), sprinkler pumps (one operation, one standby) and rolling shutter drencher pumps (one operation, one standby) Fire equipment, which are used for the foam sprinkler system in underground garage, such as fire alarm valves, foam concentrated tank and chemical dosing pump, are provided in fire equipment Four 0m3 fire water tanks and fire protection stabilized pressure devices are respectively located at four sides next to the 消防用水 消火栓:室内按40升/秒,室外按30升/秒,火灾延续时间按3个小时计 自动喷洒按22升/秒,火灾延续时间按1小时计 卷帘水幕用水量 5升/秒·米,火灾延续时间按3个小时计 消火栓:室内,室外用水量皆为756m3; 自动喷洒用水量为2 m3; 卷帘水幕用水量为 270m3; 一次火灾用水量为861,2; Water for fire protection Water consumption standard for fire protection Hydrant: 40L/s indoor, 30L/s outdoor, fire duration is 3h Sprinkler: 22L/s, fire duration is 1h Drencher for rolling shutter: 5L/s·m, fire duration is 3h Water consumption for fire protection Hydrant: indoor and outdoor water consumptions are 756m3 respectively Sprinkler: 2 m3 Drencher for rolling shutter: 270m3 Water consumption for one fire: 105,2 m3 消火栓的布置 在整个建筑物内沿墙,沿柱,沿走廊,风塔上及楼梯附近设有必要数量的室内消火栓,消火栓间距小于30米消火栓管网水平,竖向皆成环状布置,消火栓箱内配有DN65消火栓一支,25米衬胶水龙带一条,φ19毫米喷咀水枪一支,并配消防卷盘(DN25消火栓一支,30米胶管,φ9毫米喷咀水枪一支)且设有可直接启动消火栓泵的按钮;在室内消火栓箱下设有磷酸铵盐手提式灭火器箱室内消火栓系统在室外设有三组水泵接合器 Hydrant arrangement Necessary number of hydrants are installed indoors along the wall, columns, corridors, and staircases, at intervals of less than Hydrant networks are connected as a loop both horizontally and Inside each hydrant box, a DN65 hydrant, a 25m long rubber lined hose, a water nozzle of φ19mm, hose reel (a DN25 hydrant, a 30m long rubber lined hose and a water nozzle ofφ9mm), and a direct starting button for the hydrant pump are Under each indoor hydrant box, a portable ammonium phosphate powder extinguisher box is There are three sets of pump adopters being installed outdoors for the indoor hydrant 消防系统 防水泵房及消防水池 供水管DN200在红线内连成环路管网,管网上安装 一定数量的消火栓两根DN200供水管分别引入供应楼内两个消防泵房内的消防水池消防水池总容量不应小于4000m3, 每个为 Fire protection system Water pump room and water pool for fire protection The lead-in pipes (DN200) are connected as a loop inside the red line, on the loop, certain number of hydrants are Two water supply pipes (DN200) are led into the fire water pools at each fire water pump room in In consideration of the importance of the project, the volume of the fire water pools should be not less than 4000m3, each is 自动喷淋系统 自动喷淋系统安装在全建筑范围,除了室外和高于10 米的房间喷淋泵安装在地下的消防泵房内报警阀设置在地下的消防泵房内和中间的消防设备中心内,水流显示器设在每个防火分区内 Sprinkler system Sprinkler systems will be provided inside the whole building except outside areas and roomshigher than 10m, with sprinkler pumps installed in the underground fire water pump Alarming valves installed in underground fire water pump rooms and four fire equipment centers in the middle, water flow indicators are installed by fire 除了安装一个封闭喷淋系统,将为地下车库设置一个泡沫喷淋系统餐厅内安装93oC启动的自动喷淋头,但在其它房间,仅安装93oC启动的普通和快速反应自动喷淋头三组泵接合器安装在室外 Besides an enclosed sprinkler system, a foam sprinkler system composed of a proportioning mixer and a foam concentrated tank is provided for the underground Sprinkler actuated at 93oC are provided in the restaurants, but in other rooms, only ordinary sprinklers and fast response sprinklers actuated at 68oC are Three sets of pump adaptors for this system will be installed 排水系统 为排水系统设置污水主立管和特别垂直排气管排气管与污水管在每层连接,污水排出体操馆餐厅的污水首先在油脂分离池中处理,然后排入室外排水网给排水污水将被在化粪池收集和处理,然后排入市政排水管网化粪池在输送区旁最大天排水量为870m3/天 Drainage system Main vertical sewage pipes and special vertical vent pipes are provided for the drainage The vent pipes are connected with sewage pipe at each floor; sewage water is drained out of Sewage water in the restaurants and garage are treated in the grease and oil separation tank, and then discharged into the outdoor drainage Sanitary sewage water is collected and treated in the septic tank, then drained into the municipal The septic tanks are located besides the Maximum daily drainage amount is 870m3/ 卷帘水幕系统 地下车库设置有卷帘水幕系统水幕泵安装在消防水泵房内,采用开式雨淋头,电动或手动控制十组泵接合器安装在室外 Drencher system for rolling shutters Rolling shutter protected by drenchers are provided for the underground garage, the drencher pumps are installed in the fire water pump rooms, open drencher heads are selected, and are controlled both by electrically and Ten pump adapters will be installed outdoors for this 地下室内污水设有污水坑,废水设有废水坑,生活污水,废水经潜污泵提升排至室外排水管网,潜污泵的启停皆由磁性浮球控制器的控制 地下汽车库废水设有废水坑,废水经潜污泵提升排至室外,经隔油池处理后排入室外雨水管网 There are cesspits for sewage water and wastewater pits for wastewater in the basement, the sewage and wastewater is sucked up and drained to the outdoor drainage networks by submerged sewage Operation of the pumps is controlled by the magnetic floating ball Wastewater pits are provided for the underground garage, wastewater is sucked up and drained to outdoor oil separation tank by submerged sewage pumps, after treated, wastewater is drained to the outdoors rainwater 在柴油发电机房,变配电房和通讯设备机房设低压二氧化碳气体灭火系统 Low pressure CO2 extinguisher systems are provided in diesel generator rooms, transformer substations and telecommunication equipment 在本建筑内按"建筑灭火器配置设计规范"在每个消火栓箱下设手提式灭火器箱,箱内设有必要数量的磷酸铵盐手提式灭火器 According to the Code for Design of Extinguisher Disposition in Buildings, portable fire extinguisher box, in which there are necessary number of portable ammonium phosphate powder extinguishers, will be installed under every hydrant 在每个消防电梯井底旁设有消防排水坑,废水经潜污泵提升排至室外 Fire water drain pit is provided at side of bottom of each fire elevator well, waste water will be sucked up and drained out by the 雨水系统 雨水排水屋顶采用压力流排水 雨水设计重现期按P=10年计算,降雨历时为5分钟,暴雨强度公式按Q=002(1+568lgP)/(t+983)465计算 沿柱在屋面设置雨水沟雨水通过雨水沟收集,然后进入雨水头和下排管,然后到室外雨水观察井 Rainwater system Pressurized drainage system is adopted for roof rainwater drainage Here, return period P=10 years, rainfall duration is 5 minutes, stormwater amount is calculated by the following formula: Q=002(1+568lgT)/(t+983)465 Rainwater gutters are provided on roof along columns, Rainwater is collected in the gutter, then to rainwater heads and downpipes, and to the outdoors rainwater inspection 管材 - 生活给水管,冷却塔补水管采用铜管,氩弧焊接 - 直饮水管采用不锈管 - 消火栓管,冷却循环管,水幕管,水泵吸水管采用焊接钢管,焊接 - 自动喷洒水管,雨淋水管采用热镀锌钢管,丝扣连接或卡压连接 -二氧化碳管采用无缝钢管焊接 - 地下车库泡沫喷淋水管采用不锈钢管,卡压连接 Pipe material Copper pipes connected by argon arc welding are adopted for the sanitary water pipes, make-up water pipes for cooling Stainless stell pipes are adopted for portable water Welded steel pipes connected by welding are selected for hydrant pipes, cooling circulating pipes, drencher pipes, pump suction Hot-galvanized steel pipes connected by threads or compression-seizing are selected for sprinkler and deluge sprinler Seamless steel pipes connected by welding are selected for CO2 Stainless steel pipes connected by pressed clamp is selected for the pipes of foam sprinklers in the underground 当雨水两超出雨水沟设计量时,雨水可沿屋檐自由排放雨水被收集,然后排入市政集水池 When the amount of rainwater is more than the design value of the gutters, water is discharged naturally along the Rainwater is collected, and then drained to the municipal catch 围绕体育馆的循环池将用于喷洒运动场和作为室外绿化带的储水池 此池将作为一个循环过滤设施,可容水约500 m 喷洒压力设备和其它必须的过滤设备安装在供应楼里 The circular senic pool surround stadium will be used for spraying sportsfield and as reservoir for outdoor The pool will be used as a circular filtering facility and will be adopted with a water volume of about 500 m The spray water pressurizing equipment as well as further necessary filtering equipment will be adopted in the supply 0 制冷 0 Cooling 冷源: 空调冷负荷(估算): 本工程建筑面积共000平方米,包括观众区,休息室,更衣室,小会议室,餐厅,办公室和其它附属房空调设计日峰值冷负荷为4MW,设计日总冷负荷为3 kW Refrigerating source Cooling load of air conditioning system Total floor area for this building is 50,000sqm, which includes spectator areas, lounges, Clothing and changing rooms small meeting rooms, restaurant, office and other auxiliary Designed dayly peak cooling load is 2,4MW, designed total dayly cooling load is 3kW 每台1200kW制冷机配一台 流量为206m3/h离心泵各配一台备用泵 一次泵采用压差旁路控制 通过埋地敷管,向游泳体操馆供应冷冻水 A centrifugal pump with a flow rate of 103m3/h is provided for each 1200kW One operation pump with a standby corresponds to one Pressure difference branch control is adopted for primary pump Via earth laid pipes from supply building to gymnasium chilled water supply will be 冷源的选择: 根据建筑的实际情况,3台制冷机将安装在供应楼内的冷冻机房设计容量为4800kW 为了实现能量的效率化使用,设计方案为,1台制冷机的出力为总设计容量的50%而另2 台每台出力为总设计容量的25% 冷冻水系统的主要设备包括3台电动制冷机,一级冷冻泵,二级冷冻泵,自动控制阀等等冷冻水的供/回水温度为-7/ 12°C Selection of refrigerating source According to the real condition of the building, 3 chillers are located in the refrigerating plant rooms in the supply building, designed capacity is 2400kW For actuing in an energy efficient way one chiller about 50% of total capacity (200 kW) and two chillers with 25% of total (600 kW each)capacity each are Main equipment of chilled water system includes 3 electrical chiller, primary cool water pump, secondary chilled water pump and automatic controlled valve, supply/return temperature of the chiller is-7/ 12°C 二次泵系统:根据使用功能,各制冷机房又分成不同的循环支路 二次泵采用变频调速控制根据负荷侧供回水管的压差,控制水泵的转速 二次泵循环支路的管道采用异程式 Secondary pump system: Each refrigerating plant room is subdivided into different circulation branch loops according to use Variable-frequency speed-regulating control is adopted for secondary The rotating speed of a water pump is controlled according to the pressure difference between water supply and return Direct return system is adopted for the pipes of circulating branch of secondary pumps 空调冷冻水系统 由于本工程占地面积大,功能复杂,有连续使用,也有间歇使用,为了达到运行灵活,节能的目的,空调冷冻水系统采用两管制二次泵系统 Chilled water system Due to the large occupied area of this project, the complicated functions and the combination of continuous utilization and intermittent utilization, in order to accomplish the purpose of flexible operation and energy saving, the chilled water system is of two-pipe secondary pump 管材: 水管采用焊接钢管及无缝钢管 本工程的风管除土建风道外,均采用镀锌铁皮咬口制作每节风管之间用法兰连接 Pipe and duct materials The water pipes adopt welded steel pipes and seamless steel Air ducts for this project are made of galvanized sheet steel by seaming except ducts by civil Air ducts are connected together by 一次泵系统: 供应楼冷冻机房 2400kW制冷机配一台离心泵, 流量为412m3/配一台备用泵 Primary pump system: Chiller room supply building A centrifugal pump with a flow rate of 412m3/h is provided for 1200kW One operation pump with a standby corresponds to one 保温材料: 空调供,回水管,冷凝水管采用酚醛管壳保温 空调送,回风管以及处理后的新风管采用外贴铝箔的离心玻璃棉板保温 - 管道穿防火墙的空隙处采用岩棉材料等非燃材料填充 Thermal materials phenolic pipes are adopted for thermal insulation of water supply and return pipes for air conditioning, as well as air-conditioning condensate Aluminum foil faced glass fiber boards are adopted for thermal insulation of air-conditioning air supply and return ducts as well as fresh air ducts after Non-flammable material will be selected to fill the interspace in the fire protection wall where the ducts go 消声与隔振: 冷水机组,水泵等设备采用减振台座,弹簧减振器或橡胶减振垫减振降噪 在空调机组,新风机组,通风机的进出口采用涂胶帆布软管连接 - 水泵进出水管上采用可曲挠橡胶接头,使设备振动与配管隔离 Noise reduction and vibration isolation Shock absorption bases, spring shock absorbers on rubber shock absorption pads are adopted for equipment, such as water chiller units, pumps, etc to reduce vibration and lower Flexible rubber-coated canvas hoses are adopted far connections of inlets and outlets of air-conditioning units, fresh air handling units and Flexible rubber couplings are adopted for the water intake and delivery pipes of the pumps to isolate equipment vibration from their 0空调和通风系统 0 Air Conditioning and Ventilation Systems 方案设计范围 Scope of schematic design 空调设计 Air Conditioning Design 在体育馆内,一些区域设置空调系统这些区域划分为: 西侧地下二层的贵宾休息室 东侧地下二层酒店门廊 地下一层的输送区,技术机房,运动员更衣间,医务服务,热身区,裁判区,健身中心,酒店大堂,会议室,厨房,特许区和贵宾大堂混合区 首层的酒店大堂,酒店区,贵宾门廊,急救 In the stadium, in some ranges air conditioning systems are These ranges subdivide themselves as follows: VIP – Lobby in West of levelel -2 Hotel lobby in the east of level –2 Delivary Circle, technical Plantrooms, Changingrooms for the athletes, Medical Service and warm up area, Judges Area, Fitness Center, Hotel Lobby, Conferenz, Kitchen and Concession, Vip lobby- Mixed Zone in level -1 Hotel lobby, Hotel area, Vip lobby, Vip Area, First aid in 0

污水处理厂是从污染源排出的污(废)水,因含污染物总量或浓度较高,达不到排放标准要求或不适应环境容量要求,从而降低水环境质量和功能目标时,必需经过人工强化处理的场所。一般分为城市集中污水处理厂和各污染源分散污水处理厂,处理后排入水体或城市管道。有时为了回收循环利用废水资源,需要提高处理后出水水质时则需建设污水回用或循环利用污水处理厂。处理厂的处理工艺流程是有各种常用或特殊的水处理方法优化组合而成的,包括各种物理法、化学法和生物法,要求技术先进,经济合理,费用最省。设计时必须贯彻当前国家的各项建设方针和政策。因此,从处理深度上,污水处理厂可能是一级、二级、三级或深度处理工艺。污水处理厂设计包括各种不同处理的构筑物,附属建筑物,管道的平面和高程设计并进行道路、绿化、管道综合、厂区给排水、污泥处置及处理系统管理自动化等设计,以保证污水处理厂达到处理效果稳定,满足设计要求,运行管理方便,技术先进,投资运行费用省等各种要求。

污水处理论文摘要

水处理工艺:工艺流程为厌氧或微氧接触混合,短时曝气,分离,好氧饥饿污泥回流或SBR时的直接进水等工序,使原污水与好氧饥饿的污泥充分接触混合、短时曝气、沉降分离;沉降分离后的上清液即处理后的出水,沉降分离后的污泥,大部分在好氧条件下使其饥饿,饥饿污泥再与原污水重复接触,其余部分为剩余污泥排放。工艺系统,主要由依次连接的AC池、AeT池、AS池、AeS池组成 污水处理过程的监视与控制系统由模型、传感器、局部调节器和上位监控策略等4个部分组成。其中,传感器是污水处理厂监控系统中最薄弱,也是最重要、最基础的环节。日益严格的污水排放标准导致了污水处理工艺流程和装备的复杂化,对用于污水处理过程监视与控制的传感器的性能也提出了更高的要求,促进了污水处理领域传感器技术的发展,一些适用于污水处理过程的新型传感器相继问世。污水处理过程是复杂的生化反应过程,所涉及的仪器仪表种类繁多,多数传感器是污水处理过程所特有的,分别应用于不同的场合,反映一个或多个特定变量的状态信息变化。 污水处理工艺一般由机械处理、生化处理和化学处理构成,其中涉及液相、固相、气相三种物质成分。监视这些相态的仪表可以简单地分为通用型和特殊性两大类。 2、污水处理过程的通用仪表 h2o123上有不少这类资料,你可以去上面搜搜

“化学法废水零排放技术”充分的利用了企业的废水资源,将企业原来要花钱处理后排放的废水进行了再利用,节约了企业水资源费、废水处理费、排污费等费用,即为企业带来了经济效益又可以从根本上解决废水排放造成的水资源环境的污染。

浅谈生活污水处理技术【摘要】在城市污水管网尚未铺就或不可能到达,或尚未建成城市污水处理厂的城市的住宅小区,生活污水处理一直都是很难解决的问题。过去常用的化粪池沉淀和厌氧发酵,虽然对悬浮物质和寄生虫卵有一定的去除作用,但BOD5去除率很低,且不具备脱氮除磷功能,已不能满足水污染防治和水环境保护的需要。近年来,适用于住宅小区的小型污水处理站和污水处理设备的技术开发发展迅速。本文拟就这方面的成果进行论述,并对存在的问题提出看法。【关键词】生活污水处理;技术开发;问题探讨【Abstract】Haven't spread at the city soil pipe net or impossible arrive, or haven't built up city wastewater treatment the residence small area of city of the factory, life the wastewater treatment have been the problem that can hardly Past the in common use septic tank precipitate with be disgusted with oxygen to ferment, although clean a function towards suspending material and parasite egg to have certainly of, the BOD5 clean a rate very low, and don't have nitrogen of take off in addition to Lin function, already can't satisfy water pollution prevention and cure and water environmental protection of In recent years be applicable to the small scaled wastewater treatment station of the residence small area and the technique of the wastewater treatment equipments development development This text has drafted the result of this aspect to carry on discuss, and to existence of the problem put forward 【Key words】Life wastewater treatment;Technique development;Problem study 技术开发 住宅小区生活污水处理技术的沿革,经历了从单一工艺到组合工艺的过程。从是否需氧的角度考察,则沿着“厌氧→好氧→厌氧+好氧→厌氧+缺氧” 的轨迹发展。从去除对象来看,早期技术仅能去除SS物质,而现在的工艺还具备脱氮除磷功能。下面介绍几种目前常用的处理技术和设备。 1.1生物接触氧化法。生物接触氧化法,是一种介于活性污泥法和生物膜法的污水生物处理技术,兼备两者的优点。其主要构筑物为生物接触氧化池,池内充填填料。已经充氧的污水以一定的流速流经被其浸没的填料,在填料上形成生物膜。污水与生物膜广泛接触,在生物膜上微生物的作用下,有机污染物得到去除,污水得到净化。由于池内具备适于微生物栖息增殖的良好环境条件,因此,生物膜上生物相丰富、食物链长、微生物浓度高、活性强,不产生污泥膨胀,污泥生成量少,且易于沉淀。生物接触氧化法具有多种净化功能,除有效地去除有机物外,如运行得当,还能够脱氧和除磷。 生物接触氧化法的关键部位是填料。传统的蜂窝状塑料管较易堵塞,现在常采用吊挂式软性填料和悬浮或半悬浮球形填料,能有效地防止堵塞,且面积较大,处理效果好。 生物接触氧化法是住宅小区生活污水处理较早的采用的技术之一,其主体工艺流程为: 原污水→初沉池→接触氧化池→二沉池→消毒池→排放 初沉池、二沉池均为竖流式沉淀池,上升流速分别为6~8mm/s和3~4mm/s。采用梯形直管填料,池中心廊道式射流曝气,气水比为 10:1~12:1,停留时间为5~3h。设计进水平均BOD5=200mg/L,出水BOD5=20mg/L。 1.2两段活性污泥法。两段活性污泥法,简称AB法。该法把污水管道、污水处理厂视为一个污水处理系统。其工艺特点是:不设初淀池,A段高负荷,B段低负荷,A、B两段污泥分别回流,充分利用污水管道中的微生物,为不同时期生长的优势微生物种群创造良好的环境条件,让其充分发挥作用,耐冲击负荷能力强,处理效果稳定。其主体工艺流程为: 原污水→格栅→顶曝气调节池→A段曝气池→A段沉淀池→B段曝气池→B段沉淀池→排放 该类设备,采用自吸式射流曝气机、无支架的污泥悬浮型生物填料、侧向流坡形斜板沉淀池等先进技术。BOD5去除率为90%,COD去除率为80%。 1.3序批式活性污泥法。序批式活性污泥法,简称SBR法。原则上,SBR法的主体工艺设备只有一个间隙反应器,在一个运行周期中,按运行次序,分为进水、反应、沉淀、排水和闲置五个阶段。SBR法的关键设备滗水器的研制,已取得长足的发展。目前常用的滗水器,有虹吸式、旋转式和套筒式三种。SBR法工艺简单、节省费用,理想的推流过程使生化反应推力大、效率高,运行方式灵活,脱氮除磷效果好,没有污泥膨胀,耐冲击负荷、处理能力强。其主体工艺流程为: 原污水→调节池→SBR反应池→消毒池→出水 采用该工艺流程的上海某污水处理站设计平均流量750m3/d,进水水质BOD5=200mg /LSS=250mg/L,TN=40mg/L,NH4+=20mg/L,出水水质达到黄浦江上游污水排放标准,即BOD5<30mg /L,SS<30mg/L, NH4+<10 mg/L, TN<20mg/L。 1.4厌氧生物滤池。厌氧生物滤池是一种内部装有填料作为微生物载体的厌氧生物膜法处理装置。厌氧微生物附着载体的表面生长,当污水自下而上升式通过载体所构成的固定床层时,在厌氧微生物作用下,污水中的有机物得以厌氧分解,并产生沼气。厌氧生物滤池有多种变型,填料的发展迅速,其工艺流程为: 进水→沉淀池→厌氧消化池→厌氧生物滤池→拔风管→氧化沟→进气出水井→排水 污水经沉淀池预处理后进入厌氧消化池进行水解和酸化,可提高污水的可生化性,为后续处理创造条件。在拔风系统作用下,生物滤池处于兼氧状态,阻止了污水中甲烷细菌的产生,使整个系统仍处于酸性阶段,而氧化沟内溶解氧一般可稳定在5~8mg/L,污水在此进一步好氧处理。该工艺的实质类似于A/O法,但兼性厌氧生物滤池使厌氧段得到强化。拔风系统是处理过程的关键。其主要优点是不耗能、造价低、管理简单、无噪声、无异味、挂膜快、剩余污泥量少、出水水质好、运行效果稳定。 2. 问题探讨 住宅小区生活污水就其处理技术而言,可以采用目前城市污水处理的成熟技术和工艺,但住宅小区生活污水处理,有其自身的特点,应予考虑。 1住宅小区污水流量小,可生化性好,宜优先采用生物膜法处理技术。生物膜法具有生物相丰富、微生物浓度高、食物链长、不会发生污泥膨胀、污泥沉降性能好等优点,适用于小量的污水处理。过去担心的堵塞问题,在采用新型填料后已基本解决。 2住宅小区用地紧张,应优先考虑占地省的污水处理工艺,并在设计中采取一定措施。现在,一般设计成地下式或半地下式,形成地下为污水处理站,地面为绿地或花坛的格局,可以美化环境。但这样设计时,应注意埋深、提升设备、通风要求和臭气处理等问题。 3由于受小区管理人员人数和专业素质的限制,应优先选用运行维护管理较方便的工艺,并努力提高运行管理自动化程度。 4住宅小区建设工程工期要求紧,污水处理设施由构筑物向设备的转化,似是一种必然趋势。采用装配式污水处理设备,安装简捷,工期短,便于维护。大亚湾核电站引进法国的一种小型污水处理站,主要设备全是散件,现场装配,其中,暖气池和沉淀池由10块小件组成,从土方开挖到开始调试,仅用20天就完工〔2〕。国内小型污水处理设备的生产厂家如雨后春笋,但良莠不齐。多数生产厂家设计、研究、测试化验力量较弱,很难保证出厂产品的质量,售后服务也比较差〔3〕。国家应加强这方面的监控管理。 5随着对出水水质要求的提高,单一工艺难以满足需要,组合式污水处理技术和设备得以发展。目前的组合方式,主要有多级好氧处理、厌氧+好氧处理、厌氧+缺氧处理等。从降低能耗、回收生物能方面来看,厌氧生物处理有着广阔的前景。污水中的有机物质本身都具有一定的潜在能量。厌氧处理时,一方面,勿需嚗气充氧,可降低能耗;另一方面,其生成物-沼气,可回收利用,供小区采暖和供热,形成小区生态平衡系统,这是比较理想的发展趋向。 结语住宅小区生活污水处理站,为防止污染,保护水环境,起到了积极的作用。尽管城市污水处理的发展趋势,是集中处理取代分散处理,但笔者认为,小型生活污水处理站,在我国的一些中小型城市,还将存在相当长的时期,所以,其技术开发和设备研制应予以高度重视。参考文献〔1〕罗璟,郭静,张大群,厌氧序批式活性污泥法(ASBR)特性分析给水排水,4〔2〕石亮民介绍一种小型污水处理站给水排水,8〔3〕曹瑞钰,顾国维,黄菊文等组合式生活污水处理设备的发展与分析 中国给水排水,4转贴

污水处理相关论文

浅析城市污水处理厂建设选址的影响因素近年来,国内城市污水处理厂基础设施建设进度不断加快,城市污水处理厂建设作为城市水污染防治的主要基础设施,已受到各级政府部门的高度重视。作为城市污水处理厂建设前期筹备阶段的厂址选择非常关键,它关系着整个污水处理工程建设的方案合理性,选址时有必要综合考虑当地规划、环境保护、处理工艺以及总投资费用等影响因素,确定最优化厂址。[关键词]城市污水处理厂厂址选择影响因素1概述目前,国家在“十一五”规划中已加大城市污水处理厂建设投资力度,城市集中式污水处理厂的建设进度明显加快。目前,许多城市污水处理厂进行选址时由于缺乏综合性慎重考虑,往往不能取得较优的建设方案。在这种情况下,笔者结合多年对污水处理厂选址可行性论证的工作实践,对合理化城市污水处理厂的建设选址的具体影响因素进行总结探讨,希望能够引起同业者共同关注。目前,行业内城市污水处理厂选址一般根据城市的规划布局,结合规范条文的基本选址因素,并结合城市的实际发展情况综合选择确定。但是,目前规范条文较为简要,在具体工作中只能作为指导性纲要,实际选址中往往要求抓住主要矛盾,结合当地实际情况,优化城市污水处理厂建设选址问题。本文主要从规划、环保、处理工艺以及投资等影响因素应关注的问题进行浅析。2规划角度污水处理厂选址从规划角度而言,一般要求位于城市规划区下游,以尽量依靠地形坡度和重力流收集城市污水,节约污水收集运行费用。除此以外,笔者认为,从规划角度考虑,还应注重规划收集范围的管道走向、水量布局、实施期限等情况,确定最优厂址。如我省某县的污水处理厂选址中,规划城市居住片区和下游开发区中间跨越距离5公里的山头,综合比较后,选择城市规划区与规划开发区间作为最优选址,目的是以节省工程整体造价(主要是收集干管)和施工难度。另外,有些污水处理厂选址时会考虑城市规划污水量布局,如主要污水量位于城市规划区中上游,而目前下游规划片区实施较为长远,因此,一般在结合财政实力和运行总费用考虑,不应简单将污水处理厂厂址设置于规划区最下游。3环保角度污水处理厂选址从环保角度而言,一般要求污水处理厂建成后不要对周围环境(指自然资源、水域、地下水、耕地、森林、水产、风景、名胜、自然保护区等)造成不可恢复的破坏,一般不宜设置在城市或居民区的上风向、城市水源的近距离上游。除此以外,在选址时应关注污水处理厂在建成投产后排放的污染物不超过地方环境容量所容许的范围。同时,污水处理厂建成投产后,对周围特别是下游城镇的水源保护区、养殖区等生态环境敏感区的环境影响应在该地区的要求范围之内。4处理工艺角度污水处理厂建设设计时应结合当地实际进、出水要求选择合适处理工艺。一般城市污水处理厂主要以处理城市生活污水为主,污水可生化性较好,一般采用二级生物化学处理工艺或者进一步深度处理工艺。因此,污水处理厂选址时应结合不同的进出水要求,确定合理工艺和厂址用地,并结合当地的实际条件,选择最优厂址。5总投资角度目前,城市污水处理厂建设投资一般受用地规模、处理工艺、防洪、地基处理等要素影响,而且国内大部分城市污水处理厂主要采用BOT运作,因此污水处理厂投资基本能够得到较好控制。但是,作为一个城市污水处理基础设施建设而言,城市污水收集干管投资往往比厂区建设的投资大,而且管网布局走向在一定程度上也受到厂区位置影响。因此,从优化投资角度考虑城市污水处理厂选址时,还应同步考虑污水处理厂选址对厂外截污干管布局及投资的影响,选择总投资费用最小化的厂址,确保选址决策的科学性。6结语城市污水处理厂选址中一般要结合规范要求进行比选,但同时也要求具体问题应该具体分析。在实际工作中,应结合当地可供选择场地的特点,在综合考虑规划、环保、处理工艺、投资等角度,确定技术经济最佳方案,保证污水处理厂工程建设的科学实施。

随着合成医药工业的发展,化学制药废水已成为严重的污染源之一。制药工业是国家环保规划中重点治理的12个行业之一。据统计,制药工业占全国工业总产值的7%,而污水排放量占2%。由于化学成分品种繁多,在制药生产过程中使用了多种原料,生产工艺复杂多变,产生的废水等成分也十分复杂。这就给当今环境保护制造了一个难题。 1 化学制药废水特点 1COD含量高、成分复杂 化学制药废水的COD、BOD5值高,有的高达几万甚至几十万,但B/C值较低,废水一经排入水体中,就会大量消耗水中溶解氧,造成水体缺氧。同时,废水的成分复杂且变化大,有机物种类繁多、浓度高、营养元素比例失调。 2 无机盐浓度高 废水中的盐分浓度过高对微生物有明显的抑制作用,当氯离子超过3000mg/L时,未经驯化的微生物的活性将明显受到抑制,严重影响废水处理的效率,甚至造成污泥膨胀,微生物死亡的现象。 3 存在生物毒性物质 废水中含有氰、酚或芳香族胺、氮杂环和多环芳香烃化合物等微生物难以降解,甚至对微生物有抑制作用的物质。 2 合成制药废水生化前预处理方法 预处理为降低后续生物处理难度,在生物处理前必须先进行预处理,达到排除生物毒性物质干扰,降低废水浓度的目的。目前合成制药废水生化前预处理方法主要包括:物化法、生物法等。 1物化法 1 混凝法 化学制药废水成分复杂,冲击负荷大,采用化学絮凝进行预处理,以便减少生物毒性物质干扰,降低废水浓度。利用混凝沉淀方法去除混合液中的有机物及部分非溶解态的溶媒物质具有较好的效果,COD由4080mg/L降低至2774mg/L,平均去除率达到0%。但是,混凝法容易产生二次污染。 2 膜分离法膜技术 如用NF-90纳滤膜处理水杨酸废水,COD为4000-5000mg/L,去除率高达80%以上。利用该项技术对抗生素废水进行浓缩分离,有良好的经济效益和社会效益。 3 电解法 如在甲红霉素废水中加入NaCl电解质,电解阳极间接氧化法的处理效果。电解产物NaClO具有极强的氧化性,当进水COD为331630mg/L时,其COD去除率可达1%,但所需电解时间相对较长。 4 微电解法 如采用铁屑-活性炭内点解法预处理大连某制药厂废水,COD去除率达到了38%,B/C由1提升至31。 5 Fenton氧化技术 Fenton氧化技术是高级氧化技术中的一种,与其他高级氧化技术相比,Fenton氧化技术具有快速高效、可产生絮凝、设备简单、成本低、技术要求不高等优点。2 生物法 目前生物法预处理化学制药废水主要采用水解酸化。其原理是在废水处理中,利用水解酸化来提高废水的可生化性,也为废水的后期处理创造良好的条件。对于含有难降解物质较高的制药废水,水解酸化的重要作用已经逐渐得到人们的认可,水解酸化的相关研究也成为国内外的研究热点。如采用水解酸化法对化学制药废水进行的预处理试验,结果表明,废水COD由2560mg/L降为1623mg/L,B/C由375提升至427。 3 生物性处理 1厌氧生物处理 通常指在无分子氧条件下,通过兼性菌和厌氧菌的代谢作用降解废水中的有机污染物,分解的最终产物是甲烷、二氧化碳、水及少量硫化氢和氨。厌氧处理的特点:厌氧处理具有对营养物需求低、成本低、能耗低、节能、污泥产量小等优点。但也有其弊端,例如厌氧处理的出水质量较差,通常需要后处理以使废水达标排放。另外,厌氧处理在操作对操作过程和技术要求非常高。 目前,国内外处理高浓度有机废水主要是以厌氧法为主要手段和途径。用于化学制药废水处理的厌氧工艺主要包括:厌氧复合床(UBF)、上流式厌氧污泥床(UASB)、厌氧折流板反应器(ABR)等。 1 上流式厌氧污泥床(UASB)法 UASB法是目前研究较多,应用日趋广泛的废水厌氧生物处理工艺,它具有以下优点:(1)可实现污泥的颗粒化;(2)气、固、液的分离实现了一体化;(3)通常情况下不发生堵塞。但是UASB工艺也存在一些难以解决的问题:如三相分离器的设计还没有一个成熟的方法,对那些含有高浓度悬浮固体的废水需要考虑悬浮物(SS)的预处理问题,污泥的颗粒化对工艺要求比较严格等。采用UASB对上海化工厂排放的高浓度、高盐度有机废水进行处理。试验结果表明,该化工厂CMC生产废水采用UASB工艺处理可行。废水经厌氧处理,COD去除率超过60%。2 厌氧复合床(UBF) UBF反应器的主要特点是:下部为污泥床,充分发挥其生物保有能力大,成熟后的颗粒污泥去除有机物效率高的作用;上部为过滤层,充分发挥滤层填料有效截留厌氧污泥的能力,减轻了厌氧反应器运行过程中的污泥流失。冯婧微等采用UBF处理水解酸化后的抗生素废水,COD由9262mg/L降至769mg/L,去除率达到了7%。3 厌氧折流板反应器(ABR) 厌氧折流板反应器(ABR)具有独特结构,是一种理想的多段分相、混合流态的处理工艺。它具有良好的生物分布和生物固体截流能力,对有毒物质适应性强,抗冲击负荷能力强,并且具有启动较快、运行稳定等多种优良性能。采用ABR反应器处理高浓度头孢抗生素废水,当进水COD负荷控制在67-0kg/(d),温度控制在35±5℃时,ABR对该废水COD的去除率可达在50%,且其可生化性得到了有效的提高,促进了废水进一步后续生化处理的运行稳定性。2 处理技术 1 好氧生物处理技术 是指废水中的溶解性有机物在好氧微生物作用下转化成不溶性可沉的微生物固体和一部分有机物,从而使废水得到净化的过程。如采用逐步提高有机负荷盐浓度的方法,驯化出耐高浓度盐污泥,在进水NaCl质量浓度为68×104-72×104mg/L之间时,保持较高的污泥浓度可使反应器COD容积负荷达到6kg/(d),COD和苯乙酸去除率达到95%以上。 2 生物接触氧化法 如采用生物接触氧化处理医药中间体TMBA废水,最高进水COD控制在1600mg/L左右,COD去除率高达90%左右。 3 AB法 AB法属超高负荷活性污泥法,如采用A-B二段法处理环氧丙烷皂化废水,COD去除率可达80-86%。4 SBR法 SBR法如采用SBR法对药物合成废水预处理出水,进水COD为2000-2500mg/L,可生化性为2,出水COD降到200mg/L以下,COD去除率达到90%左右。 5 膜生物反应器 膜生物反应器(MBR)是近年来一种迅速发展的废水生物处理技术。该项新型技术是将污水的生物处理技术和膜过滤技术结合在一起。对有机污染物去除率高,出水中没有悬浮物,硝化能力强,污泥产率低,便于实现自动化控制。如利用一体式膜生物反应器对COD为2500-4000mg/L的抗生素废水进行了处理。 3 传统的生物强化污水处理技术工艺 由于活性污泥中杂菌多,导致消耗较多的氧与养料,抑制了正常细菌的生长和作用发挥,对其进行分离纯化后,能获得较高的降解效率。如分离、筛选得到的效应菌株分别属不动杆菌属、假单胞菌属、埃希氏菌属和芽孢杆菌属,将效应菌株制成混合菌液处理β-2内酰胺环类抗生素废水,废水COD由4100mg/L降至7mg/L,COD去除率达到了86%,并对此类抗生素有较强耐受能力。 4 固定化技术 固定化微生物法是将微生物固定在载体上或定位于限定的空间区域内,并保持其生物功能,反复利用。固定化微生物技术已用来处理四环素、阿苯哒唑、扑尔敏、布洛芬等制药生产废水,另外,亦可在SBR中采用固定化微生物技术来处理氨氮含量高的制药废水。如PVA复合载体包埋固定化微生物颗粒处理抗生素废水的工艺条件,活性微生物为经抗生素废水以10%浓度增幅驯化75d后的活性污泥。 结果表明:进水COD为2000mg/L、曝气20h、温度控制在10-45℃、pH值7-10、固定化颗粒与废水比例1:4是固定化活性污泥处理抗生素废水的最佳工艺条件,COD去除率可达57%。 5 化学制药废水的处理 化学制药废水的处理多数采用单一生化法处理不能彻底解决问题,必须进行必要的预处理。首先设调节池,调节水质水量和pH,且根据实际情况采用特定物化或化学法进行预处理,提高废水的可降解性,以利于废水的后续生化处理。预处理后的废水,可选取某种厌氧和好氧工艺进行处理,如采用微电解-厌氧水解酸化-SBR串联工艺处理化学合成制药废水,原废水BOD5/COD约为13,属难生物降解废水,经微电解-厌氧水解酸化处理后,出水BOD /COD可达63,可生化性大大提高。 在进行SBR处理时,维持SBR进水COD在1500mg/L左右,污泥负荷为5kgCOD/(kgMLSSd),曝气8-10h,出水COD可以降低至200mgL-1以下。如采用吹脱-厌氧-好氧串联工艺处理含有氯霉素、抗菌素增效剂和磺胺新诺明的合成制药废水,经吹脱和厌氧水解酸化处理后,COD去除率为70%,再经好氧生化系统处理,COD去除率可达60%。 4 结语 化学制药废水是一种成分复杂、毒性高、含难降解有机物质的有机废水,目前的处理方法有预处理-生物处理。工程应用以单元处理为主,因此开发经济、有效的复合水处理单元迫在眉睫。此外,新技术如膜技术、生物强化技术等的应用在化学制药废水处理方面有更广阔的应用前景。 这是之前写的一个小报告,希望能对你有所帮助!

已发送 注意查收可以请采纳

污水处理文献综述

1、文献综述是对某一方面的专题搜集大量情报资料后经综合分析而写成的一种学术论文, 它是科学文献的一种。  2、格式与写法  文献综述的格式与一般研究性论文的格式有所不同。这是因为研究性的论文注重研究的方法和结果,特别是阳性结果,而文献综述要求向读者介绍与主题有关的详细资料、动态、进展、展望以及对以上方面的评述。因此文献综述的格式相对多样,但总的来说,一般都包含以下四部分:即前言、主题、总结和参考文献。撰写文献综述时可按这四部分拟写提纲,在根据提纲进行撰写工。  前言部分,主要是说明写作的目的,介绍有关的概念及定义以及综述的范围,扼要说明有关主题的现状或争论焦点,使读者对全文要叙述的问题有一个初步的轮廓。  主题部分,是综述的主体,其写法多样,没有固定的格式。可按年代顺序综述,也可按不同的问题进行综述,还可按不同的观点进行比较综述,不管用那一种格式综述,都要将所搜集到的文献资料归纳、整理及分析比较,阐明有关主题的历史背景、现状和发展方向,以及对这些问题的评述,主题部分应特别注意代表性强、具有科学性和创造性的文献引用和评述。  总结部分,与研究性论文的小结有些类似,将全文主题进行扼要总结,对所综述的主题有研究的作者,最好能提出自己的见解。 参考文献虽然放在文末,但却是文献综述的重要组成部分。因为它不仅表示对被引用文献作者的尊重及引用文献的依据,而且为读者深入探讨有关问题提供了文献查找线索。因此,应认真对待。参考文献的编排应条目清楚,查找方便,内容准确无误。关于参考文献的使用方法,录著项目及格式与研究论文相同,不再重复。

回答 污水处理一般流程:废水经过格栅、筛网后流、絮凝沉淀池、预曝气调节池、一级浮动填料生化池、二级浮动填料生化池、斜板沉淀池、混凝沉淀池后,最终斜板沉淀池排出的水流入清水池中,经检测后外排。 1、废水首先经过格栅、筛网后流至絮凝沉淀池,为了使处理效果好,在絮凝沉淀池中加入混凝剂,使废水中悬浮物治理效果更好,混凝加药也起到调节废水的作用絮凝沉淀后的废水流入预曝气调节池中。 2、曝气调节池中通入空气,起到预曝气调节的作用调节均匀的废水用泵提升到一级浮动填料生化池中。 3、生化池中安装充氧效率很高的曝气头,并装入浮动填料,实践证明该项技术对COD和BOD有较高的去除效率一级浮动填料生化池中废水自流入二级浮动填料生化池,二池采用方法相同。 4、二级浮动填料生化池水自流入斜板沉淀池中池中加入聚丙烯蜂窝斜管,可大大提高沉降效率,另外水力负荷高,停留时间短,占地面积小。 5、混凝沉淀池与斜板沉淀池沉淀污泥排入污泥浓缩池中,然后经污泥脱水机械脱水。6、斜板沉淀池排出的水流入清水池中,经检测后外排。 提问 有没有实操教学视频 回答 抱歉,这个无法发送视频 更多12条 

百科里面有

相关百科

热门百科

首页
发表服务