隧道施工论文参考文献

发布时间:

隧道施工论文参考文献

桥梁与隧道工程论文参考文献

参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!

桥梁与隧道工程论文参考文献一

[1] Measor .,New, The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.

[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.(3):95-101.

[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.

[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.

[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.

[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.

[7] Gunn M J,Yan,R W M. Stress transfer and around a di^)hragm wallpanel [J]. of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.

[8] , , . The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.

[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.

[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.

[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.

[12] Ming-Fang, Chang, ., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.

[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.

[14] Skempton, . Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.

桥梁与隧道工程论文参考文献二

[15] Meyerhof,GG,Murdock, . An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.

[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.

[17] . , Concrete pressures on formwork. CIRIA association. Report 108,1985.

[18] Lings,., Ng, , . The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Civ. Engrs Geotech. Engng, 1994,107:163-172.

[19] Symons, , Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.

[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.

[21] Leussink, K And Wenz, ., 1969,Storage Yard Foundatio on Soft Coheesive , Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.

[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.

[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.

[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.

[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.

[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.

[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.

[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.

有关盾构法施工技术的参考文献有: 1、《我国盾构法隧道施工技术研究》 2、《盾构法隧道施工技术及应用》周文波 3、《地铁盾构法施工技术浅析》王靖雅,李建,董晶 4、《城市建设理论研究 5、《盾构隧道施工技术现状及展望—隧道的应用前景之发展方向》 6、《我国软土盾构法隧道施工技术综述》周文波 7、《我国隧道盾构掘进机技术的发展历程》傅德明 8、《盾构法隧道》(中国铁道出版社) 9、《土压盾构掘进机在我国隧道工程中的应用和发展》傅德明 10、《对我国当前盾构施工技术存在问题的探讨》张智 11、《地铁盾构施工对地表沉降的影响分析》王庆,周斌 12、《盾构推进轴线控制技术》陈平 13、《盾构近距离穿越重大管线施工技术研究》程文峰 14、《浅析盾构穿越地下障碍物关键技术》陈万忠等等。

[1] 关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.[2] 孔德岩.隧道浅埋段开挖及支护施工技术[J].浙江建筑,2006, 23(4).[3] 王毅才.隧道工程[M].北京:人民交通出版社, 2005.[4] JTJ042- 94, 公路隧道施工技术规范[S].

土木工程隧道施工论文参考文献

土木工程参考文献

参考文献,仅限于著录作者亲自阅读过并在论文中直接引用的文献,而且,无特殊需要不必罗列众所周知的教科书或某些陈旧史料。以下是我为您整理的土木工程参考文献,希望能提供帮助。

[1]国家标准.建筑制图标准(GB/T 50104-2010).北京:中国计划出版社,2010.

[2]国家标准.房屋建筑制图统一标准(GB/T 50001-2010).北京:中国计划出版社,2010.

[3]国家标准.建筑设计防火规范(GB 50016-2006).北京:中国建筑工业出版社,2006.

[4]国家标准.办公建筑设计规范(JGJ 67-2006).北京:中国建筑工业出版社,2006.

[5]国家标准.无障碍设计规范(GB 50763-2012).北京:中国建筑工业出版社,2012.

[6]国家标准.公共建筑节能设计标准(GB 50189-2005).北京:中国建筑工业出版社,2005.

[7]陕西省建筑设计标准图集(陕09J01-09).陕西省建筑标准设计办公室.2010.

[8]建筑设计资料集编委会.建筑设计资料集(第2、4、8集).北京:中国建筑工业出版社,1998.

[9]同济大学、西安建筑科技大学、东南大学、重庆大学合编.房屋建筑学.北京:中国建筑工业出版社,2005.

[10]国家标准.建筑结构荷载规范(GB 50009-2012).北京:中国建筑工业出版社,2012.

[11]国家标准.建筑抗震设防分类标准(GB 50223-2008).北京:中国建筑工业出版社,2008.

[12]国家标准.建筑抗震设计规范(GB 50011-2010).北京:中国建筑工业出版社,2010.

[13]国家行业标准.工程结构可靠性设计统一标准(GB 50513-2008).北京:中国建筑工业出版社,2008

[14].国家标准.混凝土结构设计规范(GB 50010-2010).北京:中国建筑工业出版社,2010.

[15]国家标准.建筑结构制图标准(GB/T 50105-2010).北京:中国计划出版社,2010.

[16]国家建筑标准设计图集.建筑物抗震构造详图(03 G329-1).中国建筑标准设计研究院出版,2003.

[17]龚思礼主编.建筑抗震设计手册(第二版).北京:中国建筑工业出版社,2002.

[18]梁兴文、王社良主编.混凝土结构设计原理(第二版).北京:中国建筑工业出版社,2011.

[19]梁兴文、史庆轩主编.混凝土结构设计(第二版).北京:中国建筑工业出版社,2011.

[20]丰定国、王社良主编.抗震结构设计(第2版).武汉:武汉工业大学出版社,2003.

[21]梁兴文、史庆轩主编.土木工程专业毕业设计指导.北京:科学出版社,2002.

[22]国家标准.建筑地基基础设计规范(GB 50007-2011).北京:中国建筑工业出版社,2012.

[23]国家标准.建筑地基处理技术规范(JGJ 79-2002 )北京:中国建筑工业出版社,2002.

[24]华南理工大学等编著.地基及基础(第三版).北京:中国建筑工业出版社,1998.

[1]王恩斌.论山区农村饮水工程建设管理存在的问题及建议[J].黑龙江水利科技,2014,(11):87-89

[2]韩娜,王霞.农村饮水工程建设与管理方法探究[J].黑龙江科技信息,2013,(30):246-246.

[3]冉启福.农村饮水工程建设中存在问题分析及其安全管理[J].中国新技术新产品,2012,(17):103-104.

[4]徐伟,陈东杰,模板与脚手架工程详细图集,北京,中国建筑工业出版社,2002

[5]山东省建筑工程工程量清单计价办法,北京:中国建筑工业出版社

[6]中华人民共和国建设部,建设工程工程量清单计价规范(GB50500-2003),第1版,北京:中国计划出版社,2003

[7]混凝土结构设计规范(GB50010---2002).北京,中国建筑工业出版社,2002

[8]中国建筑标准设计研究院组织,混凝土结构施工图平面整体表示方法制图规则和构造详图03G101-2,北京,中国计划出版社,2006

[9]编写组, 建筑施工手册,第4版,北京:中国建筑工业出版社,2003

[10]中国建筑标准设计研究院组织,混凝土结构施工图平面整体表示方法制图规则和构造详图03G101-4,北京,中国计划出版社,2006

[11]中国建筑业协会,建筑机械设备管理分会,简明建筑施工机械实用手册,北京,中国建筑工业出版社,2003

[12]江正荣,建筑施工计算手册,第二版,北京:中国建筑工业出版社

[13]编写委员会,建设工程项目管理规范实施手册,第1版.,京:建筑工业出版社,2002

[14]青岛市建委,青岛市工程结算资料汇编,青岛,中国海洋大学出版社,2008

[15]中国建设科学研究院、哈尔滨工业大学,建筑施工扣件式钢管脚手架安全技术规范JGJ130-2001,北京,中华人民共和国建设部,2002

[16]严微.土木工程项目管理与施工组织设计.北京:人民交通出版社,1999

[17]混凝土结构工程施工质量验收规范(GB50204-2002).北京:中国建筑工业出版社,2002

[18]山东省建设厅,山东省建筑工程消耗量定额上册,北京,中国建筑工业出版社,2006

[19]重建工,同济,哈建工,建筑施工,第2版,北京,中国建筑工业出版社,2009

[20]中国建筑标准设计研究院组织《混凝土结构施工图平面整体表示方法制图规则和构造详图03G101-1》,北京,中国计划出版社,2006

[21]建筑结构荷载规范(GB50009---2001),北京,中国建筑工业出版社,2002

[22]汪正荣,朱国梁,简明施工手册,第2版,北京,中国建筑工业出版社,2009

[23]邢莉燕,王坚,梁振辉,工程估价,北京,中国电力出版社,2004

[24]邢莉燕,陈起俊,工程估价,北京,中国电力出版社,2008

[25]建设工程劳动定额-装饰工程(LD/T ),北京,中国计划出版社,2009

1、腾智明,朱金铨编著.《混凝土结构及砌体结构》.中国建筑工业出版社,199

2、黄棠.王效通主编.《结构设计原理(上册)》.中国铁道出版社,1999

3、邵全,韦敏才.《土力学与基础工程》.重庆大学出版社出版,1997

4、王祖华主编.《混凝土及砌体结构》.华南理工大学出版社,1993

5、王萍主编.《混凝土结构及砌体结构》.大连理工大学出版社,2000

6、李国强.《建筑结构抗震设计》.中国建筑工业出版社,2002

7、朱彦鹏主编.《混凝土结构设计原理》.重庆大学出版社,2002

8、黄双华主编.《房屋结构设计》.重庆大学出版社,2001

9、陈树华主编.《建筑地基基础》.哈尔滨工程大学出版社,2003

10、侯治国主编.《砼结构》.武汉工业大学出版社,1999

11、胡乃君主编.《建筑结构课程设计指导》.武汉工业大学出版社,2001

12、沈满生、苏三庆主编.《高等学校建筑工程专业毕业设计指导》.中国建筑工业出版社,2000

13、贾韵绮、王毅红主编.《工业与民用建筑专业课程设计指南》.中国建筑工业出版社,1994

14、陈登鳌主编.《建筑设计资料集(1、2、3、8、9)》.中国建筑工业出版社出版,1994

15、《新版建筑工程勘察设计规范汇编》.北京:中国建筑工业出版社,2002

16、同济大学、西安建筑科技大学、东南大学、重庆建筑大学编.《房屋建筑学》中国建筑工业出版社,1997

[1] 苏文菊.浅谈施工企业成本管理的现状及对策[J].郑州工业高等专科学院学报,2003,19(4) : 36-37

[2] 马瀛洲.工程项目施工阶段造价控制与管理[J].现代商业,2008, (26) :66-67

[3] 周榕冰,范建双.建设项目全寿命期精益成本管理研究[J].建筑管理现代化,2009, 23(2) : 164-167

[4] 于文凯,刘伟.对建筑成本管理的探讨[J].森林工程, 2001,17(6) :27-28

[5] 赵勇,吕敏娟,张永学.影响建设项目工程造价的因素分析[J].建筑与预算,2009, 25(3) : 15-15

[6] 贾志远.浅析建设项目施工阶段造价的控制[J].现代企业文化,2009, (27) : 92-93

[7] 于江泳,陈继伟.建设工程造价控制中存在的问题与对策[J]黑龙江科技信息,2009, (27) :249-249

[8] 吴学军,胡韫频,郭树元.关于大型建设项目全生命周期投资控制的探讨[J].武汉理工大学学报,2005, 27(6) : 133-136

[9] 黄屹岳.浅谈招标投标中工程造价的管理[J].管理观察,2009, (26) :16-17.

[10] 任民主.目前我国设计阶段工程造价控制的现在分析[J].山西建筑,2009,35(25) :262-263

[11] Sieglinde K. Fuller, Amy S. Boyles. Life-Cytec Costing Workshop for Energy Conservation inBuildings[J]. Student Manual, 2010,V12(4):125-129

[1] 常永红.工程造价在建设项目中的投资控制与管理.陕西建筑[J],2007,(10):44-45.

[2] 全兆松.石油工程造价分析体系研究.科技创业月刊[J],2010,02:59-61

[3] 贾俊平.统计学「M].北京:中国人民大学出版社,2009.

[4] 滕素珍,冯敬海.数理统计学[M].大连:大连理工大学出版社,2005.

[5] 孙晓斌.试论石油工程造价分析及其应用.胜利油田党校学报[J],2009,02:51-53

[6] 王鹏.石油工程造价管理信息化风险分析及其控制.现代商业[J],2012,07:95

[7] 祝春梅.信息技术在石油工程造价分析上的应用.企业导报[J],2010,11:190-191

[8] 叶峰.浅析建设项目全过程造价控制.山西建筑[J],2007,(32):25-26.

[9] 汤桥.别墅建筑工程造价分析[D].北京:北方工业大学,2009

[10] 匡雯琦.别墅安装工程造价分析[D].北京:北方工业大学,2009

[11] 唐.埃思里奇.应用经济学研究方法论[M].北京:经济科学出版社,2007

[12] 美国项目管理协会.项目管理知识体系指南(第 3 版)(PMBOK 指南)[M].北京:电了工业出版社,2005.

[13] 王星.国内外工程造价计价模式比较研究.内江科技[J],2008,07:30-41

[14] 尹贻林主编.工程造价计价与控制[M].北京:中国计划出版社,2010.

[15] Zhenhua Rui et al. Historical pipeline construction cost of Oil, Gas and Coal Technology[J], 2011,V4(3): 244-263

[16] Prof Russell Kenleya. Construction Cost Management: Learning from Management and Economics[J],2010 V28:545-546

[1]付哲.浅析现代建筑施工材料管理[J].科技创新与应用,2012 (08Z): 247-247

[2]郭建华,黄卫.高速公路工程质量管理系统数据库设计刃.公路交通科技,2001,18(4):35-39

[3]赵昕慰,张保民,杨瑞生.国际工程现场施工材料管理系统[J].兰州交通大学学报,2004, 23(4): 47-49.

[4]王静,翟全礼,仲景冰.地铁建设材料管理信息化研究m.华中科技大学学报(城市科学版),2009, 2: 019

[5]陈豫龙,何旭洪.Delphi6数据库系统开发实例导航[M].人民邮电出版社,2002.

[6]马智亮,莫方彬.建筑施工项目信息化管理系统的面向对象建模[J].土木工程学报,2001,34(2): 105-110

[7]张志杰.基于分层结构的管理信息系统架构设计[J].计算机技术与发展,2010,20(10):146-149

[8]廖志英,董安邦.基于C/S和B/S混合结构的管理信息系统运行模式[J].计算机工程与应用,2002, 38(2): 184-185

[9]余国斌.工程项目成本控制[J].铁路工程造价管理,2004,18(6): 27-29.

[10]刘芳.浅谈施工企业降低项目施工成本的途径[J].技术经济与管理研究,2006,6: 024

[1] 齐骥, 徐波. 建筑工程管理学[M]. 陕西科学技术出版社.2003

[2] 刘正周. 管理激励. 上海财经大学出版社.1999 年 1 月

[3] 刘志远, 林云. 现代企业激励机制.上海人民出版社.1997 年,第 6 页

[4] 李旭伟. 总承包体制下项目质量管理研究[J]. 科技管理研究.2006(04)

[5] 侯光明. 管理激励与约束.北京理工大学出版社.1999 年,第 80 页

[6] 杨红军. 非正式制度与企业文化研究.吉林大学 2004 年硕士论文

[7] 姜敢闯. 现代企业激励问题研究.中南大学 2002 年硕士论文

[8] 张婷. 中西方管理特点比较分析. 山东大学 2009 年硕士论文

[9] 张曼玲. 企业内部会计控制研究.首都经济贸易大学 2004 年 3 月.

[10] 陈郁.所有权、控制权与激励. 上海三联书店、上海人民出版社.1998 年

[11] 齐骥, 徐波. 香港的建筑管理制度[J]. 建筑,2002(2):50-52.

[12] 戚安邦. 现代项目管理[M]. 北京:对外经济贸易大学出版社,2001 年.

[13] 王宗昌. 建筑工程质量控制实例[M]. 科学出版社.2004

[14] 王宗昌, 高振东. 建筑工程质量百问[M]. 北京:中国建筑工业出版社.1999

[5] 朱宏亮. 项目进度管理[M]. 北京:清华大学出版社,2002 年.

[16] 刘迎心, 李清立. 中国建筑工程质量现状剖析、国际借鉴、未来对策[M]. 中国建筑工业出版社.2007

[1] 张飞涟,周继祖.铁路建设项目后评价理论体系的.研究[J].综合运输,2010(12) :25-28

[2] 黄 恺.积极开展商业房地产项目后评价[J].城市开发.2011(10): 76

[3] 汪红霞,商业地产项目引入后评价的探讨[J].重庆教育学院学报,(6):93-95

[4] 曲琳莉.正确进行商业房地产项目后评价研究[J].特区经济.2011(10), 299

[5] 曾珍香.可持续发展协调性分析[J].系统工程观论与文践,2011(3): 18-21

[6] 倪枫杰,黄金枝.工秤项目后评价研究综述[J].建筑技术开发,2009,31(11):103-106

[7] 许晓峰,肖 翔.建设项目后评价[M].中华工商联合出版社,2000

[8] 吕军印.浅谈环境经济评价的类别划分[J].中国环境保护.

[9] 张三力.项目后评价[M].清华大学出版社,2003

[10] 王 超.项目决策与管理[M].中国对外经济贸易出版社.2005

[1] 王玉杰.浅谈施工项目管理[J].城市建设理论研究,2014(10):56-58

[2] 李林.绩效管理在 HR 管理系统中的定位和作用--基于人力资源管理的工作流程[J].商情,2012(4):55

[3] 朱晨海.战略性职业生涯开发与管理研究--从人力资源计分卡到胜任力模型[D].上海:同济大学,2005

[4] 李溪.基于能力素质模型的人才测评系统的研究与实现[D].济南:山东大学,2007

[5] 彭剑锋.员工素质模型设计[M].北京:中国人民大学出版社,2003:12-13

[6] 曹志强.基于 KPI 的绩效管理体系设计[D].北京:北京交通大学,2004

[7] 魏群.供电企业 KPI 绩效管理体系的建立[D].北京:华北电力大学,2008

[8] 战冰峰.基于胜任力模型的员工绩效测评体系的应用研究[D].北京:对外经济贸易大学,2008

[9] 徐中林.中国企业国际化经营发展战略研究[D].北京:对外经济贸易大学,2012

[10] 郭祥友.风险导向内部审计下审计人员能力素质模型构建[J].企业导报,2009(1):89-91

[11] 刘芳.基于胜任力视角的职业经理人的素质评价解析[D].北京:首都经济贸易大学, 2012

[12] 宫鹤.企业实施绩效管理过程的问题研究[J].华章,2012(36):1

[13] 崔爱珍.腾飞的中建八局天津公司[J].天津建设科技,2010(2):23-24

[14] 赵岳.我国高校学生干部能力素质评价与培养研究[D].青岛:青岛大学,2012

[15] 李晶晶,张玉清.基于胜任力的绩效管理体系[J].企业导报,2009(11):82-83

[16] 李作学.人力资源管理案例(第 2 版)[M].北京:人民邮电出版社,2012:89-97

[17] 吴晓琴.基于执行力的企业中层管理者的胜任力模型及评价研究[D].西安:西安电子科技大学,2007

[1]拓勇飞,孔令伟.湛江地区结构性软土的赋存规律及其工程特性[J].岩土力学,2004,25(12):1879-1884.

[2]张先伟,孔令伟.湛江强结构性黏土的物理力学性质指标及相关性分析[J].工程地质学报,2017,19(4):447-454.

[3]孔令伟,吕海波,汪稔等.湛江海域结构性海洋土的工程特性及其微观机制[J].水利学报,2002,33(9):82-88

[4]孔令伟,吕海波.某防波堤下卧层软土的工程特性状态分析[J].岩土工程学报,2004,26(4):454-458.

[5]孙吉主,王勇.湛江海域结构性软土的边界面损伤模型研究[J].岩土力学,2006,27(1):99-103.

[6]姚珩珩,夏远野,刘胜娥.海口地区第四系湛江组灰色粘土的工程地质特性[J].港工技术,2001,(6):54-55.

[7]张丽.浅谈第四系湛江组粘土层工程特点[J].采矿技术,2017,10(1):24-25.

[8]陈书荣.湛江灰色粘土的工程特性[J].西部探矿工程,2006,(6):30-31.

[9]雷严问.浅谈湛江市老粘性土的工程地质特性与环境地质因素的关系[J].广东水利水电,2007,4:03-04.

[10]胥稳,侯玉宾,朱瑞田.大直径超长桩承载力影响因素数值分析[J].低温建筑技术,2017,10:104-106.

[11]魏静,王建华,李永林.西安地区单桩桩土相互作用数值模拟分析[J].长安大学学报,2003,25(3):63-66.

[12]徐燕,佴磊.单桩不同加载条件下有限元模拟及侧摩阻力分析[J].煤田地质与勘探,2007,35(3):55-58.

[13]蔡志.钉形搅拌桩单桩承载力的数值模拟分析[J].城市道桥与防洪,2017,8:147-149.

[14]赵健利,冯旭.基于薄层单元法的单桩挤土效应数值模拟[J].上海大学学报,2017,19(2):208-213.

[15]吕全乐,鹿群,郭少龙.静压单桩施工对道路影响的数值模拟研究[J].广西大学学报,2017,38(1):182-187.

[16]张瑞坤,石名磊,倪富健,王晋.黏性土中大直径超长钻孔灌注桩承载性状及单桩沉降分析[J].岩石力学与工程学报,2017,32:4190-4198.

[17]周健,郭建军,张昭,贾敏才.砂土中单桩静载室内模型试验及颗粒流数值模拟[J].岩土力学,2017,31(6):1763-1768.

[18]王幼青,张克绪.竖向荷载作用下单桩工作性能模拟分析[J].哈尔滨工业大学学报,2002,34(5):667-670.

[19]吴增伟.竖向荷载作用下单桩三维模型参数分析[J].地下空间与工程学报,2017,10(2):351-355.

[20]邢克勇,江松,姚升康,赵春晓,张华文.PHC管桩单桩振动台试验与数值模拟对比分析[J].华北地震科学,2017,32(1):33-37.

关于土木工程专业毕业论文参考文献

导语:土木工程专业毕业论文参考文献有哪些呢?参考文献的著录格式是否规范反映作者论文写作经验和治学态度,所以,同学们在引用参考文献的时候,必须慎重。下面是我分享的土木工程专业毕业论文参考文献,欢迎阅读!

[1] 王玉杰.浅谈施工项目管理[J].城市建设理论研究,2014(10):56-58

[2] 李林.绩效管理在 HR 管理系统中的定位和作用--基于人力资源管理的工作流程[J].商情,2012(4):55

[3] 朱晨海.战略性职业生涯开发与管理研究--从人力资源计分卡到胜任力模型[D].上海:同济大学,2005

[4] 李溪.基于能力素质模型的人才测评系统的研究与实现[D].济南:山东大学,2007

[5] 彭剑锋.员工素质模型设计[M].北京:中国人民大学出版社,2003:12-13

[6] 曹志强.基于 KPI 的绩效管理体系设计[D].北京:北京交通大学,2004

[7] 魏群.供电企业 KPI 绩效管理体系的'建立[D].北京:华北电力大学,2008

[8] 战冰峰.基于胜任力模型的员工绩效测评体系的应用研究[D].北京:对外经济贸易大学,2008

[9] 徐中林.中国企业国际化经营发展战略研究[D].北京:对外经济贸易大学,2012

[10] 郭祥友.风险导向内部审计下审计人员能力素质模型构建[J].企业导报,2009(1):89-91

[11] 刘芳.基于胜任力视角的职业经理人的素质评价解析[D].北京:首都经济贸易大学, 2012

[12] 宫鹤.企业实施绩效管理过程的问题研究[J].华章,2012(36):1

[13] 崔爱珍.腾飞的中建八局天津公司[J].天津建设科技,2010(2):23-24

[14] 赵岳.我国高校学生干部能力素质评价与培养研究[D].青岛:青岛大学,2012

[15] 李晶晶,张玉清.基于胜任力的绩效管理体系[J].企业导报,2009(11):82-83

[16] 李作学.人力资源管理案例(第 2 版)[M].北京:人民邮电出版社,2012:89-97

[17] 吴晓琴.基于执行力的企业中层管理者的胜任力模型及评价研究[D].西安:西安电子科技大学,2007

[1]拓勇飞,孔令伟.湛江地区结构性软土的赋存规律及其工程特性[J].岩土力学,2004,25(12):1879-1884.

[2]张先伟,孔令伟.湛江强结构性黏土的物理力学性质指标及相关性分析[J].工程地质学报,2017,19(4):447-454.

[3]孔令伟,吕海波,汪稔等.湛江海域结构性海洋土的工程特性及其微观机制[J].水利学报,2002,33(9):82-88

[4]孔令伟,吕海波.某防波堤下卧层软土的工程特性状态分析[J].岩土工程学报,2004,26(4):454-458.

[5]孙吉主,王勇.湛江海域结构性软土的边界面损伤模型研究[J].岩土力学,2006,27(1):99-103.

[6]姚珩珩,夏远野,刘胜娥.海口地区第四系湛江组灰色粘土的工程地质特性[J].港工技术,2001,(6):54-55.

[7]张丽.浅谈第四系湛江组粘土层工程特点[J].采矿技术,2017,10(1):24-25.

[8]陈书荣.湛江灰色粘土的工程特性[J].西部探矿工程,2006,(6):30-31.

[9]雷严问.浅谈湛江市老粘性土的工程地质特性与环境地质因素的关系[J].广东水利水电,2007,4:03-04.

[10]胥稳,侯玉宾,朱瑞田.大直径超长桩承载力影响因素数值分析[J].低温建筑技术,2017,10:104-106. (爱写作网 )

[11]魏静,王建华,李永林.西安地区单桩桩土相互作用数值模拟分析[J].长安大学学报,2003,25(3):63-66.

[12]徐燕,佴磊.单桩不同加载条件下有限元模拟及侧摩阻力分析[J].煤田地质与勘探,2007,35(3):55-58.

[13]蔡志.钉形搅拌桩单桩承载力的数值模拟分析[J].城市道桥与防洪,2017,8:147-149.

[14]赵健利,冯旭.基于薄层单元法的单桩挤土效应数值模拟[J].上海大学学报,2017,19(2):208-213.

[15]吕全乐,鹿群,郭少龙.静压单桩施工对道路影响的数值模拟研究[J].广西大学学报,2017,38(1):182-187.

[16]张瑞坤,石名磊,倪富健,王晋.黏性土中大直径超长钻孔灌注桩承载性状及单桩沉降分析[J].岩石力学与工程学报,2017,32:4190-4198.

[17]周健,郭建军,张昭,贾敏才.砂土中单桩静载室内模型试验及颗粒流数值模拟[J].岩土力学,2017,31(6):1763-1768.

[18]王幼青,张克绪.竖向荷载作用下单桩工作性能模拟分析[J].哈尔滨工业大学学报,2002,34(5):667-670.

[19]吴增伟.竖向荷载作用下单桩三维模型参数分析[J].地下空间与工程学报,2017,10(2):351-355.

[20]邢克勇,江松,姚升康,赵春晓,张华文.PHC管桩单桩振动台试验与数值模拟对比分析[J].华北地震科学,2017,32(1):33-37.

桥梁与隧道工程论文参考文献

参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!

桥梁与隧道工程论文参考文献一

[1] Measor .,New, The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.

[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.(3):95-101.

[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.

[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.

[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.

[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.

[7] Gunn M J,Yan,R W M. Stress transfer and around a di^)hragm wallpanel [J]. of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.

[8] , , . The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.

[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.

[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.

[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.

[12] Ming-Fang, Chang, ., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.

[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.

[14] Skempton, . Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.

桥梁与隧道工程论文参考文献二

[15] Meyerhof,GG,Murdock, . An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.

[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.

[17] . , Concrete pressures on formwork. CIRIA association. Report 108,1985.

[18] Lings,., Ng, , . The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Civ. Engrs Geotech. Engng, 1994,107:163-172.

[19] Symons, , Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.

[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.

[21] Leussink, K And Wenz, ., 1969,Storage Yard Foundatio on Soft Coheesive , Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.

[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.

[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.

[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.

[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.

[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.

[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.

[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.

隧道施工论文文献综述

深埋隧道工程的灾害地质问题论文

摘要 :在进行深埋隧道工程施工过程中,由于洞程较长,洞深埋设较大,地质条件较复杂,在施工时,如果处理措施不当会出现高地温、岩爆、高压涌水等问题。鉴于此,以实际工程为例,对深埋隧道工程主要存在的灾害地质问题进行了分析和探讨,保证了施工的顺利进行,以期为类似工程提供参考与借鉴。

关键词 :深埋隧道工程;灾害地质;高压涌水

1工程概况

太行山高速公路邯郸东坡隧道位于武安市岭底村南、七水岭村东、涉县东坡村东北处。隧道为分离式特长隧道,隧道工程总施工长度为3134m。左幅为ZK38+624~ZK41+740,长3116;右幅为K38+642~K41+776。最大埋深为176m。本文以此工程为例,对深埋隧道工程主要灾害地质问题进行分析和探讨。

2深埋隧道中的高地温难题

深埋地下隧道的工程中,地质问题是需要进行探索和研究的关键领域,最先要通过预测天然地温,一旦地温超过30℃一般将其称之为高地温。高地温不仅会恶化深埋隧道作业的环境,还会严重降低工人的劳动生产率,甚至会对现场施工人员的生命造成极大危害。此外,对深埋隧道施工材料选取的难度也相应增加[1]。然而,地温值是随着地下工程埋深在不断变化的,但地下工程的最大埋深和地温值的增加关系不是呈线性的,因为造成这种深埋隧道中的高地温问题的原因主要是地下水活动以及近期岩浆活动中放射性生热元素含量较高等。

3深埋隧道与岩爆的高地应力问题

在深埋地下隧道的工程中,其中一个突出的地质难题就是岩爆问题。地下隧道工程埋得越深,其地应力就会越高。深埋隧道工程和近地表工程的不同之处除了具有较高的水平构造应力外,最主要取决于围岩出现的高地应力。它不仅在硐侧壁引起高压应力,还导致硐顶部出现高拉应力,这样会导致硐室围岩不稳定,埋下隐患。由于高地应力的存在,一些黏性土含量较高,而硬岩含量较低的围岩就会产生被塑性挤出的可能。高地应力不断释放,地下隧洞就会发生变形,往往会出现隧洞短时间内突然变小的异常现象。就好比从掌子面距离正洞30m开始,洞身变形的长度有40m,起初的支架保护结构破坏就会非常严重,通过测量计算,隧洞拱顶的下沉在10~20cm之间,隧洞的拱脚和边墙也出现不同程度的挤压和移位,甚至还有混凝土开裂的情况[2]。这时就需设计一套科学有效、刚柔结合、综合治理的施工方案。为克制高地应力,考虑使用约1万根超长锚杆,要求总长超过11×104m,把地下隧洞中的断面改成环形成拱,做到先柔后刚、先放后抗的设计要求。岩爆受影响的原因有地震爆破,也有相邻岩爆或机械等外因动力的振动,但其中影响岩爆的最基本原因是岩石的结构特征。经过大量的数据分析发现,岩石颗粒排列呈定向排列还是随机排列,岩石是胶结连接还是结晶连接,是钙质胶结还是硅质胶结,这最终关系着岩爆烈度的强弱。例如:(1)随机排列的花岗岩、闪长岩等岩石的岩爆烈度,会比片麻岩、花岗片麻岩、糜棱岩等具有定向排列的围岩颗粒更强一些;(2)结晶连接的深层岩浆岩石中的岩爆烈度比胶结连接的沉积岩强;(3)具有硅质胶结岩石的天生桥二级水电站引水隧洞比关村坝的隧道中钙质胶结岩石的爆烈度强。

4深埋隧道中的高压涌水难题

深埋地下隧道的施工过程中,除了高地温以外,涌水问题也成为隧道运营中亟待解决的又一难题。由于地质条件复杂,隧道通过的地段会挖掘出很多水流量大的地质单元,一般就会出现涌水量大或水头压力高的情况。地下水水压在深部岩体中极高时,就会导致岩体水力劈裂。这就说明在高水头压力的作用下,在岩体的突水点附近,岩体断续裂隙、裂缝是朝着某个方向的,受网状交织的构造裂隙影响,经过融合后发生扩展的裂隙、空隙最终张裂开来。随着隧道深部岩体涌水量越来越大,地下水水压越来越高,会导致深埋隧道工程围岩水力劈裂。一旦出现水力劈裂的情况,就会迅速连通裂隙,空隙的张裂程度就会越来越大,涌水的渗透力会越来越强。再加上动水压力的影响,裂隙会再扩展,而使在裂隙面上的充填物发生剪切变形和位移。不论是在深埋隧道工程中还是在浅埋隧道中,容易发生的地质灾害主要表现为断层破碎带,岩体不整合接触面和结构不利组合段造成的塌方、地震,还有瓦斯爆炸、有害气体以及溶岩塌陷、泥屑流等[3]。其中,瓦斯爆炸主要指甲烷CH4在相对封闭的煤系构造地层中,由冲击波的产生、剧烈的氧化作用而导致的爆破,其灾害性极强。

5基岩裂隙水

基岩裂隙水的含义

只有储存在坚硬岩石裂隙中的非可溶性地下水,才被统一归纳在基岩裂隙水的`传统范畴中,根据含水介质的基础特征,可以将地下水分为空隙、裂隙、岩溶3种,但并非在地下水、岩石以及岩石中的空隙这3者之中产生对应关系。贮水空隙系统具有双重空隙介质,在地下水勘探中,关于贮水空隙类型还探索到了新的领域。基岩裂隙水主要存在于受符合地质构造条件的属坚硬或半坚硬的岩石所控制的以裂隙为主的贮水空间,是具有运动、富集规律的地下水。不管是溶蚀裂隙地下水在可溶性岩石中的部分,还是孔隙裂隙水中的半坚硬岩石,都属于基岩裂隙水,而它与其他类型地下水的基本区别,关键在于是不是受地质构造因素的严格控制。岩石含水的裂隙有成岩裂、构造裂和风化裂,主要是依照它的成因来划分的。如果非要与风化裂隙水和成岩裂隙水作比较,那么水源集中、水量较大的必定是构造裂隙。

基岩裂隙水的特点

由于主控因素作用,不同的蓄水构造中分布、富集基岩裂隙水的基本规律和决定主控的因素也基本相同,具有独特的分布和运动规律。我国基岩裂隙水富集的基本特色理论就是蓄水构造系统,其主要特点如下。(1)基岩裂隙水具有复杂多样的埋藏和分布形态。将储存、运移基岩裂隙水的空间和通道,叫做岩石裂隙。基岩裂隙的大小和基岩裂隙的形状,以及控制埋藏和分布裂隙发育带的产状,都是受地质构造、地层岩性、地貌条件等影响的。埋藏、分布不均匀的基岩裂隙水,大多具有不规则的含水层、多种多样形态、分布呈带状的特点[4]。比如用脆性和塑性这两种地层做比较,会产生较强的赋水性。若裂隙发育在褶皱构造中,像褶皱轴、转折、背斜倾伏等处,富水段的形成就会比较容易,而压性断裂破碎带中的赋水性是比较差的。(2)复杂的基岩裂隙水中,由于储存空间中不均匀的介质,埋深程度不同的同一含水层,其地下水的运动状态也各有不同。对于岩石中所要形成和分布的空隙,最基础的因素是地质构造,主要表现在:岩石裂隙的发育和裂隙水的储存都是受地质构造和地层岩性所影响,其中,基岩裂隙水的运动规律也被地质构造所牵制。由于地下水面的不同,即便是在基岩相同的裂缝水中,也是有时而出现无压水,时而出现承压水的情况[5]。层流、管道流、紊流、明渠流水是在岩石裂隙、溶洞的特殊形态作用下形成水运动的不同状态,因此,基岩裂隙水的不均一性以及强烈的方向感,是导致裂隙岩体的透水复杂多样、不具有规律性的根本原因。

6结论

在深埋地下隧道的工程中,比较突出的几大地质难题包括高地应力及岩爆问题、高压涌水突水问题、高地温问题等。此外,还有像地震震害、瓦斯有害气体爆炸以及涌水突泥、围岩塌方、岩溶塌陷、泥屑流等。于是,在这个复杂的、系统的深埋隧道工程中,关于灾害地质的研究,对隧道工程能否顺利开展是关键的一步,在隧道工程施工前应按照隧道工程的各方面具体情况,采取有效、有针对性的防御措施。

参考文献:

[1]重庆交通科研设计院.公路隧道设计规范:JTGD70—2004[S].北京:人民交通出版社,2004.

[2]上海市隧道工程轨道交通设计研究院,清华大学.隧道工程防水技术规范:CECS370—2014[S].北京:中国计划出版社,2014

[3]孙赤.锦屏二级深埋隧道大理岩段突水破坏机理研究[D].成都:成都理工大学,2014.

[4]王洪新.土压平衡盾构刀盘开口率选型及其对地层适应性研究[J].土木工程学报,2010(3):88-92.

[5]武力,屈福政,孙伟,等.基于离散元的土压平衡盾构密封舱压力分析[J].岩土工程学报,2010,32(1):18-23.

桥梁与隧道工程论文参考文献

参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!

桥梁与隧道工程论文参考文献一

[1] Measor .,New, The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.

[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.(3):95-101.

[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.

[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.

[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.

[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.

[7] Gunn M J,Yan,R W M. Stress transfer and around a di^)hragm wallpanel [J]. of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.

[8] , , . The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.

[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.

[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.

[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.

[12] Ming-Fang, Chang, ., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.

[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.

[14] Skempton, . Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.

桥梁与隧道工程论文参考文献二

[15] Meyerhof,GG,Murdock, . An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.

[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.

[17] . , Concrete pressures on formwork. CIRIA association. Report 108,1985.

[18] Lings,., Ng, , . The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Civ. Engrs Geotech. Engng, 1994,107:163-172.

[19] Symons, , Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.

[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.

[21] Leussink, K And Wenz, ., 1969,Storage Yard Foundatio on Soft Coheesive , Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.

[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.

[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.

[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.

[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.

[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.

[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.

[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.

隧道工程施工技术要点

无论是在学校还是在社会中,许多人都写过论文吧,论文的类型很多,包括学年论文、毕业论文、学位论文、科技论文、成果论文等。相信写论文是一个让许多人都头痛的问题,以下是我整理的隧道工程施工技术要点,仅供参考,希望能够帮助到大家。

【摘要】 伴随着我国隧道工程建设的不断增多,更多的人开始着重对于隧道工程施工技术进行研究。本文着重对于隧道施工前管理体制的构建,隧道施工过程中技术要点的分析进行归纳总结,希望可以为今后我国隧道施工建筑提供理论参考。

【关键词】 隧道工程;技术;建设

1、前言

在当今社会中,伴随着隧道工程施工的不断开展,更多的人开始意识到采用科学技术的手段投入到隧道工作中去,这无论是对于整个隧道工程项目的发展,还是对于第三方或者周边环境的经济收益都存在有非常积极地现实意义。隧道工程的多元化综合性的工作,隐蔽程度非常大,高危险性质的工作,循环程度非常的强等等。因此关于隧道工程技术要点的分析研究也带来一定的难点,同时也在某种程度上制约我国隧道工程项目的成功与否。在整个项目工程中,怎样做好项目工程的施工工程对于整个项目的发展非常重要。而在项目工程的管理中,关于技术层面的管理可以说是尤为重要,怎样将技术要点落实到实处,也就等于隧道工程的顺利施工就有了一个良好的基础,进而确保预期施工目标的顺利实现。因此可以发现,完善隧道工程施工的技术管理工作,这对于整个隧道工程项目的长远发展存在有非常积极地现实意义。

2、构建并且完善隧道施工技术管理体制

结合过去研究可以发现,隧道工程施工存在有多方面的特征,其主要集中在以下这么几个方面:

(1)作业空间相对比较局限;

(2)施工呈现出多元化综合性的工作;

(3)作业的循环程度非常的强;

(4)作业的隐蔽程度非常大;

(5)隧道施工可以说是高危险性质的工作;

(6)施工的环境非常的差;

(7)隧道施工是非静态的,工作的力学状态呈现变化的趋势,围岩的物理力学性质也随之而变化。针对上述隧道工程施工的特征,其本身也决定了隧道施工的特殊性质。因此可以发现,我们在对于隧道开采之前,要及时的分析隧道工程的当前状况,构建以总工程师为首的自上而下技术业务统一领导和分级管理系统;与此同时,还应当按照隧道工程的整体特征、规模大小设立各级技术管理职能机构和职能人员,进而安置各级职能机构的职责范围,并且构建隧道施工安全、质量分级管理责任制,健全技术管理职能机构管理制度及其内容。

3、隧道工程施工过程中的技术要点

针对我国当前隧道工程施工的现状,我们在本章节提出若干技术要点,主要集中在以下这几个方面:

隧道洞口工程施工技术管理要点。

隧道洞口工程的施工在整个项目过程中应当注意以下这么几个环节:

(1)在对于洞口施工设计的层面上,我们应当尽可能的将其和附近的工程施工进行统筹安排,这样的话能够很好的在确保工程质量的基础上,缩短工程完成的时间;与此同时,还应当尽可能的避免寒冷季节和雨季。

(2)在对于隧道的洞口施工之前,我们应当尽可能的保证仰坡以及边坡的稳定性,还应当在第一时间处理危险的石头;与此同时,还应当在整个施工过程中不断地开展监督以及预防工作。

(3)在雨季即将到来之前,我们应当及时做好隧道周边排水系统的修建工程。

(4)最大程度利用现场的环境,比如说在仰坡的坡面做好防护的工作,这样可以很好的保证隧道的洞口位于稳定状态之下。

(5)在隧道开挖的时候我们要今早的进入山洞,这样可以很好的杜绝高边坡的状态;与此同时,还需要适当的减少施工对于山体的损坏,进而杜绝水土流失现象的出现。

隧道的明洞以及洞门的.施工要点。

在整个隧道工程项目中,隧道的洞门以及明洞可以说是非常重要的部分。就这两项施工环节来说,其本身存在有非常严格的技术要点。对于隧道明洞的施工来说,一定要严格的根据施工设计的要求来工作。第一步应该完善底层的加固处理,接着可以适当地采取分层开挖的手段进行施工,同时还应当设定好相应的支护措施。举例来说,可以采用植草、格宾网等形式来确保仰坡的稳定性能。只有基于上述的工作我们才能够开展明洞的施工,然而在对于明洞的侧壁进行施工的时候,我们务必要保证地基的稳定性,这可以说是整个项目安全生产的基础。

隧道开挖施工技术的管理要点。

隧道的开采工作可以说是整个隧道施工项目过程中最为重要的环节,在对于隧道开采之前我们应当采用合理的安全保护措施确保围岩存在有自我承接的能力,而在安全性和稳定性得到保障之后我们才能够进行隧道开挖工作。结合过去研究可以发现,隧道开挖的技术大部分应用的是预裂爆破的技术、光面爆破的技术以及非爆破机械辅助开挖的手段。就隧道开挖的整体角度来说,不同的部位我们应当采用不同的技术来实施。

采用科技手段推动隧道工程技术的管理。

无论是在什么年代,科技始终是第一生产力,采用科技的手段推进我国隧道工程技术生产的工作,这样能够很好的改进项目工程。在实际的隧道工程项目中,可以适当的应用信息技术为隧道工程安全生产提供科学的依据和智能化的方法;与此同时,还可以针对隧道工程领域中的关键性、基础性,以及管理层面上的难题,进而采取科技的手段予以解决。除此之外,我国应当加快推进安全生产新材料、新技术,及时淘汰危及安全的落后工艺、设备和技术,进而增强我国隧道工程技术中的科技成分。

参考文献

1、刘金山.隧道工程施工技术管理要点[J],铁道建筑技术,2012-13(6):23—29。

摘要 :随着我国综合国力的提升,各个领域均得到了良好的发展,尤其在不断推进城市化、城镇化发展后,人们的生活水平有了更大的飞跃,这与我国基础建设得以优化方面也有着密切关系,道路建设即为其中一种。随着道路建设范围的不断加大,桥梁隧道工程数量也有所增加,此类工程与普通道路桥梁工程有所不同,施工难点也更多。本文通过查阅相关资料,简要介绍了道路桥梁隧道工程施工中的难点,并提出了行之有效的改进措施。

关键词 :道路桥梁;隧道工程;施工难点;改进措施

1、前言

建筑行业是我国几大行业之一,其发展状况直接关系到我国的经济发展、社会发展,而道路桥梁工程便是其主要内容之一,在工程建设不断发展的情况下,我国出现了越来越多的隧道工程,这主要是因为城市空间变得越来越少,交通压力却越来越大,为了改善此问题我国将施工范围逐渐扩大到地下工程,但隧道工程自身具有一定的安全隐患,且施工难度较大,如何保证安全施工、施工质量也成为了建设难点。

2、道路桥梁隧道工程施工中的难点

铺装层脱落

通过对隧道工程的研究可以发现,很多工程中均会出现不同程度的铺装层脱落问题,而一旦出现此问题势必会影响到工程质量,并且要对其进行补救,如此一来会耗费更多的人力、物力和资金。导致发生此问题的原因如下:

一,施工中没有对此方面提起重视,忽略了施工细节,施工人员往往更加注重工程外观质量;

二,在施工过程中没有严格按照施工规范开展工作,甚至有简化施工工序、偷工减料的情况出现,从而引起的松散、裂缝、脱落问题较为普遍。

钢筋生锈

隧道工程中钢筋的使用量是非常大的,对钢筋的性能也有一定要求,然而实际工程中钢筋锈蚀现象长期未得到改善,导致钢筋在后续使用中的性能有所下降,从而影响到整个工程质量,这主要是因为施工单位已经施工人员缺乏保护钢筋的意识和行为,如在对钢筋进行涂层的过程中操作不规范,或是将未经过涂层的钢筋投入使用中,使得钢筋容易受到外界腐蚀物质的影响;而有些施工企业事先对钢筋进行了涂层,但在运输以及储藏环节中没能好好保护钢筋,使得其受到磕碰、撞击,由此也会导致钢筋涂层脱落,严重时会影响到钢筋功能结构。

混凝土裂缝

混凝土一直是建筑工程中的重要原料,而此方面容易出现的问题则是裂缝,原因在于:

一,混凝土原料质量不佳,导致在应用中出现问题;

二,施工人员在进行混凝土制作的过程中方式有误,导致混凝土强度与工程要求不相符;

三,对混凝土进行浇筑时没能够很好的控制浇筑时间;

四,浇筑完成后未对混凝土进行管护,使得其很多部分被暴露在外面,或是没有及时对其进行补水、降温,从而导致内外温差过大,从而产生裂缝。

防排水问题

防排水施工具有一定的专业性和综合性,需要根据实际工程情况来开展工作,尤其是材料的选择,目前来看,我国很多防排水系统中应用较为普遍的材料是高分子防水放卷材,选定材料后将其顺着隧道壁环、纵、横三个方向来铺设排水管,如此一来就可以达到将渗水引流到纵向排水管内再集中排除的目的。然而施工环境的复杂性、材料自身质量问题以及其他因素的影响,导致防排水施工质量并未尽如人意。

3、道路桥梁隧道工程施工的改进措施

做好塌方预防工作

鉴于隧道工程环境的特殊性,使得在施工中也有可能导致塌方事故,而若要避免或减少此种情况发生,则要做好前期工作,如将施工路段的地质情况充分掌握,并进行分析,提前做好水文预报工作;在稳定性差的岩层施工时,要事先做好防护支架,一旦发生异常应立即将工人撤出;另外,隧道工程中往往需要进行爆破,此种情况更容易发生安全问题甚至是塌方,应严格控制药量,并减少对周围岩体的扰动。

做好钢筋生锈预防工作

钢筋方面则是应做好涂层工作,在正式进行涂层之前,相关人员应对钢筋进行清洁,避免有杂物存在于钢筋表面,并将涂料准备停当,涂层时应严格按照施工规范进行,涂层后做好后期养护,在对钢筋进行运输和储存时也要做好防护措施,避免在此阶段使钢筋涂层凋落。

做好裂缝预防工作

权衡利弊后对于裂缝问题最佳的解决方式是对其进行预防,因为即使在发生裂缝后对其进行补救,也很难使其恢复到正常功能状态,且耗时耗力,具体的预防措施如下:

一,在采购原材料、原材料进入现场的过程中做好材料质量管控工作,一旦发现不符合应用规范的应立即处理;

二,注重浇筑环节和后期养护工作,如在浇筑时应根据工程要求、混凝土情况来合理调整浇筑时间;

三,振捣时应实现均均振捣,且要适当加大振捣强度;

四,控制混凝土的内外温度差。

做好隧道工程给排水工作

此方面工作往往可以从如下几个方面着手:

一,控制原材料质量。目前市场上拥有很多符合施工要求的管子,但并不是所有种类的管子均适合隧道工程,且质量好坏不一,为了避免因原材料质量而引发相关问题,有条件的施工团队应尽量选择品牌商家进行合作,或是优先选择抗施工破坏性能强、耐老化性能好的材料;

二,优化安装工艺。我国的安装艺术近年来也有所提升,而在此方面的安装方式通常为焊接、粘连两种,此两种方式可以有效减少裂缝和空隙,在安装时要保证接头强度需大于同质材料,避免气泡的出现。

4、总结

综上所述,研究道路桥梁隧道工程施工中难点及改进方面的内容具有十分重要的意义,因为它直接关系到道路桥梁隧道工程的质量,社会发展、经济发展等多个方面。如何更好地提升施工质量也成为了关键问题,近年来我国在此方面不断加大资金、技术以及人才方面的支持,且小有成就,但随着工程复杂程度的不断加大,也使得工程施工中出现了新的问题和难点,因此相关机构和人员应加强此方面的研究。

参考文献:

1、赖学辉、浅谈公路工程桥梁隧道施工安全评估监控技术[J]、通讯世界,2014(24):228-229

2、赵志芹、预应力在道路桥梁施工中出现的问题及改进措施[J]、科技创新导报,2015(18):80

3、李波、道路与桥梁过渡段的施工质量控制策略[J]、科技展望,2016(1):40

4、冯若谦、小议隧道施工工程技术管理工作的重要性[J]、科技与企业,2014:09:63

隧道施工论文题目

在交通建设中,隧道占据着十分重要的地位。下面是我整理的关于隧道施工技术论文,希望你能从中得到感悟!

隧道施工技术

摘要: 在交通建设中,隧道占据着十分重要的地位。隧道施工是一件十分复杂的工程,掌握好隧道施工技术,就能够很好的把握住隧道施工的质量,这对于交通工程的安全及质量来说意义重大。

Abstract: In traffic construction, tunnel occupies a very important position. Tunnel construction is a very complex project, master well the quality of tunnel construction technology can have a good grasp of the tunnel construction, which has great significance for the safety and quality of traffic construction.

关键词: 隧道施工;问题;施工;技术;方法

Key words: tunnel construction;problems;construction;technology;method

中图分类号: 文献标识码:A 文章编号:1006-4311(2014)14-0098-02

0 引言

随着公路隧道建筑规模的逐渐扩大,两车隧道已经远远不能满足日渐增长的行车需要,三车隧道在实践中得到大规模的运用。但是隧道规模越大技术也相应复杂,因此,与过去一般的公路隧道相比,在设计、施工以及运营管理方面均有质的不同,这就给公路隧道建设者带来挑战。本文就公路隧道施工技术结合自身工作经验进行了探析。

1 我国隧道工程常用施工技术及存在的问题

我国目前主要的施工技术有:深海底抗压建设技术;深层钻爆施工技术;超浅埋、浅埋暗造技术;辅助工程建造技术;盾构法建造技术;开敞式新型挖掘技术;保护环境施工技术;深管道埋藏技术等许多其它新技术。

在施工修建的过程中存在的问题也很多,就目前隧道工程发展而言,其主要问题有:①对土质结构了解不深,致使确定施工方案存有不合理之处,造成出现豆腐渣工程现状;②高原冷冻铁路的质量难以保证,耐用性能较弱;③海底隧道抗压效果达不到实际要求,常出现变形问题;④新技术开发速度较慢,满足不了社会建设的需求,亟待提高;⑤环保隧道技术做的不够到位,造成环境被破坏的现象时有发生;⑥隧道工程建设系统缺乏统一的施工标准要求,常出现施工不科学问题。

2 施工准备期的技术准备

施工环境的勘测 ①我们根据地质钻探资料的审查对围岩进行分类,不难看出在对地质工程特点进行分析的时候,如果对岩层走向、褶曲、断层以及地下水和特殊土等分析有误,对施工就会造成十分严重的影响。②有针对性的对施工现场进行核查,核查的方面主要就是包括:地质、供水、气象、排水、原材料、动力供应、运输条件、弃渣、场地等。对于风化堆积较为严重的洞口及浅埋段等,我们要有健全的方案进行治理或补偿。

施工材料设备和方案的准备 ①要想工地实验室期限达到质监站临时资质审批要求,就需要我们有健全的试验设备、技术人员以及完善的管理制度。当承包商与业主签订合同后,监理工程师就可以根据合同规定的时间,要求承包商按照合同承诺进行各项筹备工作了。②开工前监理工程对两端反外控制点近反复检查。③承包商及时按合同规定的日期上报总体性计划和具体实施计划,这样才能保证监理工程师对工程进行整体调查、分析,然后根据出现的问题与承包商进行讨论、澄清、修改。

3 施工方法

隧道施工方法主要有:全断面法、台阶法、台阶分部法、上(下)导坑法、单侧壁导坑法、双侧壁导坑法等六种。

目前,我国隧道施工主要是以新奥法为主的,新奥法施工的精髓就是将围岩作为支护的一部分,共同承受上覆荷载的压力。利用新奥法进行隧道施工,无论在进度上还是质量上以及工程费用上都会存在明显的优越性。然而,随着设计的支护形式和施工工艺存在的差异,在施工过程中要想根据围岩性质及地质变化适时对施工工艺以及支护形式进行调整。我们在进行大跨度隧道施工的时候,主要选择的方法就是:上半断面台阶法,中隔壁法和双侧臂导坑法(眼镜法)等。

4 隧道施工的主要技术分析

软弱破碎围岩段施工技术 针对软弱的围岩可能发生的大变形,采用增大预留变形量和喷射混凝土、锚杆、钢筋网和可缩性的U型钢拱架复合式衬砌手段,采用分部开挖的方法,初期支护及时封闭,喷射混凝土可以分2~3次施工,然后加强监控量测,利用反馈的信息进行施工指导。通过软弱破碎带段富水段时,先治水,采用排堵结合等治理措施。开挖过程中配备有经验的地质工程师24小时轮流值班,及时监控地质变化情况,指导现场施工。

加强监控量测,当初期支护变形异常且无收敛趋势的时候,就是需要我们调整支护参数,必要时可以实施二次衬砌。因此,二次衬砌就是为了增设钢筋和提高混凝土强度的一种措施。

隧道防渗漏、防坍塌技术 ①防渗漏技术。隧道的二次衬砌主要是提高混凝土的抗渗性能,也是避免膨胀的一道工序,主要作用就是防止复合防水板局部因为破裂等原因造成的渗水。因此,我们要根据水量的增加情况,对盲沟布设进行设计,以更佳有利于排水。在进行防水板施工的时候,我们除了要严格检查焊缝焊接情况,还要确保施工缝、变形缝等不渗不漏。②防坍塌技术措施。采用减震爆破,尽量减少对围岩的扰动。开挖成型后及时施作喷砼等初期支护,使围岩尽早达到稳定状态。对围岩自稳能力较差地段,采用超前支护或超前加固前方围岩,坚持先护顶后开挖的原则组织施工。当初期支护变形出现异常现象且无收敛趋势时,采取初期支护加强措施,并提前施做二次衬砌。在二次衬砌中,采取增设钢筋和提高混凝土强度等措施。根据地质勘察资料,岩层与隧道轴线夹角较小,为此,采取减小循环进尺,加强超前支护,加固围岩的措施进行预防。在围岩含水地段先治水:当有渗水流时设置橡胶带盲沟引排:渗水面积较大时橡胶带盲沟可并排设置。当有集中股水流时设置弹簧盲沟引排,将水压力对初期支护的影响降至最小。为了加强对施工过程的控制:开挖过程中配备有经验的地质工程师24小时轮流值班,及时监控地质变化情况,指导现场施工。软弱不稳定围岩地段,主要领导轮流值班,强管理,严要求,及时处理紧急问题。

防排水施工技术 ①施工缝、变形缝防水。施工缝主要是隧道衬砌混凝土在施工时候所产生的冷接造成的,也是防水的薄弱环节,是整个隧道中最容易发生渗漏的地方。因此,我们在对隧道进行衬砌施工处理的时候,要避免因为处理不好而造成隧道的正常使用和行车安全,严重的还会降低结构的强度和耐久性。为了防止衬砌不均匀引起的裂损,我们就需要对沉降缝进行设置,避免因为温度的剧烈变化而导致混凝土收缩引起衬砌开裂。②防水混凝土。隧道二次衬砌混凝土既是外力的承载结构,也是最后一道防水线。而防水混凝土大多数都是通过规定的级进行配比,并掺入少量外加剂,通过调整配合比配置成具有一定抗渗能力的防水混凝土。我国的铁路隧道工程技术指南要求的二次混凝土的抗渗等级不得低于P8。

隧道二衬施工技术 ①钢筋加工及安装。钢筋采用加工专用设备进行加工,主要采用的就是单面焊接形式对钢筋接头进行焊接,焊接的长度一般不得低于10d。钢筋焊接主要就是保证焊缝饱满度,并凿除焊渣。采用自制台车进行安装,安装时应根据设计尺寸及保护层进行施工。②灌注砼。台车就位后,可以采用松木板将端头封牢。砼输送泵管道通过台车上部的天窗接入模内,同时砼输送车将砼倒入输送泵内,由输送泵将砼通过管道压入模内。

5 结束语

在进行隧道施工时,要在安全、有序、优质、高效的指导思想下,努力控制隧道施工质量达到最优化。不断的更新隧道的施工技术,针对各个控制点,有针对性的采取合适的施工技术,确保隧道施工的质量。

参考文献:

[1]陈小雄主编.隧道施工技术[M].北京:人民交通出版社, 2011,6.

[2]王浩楠,隧道施工技术质量控制概述[J].公路施工与管理,2012.

[3]冯旭.雪峰山特长隧道施工管理技术[J].科技创新导报,2009.

点击下页还有更多>>>关于隧道施工技术论文

国家铁路建设近些年发展的十分迅猛,动车、高铁的快速建设、运营,对国家的经济建设和人们的生活质量的提高影响巨大。关于城市轨道交通的论文题目有哪些呢?下面我给大家带来城市轨道交通的论文题目参考_铁道交通的论文如何选题,希望能帮助到大家!

城市轨道交通论文题目

1、公路建设项目后评价理论研究

2、基于集成神经网络的城市道路交通流量融合预测研究

3、综合交通运输系统理论分析

4、城市道路交通状态判别及拥挤扩散范围估计 方法 研究

5、基于CIC的轨道交通建设工程集成管理研究

6、城市轨道交通工程施工方风险认知研究

7、基于出行特征的交通工程设计研究

8、重大交通工程项目经济领域社会稳定风险评估方法研究

9、地下轨道交通工程抗震设防要求确定方法研究

10、基于多维矩阵WBS的城市轨道交通项目集成管理研究

11、轨道交通工程绿色施工与清洁生产研究

12、宁波轨道交通工程结构混凝土耐久性质量控制管理研究

13、天津地下交通工程混凝土墙耐久性研究

14、国内轨道交通驾驶室人机工程设计研究

15、基层质监机构的交通工程质量监督机制研究

16、交通工程施工安全防治和监管体系研究

17、珠机城际轨道交通工程线路选线规划设计研究

18、城市轨道交通工程建设项目招标采购管理研究

19、面向交通工程造价管理的服务集成与系统设计

20、重庆轨道交通工程测量管理信息系统开发与实施

21、连续长大下坡路段避险车道设置原则研究

22、在生态脆弱区交通工程建设的生态影响与生态恢复研究

23、交通仿真技术在道路交通工程中的应用研究

24、武汉城市轨道交通工程施工技术研究

25、交通工程生态环境影响评价的景观生态学方法研究

26、城市轨道交通安全保障系统设计

27、我国大城市交通拥挤对策及关键技术研究

28、公路可行性研究中的交通分析研究

29、大型市政工程施工期交通组织研究

30、基于GIS的城轨交通工程信息管理系统研究

31、重庆交通工程监理咨询公司发展战略研究

32、重庆交通工程监理咨询公司发展战略研究

33、城市轨道交通工程建设期间地面交通管理与组织方法研究

34、轨道交通工程日常安全管理系统设计与开发

35、国道G4改扩建工程施工交通组织方案优化与仿真研究

36、城市轨道交通工程项目造价控制研究

37、城市轨道交通工程建设期安全事故分析与研究

38、深圳市交通工程质量监督研究

39、交通工程技术人员职业压力的研究及其应对策略

40、轨道交通配套通信工程项目进度管理研究

41、天津市轨道交通工程风险管理研究

42、轨道交通工程主控模式下变电所综合监控的应用研究

43、甘肃圆峰交通工程有限公司供应商管理研究

44、城市交通智能感知与传感器 网络技术 研究

45、轨道交通工程资料管理系统的实现及其文本信息的数据挖掘研究

46、中铁二局城市轨道交通工程公司发展战略研究

47、交通工程质量监督管理信息系统的设计与实现

48、高速公路交通工程设施系统分析及评价研究

49、道路条件对公路交通安全的影响研究

50、基于AHP层次分析法的轨道交通工程全过程造价控制研究

铁道交通运营管理 毕业 论文题目

1、市域轨道交通规划设计关键指标和主要运输组织模式研究

2、蒙华铁路运输需求及运营管理模式研究

3、基于AFC和列车时刻表的城轨乘客时空扩展出行路径匹配

4、城轨市郊线快慢车停站方案优化研究

5、工程局铁路运输公司经济效益评价研究

6、多运营主体共存下铁路调度指挥模式研究

7、城轨实验室沙盘信号控制系统设计

8、基于节点理论的铁路冷链集散中心运作研究

9、ApacheShiro在铁路Wi-Fi运营管理系统中的应用与研究

10、京沪高速铁路GIS平台研究与实现

11、城市轨道交通运营管理综合评价模型研究

12、高等职业 教育 课程体系的构建研究

13、地铁停运紧急情况下公共交通接驳问题研究

14、城市轨道交通车辆段运营安全管理需求分析与系统开发

15、城市轨道交通站点接驳体系时空效率研究

16、网络化运营条件下城轨列车车底运用优化研究

17、我国高速铁路可持续的投融资模式研究

18、烟大铁路轮渡系统集成技术研究

19、城镇群城际轨道交通线网规划理论与应用研究

20、高速铁路行车安全机理及相关应用问题研究

21、铁路安全检查监测保障体系及其应用研究

22、智能铁路体系结构建模与分析技术的研究

23、基于利益相关者理论的综合交通枢纽价值规划研究

24、基于绿色换乘的高铁枢纽交通接驳规划理论研究

25、车辆动荷载作用下桥梁墩柱主动托换关键技术研究及应用

26、城市轨道交通网络运营安全风险评估理论与方法研究

27、基于时空视角的轨道交通与城市空间耦合发展研究

28、城市轨道交通网络列车运行计划一体化编制理论与方法研究

29、铁路隧道下穿既有路基沉降规律及控制标准研究

30、基于换乘的城市轨道交通网络流量分配建模及其实证研究

31、城市一体化客运轨道交通运输体系构建研究

32、铁路运营费用计算理论与方法研究

33、内陆中转型铁路枢纽集装箱海铁联合运输组织理论研究

34、基于旅客出行行为分析的道路客运班线优化研究

35、集疏运系统背景下运煤铁路基础设施规划与评价研究

36、城市轨道交通系统经济效益分析

37、交通枢纽城市高铁引线项目关键技术研究

38、城市轨道交通系统综合效益研究

39、高速铁路产业发展政策研究

40、地铁公共空间设计管理研究

41、日本第三部门发展的合理性问题研究

42、湖南城市轨道交通产业投资的产业关联效应研究

43、网络化运营下城市轨道交通列车车底运用优化方法研究

44、城市轨道交通乘客信息系统关键技术研究

45、编组站综合自动化系统控制技术及其扩展应用的研究

46、PPP/BOT项目的资本结构选择研究

47、高速铁路接收及运营管理相关问题研究

48、铁路运营经济效益指标及其关联分析研究

49、高速铁路列车开行方案与列车运行图协调优化理论与方法研究

50、我国城市轨道交通建设融资模式研究

铁道信号专业毕业论文题目

1、CTCS应答器信号与报文检测仪-控制主板软硬件设计

2、基于ACP方法的城市轨道交通枢纽应急疏散若干问题研究

3、全电子高压脉冲轨道电路接收器的硬件研究与设计

4、实时断轨检测系统中信号采集与通信子系统研究

5、基于模型的轨旁仿真子系统验证及代码自动生成

6、基于全相位FFT的铁道信号频率检测算法研究

7、基于机器视觉的嵌入式道岔缺口检测系统应用

8、铁路信号产品的电磁兼容分析与研究

9、铁路高职院校校内实训基地建设研究

10、铁道信号电子沙盘系统整体规划及设计

11、基于Web的高职院校考试系统的设计与实现

12、铁道信号沙盘模拟显示系统研究

13、联锁道岔电子控制模块的研制

14、基于ARM的故障监测诊断系统设计(前端采集和通信系统)

15、客运专线列控车载设备维修技术及标准化研究

16、驼峰三部位减速器出口速度计算方法研究

17、CTCS-2级列控系统应答器动态检测的研究

18、石家庄铁路运输学校招生信息管理系统的设计与实现

19、铁道信号基础设备智能网络监测器设计

20、基于光纤传感的铁道信号监测系统软件设计

21、铁道信号基础设备在线监测方法研究

22、有轨电车信号系统轨旁控制器三相交流转辙机控制模块的研究

23、基于故障树的京广高速铁路信号系统问题分析及对策

24、站内轨道电路分路不良计轴检查设备设计与实现

25、铁路综合视频监控系统的技术研究与工程建设

26、客运专线信号控制系统设计方案

27、铁路信号仿真实验室的硬件系统设计及其信号机程序测试

28、基于C语言的离线电弧电磁干扰检测系统数据采集及底层控制的实现研究

29、铁路综合演练系统的开发与实现

30、大功率LED铁路信号灯光源的研究

31、牵引供电系统不平衡牵引回流研究

32、CBTC系统中区域控制器和外部联锁功能接口的设计

33、城轨控制实验室仿真平台硬件接口研究

34、ATP安全错误检测码与运算方法的研究与设计

35、LED显示屏控制系统的设计及在铁路信号中的应用

36、客运专线列控系统临时限速服务器基于3-DES算法安全通信的研究与实现

37、基于动态故障树和蒙特卡洛仿真的列控系统风险分析研究

38、物联网环境下铁路控制安全传输研究与设计

39、轨道交通信号事故再现与分析平台研究与设计

40、铁路强电磁干扰对信号系统的影响

41、基于LTE的列车无线定位方法研究

42、列车定位 系统安全 性研究

43、基于CBTC系统的联锁逻辑研究

44、无线闭塞中心仿真软件设计与实现

45、职业技能教育的研究与实践

46、光纤铁路信号微机监测系统数据前端设计

47、LED大屏幕在铁路行车监控系统的应用研究

48、基于微机监测的故障信号研究与应用

49、语域视角下的人物介绍英译

50、基于嵌入式系统的高压不对称脉冲轨道信号发生器设计

城市轨道交通的论文题目参考相关 文章 :

★ 城市轨道交通运营管理论文范文(2)

★ 城市轨道交通运营管理论文范文

★ 关于城市轨道交通运营管理论文

★ 有关城市轨道交通运营管理论文

★ 关于轨道交通运营管理的论文(2)

★ 轨道交通运营管理论文范文(2)

★ 城市轨道交通运营发展管理论文

★ 城市轨道交通运营管理研究论文

★ 轨道交通管理论文(2)

★ 轨道交通项目管理论文(2)

相关最新论题:1.粘土陶粒混凝土空心砌块墙体施工工法 [ 工程建筑 ]摘 要:作为软质墙体材料之一的陶粒砌块,以其质轻、隔音效果好而大量应用于多层和高层建筑框架结构填充墙体中,既减轻了结构荷载,又相对增加了使用空间,使房间更为灵活...2.重庆大剧院舞台桁架高空滑移安装施工技术探讨 [ 工程建筑 ] &n...×600MW超超临界机组汽轮发电机预埋螺栓与锚固板施工技术 [ 电子机械 ]摘 要:在大唐华银某电厂汽轮发电机的施工中,为螺栓和锚固板的定位和加固设计了可调样板钢架和支承架,并在施工过程中施行,从而确保了汽轮发电机的施工质量。 关键...4.隧道下穿既有铁路管幕施工技术 [ 工程建筑 ]摘 要:110m长的管幕下穿铁路施工在国内尚属首次,如何控制长管幕施工精度及控制地表沉降是施工中的两个关键性技术难题,结合厦门市高崎互通连接线下穿鹰厦铁路隧道长...5.公路桥梁钢箱梁顶推施工技术探讨 [ 工程建筑 ]摘 要:本文结合工程实例,分析介绍了公路桥梁钢箱梁顶推技术方案,从顶推施工临时设施、梁段顶推、施工监测三方面对顶推施工技术及质量控制措施进行了详细阐述。 关...6.高层建筑基坑支护工程结构设计与施工 [ 工程建筑 ]摘 要:本文结合工程实例和工程地质情况,详细介绍了建筑基坑工程支护施工方案的比选和基坑支护工程设计,并在施工技术方案分析的基础上,对其SMW工法连续墙及整个基坑...7.沙漠公路风积沙施工质量控制 [ 工程建筑 ]摘 要:本文根据沙漠公路所处的地理环境,本着就地取材,降低工程造价的原则,提出了沙漠公路利用风积沙修筑路基的施工质量控制方法,为沙漠公路的修筑提供了质量检测的依...8.大型建设集团应用施工总承包管理模式的探索 [ 管理其它相关 ]摘要:文章在介绍大型项目上所采用的国际通行的MC模式及其对MC单位的要求基础上,对我国大型建设集团应用MC模式时需要进一步完善的内容进行了分析。 关键词...9.路桥工程施工项目成本控制措施分析探讨 [ 工程建筑 ]摘要:本文结合笔者多年建筑项目工程造价控制与管理实践经验,详细分析探讨了建筑工程项目成本控制的内容、特点及主要控制措施,并进行了具体总结。 关键词:建筑工程...10.高层建筑高空反弧悬挑结构施工技术探讨 [ 工程建筑 ]摘要:本文结合工程实例,介绍分析了高层建筑高空及弧悬挑结构施工技术难点,对其模板支撑体系的造型及结构计算进行了详细阐述,并从模板设计安装混凝土浇捣等方面进行了深...仅供参考,请自借鉴希望对您有帮助补充:房建方面可以就建设成本等等探讨,相对材料也较好找。

隧道工程施工论文答辩

一般会提问几个论文中涉及的技术难点和创新点,回答要有新颖独到之处。评委提问主要看你对论文是否清楚,以此判断是不是你自己写的。

在交通建设中,隧道占据着十分重要的地位。下面是我整理的关于隧道施工技术论文,希望你能从中得到感悟!

隧道施工技术

摘要: 在交通建设中,隧道占据着十分重要的地位。隧道施工是一件十分复杂的工程,掌握好隧道施工技术,就能够很好的把握住隧道施工的质量,这对于交通工程的安全及质量来说意义重大。

Abstract: In traffic construction, tunnel occupies a very important position. Tunnel construction is a very complex project, master well the quality of tunnel construction technology can have a good grasp of the tunnel construction, which has great significance for the safety and quality of traffic construction.

关键词: 隧道施工;问题;施工;技术;方法

Key words: tunnel construction;problems;construction;technology;method

中图分类号: 文献标识码:A 文章编号:1006-4311(2014)14-0098-02

0 引言

随着公路隧道建筑规模的逐渐扩大,两车隧道已经远远不能满足日渐增长的行车需要,三车隧道在实践中得到大规模的运用。但是隧道规模越大技术也相应复杂,因此,与过去一般的公路隧道相比,在设计、施工以及运营管理方面均有质的不同,这就给公路隧道建设者带来挑战。本文就公路隧道施工技术结合自身工作经验进行了探析。

1 我国隧道工程常用施工技术及存在的问题

我国目前主要的施工技术有:深海底抗压建设技术;深层钻爆施工技术;超浅埋、浅埋暗造技术;辅助工程建造技术;盾构法建造技术;开敞式新型挖掘技术;保护环境施工技术;深管道埋藏技术等许多其它新技术。

在施工修建的过程中存在的问题也很多,就目前隧道工程发展而言,其主要问题有:①对土质结构了解不深,致使确定施工方案存有不合理之处,造成出现豆腐渣工程现状;②高原冷冻铁路的质量难以保证,耐用性能较弱;③海底隧道抗压效果达不到实际要求,常出现变形问题;④新技术开发速度较慢,满足不了社会建设的需求,亟待提高;⑤环保隧道技术做的不够到位,造成环境被破坏的现象时有发生;⑥隧道工程建设系统缺乏统一的施工标准要求,常出现施工不科学问题。

2 施工准备期的技术准备

施工环境的勘测 ①我们根据地质钻探资料的审查对围岩进行分类,不难看出在对地质工程特点进行分析的时候,如果对岩层走向、褶曲、断层以及地下水和特殊土等分析有误,对施工就会造成十分严重的影响。②有针对性的对施工现场进行核查,核查的方面主要就是包括:地质、供水、气象、排水、原材料、动力供应、运输条件、弃渣、场地等。对于风化堆积较为严重的洞口及浅埋段等,我们要有健全的方案进行治理或补偿。

施工材料设备和方案的准备 ①要想工地实验室期限达到质监站临时资质审批要求,就需要我们有健全的试验设备、技术人员以及完善的管理制度。当承包商与业主签订合同后,监理工程师就可以根据合同规定的时间,要求承包商按照合同承诺进行各项筹备工作了。②开工前监理工程对两端反外控制点近反复检查。③承包商及时按合同规定的日期上报总体性计划和具体实施计划,这样才能保证监理工程师对工程进行整体调查、分析,然后根据出现的问题与承包商进行讨论、澄清、修改。

3 施工方法

隧道施工方法主要有:全断面法、台阶法、台阶分部法、上(下)导坑法、单侧壁导坑法、双侧壁导坑法等六种。

目前,我国隧道施工主要是以新奥法为主的,新奥法施工的精髓就是将围岩作为支护的一部分,共同承受上覆荷载的压力。利用新奥法进行隧道施工,无论在进度上还是质量上以及工程费用上都会存在明显的优越性。然而,随着设计的支护形式和施工工艺存在的差异,在施工过程中要想根据围岩性质及地质变化适时对施工工艺以及支护形式进行调整。我们在进行大跨度隧道施工的时候,主要选择的方法就是:上半断面台阶法,中隔壁法和双侧臂导坑法(眼镜法)等。

4 隧道施工的主要技术分析

软弱破碎围岩段施工技术 针对软弱的围岩可能发生的大变形,采用增大预留变形量和喷射混凝土、锚杆、钢筋网和可缩性的U型钢拱架复合式衬砌手段,采用分部开挖的方法,初期支护及时封闭,喷射混凝土可以分2~3次施工,然后加强监控量测,利用反馈的信息进行施工指导。通过软弱破碎带段富水段时,先治水,采用排堵结合等治理措施。开挖过程中配备有经验的地质工程师24小时轮流值班,及时监控地质变化情况,指导现场施工。

加强监控量测,当初期支护变形异常且无收敛趋势的时候,就是需要我们调整支护参数,必要时可以实施二次衬砌。因此,二次衬砌就是为了增设钢筋和提高混凝土强度的一种措施。

隧道防渗漏、防坍塌技术 ①防渗漏技术。隧道的二次衬砌主要是提高混凝土的抗渗性能,也是避免膨胀的一道工序,主要作用就是防止复合防水板局部因为破裂等原因造成的渗水。因此,我们要根据水量的增加情况,对盲沟布设进行设计,以更佳有利于排水。在进行防水板施工的时候,我们除了要严格检查焊缝焊接情况,还要确保施工缝、变形缝等不渗不漏。②防坍塌技术措施。采用减震爆破,尽量减少对围岩的扰动。开挖成型后及时施作喷砼等初期支护,使围岩尽早达到稳定状态。对围岩自稳能力较差地段,采用超前支护或超前加固前方围岩,坚持先护顶后开挖的原则组织施工。当初期支护变形出现异常现象且无收敛趋势时,采取初期支护加强措施,并提前施做二次衬砌。在二次衬砌中,采取增设钢筋和提高混凝土强度等措施。根据地质勘察资料,岩层与隧道轴线夹角较小,为此,采取减小循环进尺,加强超前支护,加固围岩的措施进行预防。在围岩含水地段先治水:当有渗水流时设置橡胶带盲沟引排:渗水面积较大时橡胶带盲沟可并排设置。当有集中股水流时设置弹簧盲沟引排,将水压力对初期支护的影响降至最小。为了加强对施工过程的控制:开挖过程中配备有经验的地质工程师24小时轮流值班,及时监控地质变化情况,指导现场施工。软弱不稳定围岩地段,主要领导轮流值班,强管理,严要求,及时处理紧急问题。

防排水施工技术 ①施工缝、变形缝防水。施工缝主要是隧道衬砌混凝土在施工时候所产生的冷接造成的,也是防水的薄弱环节,是整个隧道中最容易发生渗漏的地方。因此,我们在对隧道进行衬砌施工处理的时候,要避免因为处理不好而造成隧道的正常使用和行车安全,严重的还会降低结构的强度和耐久性。为了防止衬砌不均匀引起的裂损,我们就需要对沉降缝进行设置,避免因为温度的剧烈变化而导致混凝土收缩引起衬砌开裂。②防水混凝土。隧道二次衬砌混凝土既是外力的承载结构,也是最后一道防水线。而防水混凝土大多数都是通过规定的级进行配比,并掺入少量外加剂,通过调整配合比配置成具有一定抗渗能力的防水混凝土。我国的铁路隧道工程技术指南要求的二次混凝土的抗渗等级不得低于P8。

隧道二衬施工技术 ①钢筋加工及安装。钢筋采用加工专用设备进行加工,主要采用的就是单面焊接形式对钢筋接头进行焊接,焊接的长度一般不得低于10d。钢筋焊接主要就是保证焊缝饱满度,并凿除焊渣。采用自制台车进行安装,安装时应根据设计尺寸及保护层进行施工。②灌注砼。台车就位后,可以采用松木板将端头封牢。砼输送泵管道通过台车上部的天窗接入模内,同时砼输送车将砼倒入输送泵内,由输送泵将砼通过管道压入模内。

5 结束语

在进行隧道施工时,要在安全、有序、优质、高效的指导思想下,努力控制隧道施工质量达到最优化。不断的更新隧道的施工技术,针对各个控制点,有针对性的采取合适的施工技术,确保隧道施工的质量。

参考文献:

[1]陈小雄主编.隧道施工技术[M].北京:人民交通出版社, 2011,6.

[2]王浩楠,隧道施工技术质量控制概述[J].公路施工与管理,2012.

[3]冯旭.雪峰山特长隧道施工管理技术[J].科技创新导报,2009.

点击下页还有更多>>>关于隧道施工技术论文

工程管理毕业答辩自述稿

转眼间充满意义的大学生活就要结束了,我们毕业前都要进行最后的毕业论文答辩,毕业答辩是一种有准备的检验学生学习成果的形式,如何把毕业答辩做到重点突出呢?下面是我收集整理的工程管理毕业答辩自述稿,欢迎大家借鉴与参考,希望对大家有所帮助。

尊敬的各位评委老师:

大家好!我是××××工程管理班的学生×××。我的论文题目是《信息工程学校实训楼项目管理规划》。我选择研究这个课题的原因是我个人觉得比较该题目很符合我学的这个专业,我平时喜欢也擅长组织性的活动。另外我个人打算也是以后往项目经理这个方向发展。该课题主要运用了工程项目管理和施工组织这两门学科,通过通过毕业设计让我项目管理规划知识有更深的了解,对我以后的职业规划有很大的帮助!

在着手准备论文写作的时候,我针对项目管理规划这个命题,大量阅读相关的各种资料对其概况有了大致了解,缕清思路的基础上确定研究方向,然后与老师商讨,确定论文大致思路和研究方向。然后,为了完成论文,本人收集了大量的文献资料,其中主要来自网上的论文期刊、图书馆的书目、学习教材的理论资料。在徐宏年导师的耐心指导和帮助下,经过阅读主要参考资料,拟定提纲,写开题报告初稿。

下面我先汇报一下毕业设计内容第一章。工程概况该工程是在襄樊学院拟建一栋6层信息实训楼,该楼为框架结构,建筑面积3500m2,建筑高度,建筑类别为三类建筑,耐火等级为二级,建筑抗震设防烈度为6度,建筑安全等级为二级,该项目计划完成工期为270天,计划于××××年××月××日开工。

第二章,施工总部署。对项目部主要组织机构及其职责做了明确划分,在项目工期,质量,施工环境及安全目标上有具体说明,并对项目施工顺序及部署原则作了简要阐述。

第三章,主要分部分项工程施工技术方案。按施工顺序对该工程的测量方案,土方工程,基础及主体钢筋,模板,混凝土工程,装饰装修工程以及屋面工程等工序的要求和施工方案作了比较详细的说明。

第四章,计算了主要分步分项工程工程量,并按各项定额列出工程量计价清单。第五章,第七章分别是在第四章工程量计算的基础上设计出施工进度计划表以及资源需求计划

第六章,质量计划,第八章职业健康安全与环境管理计划,第九章风险管理计划,第十章信息管理计划,第十一章项目沟通管理计划,分别对该工程项目中各项管理制定了具体的管理措施,

第十二章项目收尾管理计划。指出了项目竣工验收所应作的资料和现场准备。

第十三章针对工程项目建设具有庞大、复杂、周期长、相关单位多等特点,工程施工进度无论在主观或客观上都受到诸多因素的制约,对如何采取措施加强对施工单位工程进度控制管理提出一些探索性认识与看法。

第十五章,根据工程量清单统计处该项目工程中主要技术经济指标。在论文的最后,根据毕业设计任务书和工程施工要求,为该工程设计出施工平面图,施工横道图以及双代号时标网络图!

经过本次论文写作,我学到了许多有用的东西,也积累了不少经验,但由于学生能力不足,加之时间和精力有限,在许多内容表述上存在着不当之处,与老师的期望相差甚远,许多问题还有待于进一步思考和探索,借此答辩机会,万分恳切的希望各位老师能够提出宝贵的意见,多指出本篇论文的错误和不足之处,学生将虚心接受,从而进一步深入学习研究,使该论文得到完善和提高。在论文的准备和写作过程中,我阅读了大量的关于项目管理规划的相关书籍和学术期刊,这得益于我们学校图书馆丰富的参考书籍和学术期刊数据库的专业论文本文经过一二稿并最终定稿,在这期间,我的论文指导老师×××老师对我的.论文进行了详细的修改和指正,并给予我许多宝贵的建议和意见。在这里,我对他表示我最真挚的感谢和敬意!

以上就是我的答辩自述,希望各评委老师认真阅读论文并给予评价和指正。谢谢!

尊敬的各位老师:

大家上午好!

我叫XX,来自经济管理学院工程管理专业,本次论文导师是XX老师,我选的毕业论文题目是《XX研究》,下面我先汇报一下选择这篇论文的原因以及论文选题背景、基本写作思路、理论与实践意义。

首先来陈述一下我的写作原因,我毕业签订的工作是一家单位的预算员,然后去年我参加过一个大学生创新性实验课题是有关地方科技部门信息公开化,经过我对相关资料的查阅和一些调查,认为建筑业市场混乱,集成度提升缓慢与行业利润率低下的重要原因之一是建筑工程造价信息化困难,工程造价信息严重不透明。这样的市场环境难以形成优胜劣汰的市场竞争机制,企业间信息化集中度就难以提高,市场就会充满无序恶性竞争,因此我觉得结合我的专业与经验,就选择了《建筑企业工程造价信息化建设问题与对策研究》,一方面希望能通过论文让自己对专业知识以及国外先进理论有所提升,另一方面也希望提出一些自己的见解,为自己的未来做一些铺垫。

其次,我要陈述的是本篇论文的主要论点及结构。本文通过调查相关信息主要论点有:

1、建筑企业内部造价系统集成化程度低;

2、建筑企业之间造价信息协同度不高;

3、建筑企业造价系统的盲目国际化;

4、工程造价管理人员素质不能适应信息化要求。

从企业内部集成角度分析的时候,我总结出三点,各级软件相互独立工作,则无法形成集成体系;由于信息的计算收集统计难度大,就无法实时对系统反馈,也就无法集成系统;由于建筑业与制造业的不同,具体到实物量的数据难度大,集成化有相当难度。我的解决方案基于造价分析框架,构建出四位一体的集成系统。

从企业外部协同度分析,我总结出两点,价格信息数量大变化快,企业间信息不同步,企业间难以协调;供应商与造价方的利益冲突,造成信息准确性和透明度差,间接影响企业间信息协同。我的解决方案是从企业内部与外部两个角度,设计出两套方案来解决企业间信息化协同,同时解决信息透明化公开化的问题。

联系国外先进技术,我发现建筑企业的盲目国际性,总结为两点,通过诺兰模型反应学习技术是无法做到发展阶段的跳跃,如果不借鉴最先进的技术国际化竞争中依然处于劣势;由于只学习国外技术,而不学习信托体制,导致信息化畸形发展。我的解决方案是,学习目前国外最先进BIM4D技术在工程造价信息化的运用,跟上国际步伐;构建美国式的信托机制,促进造价信息化的健康发展。

从人员角度看,素质不高和专业技术与信息技术复合,是目前最大的问题。解决方案是,加大投资对人员的培训,市县人员网上流动管理,和会员服务方式。

在写完这篇论文的时候,自己感觉条理上还不是很严谨,对一些数据的收集还不足。但通过自己的思考,想出的解决方案有一定的意义,需要不断地实践来验证理论的正确性。同时写作期间,所学的知识与论文的结合,让我对专业有了更进一步的了解。

最后,恳请各位老师批评指正,谢谢大家!

会问一些组织设计里面的常识定义,像什么流水节拍、流水步距、单代号、双代号、怎么确定时差等等。基本就这些问题,专科类的估计不会问太难的,3到5个问题一般! 追问: 比如说 某某小区1单元施工组织设计,就是3000-4000平方的一个宿舍楼的施工组织设计,他会问些什么呢, 我是搞水电造价的,但是这边只能报土建,所以请说的具体点,我实在不太明白。毕业设计论文的内容大概是,组织管理体系,施工部署,施工准备,施工方法流程,质量保证,重点部位施工,施工安全及文明施工等几部分,请具体说明,万分感谢。 回答: 你把组织设计这本书读一遍,应该没什么问题了,老师问问题不会很深,因为毕竟是学生。在问你关于这个宿舍楼的问题时,基本都可以用书本的理论结合此设计内容就回答了。你又是学造价的,那么问的应该都是纯理论的东西了,不要害怕!组织管理体系,施工部署,施工准备,施工方法流程,质量保证,重点部位施工,施工安全及文明施工等等,老师不会怎么问的。主要把组织管理体系、施工方法和流程、重点部位施工记熟。