首页

> 学术论文知识库

首页 学术论文知识库 问题

工程施工索赔论文参考文献

发布时间:

工程施工索赔论文参考文献

转眼间大学生活即将结束,大家都知道毕业前要通过最后的毕业论文,毕业论文是一种、有准备的检验大学学习成果的形式,那么优秀的毕业论文是什么样的呢?下面是我精心整理的施工组织设计毕业论文参考文献,欢迎阅读与收藏。

[1]韦诗琦.市政道路施工质量管理问题及对策研究[J].绿色环保建材,2019(07):136.

[2]何康.浅谈施工总承包工程成本控制管理[J].低碳世界,2019(07):325-326.

[3]刘聪,高楠.案例教学在给排水施工组织与管理课程中的应用探析[J].智库时代,2019(33):226-227.

[4]傅巧玲.信息化技术在《建筑施工组织编制与实施》课程教学中的应用与创新[J].居舍,2019(21):47+89.

[5]谢丽萍.建筑工程质量管理中重点问题及解决策略[J].居舍,2019(21):166.

[6]戴松.公路桥梁施工组织设计及其施工管控策略分析[J].价值工程,2019,38(20):27-29.

[7]刘炫炀,刘德湘.施工组织设计在建筑施工管理中的重要性探讨[J].建材与装饰,2019(20):152-153.

[8]赵伟.成倍节拍流水和无节奏流水在建筑施工中的应用[J].居舍,2019(20):82.

[9]王菁,曹广祝,李诗平.珠海市横琴口岸C区桩基工程施工组织设计[J].中国水运(下半月),2019,19(07):232-233.

[10]周建文.高速公路工程造价预算控制措施[J].交通世界,2019(17):151-152.

[11]陈瑞.CDIO理论结合BIM技术在施工组织学教学中的应用探讨[J].科教文汇(上旬刊),2019(07):73-75.

[12]刘军.电解区域桩基施工组织设计研究[J].江西建材,2019(06):155+157.

[13]徐国军.监理工程师在建筑工程质量保险新形势下的作用[J].建筑与预算,2019(06):31-33.

[14]祁波.加强园林绿化工程造价全过程控制的措施分析[J].智能城市,2019(12):91-92.

[15]柴文革,李文利.土木工程专业施工组织设计类毕业设计实践教学探析[J].北京城市学院学报,2019(03):40-44.

[16]黄常青.解析建筑施工组织设计在实际工程中的应用[J].低碳世界,2019,9(06):115-116.

[17]吴宁.施工组织设计对建筑工程经济中造价的影响[J].住宅与房地产,2019(18):23.

[18]蔡旻璐.装配式高层住宅建筑施工组织设计的优化[J].住宅与房地产,2019(18):76-77.

[19]周桂州.市政工程给排水施工管理探讨[J].住宅与房地产,2019(18):163.

[20]张杰.“公路施工组织与概预算”教学改革[J].西部素质教育,2019,5(12):203+205.

[21]董旭.建设单位如何加强EPC项目的管理[J].天然气化工(C1化学与化工),2019,44(03):103-105.

[22]陈飞龙.枢纽互通式立交施工期交通组织设计[J].中国标准化,2019(12):122-123.

[23]沈建平.成都项目混凝土地坪一次成型施工管理和成本管理[J].建材与装饰,2019(17):119-120.

[24]何振堂.分析建筑深基坑工程的施工监理控制[J].建材与装饰,2019(17):142-143.

[25]李让勤.施工阶段工程造价失控的因素分析[J].建材与装饰,2019(17):162-163.

[26]杨勇刚.施工现场临时用电的各种隐患及纠正措施[J].建材与装饰,2019(17):241-242.

[27]李娜.电网建设项目工程结算问题及解决策略[J].建材与装饰,2019(17):236-237.

[28].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(06):768.

[29]刘飞虎,廖勇,赵宇,辜斌,习兰云,陈强.基于BIM的施工组织辅助决策系统的研发及应用[J].土木建筑工程信息技术,2019,11(03):29-32.

[30]杨凯.建筑给排水工程中施工质量管理研究[J].工程与建设,2019,33(03):469-470.

[31]刘飞.探讨现代园林绿化施工与养护管理技术[J].农家参谋,2019(12):143.

[32]王艳华,熊平,庞向锦,崔梦轩,余洪亮.工程总承包项目全过程管理流程解析[J].项目管理技术,2019,17(06):110-114.

[33]徐胜男.施工阶段工程造价影响因素及控制措施[J].项目管理技术,2019,17(06):138-141.

[34]周雪芳.下穿既有铁路站场立交桥施工组织设计意见设计要点[J].科技风,2019(16):15-17.

[35]王李.基于施工BIM应用的工程招标评标标准研究[J].黄冈师范学院学报,2019,39(03):115-119.

[36]张玉成.建筑施工企业对工程质量的管理方法[J].价值工程,2019,38(16):8-10.

[37]钟万春.建筑工程管理运作中存在的问题与对策研究[J].居舍,2019(16):15.

[38]马毅.公路工程造价控制中存在的问题及应对策略[J].交通世界,2019(16):138-139.

[39]谢宏伟.建筑工程经济预算与成本控制研究[J].中外企业家,2019(16):106.

[40]冯宇.海上风电勘测设计存在的问题及优化思路浅析[J].科技视界,2019(16):28-29+40.

[41]张臻.以技术管理为支撑[J].施工企业管理,2019(06):88-90.

[42]董可青.浅议施工阶段工程造价控制[J].知识经济,2019(18):85-86.

[43]李江.港珠澳大桥钢桥面铺装精细化施工组织方案[J].中国公路,2019(11):135-137.

[44]张莉,权雅萍,祁雪花.如何做好施工准备工作[J].中国金属通报,2019(05):114-116.

[45].施工组织设计如何编细编实[J].中国招标,2019(21):42-44.

[46]何源涛.探讨建筑工程施工质量的监理控制要点[J].智能城市,2019,5(10):101-103.

[47]黄冠.建筑装饰工程施工过程的质量控制探述[J].智能城市,2019,5(10):158-159.

[48]叶庆鹏.建筑工程施工现场临时用电安全管理分析[J].建筑技术开发,2019,46(10):84-85.

[49]苟树生.柯克牙河流域水雨情预警系统工程建设中施工组织及质量控制措施分析[J].地下水,2019,41(03):174-175+211.

[50]薛家斌.施工企业投标文件的编制[J].中小企业管理与科技(下旬刊),2019(05):45-46.

[51]张娜.小型灌溉工程施工组织设计分析[J].陕西水利,2019(05):199-200.

[52]吴湘利.水利工程设计概算质量的影响因素探讨[J].湖南水利水电,2019(03):118-119.

[53]杜金龙,陈贵德.浅谈桥梁施工组织设计的编制[J].黑龙江交通科技,2019,42(05):205-206.

[54].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(05):640.

[55]彭洪元,陈诚.烘背水库大坝枢纽主体工程施工组织设计[J].水利规划与设计,2019(05):96-99.

[56]马星敏.隧道施工成本管理与控制策略探析[J].智库时代,2019(19):58-59.

[57]邓斯妮.建设工程项目造价管控的要点与方法探析[J].工程技术研究,2019,4(09):130-131.

[58]杨建华.工程内业在工程预结算中的重要性[J].四川建材,2019,45(05):228-229.

[59]郭标.邻近铁路营业线施工安全的分析及对策研究[J].中小企业管理与科技(上旬刊),2019(05):42-43.

[60]张永旺.建设工程电子招标数据应用场景分析[J].中国管理信息化,2019,22(09):159-161.

[61]贾帅. 古建筑修缮工程项目绩效评价研究[D].郑州大学,2019.

[62]冯彦维. 浅谈施工组织设计优化措施[A]. .水与水技术(第9辑)[C].:辽宁省水利学会,2019:3.

[63]张震.灵石东山供水县域小水网供水施工组织设计[J].山西水利,2019,35(04):32-33.

[64]黄澍.现场管理水平对施工管理的影响分析[J].住宅与房地产,2019(12):137+178.

[65]罗亮.塔式起重机在工程施工中合理选择及定位分析[J].设备监理,2019(04):48-50.

[66]李长城.建筑工程施工项目的精细化管理分析探讨[J].中国标准化,2019(08):19-20.

[67]马莉.建筑工程施工组织设计存在的问题及改进措施分析[J].居舍,2019(12):103.

[68].全套工程技术交底辨析[J].中国招标,2019(15):33-36.

[69]董子豪.建筑施工组织设计研究与探讨[J].四川水泥,2019(04):81.

[70]张跃飞.论土建施工管理中存在的问题与对策研究[J].四川水泥,2019(04):171.

[71]原培.全过程造价管理在土建工程中的有效应用[J].四川水泥,2019(04):208.

[72]张宇.探讨桥梁施工监控中BIM技术的应用[J].四川水泥,2019(04):64.

[73].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(04):512.

[74]曹武,罗平,陈崇德.永圣渡槽拆除重建工程施工组织评价研究[J].小水电,2019(02):64-68.

[75]李裔通.浅谈施工组织设计在工程地质勘察施工过程中的应用[J].中小企业管理与科技(中旬刊),2019(04):53-54.

[76]刘星.建筑工程现场施工技术管理研究[J].中外企业家,2019(11):102.

[77]孙悦.道路施工组织优化设计研究--以长春路西段为例[J].智能城市,2019,5(07):88-89.

[78]文靓.浅谈铁路工程施工项目成本管理[J].中国集体经济,2019(11):59-60.

[79]邓德学,徐新瑞.基于模糊决策理论的工程评标方法研究[J].山西建筑,2019,45(10):218-219.

[80]吕强华,广晓平.城市道路施工期间交通组织设计方法研究[J].甘肃科技纵横,2019,48(03):47-50.

[81]江运河,季雯雯.工程预算造价管理中的主要问题及应对策略[J].居舍,2019(09):12.

[82]单传忠.房屋建筑与装修施工组织分析[J].住宅与房地产,2019(09):32+38.

[83]古江林.浅析在建矿井停缓建期的施工组织安排[J].陕西煤炭,2019,38(02):160-162.

[84]林森.设计施工一体化条件下的保通交通组织方案研究[J].北方交通,2019(03):57-60.

[85]王文静,许念勇.基于BIM技术和递进式思想的“施工组织”课程设计全过程设计[J].教育教学论坛,2019(12):92-93.

[86]周怡安.将BIM技术融入高职实训教学的研究--以工程造价专业为例[J].辽宁高职学报,2019,21(03):76-79.

[87]习明星.新时代高速公路施工组织设计[J].中国公路,2019(06):98-99.

[88]毛钟豪.关于建筑工程资料管理的探讨[J].现代物业(中旬刊),2019(03):49.

[89]崔亚杰.浅谈姚江船闸施工组织设计与概预算[J].南方农机,2019,50(05):260.

[90]崔垒.浅析沙特阿拉伯地区施工组织设计特点[J].中国水能及电气化,2019(03):56-58.

[91]李勤.交通安全设施工程施工要点及临时施工期交通组织设计[J].建筑技术开发,2019,46(05):20-21.

[92]王金.施工组织设计在建筑工程中的应用[J].四川水泥,2019(03):49.

[93]徐娟.施工组织设计对建筑工程经济中造价的影响[J].中国市场,2019(09):101+113.

[94]文玲.浅谈施工组织设计对工程施工成本的影响[J].中小企业管理与科技(上旬刊),2019(03):36-37.

[95]王甲.施工现场临时安全用电组织设计[J].中外建筑,2019(03):174-175.

[96]孟耀东. 扬尘治理背景下的施工阶段工程造价控制研究[D].郑州大学,2019.

[97]张志燕.浅述公路桥梁施工组织设计及施工管理[J].中国标准化,2019(04):84-85.

[98]谭支博.探究施工组织设计对水利水电工程造价影响[J].山东工业技术,2019(05):123.

[99]赵雯雯.河流下游段治理工程的施工组织设计与环境治理策略探讨[J].内蒙古水利,2019(02):25-26.

[100]贾晓雷.桥梁施工组织设计及施工管理有效策略分析[J].工程技术研究,2019,4(04):186-187.

[101]刘国超.浅析目前建筑工程造价管理存在的问题及其对策[J].绿色环保建材,2019(02):212+214.

[102]郭婧.合理施工组织设计对施工图预算及工程造价的影响[J].住宅与房地产,2019(06):50.

[103]付彬.特长小段面引水隧洞开挖施工组织及安全措施应用[J].建材与装饰,2019(06):274-276.

[104]尹文兴.建筑工程项目施工阶段的质量控制探讨[J].建材与装饰,2019(06):13-14.

[105]张健.浅析项目监理日志记录内容[J].山西建筑,2019,45(06):208-209.

[106]吴晓萌.临时工程成本控制常见问题与对策[J].工程经济,2019,29(02):10-13.

[107]钟升明,杨星一,兰洁.基于BIM技术的城市轨道交通工程精细化施工管理研究[J].城市建筑,2019,16(05):119-121.

[108]艾江林,陈然,向家林,毛四海.浅谈工程项目成本控制[J].城市建筑,2019,16(05):175-176+192.

[109]李畅.论施工方建设工程项目管理的重点任务及其管理措施[J].住宅与房地产,2019(05):155-156.

[110]张金艳.公路桥梁施工组织设计及其施工管控[J].交通世界,2019(Z2):122-123.

[111].欢迎订购2017年合订本和精品建筑图书[J].建筑技术,2019,50(02):256.

[112]董璐.公路桥梁施工组织设计和施工管理策略研究[J].工程技术研究,2019,4(03):159-160.

[113]刘晓峰.基于BIM技术的施工过程管理在建筑施工组织课堂教学中的应用研究[J/OL].品牌研究:1-2[2019-07-31]..

[1]宋亚平,陈硕.浅谈水利工程施工组织设计的优化[J].科技展望,2017,03:52-53.

[2]张春红.有关水利工程施工中导截流施工技术的探讨[J].科技展望,2017,04:36.

[3]祁天龙,张欢.试论水利水电工程施工管理措施[J].科技展望,2017,02:180.

[4]常仲达.水利工程施工中防渗技术的实践探究[J].科技展望,2017,04:109.

[5]王鹏.水利水电工程施工中的新技术及环境保护策略分析[J].科技展望,2017,03:24.

[6]刘鹏.水利工程施工组织管理质量控制的有效性探讨[J].科技展望,2017,02:41.

[7]袁卫兵.水利施工中软土地基处理技术探讨[J].珠江水运,2017,02:74-75.

[8]黄永明.探究水利施工中水坝堤防堵口施工技术要点[J].黑龙江水利科技,2016,10:96-97+138.

[9]李新根.水利施工中软土地基处理的方法分析[J].黑龙江水利科技,2016,10:105-107.

[10]白晓昱.水利工程施工中常见的问题和解决方案[J].山东工业技术,2017,02:108-109.

[11]张会.浅谈水利水电工程的基础施工技术[J].科技创新与应用,2017,01:243.

[12]翟志刚.刍议水利水电工程中的水闸施工技术[J].科技创新与应用,2017,03:218.

[13]赵佳欣.水利工程施工阶段造价控制要点分析[J].黑龙江科技信息,2017,03:205.

[14]汪沫.试论如何实现水利水电建筑工程施工质量的有效控制[J].黑龙江科技信息,2017,03:208.

[15]刘兵旗.水利施工中的混凝土裂缝的原因分析及防治措施[J].四川水泥,2017,01:210.

[16]任杰.水利水电工程防渗技术施工要点分析[J].中国新技术新产品,2017,03:95-96.

[17]刘寿辉,孙士玲,李爱青.混凝土施工技术在水利施工中的应用价值[J].珠江水运,2017,01:80-81.

[18]余洁,徐煜亮.水利工程监理对施工阶段质量控制分析[J].智能城市,2017,01:290.

[19]姜永鹏.水利工程施工安全隐患及预防管理分析[J].技术与市场,2017,01:118.

[20]张益民.水利施工中混凝土裂缝的分析及控制[J].中国水能及电气化,2017,01:10-13.

[21]杨育红.试论农田水利的U形渠道防渗施工[J].黑龙江科技信息,2017,02:230.

[22]杨旭亮.浅谈水利工程施工中基坑排水需关注的问题[J].科技创新与应用,2017,06:225.

[23]龚昱文.试论水利水电施工中土石坝筑坝工程的主要工艺[J].江西建材,2017,04:124.

[24]王强.浅谈农田水利施工建设技术水平的提高[J].科技创新与应用,2017,06:217.

[25]张晓祥.浅析水利工程中灌注桩施工工艺[J].黑龙江科技信息,2017,04:195.

[26]徐欢.水利工程施工总布置动态信息可视化方法研究[J].黑龙江科技信息,2017,04:228.

[27]吕继辉.浅谈水利工程滑模施工技术[J].科技经济导刊,2017,03:65+57.

[28]王正东.分析水利水电工程施工质量管理研究[J].江西建材,2017,05:117+121.

[29]李伟.如何提高水利工程施工现场管理质量[J].黑龙江科学,2017,02:120-121.

[30]李彩凤.试论加强水利施工技术控制措施[J].黑龙江科学,2017,02:128-129.

[31]周亚鹏.水利施工管理中存在的问题及解决对策探究[J].中小企业管理与科技(上旬刊),2017,02:67-68.

[32]杨松.水利施工中碾压混凝土施工的技术要点[J].绿色环保建材,2017,01:166.

[33]王晓明.浅议水利工程施工管理[J].黑龙江科技信息,2017,01:237.

[34]王洪兴.水利工程施工建设对生态环境的影响[J].河南水利与南水北调,2017,02:12+19.

[35]高鹏,戴洪巧.水利工程施工管理特点及质量控制刍议[J].河南水利与南水北调,2017,02:85-86.

[36]谢良.浅析水利工程施工管理特点及质量控制策略[J].农业科技与信息,2017,04:111+114.

[37]邱亚平.水利工程施工中土方填筑技术分析[J].黑龙江科技信息,2017,05:160.

[38]胡福来.水利工程中浆砌石工程的施工技术分析[J].黑龙江科技信息,2017,05:181.

[39]邓怡强.水利施工中钻孔灌注桩施工关键技术与质量管理思考[J].黑龙江水利科技,2016,12:164-166.

[40]安军,霍云晶.农业工程中水利项目大体积混凝土施工关键技术[J].农业工程技术,2017,02:38.

[41]吴凤林.有关水利施工工程中开挖支护技术的分析[J].黑龙江科技信息,2017,06:226.

[42]李钱军.加强水利施工中水闸施工管理的`途径探析[J].珠江水运,2017,04:67-68.

[43]徐鸿昊.水利工程施工中软土地基处理技术浅析[J].工程建设与设计,2017,06:29-30.

[44]王洪兴.混凝土工程在水利施工中的质量控制重点研究[J].工程建设与设计,2017,06:140-141.

[45]杨晓晖.浅谈围堰技术在水利施工工程中的应用[J].中国新技术新产品,2017,08:90-91.

[46]张永生.水利工程中桥梁钻孔灌注桩施工技术的研究[J].科技创新与应用,2017,09:223.

[47]高原,刘付涛.浅谈水利水电施工对于施工导流和围堰技术的运用[J].科技创新与应用,2017,09:225.

[48]孙庆凤.水利工程施工管理质量控制分析[J].农业与技术,2017,05:53-54.

[49]刘兆虎.农田水利施工中的水土保持工作[J].科技创新与应用,2017,09:227.

[50]余鹏.探讨水利施工技术现状及改进措施[J].江西建材,2015,24:187+190.

[51]刘点,张海忠.水利施工中水坝堤防堵口施工技术研究[J].安徽水利水电职业技术学院学报,2015,04:27-29.

[52]李涛.水利施工中水闸施工管理的实践路径思考[J].科技创新与应用,2016,04:208.

[53]徐立建.浅谈水利施工钻孔灌注桩施工技术[J].科技创新与应用,2016,04:221.

[54]钱治国.探究水利施工中软土地基处理技术[J].中国新技术新产品,2016,04:113.

[55]尚琰.水利施工钻孔灌注桩施工技术解析[J].建材与装饰,2015,50:248-249.

[56]于兴龙,于兴平,王作强.水利施工新技术应用现状及发展趋势[J].山东水利,2016,01:44+46.

[57]许天君.水利施工过程的质量监测方法[J].科技创新与应用,2016,07:210.

[58]郑彬鹏.水利施工钻孔灌注桩施工技术探讨[J].科技创新与应用,2016,07:223.

[59]苏力坦古力·吾买尔.关于水利施工管理中的创新性研究[J].北京农业,2016,03:124-125.

[60]李秀玉.水利施工中水闸施工的管理措施分析[J].科技与企业,2016,04:16-17.

[61]杜妮.基于改进LEC法的水利施工现场危险源识别及防控对策[J].吉林水利,2016,04:59-62.

[62]李景春.水利施工中的混凝土裂缝控制措施探讨[J].水利技术监督,2016,02:43-44+67.

[63]李艳丽.水利施工中混凝土的浇筑过程及后期养护[J].黑龙江科学,2016,09:36-37.

[64]张玉才.水利施工中滑模技术的应用[J].中国新技术新产品,2016,09:109-110.

[65]管晋莉.刍议水利施工企业人事行政管理与思想政治工作的相关性[J].中小企业管理与科技(中旬刊),2016,04:9-10.

[66]杨升.水利施工钻孔灌注桩施工技术解析[J].甘肃农业,2016,09:41-42.

[67]常永春.加强水利施工安全管理的有效途径[J].智能城市,2016,07:161.

[68]吴航.刍议水利施工中混凝土裂缝的防治技术[J].江西建材,2016,18:148+150.

[69]熊国华,王鹏.水利施工中大体积混凝土抗裂技术研究[J].江西建材,2016,19:130-131.

[70]李燕.试析水利施工中的滑模技术[J].科技创新与应用,2016,22:223.

[71]刘双强,张一君.水利施工中混凝土裂缝的主要原因及防治对策分析[J].企业技术开发,2016,17:151+157.

[72]于磊,朱孝克.探讨水利施工中软土地基处理技术的重要性及应用[J].山东工业技术,2016,15:86.

[73]朱冰.基于水利施工管理现状以及改进策略研究[J].吉林水利,2016,10:57-59+62.

[74]笪贤汉.浅谈水利施工中混凝土裂缝的防治技术[J].建材与装饰,2016,33:233-234.

[75]江庆华.浅谈水利施工中的混凝土裂缝控制[J].江西建材,2016,23:118+117.

[76]黄玉芳.水利施工物资供应管理与施工经济效益[J].建材与装饰,2016,33:254-255.

[77]陶山.水利施工中的混凝土裂缝的原因及预防对策[J].江西建材,2016,23:136-137.

[78]涂业斌.水利施工管理重点事项探究[J].建筑技术开发,2016,08:70-71.

[79]马贵友.动态联盟模式下水利施工分包价格制定探析[J].吉林水利,2016,11:21-24.

[80]付萍.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,01:172.

[81]肖小勇.基于水利工程施工管理的创新对策探析[J].江西建材,2015,02:124-125.

[82]张薇,韩宇舟.浅析水利施工中软土地基施工技术[J].科技创新与应用,2015,01:119.

[83]胡云鹏.试论水利施工中的安全隐患与措施[J].科技创新与应用,2015,05:133.

[84]郎海彦.浅谈如何提高水利施工技术确保工程质量[J].科技创新与应用,2015,07:129.

[85]陈钢.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,06:131.

[86]常瑞松.水利施工管理中存在的安全风险及改进对策分析[J].四川水泥,2015,05:279.

[87]罗向天.水利施工中碾压混凝土施工技术研究[J].山西建筑,2015,14:215-216.

[88]张来军.对水利施工钻孔灌注桩施工技术的探析[J].科技资讯,2015,09:79.

[89]高存晓.水利施工中水闸施工的管理措施[J].四川水泥,2015,06:248.

[90]李轶.水利工程混凝土施工技术及其质量控制策略[J].黑龙江水利科技,2015,04:174-176.

[91]李勇,黄长权.探究水利工程施工质量及控制措施[J].科技经济市场,2015,08:181-182.

[92]徐建英.长沙水利施工工程中的测绘过程的优化定位措施分析[J].工程经济,2015,05:65-70.

[93]周莳备.水利施工技术的现状分析及改进措施[J].山西建筑,2015,23:214-215.

[94]夏云东.水利工程施工质量管理策略探究[J].建筑与预算,2015,06:31-33.

[95]范维君.水利施工中碾压混凝土施工技术探究[J].科技创新与应用,2015,24:219.

[96]李海强,段刘勇.水利施工中混凝土浇筑过程及后期养护的探讨[J].河南水利与南水北调,2015,14:35-36.

[97]李立志.水利施工企业安全生产标准化建设途径探讨[J].吉林水利,2015,08:55-57.

[98]薛士海.水利施工中软土地基处理技术[J].企业导报,2015,13:44+97.

[99]王万钧.水利施工机械设备的管理探讨[J].科技经济市场,2015,10:195-196.

[100]陈风英.关于水利施工管理中的创新性研究[J].农业科技与信息,2015,18:96-97+107.

[101]王孝兰.营业税改增值税改革对水利施工企业的影响及应对策略分析[J].财经界(学术版),2015,20:346-347.

[102]黄仁兴,冯是明.解析水利施工中混凝土施工[J].河南水利与南水北调,2015,20:6-7.

[103]魏远东.工程模糊集理论在水利工程施工导流中应用研究[D].黑龙江大学,2015.

土木工程索赔第三版 Civil Engineering Claims Third Edition

建筑工程作为与人们生产生活息息相关的工程,与整个国家经济的发展、人民生活的改善有着密切的关系。下面是我带来的关于建筑工程技术 毕业 论文题目的内容,欢迎阅读参考!建筑工程技术毕业论文题目(一) 1、软土地基上基础的处理 措施 2、拟建建筑物地质差异较大时的地基处理措施 3、结构设计中梁柱的交接处理 方法 4、结构设计中基础梁的设计处理方法 5、砌体结构房屋产生裂缝的处理措施 6、重力式挡土墙安全问题的研究 7、防止高层建筑基础不均匀沉降的措施 8、工程项目施工的组织研究 9、软弱地基的处理方法 10、地形地貌对建筑体型和层高的影响研究 11、建筑物三缝合一的处理方法研究 12、解决屋面渗漏问题的方法 13、论建筑与人 文化 的协调统一 14、论建筑设计与结构设计的协调统一 15、底层商场的设计处理方法 16、电梯轿箱基础与框架独立柱基的设计处理方法研究 17、深基础支护结构的设计与施工方法 18、框架结构中楼梯与框架梁柱的连接方法研究 19、提高普通建筑物的保温隔热措施 20、保证工程预算准确性的措施 建筑工程技术毕业论文题目(二) 1 浅谈企业从事工程总承包面临的问题 2 试述工程建设项目施工索赔的艺术 3 关于房地产开发成本管理的初探 4 浅谈施工方案与工程项目施工质量的关系 5 试论建筑工程监理应如何确保施工安全 6 论述工程量清单计价模式下的造价控制与管理 7 浅析如何搞好工程建设监理工作 8 试述施工现场基础工程质量控制 9 浅谈工程项目主要成本管理与控制 10 试述工程管理项目中的成本控制和品质管理 11 关于做好项目工程造价全过程的控制 12 浅谈网络计划技术在项目管理中的应用 13 浅谈建设工程项目的造价管理 14 论述工程成本的影响因素及控制对策 15 论述工程建设项目投资中的造价控制 16 论述可行性研究在建设中的作用 17 浅析工程项目投资管理 18 试论建设工程项目质量管理与控制 19 浅谈房地产开发中的工程成本控制 20 浅谈工程建设项目的技术变更管理 建筑工程技术毕业论文题目(三) 1. 浅谈如何做好工程项目的施工质量管理 2. 发包人如何做好工程合同管理 3. 建筑工程项目施工风险防范分析 4. 我国工程监理业存在的问题及对策讨论 5. 关于施工企业实施低成本的战略讨论 6. 浅谈大型工程项目的信息化管理 7. 双代号时标网络计划在建筑施工进度控制中的应用 8. 施工企业如何应对清单环境下的成本管理 9. 浅论如何加强施工项目的成本管理 10. 信息管理在施工管理中的应用 11. 关于工程项目成本管理的预测与控制 12. 浅谈工程索赔对减少工程经营风险的作用 13. 浅谈如何有效的进行工程造价管理 14. 浅谈施工阶段工程项目成本的有效控制 15. PDCA循环管理在建设工程管理中的应用 猜你喜欢: 1. 2017年工程管理毕业论文题目 2. 大专建筑工程技术论文题目 3. 建筑工程技术毕业论文范文 4. 建筑工程技术论文参考文献 5. 建筑工程技术管理毕业论文

工程索赔论文参考文献

论如何有效进行工程索赔论文关键词:工程索赔 工程量清单 索赔事件 索赔程序 论文摘要:工程索赔是现在采用工程量清单报价方式以后在工程施工过程中施工单位为了维护其合法的效益,常采用的索赔方式。本文从投标报价阶段、签定工程阶段、常见索赔事件、索赔的程序以及索赔的要点几个方面来阐述工程索赔在施工单位获得效益的重要性。 0 引言 随着的高速发展,中国业呈现出良好的发展态势,然后,由于国情的原因,目前国内建筑存在着较多的不稳定因素和不完善机制,又加上竞争激烈,各个施工单位为了争揽工程,不断地降低报价,招标单位也抓住了施工单位的,“你不干他干,总有干的”,给工程的承发包方留下了好多不良的后遗症,种种的索赔纠纷不断出现,影响工程的顺利进行和质量保证。然而国外承包商投标报价的原则是“低报阶,高索赔”。承包商在投标时便将工程中可能引起的各种因素考虑在其报价中,从而使投标价很低,在合同签定后工程实施中,利用各种非已方责任或业主风险而受到的损失向责任方或业主方索赔,从而取得利润。那么国内承包商又如何争取更多的索赔呢?我认为有以下几个方面值得探讨: 1 读透招标文件,合理编制投标报价 在获得招标的信息后,要熟读招标文件的每一个条款,如果不注意就会给编制报价工作时造成很大的误区。现在报价的方式,多采用工程量清单报价方法,这种方法简单,便于以后调整。但报价应注意几下几个方面,否则会给承包人带来损失。 分部分项工程量清单为不可调整的闭口清单,投标人对投标文件提供的分部分项清单必须逐一计价,对清单所列内容不允许作任何更改变动。每一个项中的价格为最后价格,工程如有变更时,均按此价格进行增减调整,如在投标中知道有哪些设计项目不符合当地要求,可能要修改,就将此单价降低,使得以后设计变更索赔获得更大。 措施项目清单为可调整清单,投标人对招标文件中所列项目,可根据企业自身特点作适当的变更增减。投标要对拟建工程可能发生的措施项目和措施费用作通盘考虑。清单一经报出,即被认为是包括了所有应该发生的措施项目的全部费用。如果报出的清单中没列项,且施工中又必须发生的项目,业主有权认为,其已经综合在分部分项工程量清单的综合单价中。将来措施项目发生时,投标方不得以任何借口提出索赔和调整。 其他项目清单由招标人填写的项目与数量,投标人不得随意更改,且必须进行报价。如果不报价,招标人有权认为投标人就未报价内容无偿为自己服务。当投标人列项不全时,投标人可自行增加列项并确定本项目的工程数量及计价。其他项目清单应根据工程的具体情况,参照下列内容列项:预留金、购置费、总承包服务费、零星工作项目费。”在投标报价过程中,要收集、整理和分析有关资料,如了解招标单位的情况、资金到位情况、拨款方式;当地的材料价格、当地的质量要求、特殊要求、甲方的一些无理要求;当地政府的一些手续费用,编制报价的同时为今后埋下伏笔,把风险承担交由发包人,以利于在施工阶段进行索赔。 2 施工过程中常见的索赔事件 施工过程是一个千变万化的复杂过程,随时有与合同及计划不同之处,因此需要我们时刻重视索赔,在索赔管理中要体现效益。一个小的疏忽马虎而漏掉索赔的可能性始终会存在,这就要求我们在施工过程中精心组织合同管理,认真处理每一个索赔事件,施工中的常见索赔项目主要有下面种种类型:工程延误开工;暂停施工;工期延误;工程检查及中间验收;设计变更;合同中约定的“三通一平”由业主负责,而实际中经常有由施工单位完成全部或一部分;与设计图中不相符的情况,复杂地基处理、地下地上障碍物清除;业主分包工程(桩基、通风、消防、电梯等工程)取配合施工费;业主供料的二次、装卸车费用、保管费;安全生产的要求的施工措施(边坡防护、特殊安全通道、市容维护等)在施工组织中要明确,并计算费用;业主已批准施工进度计划,要求加速施工,应付赶工费;高层及特殊结构的人工降效、降效;特、大型机械安拆、检测、场外运输、基础;场地狭小造成的材料的二次搬运;冬季、雨季、夜间施工增加费;混凝土及砂浆实际配合比与定额配合比的调整,并且其中掺入的外加剂费用;未考虑的地下水的降水费用,抽水台班的计取费用;管道消毒、3 认真履行索赔的程序 发包人未能按约定履行自己的各项义务或发生错误以及应由发包人承担责任的其他情况,给承包人造成各种损失,承包人可按下列程序以书面形式向发包人索赔; 索赔事件发生后28天内,向业主工程师发出索赔意向通知; 发出索赔意向通知28天内,向业主工程师提出补偿损失的索赔报告及有关资料(事件的名称、发生的时间、情况简介、合同依据、索赔要求); 工程师在收到承包人送交的索赔报告和有关资料后,于28天内给予答复,或要求承包进一步补充索赔理由和证据; 工程师在收到承包人送交的索赔报告和有关资料28天内未予答复或未对承包人作进一步要求,视业主对该项索赔已认可; 当该索赔事件持续进行时,承包人应当阶段性向工程师发出索赔意向,在索赔事件终了28天内,向工程师送交索赔的有关资料和最终索赔报告。索赔答复程序与3、4条相同。 4 掌握好索赔的要点 要有充分的索赔证据,没有证据就不能索赔。在过程中要收集索赔证据资料,包括招标文件、合同、设计变更、气象资料、备忘录、会议纪要、工程照片、声像资料、进度计划、隐藏工程检查记录、施工日志、业主或监理已批准的施工方案或施工组织设计,现场签证。 需要施工现场临时签证的,要在索赔的第一时间内完成签证,不能等事件完成后再签,以免发生漏签,更不要把各个索赔事件进行累加后再签证,一次性大的数额,业主也会不满,要学会积少成多,签证是索赔的第一手充分必要证据。 编写索赔报告,数额计算。在索赔报告概述中要简明扼要地论述事件发生的过程;论证中详细介绍和分析索赔事件的发生、发展、处理和解决过程、索赔依据等;索赔计算中要具体在对施工进度影响、工程的损失等方面合理地计算,各项费用要有依据,不可无理夸张加大。 在业主索赔时,要处理好关系。要加强与业主的沟通,尽可能通过友好协商的办法解决,争取业主的同情理解,或调解解决,如再不能达成一致意见时,再提交仲裁。 随着工程招、投标制度的不断完善及业主、监理、施工单位章程进一步健全,索赔工作也逐渐步入正常轨道,只要我们充分理解施工图纸、技术规范,合理安排施工组织,正确履行与业主、监理、施工单位签订的合同协议和各项往来性文件,在索赔工作中做到有理、有据,将会有更多的索赔项目被受理或批复,从索赔中获得效益。 参考文献: [1]尹贻林主编.工程造价与控制.中国计划出版社2003 [2]何红锋.建设工程施工合同纠纷案例评析.知识产权出版社2005 [3]何伯森主编.国际工程合同管理.中国建筑出版社2005 [4]危道军,刘志强主编.工程项目管理.武汉理工大学出版社2004 [5]国际咨询工程师联合会中国工程咨询协会编译.FIDIC施工合同条件.工业出版社2002

1) according to claim the parties classificationBetween the contractor and the developer claims itself;Between the contractor and subcontractor claim itself;Second-ranking between contractor for loans with claims;Second-ranking between with the underwriter claim ) the effects of the event of classification according to the claimTime delay claims due to the developer had failed to provide construction conditions prescribed by the contract, if not prompt delivery design drawings, technical data, site, road; Or the contractor reason the developer instructions to stop the project implementation; Or other causes of force majueure effect cause for engineering interrupt, or engineering progress slow down, make this time delay, contractor a unforeseeable external obstacles or condition claim if during construction, the contractor on the scene encountered an experienced contractor usually can't foreseen the external obstacles or conditions, such as geology and expected client provides information) (different, appear unforeseen rocks and mud and groundwater, engineering change claim because the developer or engineer instruction modified design, increase or decrease of quantities, add or delete part of the project, modify implementation plan, change construction sequence of the extension of time and cost, causing loss this claim, the project for some reason terminate claims, such as force majeure influence, the developer default, the engineering was forced to have stopped before completion, and no longer continue implementing, make the contractor incur pecuniary loss, therefore lodge a claim against other claim such as currency devaluation, exchange rates, prices and wages rise, policy law change, the developer delayed payment of claims caused ) according to the claim classificationThe claim which requires time second-ranking extended period, delayed completion expenses claims which requires the developer compensation costs, adjust the contract ) press claim based on the reason classificationSecond-ranking contract in claims that claims to contract provision as basis, happened to compensate for the contractor stipulated in the contract, the contractor the disturbance events claim according to the contract stipulations. This is the most common claim refers to contract the interference of engineering during the nature of the event has exceeded the contract scope. In the contract can't find out specific basis, the general must according to applicable to contracts of legal relation of solving moral claim to because the contractor mistake (. quotation blunders, such as environmental investigation errors occur, or the contractor shall) caused by the contractor for the risk of severe ) handling of classified according to the claimSecond-ranking single claim is for single claim a jamming events proposes. Claims processing is implementation of the contract, interference event happens, or after once. It consists of contract management personnel handling, and in the provisions of the contract within the validity of the claim of intent and claim to submit claims also called package itself claims or comprehensive claims. This is often adopted in international engineering claim to handle and solve a method. General in the project completion, the contractor will engineering process before the single claim not solve together and puts forward a total claims report. In engineering contract both sides before or after delivery of the final negotiations, delivered with package solving claim.

土木工程索赔第三版 Civil Engineering Claims Third Edition

经典施工索赔论文参考文献

〖检索时间〗2008-03-19 05:53:32〖检索范围〗全部期刊〖起止年代〗2001-2007〖检索条件〗(题名=工程造价管理*年=2001-2007)*(题名=施工)〖检索结果〗检中81篇,选中81篇1/81【题 名】施工企业如何进行工程造价管理【作 者】谢秀杰【刊 名】中国高新技术企业.2007(8): 184-1842/81【题 名】浅谈施工企业工程造价管理【作 者】李玉顺 吴广君【刊 名】黑龙江科技信息.2007(08X): 278-2783/81【题 名】清单计价下施工企业加强工程造价管理的对策【作 者】吴瑛 蒋伟琪【刊 名】山西建筑.2007,33(19): 243-2444/81【题 名】施工企业投标阶段的工程造价管理【作 者】曾萍【刊 名】山西建筑.2007,33(19): 249-2505/81【题 名】浅谈施工阶段的工程造价管理【作 者】卢桂梅【刊 名】山西建筑.2007,33(19): 264-2656/81【题 名】浅议建设单位工程造价管理人员在施工阶段如何控制工程成本【作 者】丁峰【刊 名】煤矿现代化.2007(3): 66-677/81【题 名】浅谈施工企业工程造价管理【作 者】罗家驹【刊 名】广东建材.2007(6): 183-1848/81【题 名】浅谈施工企业的工程造价管理【作 者】孟丽【刊 名】山西建筑.2007,33(17): 270-2719/81【题 名】建筑施工企业的工程造价管理【作 者】吴福平【刊 名】山西建筑.2007,33(14): 253-25410/81【题 名】施工企业工程造价管理工作分析【作 者】杨岭【刊 名】安装.2007(4): 14-1611/81【题 名】浅析施工企业工程造价管理【作 者】杜琼【刊 名】甘肃科技纵横.2007,36(2): 92-92,10212/81【题 名】石油化工施工企业工程造价管理分析【作 者】陆平杰【刊 名】化工质量.2007(2): 44-4813/81【题 名】浅谈施工企业的工程造价管理【作 者】牛永科【刊 名】科技信息:学术版.2007(6): 135-13514/81【题 名】施工阶段工程造价管理【作 者】张艳春【刊 名】山西建筑.2007,33(1): 253-25315/81【题 名】浅析施工企业施工过程中的工程造价管理【作 者】闫静 黄必军【刊 名】水利水电工程造价.2006(3): 13-1416/81【题 名】浅析施工阶段的工程造价管理【作 者】吴金来【刊 名】科技信息:学术版.2006(01S): 118-11817/81【题 名】建设单位在工程施工招标阶段工程造价管理【作 者】张纯林【刊 名】机场建设.2006(4): 44-4618/81【题 名】施工单位工程造价管理浅议【作 者】李海军【刊 名】现代农业.2006(12): 136-13719/81【题 名】论电力施工企业的工程造价管理【作 者】张强【刊 名】经济与管理.2006,20(12): 80-8320/81【题 名】浅谈施工企业的工程造价管理【作 者】杨丽梅【刊 名】科技情报开发与经济.2006,16(23): 223-22421/81【题 名】浅谈施工企业的工程造价管理【作 者】要小俊【刊 名】太原科技.2006(8): 46-4722/81【题 名】施工企业的工程造价管理探讨【作 者】王大慧 季同月【刊 名】山西建筑.2006,32(18): 237-23823/81【题 名】对施工阶段工程造价管理的思考【作 者】岑佩珠【刊 名】科技资讯.2006(22): 50-5024/81【题 名】浅谈工程量清单计价下的施工企业工程造价管理【作 者】张磊【刊 名】福建建筑.2006(4): 142-14325/81【题 名】浅谈施工阶段工程造价管理【作 者】孙立峰【刊 名】山西水利.2006,22(3): 85-8626/81【题 名】浅析建筑施工企业的工程造价管理【作 者】张碧君【刊 名】山西建筑.2006,32(13): 239-24027/81【题 名】浅析施工企业工程造价管理【作 者】周岚【刊 名】新疆有色金属.2006,29(2): 51-5228/81【题 名】浅析施工企业工程造价管理【作 者】寇国力【刊 名】四川建筑.2006,26(3): 186-18729/81【题 名】建筑施工企业工程造价管理的探讨【作 者】黎慧敏【刊 名】广东建材.2006(6): 112-11430/81【题 名】施工企业在招投标阶段的工程造价管理【作 者】苏奋【刊 名】广东建材.2006(5): 140-14131/81【题 名】施工企业工程造价管理【作 者】王俊玲【刊 名】山西煤炭管理干部学院学报.2006,19(2): 22-22,3032/81【题 名】施工企业工程造价管理浅析【作 者】曾炽容【刊 名】广东建材.2006(2): 122-12333/81【题 名】实施工程量清单计价 加强工程造价管理【作 者】徐卫成【刊 名】中国科技信息.2006(4): 140-14134/81【题 名】浅谈施工合同管理在工程造价管理中的意义【作 者】陈惠娟【刊 名】中国科技信息.2006(03B): 41-41,6435/81【题 名】施工企业如何进行工程造价管理【作 者】王慧敏【刊 名】经济技术协作信息.2006(3): 67-6736/81【题 名】施工企业工程造价管理剖析【作 者】费冬玲【刊 名】辽宁经济.2006(2): 87-8738/81【题 名】浅议工程建设施工和竣工结算阶段工程造价管理【作 者】周广联【刊 名】中国科技信息.2005(24B): 140-14039/81【题 名】如何有效进行施工企业工程造价管理【作 者】田玲【刊 名】四川建筑.2005,25(5): 153-15440/81【题 名】现阶段电力施工企业工程造价管理【作 者】李永胜【刊 名】山西电力.2005(6): 36-37,4641/81【题 名】浅谈实施工程量清单计价后的工程造价管理【作 者】付凌云【刊 名】中国招标.2005(11M): 62-6543/81【题 名】关于建筑施工企业工程造价管理的探讨【作 者】龚文胜【刊 名】葛洲坝集团科技.2005(1): 53-5544/81【题 名】工程造价管理与项目成本控制——施工企业的制胜之道【作 者】周新莉【刊 名】中小企业科技.2005(8): 25-2645/81【题 名】新形势下施工企业的工程造价管理【作 者】吴艺【刊 名】公路与汽运.2005(3): 173-17446/81【题 名】论施工过程中的工程造价管理【作 者】梁德文【刊 名】建材技术与应用.2005(3): 59-6047/81【题 名】对施工阶段工程造价管理的思考【作 者】张宏君【刊 名】新疆农垦经济.2005(4): 111-11248/81【题 名】谈施工企业的工程造价管理【作 者】赵春锋【刊 名】陕西建筑.2005(6): 34-3649/81【题 名】浅谈工程造价管理对施工成本管理与控制的作用【作 者】许成枫【刊 名】安徽建筑.2005,12(2): 125-12650/81【题 名】谈工程造价管理应注重施工合同的审查【作 者】陈鸿【刊 名】国外建材科技.2005,26(1): 121-12351/81【题 名】现行招投标模式下的施工企业工程造价管理【作 者】胡春媚【刊 名】山西建筑.2005,31(4): 154-15552/81【题 名】论施工阶段的工程造价管理【作 者】刘东伟【刊 名】山西建筑.2005,31(4): 158-15953/81【题 名】加强工程造价管理 提高施工企业效益【作 者】张静 陈雪萍【刊 名】江西冶金.2004,24(6): 44-4554/81【题 名】浅谈如何加强施工企业的工程造价管理【作 者】姚爱华【刊 名】特区经济.2004(8): 131-13155/81【题 名】论建筑施工企业的工程造价管理【作 者】戴刚 陈芝春【刊 名】甘肃农业.2004(8): 116-11756/81【题 名】浅谈施工企业的工程造价管理【作 者】肖文健【刊 名】科技情报开发与经济.2004,14(8): 234-23457/81【题 名】施工企业的工程造价管理【作 者】陶云霞【刊 名】山西建筑.2004,30(5): 99-10058/81【题 名】山东高密实施工程造价管理新模式推进工程量清单招标投标 成效显著【作 者】葛萌【刊 名】建筑市场与招标投标.2004(6): 22-2259/81【题 名】谈施工过程中的工程造价管理【作 者】陈强【刊 名】上海建设科技.2004(5): 62-6360/81【题 名】浅谈建筑施工企业工程造价管理【作 者】耿春红【刊 名】山西建筑.2004,30(19): 173-17461/81【题 名】如何加强建筑施工企业的工程造价管理【作 者】陈伟【刊 名】安徽建筑.2004,11(2): 119-12062/81【题 名】新模式下铁路施工企业工程造价管理初探【作 者】王森华【刊 名】铁路工程造价管理.2003,18(6): 25-2663/81【题 名】浅析施工企业工程造价管理【作 者】张永光 张佳音【刊 名】黑龙江科技信息.2003(11): 65-6564/81【题 名】谈施工企业的工程造价管理【作 者】施建斌【刊 名】山西建筑.2003,29(17): 129-13065/81【题 名】谈施工企业的工程造价管理【作 者】王庆生 杨丽梅【刊 名】山西建筑.2003,29(8): 208-20966/81【题 名】浅论入世后施工企业与工程造价管理【作 者】张潜 邹灵岚【刊 名】人民长江.2003,34(3): 65-6667/81【题 名】从永久船闸工程看施工管理对工程造价管理的影响【作 者】万华琳 冯军捷【刊 名】水利水电工程造价.2003(4): 27-28,5868/81【题 名】施工企业的工程造价管理【作 者】邬鹏华【刊 名】建材技术与应用.2003(5): 63-6469/81【题 名】施工企业工程造价管理问题研究【作 者】李雨洁 李多修【刊 名】铁道工程企业管理.2003(6): 16-1870/81【题 名】入世后施工企业内部的工程造价管理探析【作 者】黄先友【刊 名】经济师.2002(7): 150-15171/81【题 名】浅议施工企业的工程造价管理【作 者】周瑞卿【刊 名】福建建筑.2002(B10): 83-8472/81【题 名】从施工实践谈铁路工程造价管理【作 者】安生理【刊 名】山西建筑.2002,28(8): 106-10773/81【题 名】浅谈施工阶段的工程造价管理【作 者】赵二平【刊 名】山西建筑.2002,28(8): 129-13074/81【题 名】施工组织设计与工程造价管理【作 者】赵倩【刊 名】基建优化.2002,23(5): 38-4075/81【题 名】基于C/S结构的施工企业工程造价管理信息系统【作 者】徐学东 赵卫东 等【刊 名】山东农业大学学报:自然科学版.2002,33(3): 360-36476/81【题 名】施工索赔是工程造价管理的重要工作【作 者】郭照金【刊 名】铁路工程造价管理.2002,17(6): 17-1877/81【题 名】浅议施工企业的工程造价管理【作 者】付永贵【刊 名】铁路工程造价管理.2002,17(2): 1-478/81【题 名】新形势下建筑施工企业工程造价管理工作【作 者】马楠 王健【刊 名】华北科技学院学报.2002,4(1): 30-3179/81【题 名】福州平安大厦施工阶段工程造价管理【作 者】林华【刊 名】福建建材.2001(4): 43-44

1) according to claim the parties classificationBetween the contractor and the developer claims itself;Between the contractor and subcontractor claim itself;Second-ranking between contractor for loans with claims;Second-ranking between with the underwriter claim ) the effects of the event of classification according to the claimTime delay claims due to the developer had failed to provide construction conditions prescribed by the contract, if not prompt delivery design drawings, technical data, site, road; Or the contractor reason the developer instructions to stop the project implementation; Or other causes of force majueure effect cause for engineering interrupt, or engineering progress slow down, make this time delay, contractor a unforeseeable external obstacles or condition claim if during construction, the contractor on the scene encountered an experienced contractor usually can't foreseen the external obstacles or conditions, such as geology and expected client provides information) (different, appear unforeseen rocks and mud and groundwater, engineering change claim because the developer or engineer instruction modified design, increase or decrease of quantities, add or delete part of the project, modify implementation plan, change construction sequence of the extension of time and cost, causing loss this claim, the project for some reason terminate claims, such as force majeure influence, the developer default, the engineering was forced to have stopped before completion, and no longer continue implementing, make the contractor incur pecuniary loss, therefore lodge a claim against other claim such as currency devaluation, exchange rates, prices and wages rise, policy law change, the developer delayed payment of claims caused ) according to the claim classificationThe claim which requires time second-ranking extended period, delayed completion expenses claims which requires the developer compensation costs, adjust the contract ) press claim based on the reason classificationSecond-ranking contract in claims that claims to contract provision as basis, happened to compensate for the contractor stipulated in the contract, the contractor the disturbance events claim according to the contract stipulations. This is the most common claim refers to contract the interference of engineering during the nature of the event has exceeded the contract scope. In the contract can't find out specific basis, the general must according to applicable to contracts of legal relation of solving moral claim to because the contractor mistake (. quotation blunders, such as environmental investigation errors occur, or the contractor shall) caused by the contractor for the risk of severe ) handling of classified according to the claimSecond-ranking single claim is for single claim a jamming events proposes. Claims processing is implementation of the contract, interference event happens, or after once. It consists of contract management personnel handling, and in the provisions of the contract within the validity of the claim of intent and claim to submit claims also called package itself claims or comprehensive claims. This is often adopted in international engineering claim to handle and solve a method. General in the project completion, the contractor will engineering process before the single claim not solve together and puts forward a total claims report. In engineering contract both sides before or after delivery of the final negotiations, delivered with package solving claim.

土木工程索赔第三版 Civil Engineering Claims Third Edition

目 录文摘英文文摘独创性说明及关于论文使用授权的说明引 言1工程项目管理概述项目管理工程合同工程合同的内涵 FIDIC条款合同管理工程合同管理的目标和特点合同管理的角度合同管理的目标建筑工程合同管理的特点合同管理在建筑工程项目管理中的地位合同管理在建筑工程项目管理中的职能2合同管理体系研究建筑工程合同总体策划国外成熟承包商的策划切入点我国承包商在总体策划方面的完善措施招投标阶段的合同管理承包商的投标目标和投标工作分析合同管理在招投标阶段的基本任务报价及合同谈判施工合同前期策划应注意的问题考虑承包商的基本利益考虑垫资施工的问题重视合同有效性的问题重视合同的审查和风险分析重视资信调查问题尽可能使用标准的合同文本施工合同实施控制建立施工合同实施保证体系的必要性建立施工合同实施保证体系施工合同变更规范管理工程变更对施工合同规范管理的影响施工合同变更的主要原因分析工程变更的程序工程变更的规范管理施工合同分包管理分包在一些大中型工程中存在的原因分包合同的规范管理3索赔索赔的基本概念索赔的含义索赔的作用索赔和反索赔索赔和变更的关系索赔的种类承包商向业主索赔业主向承包商索赔索赔管理索赔意识索赔管理的任务避免索赔存在的误区索赔与合同管理的关系索赔程序国际程序国内程序不同种类索赔项目的起止日期计算方法索赔的证据和依据索赔证据的基本要求索赔的依据索赔解决方式比较分析4我国建筑行业合同管理及索赔现状与实例分析我国建筑行业合同管理及索赔现状我国建筑行业合同管理及索赔问题产生的原因实例分析背景介绍实例分析评价与总结政府应采取的措施建筑企业应采取的对策

施工索赔毕业论文参考文献

〖检索时间〗2008-03-19 05:53:32〖检索范围〗全部期刊〖起止年代〗2001-2007〖检索条件〗(题名=工程造价管理*年=2001-2007)*(题名=施工)〖检索结果〗检中81篇,选中81篇1/81【题 名】施工企业如何进行工程造价管理【作 者】谢秀杰【刊 名】中国高新技术企业.2007(8): 184-1842/81【题 名】浅谈施工企业工程造价管理【作 者】李玉顺 吴广君【刊 名】黑龙江科技信息.2007(08X): 278-2783/81【题 名】清单计价下施工企业加强工程造价管理的对策【作 者】吴瑛 蒋伟琪【刊 名】山西建筑.2007,33(19): 243-2444/81【题 名】施工企业投标阶段的工程造价管理【作 者】曾萍【刊 名】山西建筑.2007,33(19): 249-2505/81【题 名】浅谈施工阶段的工程造价管理【作 者】卢桂梅【刊 名】山西建筑.2007,33(19): 264-2656/81【题 名】浅议建设单位工程造价管理人员在施工阶段如何控制工程成本【作 者】丁峰【刊 名】煤矿现代化.2007(3): 66-677/81【题 名】浅谈施工企业工程造价管理【作 者】罗家驹【刊 名】广东建材.2007(6): 183-1848/81【题 名】浅谈施工企业的工程造价管理【作 者】孟丽【刊 名】山西建筑.2007,33(17): 270-2719/81【题 名】建筑施工企业的工程造价管理【作 者】吴福平【刊 名】山西建筑.2007,33(14): 253-25410/81【题 名】施工企业工程造价管理工作分析【作 者】杨岭【刊 名】安装.2007(4): 14-1611/81【题 名】浅析施工企业工程造价管理【作 者】杜琼【刊 名】甘肃科技纵横.2007,36(2): 92-92,10212/81【题 名】石油化工施工企业工程造价管理分析【作 者】陆平杰【刊 名】化工质量.2007(2): 44-4813/81【题 名】浅谈施工企业的工程造价管理【作 者】牛永科【刊 名】科技信息:学术版.2007(6): 135-13514/81【题 名】施工阶段工程造价管理【作 者】张艳春【刊 名】山西建筑.2007,33(1): 253-25315/81【题 名】浅析施工企业施工过程中的工程造价管理【作 者】闫静 黄必军【刊 名】水利水电工程造价.2006(3): 13-1416/81【题 名】浅析施工阶段的工程造价管理【作 者】吴金来【刊 名】科技信息:学术版.2006(01S): 118-11817/81【题 名】建设单位在工程施工招标阶段工程造价管理【作 者】张纯林【刊 名】机场建设.2006(4): 44-4618/81【题 名】施工单位工程造价管理浅议【作 者】李海军【刊 名】现代农业.2006(12): 136-13719/81【题 名】论电力施工企业的工程造价管理【作 者】张强【刊 名】经济与管理.2006,20(12): 80-8320/81【题 名】浅谈施工企业的工程造价管理【作 者】杨丽梅【刊 名】科技情报开发与经济.2006,16(23): 223-22421/81【题 名】浅谈施工企业的工程造价管理【作 者】要小俊【刊 名】太原科技.2006(8): 46-4722/81【题 名】施工企业的工程造价管理探讨【作 者】王大慧 季同月【刊 名】山西建筑.2006,32(18): 237-23823/81【题 名】对施工阶段工程造价管理的思考【作 者】岑佩珠【刊 名】科技资讯.2006(22): 50-5024/81【题 名】浅谈工程量清单计价下的施工企业工程造价管理【作 者】张磊【刊 名】福建建筑.2006(4): 142-14325/81【题 名】浅谈施工阶段工程造价管理【作 者】孙立峰【刊 名】山西水利.2006,22(3): 85-8626/81【题 名】浅析建筑施工企业的工程造价管理【作 者】张碧君【刊 名】山西建筑.2006,32(13): 239-24027/81【题 名】浅析施工企业工程造价管理【作 者】周岚【刊 名】新疆有色金属.2006,29(2): 51-5228/81【题 名】浅析施工企业工程造价管理【作 者】寇国力【刊 名】四川建筑.2006,26(3): 186-18729/81【题 名】建筑施工企业工程造价管理的探讨【作 者】黎慧敏【刊 名】广东建材.2006(6): 112-11430/81【题 名】施工企业在招投标阶段的工程造价管理【作 者】苏奋【刊 名】广东建材.2006(5): 140-14131/81【题 名】施工企业工程造价管理【作 者】王俊玲【刊 名】山西煤炭管理干部学院学报.2006,19(2): 22-22,3032/81【题 名】施工企业工程造价管理浅析【作 者】曾炽容【刊 名】广东建材.2006(2): 122-12333/81【题 名】实施工程量清单计价 加强工程造价管理【作 者】徐卫成【刊 名】中国科技信息.2006(4): 140-14134/81【题 名】浅谈施工合同管理在工程造价管理中的意义【作 者】陈惠娟【刊 名】中国科技信息.2006(03B): 41-41,6435/81【题 名】施工企业如何进行工程造价管理【作 者】王慧敏【刊 名】经济技术协作信息.2006(3): 67-6736/81【题 名】施工企业工程造价管理剖析【作 者】费冬玲【刊 名】辽宁经济.2006(2): 87-8738/81【题 名】浅议工程建设施工和竣工结算阶段工程造价管理【作 者】周广联【刊 名】中国科技信息.2005(24B): 140-14039/81【题 名】如何有效进行施工企业工程造价管理【作 者】田玲【刊 名】四川建筑.2005,25(5): 153-15440/81【题 名】现阶段电力施工企业工程造价管理【作 者】李永胜【刊 名】山西电力.2005(6): 36-37,4641/81【题 名】浅谈实施工程量清单计价后的工程造价管理【作 者】付凌云【刊 名】中国招标.2005(11M): 62-6543/81【题 名】关于建筑施工企业工程造价管理的探讨【作 者】龚文胜【刊 名】葛洲坝集团科技.2005(1): 53-5544/81【题 名】工程造价管理与项目成本控制——施工企业的制胜之道【作 者】周新莉【刊 名】中小企业科技.2005(8): 25-2645/81【题 名】新形势下施工企业的工程造价管理【作 者】吴艺【刊 名】公路与汽运.2005(3): 173-17446/81【题 名】论施工过程中的工程造价管理【作 者】梁德文【刊 名】建材技术与应用.2005(3): 59-6047/81【题 名】对施工阶段工程造价管理的思考【作 者】张宏君【刊 名】新疆农垦经济.2005(4): 111-11248/81【题 名】谈施工企业的工程造价管理【作 者】赵春锋【刊 名】陕西建筑.2005(6): 34-3649/81【题 名】浅谈工程造价管理对施工成本管理与控制的作用【作 者】许成枫【刊 名】安徽建筑.2005,12(2): 125-12650/81【题 名】谈工程造价管理应注重施工合同的审查【作 者】陈鸿【刊 名】国外建材科技.2005,26(1): 121-12351/81【题 名】现行招投标模式下的施工企业工程造价管理【作 者】胡春媚【刊 名】山西建筑.2005,31(4): 154-15552/81【题 名】论施工阶段的工程造价管理【作 者】刘东伟【刊 名】山西建筑.2005,31(4): 158-15953/81【题 名】加强工程造价管理 提高施工企业效益【作 者】张静 陈雪萍【刊 名】江西冶金.2004,24(6): 44-4554/81【题 名】浅谈如何加强施工企业的工程造价管理【作 者】姚爱华【刊 名】特区经济.2004(8): 131-13155/81【题 名】论建筑施工企业的工程造价管理【作 者】戴刚 陈芝春【刊 名】甘肃农业.2004(8): 116-11756/81【题 名】浅谈施工企业的工程造价管理【作 者】肖文健【刊 名】科技情报开发与经济.2004,14(8): 234-23457/81【题 名】施工企业的工程造价管理【作 者】陶云霞【刊 名】山西建筑.2004,30(5): 99-10058/81【题 名】山东高密实施工程造价管理新模式推进工程量清单招标投标 成效显著【作 者】葛萌【刊 名】建筑市场与招标投标.2004(6): 22-2259/81【题 名】谈施工过程中的工程造价管理【作 者】陈强【刊 名】上海建设科技.2004(5): 62-6360/81【题 名】浅谈建筑施工企业工程造价管理【作 者】耿春红【刊 名】山西建筑.2004,30(19): 173-17461/81【题 名】如何加强建筑施工企业的工程造价管理【作 者】陈伟【刊 名】安徽建筑.2004,11(2): 119-12062/81【题 名】新模式下铁路施工企业工程造价管理初探【作 者】王森华【刊 名】铁路工程造价管理.2003,18(6): 25-2663/81【题 名】浅析施工企业工程造价管理【作 者】张永光 张佳音【刊 名】黑龙江科技信息.2003(11): 65-6564/81【题 名】谈施工企业的工程造价管理【作 者】施建斌【刊 名】山西建筑.2003,29(17): 129-13065/81【题 名】谈施工企业的工程造价管理【作 者】王庆生 杨丽梅【刊 名】山西建筑.2003,29(8): 208-20966/81【题 名】浅论入世后施工企业与工程造价管理【作 者】张潜 邹灵岚【刊 名】人民长江.2003,34(3): 65-6667/81【题 名】从永久船闸工程看施工管理对工程造价管理的影响【作 者】万华琳 冯军捷【刊 名】水利水电工程造价.2003(4): 27-28,5868/81【题 名】施工企业的工程造价管理【作 者】邬鹏华【刊 名】建材技术与应用.2003(5): 63-6469/81【题 名】施工企业工程造价管理问题研究【作 者】李雨洁 李多修【刊 名】铁道工程企业管理.2003(6): 16-1870/81【题 名】入世后施工企业内部的工程造价管理探析【作 者】黄先友【刊 名】经济师.2002(7): 150-15171/81【题 名】浅议施工企业的工程造价管理【作 者】周瑞卿【刊 名】福建建筑.2002(B10): 83-8472/81【题 名】从施工实践谈铁路工程造价管理【作 者】安生理【刊 名】山西建筑.2002,28(8): 106-10773/81【题 名】浅谈施工阶段的工程造价管理【作 者】赵二平【刊 名】山西建筑.2002,28(8): 129-13074/81【题 名】施工组织设计与工程造价管理【作 者】赵倩【刊 名】基建优化.2002,23(5): 38-4075/81【题 名】基于C/S结构的施工企业工程造价管理信息系统【作 者】徐学东 赵卫东 等【刊 名】山东农业大学学报:自然科学版.2002,33(3): 360-36476/81【题 名】施工索赔是工程造价管理的重要工作【作 者】郭照金【刊 名】铁路工程造价管理.2002,17(6): 17-1877/81【题 名】浅议施工企业的工程造价管理【作 者】付永贵【刊 名】铁路工程造价管理.2002,17(2): 1-478/81【题 名】新形势下建筑施工企业工程造价管理工作【作 者】马楠 王健【刊 名】华北科技学院学报.2002,4(1): 30-3179/81【题 名】福州平安大厦施工阶段工程造价管理【作 者】林华【刊 名】福建建材.2001(4): 43-44

建筑学毕业论文参考文献大全

接地气的大学生活即将结束,毕业论文是每个大学生都必须通过的,毕业论文是一种的检验学生学习成果的形式,怎样写毕业论文才更能吸引眼球呢?以下是我精心整理的建筑学毕业论文参考文献,仅供参考,大家一起来看看吧。

[1]邢莉燕,陈起俊.工程估价.北京:中国电力出版社,2008.

[2]郑少瑛,周东明,王力强.土木工程施工组织.北京:中国电力出版社,2007.

[3]郑少瑛,周东明,周少瀛.土木工程施工技术.北京:中国电力出版社,2007.

[4]张立新.住宅工程施工组织设计编制与案例精选.北京:中国建筑工业出版社,2005.

[5]山东省建设厅.山东省建筑工程消耗量定额.北京:中国建筑工业出版社,2003.

[6]中国建筑标准设计研究院.混凝土结构施工图平面整体表示法制图规则和构造详图(03G101-1).北京:中国计划出版社,2006.

[7]中华人民共和国建设部.建设工程工程量清单计价规范(GB50500-2008).第1版.北京:中国计划出版社,2008.

[8]中国建筑科学研究院,哈尔滨工业大学.建筑施工扣件式钢管脚手架安全技术规范(JGJ130-2001).第二版.北京:中国建筑工业出版社,2002.

[9]汪正荣,朱国梁.简明施工手册.第二版.北京:中国建筑工业出版社,2003.

[10]《建筑施工手册》(第四版)编写组.建筑施工手册.第4版.北京:中国建筑工业出版社,2003.

[11]中华人民共和国建设部标准定额司.全国统一建筑工程预算工程量计算规则土建工程(GJDGZ-101-95).北京:中国计划出版社,2001.

[12]山东省建设厅.山东省建筑工程工程量清单计价办法.北京:中国建筑工业出版社,2004.

[13]中华人民共和国建设部.建设工程项目管理规范(GB/T50326-2001).北京:中国建筑工业出版社,2002.

[14]中国建筑业协会建筑机械设备管理分会.简明建筑施工机械实用手册.北京:中国建筑工业出版社,2002.

[15]王玉龙.扣件式钢管脚手架计算手册.北京:中国建筑工业出版社,2007.

[16]四川省建设工程造价管理总站,四川省造价工程师协会.建设工程劳动定额建筑工程.北京:中国计划出版社,2009.

[17]四川省建设工程造价管理总站,四川省造价工程师协会.建设工程劳动定额装饰工程.北京:中国计划出版社,2009.

[18]中国建筑工业出版社.新版建筑工程施工质量验收规范汇编(修订版).第二版.北京:中国建筑工业出版社,中国计划出版社,2003.

[19]荆莉燕,王坚,梁振辉.工程估价.北京:中国电力出版社,2004.

[20]山东省建设厅.山东省装饰装修工程工程量清单计价办法.北京:中国建筑工业出版社,2004.

[1]刘柏茹.导线测量的精度控制探讨[J].硅谷,2009,(05).

[2]郭宗河,郑进凤,贺可强.全站仪导线测量若干问题的探讨[J].合肥工业大学学报(自然科学版),2010,(02).

[3]陈正耀.导线测量的计算与应用[J].北方交通,2009,(05).

[4]姜华根.双点导线测量[J].科技资讯,2009,(15).

[5]王汉存.全站仪导线测量平差方法浅析[J].中国煤炭地质,2009,(11).

[6]焦建新,沈荣林,闫玮.全站仪测量导线中的错误分析和处理[J].南京工业大学学报(自然科学版),2007,(04).

[7]王海明.全站仪坐标导线测量的平差方法[J].交通世界(建养.机械),2009,(09).

[8]孟令涛.城市导线测量一体化程序设计[J].现代测绘,2009,(04).

[9]黄艳立,高怡.全站仪导线测量数字化研究[J].河南城建学院学报,2009,(04).

[10]张小诺,李彦阳.导线测量严密平差定权方法研究[J].长春工程学院学报(自然科学版),2009,(04).

[11]熊法堂.导线测量粗差浅析[J].人民长江,2000,(05)

[12]景德广.导线测量中错误或粗差的分析[J].测绘技术装备,2003,(02)

[13]尚海旺,王水林.导线测量检验粗差的有效方法[J].科技信息,2010,(01)

[14]吴家乃.导线测量中粗差的查找[J].工程勘察,1981,(02)

[15]陈章明.检查导线测量错误的方法[J].引进与咨询,2000,(04)

[16]黄林.论导线测量粗差的判断[J].地矿测绘,1996,(02)

[17]蔡群.关于粗差含义及其多样性的探讨[J].连云港化工高等专科学校学报,1996,(01)

[18]宁卫远,焦利伟,刘艳玲.导线测量粗差判定方法的探讨[J].中州煤炭,2004,(06)

[19]陈玉平,胡奎.井下大压力巷道导线测量方法探讨[J].矿山测量,1998,(02)

[20].斯列涅夫斯基,.卡拜斯基,刘志源.导线测量中的坐标连测问题[J].矿山测量,1980,(03)

[1]王楠,邵毅明,周娜娜,阎宏涛.道路交通安全中的视错觉现象分析[J].公路与汽运,2010,(07)

[2](美)JR布洛克.奇妙的视错觉——欣赏与应用[M].北京:世界图书出版公司,1992.

[3]杨阿联.格式心理学与建筑设计[N].中国旅游报,2008.

[4]曹方.视觉传达设计原理[M].南京:江苏美术出版社,2005:146.

[5]贺俊杰.透视与错觉[M].湖南:湖南科技出版社,2012:98.

[6]随艳金敏丽.视错觉在公共空间艺术设计中的运用[J].院校风采,2010.

[7]刘跃国.浅谈视错觉在建筑立面设计中的应用[J].广西城镇建设,2010.

[8](英)查尔斯麦基.可怕的错觉:人人都会犯的致命错误[M].北京:新世界出版社,2008.

[9]马连弟刘运符.透视学原理[N].吉林美术出版社,2006:38

[10]熊圣.视错觉在在室内装饰设计中的应用[N].湖南城市学院学报,2005.

[11]李蔚.神奇的空间魔术——谈视错觉在餐饮空间设计中的应用[J].上海建材,2011(2)

[12]张引良.浅谈符号学与电影海报的视觉符号[J].中国-东盟博览,2012

[13]张福昌.视错觉在设计上的应用[M].北京:轻工业出版社,1983:1.

[14],[M]苏茂生,台北:大陆书店,1975:11.

[15]周东梅.视错觉在环境空间中的研究与应用[D]上海:东华大学,2006:7.

[16]熊兴福,刘金萍.析视觉负后像在艺术设计中的应用[J].包装工程,2007(08):1.

[17]蔡从.浅谈视错觉在中国古典园林中的应用[J].艺术广角,2011(04):58.

[18]康波,万铮.中国古典园林.2010:10.

[19]朴哲龙.人眼光学结构的研究[D]吉林延吉:延边大学,2007:6.

[20]贡布里希.贡布里希文集:艺术与错觉[M]杨成凯,广西:广西美术出版社,2012:5.

[1]宁龙梅.武汉市湿地功能评价与景观格局动态变化研究[D].中国科学院研究生院(测量与地球物理研究所),2004

[2]马健 章.关注正在消失的湿地[J].大自然,2012,(5).

[3]李益敏,李卓卿.国内外湿地研究进展与展望[J].云南地理环境研究,2013,(1):36-43.

[4]陈求稳.我国湿地保护立法的科学支撑[C].2005年全国环境立法与可持续发展国际论坛.2005.

[5]HOLLANDCC,HONEAJE,[J].Wetlands,1995(15):336-345.

[6]崔保山,杨志峰,李英华等.城市拓展中湿地的综合保护与发展[J].自然资源学报,2004,19(4):462-471.

[7]肖清风.有机设计——中国古代的设计特征之一[J].设计艺术研究,2013,3(6):83-88.[8]朱建宁.城市湿地公园:概念与规划⑴.建设科技,2009,(3):51-59.[9]孙广友,王海霞,于少鹏.城市湿地研究进展[J].地理科学迸展,2004,23(5):94-99.

[10]吴丰林,周德民,胡金明.基于景观格局演变的城市湿地景观生态规划途径[J].长江流域资源与环境,2007,16(3):368-372

[11]王建华,吕宪国.城市湿地概念和功能及中国城市湿地保护[J].生态学杂志,2007,26(4):555-560.

[12]温亚利,李小勇,谢屹.北京城市湿地现状与保护管理对策研究[M].北京:中国林业出版社,2008.

[13]张京祥.西方城市规划思想史纲[M].南京:东南大学出版社,2005.

[14]张冠增.西方城市建设史纲[M].北京:中国建筑工业出版社,2011.

[15]宋言奇.生态城市理念:系统环境观的阐释[J].城市生态与环境,2004,11(2):71-74.

[16]李明.融通的智慧:唐君毅.论中国哲学的有机肖然观[J].宜宾学院学报,2013,(1)81

[17]杜洁,车代弟.依托青山碧海,建设山水城市[J].北方园艺,2005,(2):40-41.

[18]李昊,孙倩.文化·生态·景观——中国“山水城市”理念的历史内涵与.当代诠释[J].建筑与文化,2013,(8):18-22.

[19]吴良镛.人居环境科学导论[M].北京:中国建筑工业出版社,2001.

[20]张巍巍.城市湿地公园开发模式研究——以唐山南湖城市湿地公园为例[D].北京:北京交通大学,2011.

附 :建筑学毕业论文选题

1、室内外气温对建筑围护结构吸收太阳能的影响

2、鲁西南地区门墩石造型、纹样初探

3、室外气温和保温层位置对间断供暖房间能耗特征的影响

4、极少主义室内光环境设计研究

5、建筑工程项目成本控制研究

6、老年人建筑的自然光环境设计初探

7、杨凌城市色彩景观规划研究

8、襄城县古城墙遗址保护公园规划设计

9、光导管照明系统的配光及应用研究

10、BIM技术在钢结构工程建设阶段的应用

11、民营建筑企业项目团队核心利益相关者冲突管理研究

12、市政工程项目责任成本管理应用研究

13、长春七天酒店(火车站店)装饰工程的成本管理研究

14、国学中心项目施工成本控制研究

15、黑龙江移动枢纽楼建筑工程项目的成本控制研究

16、呼和浩特市建筑勘察设计研究院发展战略研究

17、包头市A装饰公司发展战略研究

18、南京国际金融中心续建工程项目成本控制研究

19、国有施工单位材料采购管理研究

20、基于互联网+的PMIS的运维管理研究

21、建发集团观澜丽景二期项目工程造价管理研究

22、俄侨文化影响下的中东铁路建筑及其历史价值研究

23、建筑艺术表现在房地产经营销售策略中的应用研究

24、吉林鼎鑫路桥建设有限公司发展战略研究

25、湘黔古镇聚居文化和建筑空间形态研究

26、“营改增”对建筑企业税负影响分析

27、BIM在建筑工程管理中的应用研究

28、基于FIDIC合同条件的承包商索赔研究

29、基于分项计量的空调系统能耗诊断的实用研究

30、基于VE工程项目成本控制的研究与应用

31、建筑施工项目安全文化建设研究

32、太阳能-空气源热泵系统在独立式住宅中的应用研究

33、青岛地区农村钢结构住宅热桥的热工分析

34、英谈村历史建筑保护与利用研究

35、我国建筑业营改增相关问题研究

36、延长油田中心化验室项目成本管理研究

37、低气压下噪声环境对人体舒适感影响机理的研究

38、青岛市住宅建筑室内热环境的实测与研究

39、晋鲁地区民居烟囱的建构技术与文化意义研究

40、挣值法在中铁一局二公司项目成本控制中的应用研究

41、我国工程承包企业进入国际市场的对策研究

42、冯坪办公楼项目工程造价管理与控制研究

43、ZHGY集团管道安装项目预算控制研究

44、延长石油南区采油厂办公楼建设项目成本管理研究

45、NK集团土地整理项目的成本管理优化研究

46、延长油田崖里坪住房小区工程项目成本管理研究

47、基于公司战略的建筑企业多项目管理研究

48、注册造价工程师诚信评价体系研究

49、HCE集团项目成本管理研究

50、K公司固定资产质量评价及优化对策研究

51、基于BIM的框架结构参数化设计研究

52、智能型太阳能LED路灯控制器的研究

53、青岛里院建筑保护与改造模式研究

54、基于博弈分析的绿色住宅发展研究

55、青岛市大型公建能耗现状评估与预测研究

56、符合被动式围护结构热工标准的“抬梁式”农村住宅构造方法研究

57、我国新型建筑工业化发展制约因素及对策研究

58、基于可操作性目标的城市色彩设计方法研究

59、基于BIM的规则建立在建筑设计阶段应用研究

60、建设工程网上招投标系统的研究与设计

61、工程招投标中违规行为分析与监督机制完善

62、BIM技术在工程项目全寿命周期成本管理中的应用

63、商品房住宅项目成本管控的研究

64、以“美居购”网为例探析家居软装电子商务经营

65、建筑行业新生代农民工的劳动权益保障问题研究

66、“营改增”对建筑业税负影响分析及对策

67、北方寒冷地区农村住宅保温结构一体化设计研究

68、北戴河新区国家级绿色建筑示范区创建研究

69、河北省建材产业物流指数研究

70、挣值法用于建筑工程成本控制的研究

71、高层住宅小区风环境数值模拟研究

72、绿色建筑运营阶段隐性成本估算模型研究

73、基于系统动力学的工程项目人工成本优化研究

74、工程项目供应链材料采购成本系统动力学仿真研究

75、高温影响的舒适度模型研制及在我国南方城市的应用

76、唐华清宫景区气候适宜性空间格局初探

77、施工现场建筑工人作业疲劳的影响因素研究

78、基于热管置入式墙体的小型建筑能耗数值分析

79、中铁咨询集团公司财务与资本运营子战略研究

80、某公司可持续发展的实践研究

81、ZH公司CM科技园项目成本管理研究

82、风险理论在工程安全监理实践中的应用研究

83、某研发中心与产业基地可行性研究

84、中铁工程设计咨询集团发展战略研究

85、青岛中山路商业街历史建筑保护修复研究

86、某市建筑节能检测平台建立与运行维护研究

87、基于BIM技术的建筑性能辅助商品房定价

88、建筑企业隐性知识转移影响机制研究

89、建筑施工企业工程质量诚信体系建设研究

90、现代建筑空间与水要素研究

91、算量软件在建筑工程上的应用及问题探讨

92、政府项目代建制合同管理体系研究

93、建筑企业工程项目管理信息化探讨

94、建筑供应链环境下的材料联合库存优化研究

95、建筑材料“暴露”手法在建筑空间设计中的应用研究

96、虚实相生对空间意境营造的作用机制研究

97、基于Matlab对DEA工程建设项目评标模型的应用研究

98、西方文艺复兴绘画名作中建筑图景及其历史价值研究

99、房地产开发项目成本控制研究

100、建设工程合同信用对合同管理绩效的影响研究

附:建筑学研究生毕业论文

摘要:在今天的企业施工过程中,为了保证工程的效率性,做好建筑工程质量监督的工作是很有必要的。合理地制定建筑工程质量监督的条约,加大监督的管理力度,将工程的质量问题放在首要位置,保证了建筑本体的安全性,也体现了以人为本的思想。本文针对建筑工程质量方面缺乏的相关法律条例、建筑企业质量监督的态度浅薄以及监督人员的专业素质差异过大进行讨论,根据此情况对提高工程质量的监督能力、加强施工单位的监督作用以及提高管理人员的综合素质提出几点看法和建议,也希望政府能够大力发挥宏观调控的作用,使建筑工程的质量问题得到有效根治。

关键词:建筑工程;质量监督;难题;管理方式

由于我国的经济发展迅猛,刺激了城市化进度的加深,作为城市化标志之一,建筑工程在不断发展的同时,也带来了一些质量监督方面的问题。对此,国家与建筑业相关部门开始对建筑工程的质量问题进行深究。经过一段时间的努力,各方面的尽力配合,积极响应国家的号召,使得建筑工程的一些管理模式得到优化,也成功解决了一部分难题,但是对于日益增多的建筑工程项目来说,这些措施还是远远不够的。所以,在我们保持关注建筑工程质量监督问题的基础上,对于在工程进行中出现的问题进行理解和归纳,总结出一套完善的管理体系,保证建筑工程施工质量的安全性,也对建筑工程的健康发展起到了至关重要的'作用。

一、建筑工程质量监督存在的难题

(一)相关的法律法规不够健全

当前我国建筑工程质量监督的能力还有待提高,是因为没有一个完整的体系去制约建筑工程中出现的质量问题,而一部分的法律政策太过片面,监督力度明显不足以约束一个庞大的建筑工程。所以,在进行建筑工程项目时,如果施工方不遵守规定,在施工质量上大打折扣,那么对于这种情况也没有一个专门细致的惩处管理条例。为了改善这种不良环境,我国应该针对具体情况做出相应措施,完善建筑工程质量监督的相关法律,政府在宏观上加大对工程的监督力度,一个官方的、完整的约束条例对于建筑工程的需要来说,已经是迫在眉睫。

(二)建筑企业质量监督的态度浅薄

建筑工程质量监督的管理之所以疏松,其中一个原因就是负责监督的企业专员对待质量监督没有一个积极的态度,缺乏监督的意识,这样一种不负责任的工作态度对于建筑工程的质量产生了极坏的影响,相关的工作无法进行。同时,企业部门对于这种消极的影响也放任不管,一个工程项目的整体都缺少相关的监督措施,导致监督体制最终只是一个可有可无的形态,使得建筑工程质量监督的管理力度越来越小,也就无法保证工程的效率。

(三)监督人员的素质差异过大

从某个方面来讲,负责质量监督的人员素质也决定了建筑工程质量监督能否有效开展。在今天,一些工程项目中安排了专门的人员进行质量监督,但是这些监督人员的专业素质有高有低,在面对质量问题时,一些人会严把大关,另一些人可能会有所放松,这种情况使得政府的监督工作无法继续进行。所以,如果负责建筑工程质量监督的人员素质过低,不仅难以保证建筑工程的质量,也会使得政府的监督力度大打折扣。

二、建筑工程质量监督的管理方式

(一)制定建筑工程质量监理制

工程质量监理制度的实行,能够大大加强建筑工程质量监督的力度,对于工程的正确实施有着推动作用。所以,政府在大体方向上监督的同时,也要加强建筑工程监理制的规划,使得建筑工程监理制得以健全自己的形势内容,而且把监理制合法化,加强负责建筑工程质量监督工作者的认真态度,使这些工作者负责的工程项目与法律挂钩,一旦玩忽职守就意味着违法。对于建筑工程质量监理的专门人员要进行精挑细选,这些人在工作时一定要遵守工程项目的监理机制,确保工程项目的顺利进行。

(二)加强对设计单位和设计人员的监督力度

建筑工程里许多的组合因素中,设计方案的可行性有着至关重要的作用。所以建筑工程在正式开工前,对于设计人员的来历要有一个细致的了解,对于指派他的企业或者组织要进行深刻的调查,确保人员的选择没有问题。然后,对于设计人员提交的设计方案进行仔细研究,多次检查其合格性,一旦发现任何不妥之处立刻要求其做出修改,保证设计方案的正确性、完整性,对建筑工程起到决定的作用。

(三)提升管理人员的综合素质

在建筑工程质量监督中,相关的工作者综合素质必须要高,对于工程质量要时刻进行监督,才能使建筑工程质量监督的方针得到有效实行。但是,相当一部分企业只把重点放在怎样获取较高的经济利润上,忽视了建筑工程的质量,使得建筑工程没有得到相应的保护措施,其中产生的许多问题在未来更加难以解决。所以,企业在挑选管理人员时要制定相应的选拔规则与制度,对于施工人员也要仔细选择,确保每一个工作位置都要有任务、有效率地进展,对建筑工程质量监督人员定期开展相关知识方面的工作,加强管理人员的质量监督意识,使他们认识到监督的重要性,提升管理人员的素质,为建筑工程的顺利实施提供有力保障。

三、结语

通过以上几大方面可知,完善建筑工程质量监督的体系对于建筑工程来说是势在必行的,但是在实施的过程中有着较多的阻碍因素,这些因素分散于各个施工单位或者个人,如何集中这些因素并进行妥善处理是建筑工程质量监督的一大难点。所以负责工程质量监督管理的相关工作者要处理好自己的工作重心,对于工程项目中实行的监督管理监制要大力提倡并严格执行,政府在宏观调控的同时,对于单位及个体要及时加大监督力度,在整个过程中起到了推波助澜的作用,这样对于建筑工程的质量将起到良好的监督作用,在良好的监督作风下,建筑工程的质量问题才能得到有效解决,这样的建筑物才能够被安全地放入市场中,人们对于建筑成品的使用才能感到放心如意。

参考文献:

[1]彭淑芬.浅析建筑工程质量监督管理[J].山西建筑,2011,02(03):210-211.

[2]林星友.新时期建筑工程质量监督创新管理措施[J].中国科技信息,2011,10(19):86.

[3]鞠录平.试论建筑工程质量监督管理体系构建[J].赤峰学院学报(自然科学版),2016,07(06):129-130.

[4]宋献博.关于新形势下建筑工程质量监督中几个问题的思考[J].工程质量,2014,11S2:144-146.

1) according to claim the parties classificationBetween the contractor and the developer claims itself;Between the contractor and subcontractor claim itself;Second-ranking between contractor for loans with claims;Second-ranking between with the underwriter claim ) the effects of the event of classification according to the claimTime delay claims due to the developer had failed to provide construction conditions prescribed by the contract, if not prompt delivery design drawings, technical data, site, road; Or the contractor reason the developer instructions to stop the project implementation; Or other causes of force majueure effect cause for engineering interrupt, or engineering progress slow down, make this time delay, contractor a unforeseeable external obstacles or condition claim if during construction, the contractor on the scene encountered an experienced contractor usually can't foreseen the external obstacles or conditions, such as geology and expected client provides information) (different, appear unforeseen rocks and mud and groundwater, engineering change claim because the developer or engineer instruction modified design, increase or decrease of quantities, add or delete part of the project, modify implementation plan, change construction sequence of the extension of time and cost, causing loss this claim, the project for some reason terminate claims, such as force majeure influence, the developer default, the engineering was forced to have stopped before completion, and no longer continue implementing, make the contractor incur pecuniary loss, therefore lodge a claim against other claim such as currency devaluation, exchange rates, prices and wages rise, policy law change, the developer delayed payment of claims caused ) according to the claim classificationThe claim which requires time second-ranking extended period, delayed completion expenses claims which requires the developer compensation costs, adjust the contract ) press claim based on the reason classificationSecond-ranking contract in claims that claims to contract provision as basis, happened to compensate for the contractor stipulated in the contract, the contractor the disturbance events claim according to the contract stipulations. This is the most common claim refers to contract the interference of engineering during the nature of the event has exceeded the contract scope. In the contract can't find out specific basis, the general must according to applicable to contracts of legal relation of solving moral claim to because the contractor mistake (. quotation blunders, such as environmental investigation errors occur, or the contractor shall) caused by the contractor for the risk of severe ) handling of classified according to the claimSecond-ranking single claim is for single claim a jamming events proposes. Claims processing is implementation of the contract, interference event happens, or after once. It consists of contract management personnel handling, and in the provisions of the contract within the validity of the claim of intent and claim to submit claims also called package itself claims or comprehensive claims. This is often adopted in international engineering claim to handle and solve a method. General in the project completion, the contractor will engineering process before the single claim not solve together and puts forward a total claims report. In engineering contract both sides before or after delivery of the final negotiations, delivered with package solving claim.

浅谈建设工程施工索赔论文范文

金融危机后中国建筑业的发展【摘要】世界金融危机对国内建设工程带来直接、持久的影响。本文分析了在金融危机下建筑安装工程安全管理出现的新矛盾和新问题,并提出解决问题的对策措施。【关键词】金融危机建安工程安全管理为了应对世界金融危机, 我国加快建设投融资体制改革步伐,采取适度宽松的财政金融政策,增大基本建设投资规模, 使建筑业生产保持了良好的发展态势。但从全球经济形势分析,受金融危机影响,世界经济增速放缓,投资减少,这是不可避免的。中国经济也不可避免地受到金融海啸的波及, 随着金融危机向实体经济的渗透和转移,在今后一段时期,金融危机对建筑业更深层次的影响会逐步显现。一、金融危机对建设工程带来的直接影响1. 建设项目投资规模缩减。由于国际经济大环境不佳,中国不可能独善其身,必然直接影响到国内经济。如产品出口减少,外汇收入下降,股票暴跌,失业增加,消费减少,经济增速趋缓。经济不景气将直接导致建设项目投资规模缩减,许多项目因经济受阻放缓甚至叫停。由于建设工程业务的特殊性决定其受影响的滞后性,金融危机对建筑行业的影响是甚为持久深远的。2. 建设工程市场竞争加剧。市场经济下滑,建设自有资金流动不足,金融机构出于规避风险考虑,对建设投资信贷持审慎政策,贷款条件更加严格,门槛提高,致使建设方信贷资金困难,建设投资减少,在建项目萎缩,建筑业出现“僧多粥少”的现象,工程施工方承揽任务的难度加大。为了获取任务,有的不惜采取各种手段参与竞争,从而加剧了建筑市场的混乱和无序化。3. 建筑业利润减少,建设工程风险增大。受金融危机冲击, 建设行业中标机会减少,企业直接收益下降,成本增加,项目管理难度增大。建设方受资金紧缺影响,履约能力降低,项目周期延长,工程款拖延支付的可能性增加,对施工方构成一定的资金压力;如业主资金链断裂,建设项目“烂尾”,建设方缺乏项目的最终结算欠款偿还能力,造成施工承包方利益受损,施工企业面临更大的财务风险。二、金融危机影响下建设工程安全管理出现的新问题金融危机导致建设规模缩减,市场竞争加剧,建设任务不足,企业利润下降,承建工程风险增大,这必然对建筑工程安全管理带来新矛盾和问题。1. 建设项目在资金不落实的情况下开工,安全投入难以得到保证。项目建设因受金融危机影响而出现资金不足,如建设主体行为不当,将资金缺口的问题转嫁给施工方,要求施工单位垫资施工,导致施工单位增大了资金成本压力, 保证生产安全的资金投入缺失,给安全管理工作带来不利。2. 建设项目减少,行业竞争加剧,不当竞争为工程施工埋下了安全隐患。建设规模压缩,项目承揽竞争激烈,不当竞争的现象时有发生,更有可能趋生恶性竞争,这为项目建设埋下了不安全、不稳定的因素。另一方面,因建设资金紧缺,投标模式多以低价中标为主,利润空间少,或者只能保本甚至亏损。为了争取利润或保本止亏,施工方唯有压缩开支,在人员配置、机械设备、防护设施、防护用品等方面压减安全费用,或者将工程再分包,而建筑安装工程往往是压价再分包的项目,致使安全措施不落实,安全管理失控。3. 建筑市场秩序混乱, 责任主体行为不规范,给施工安全管理工作造成直接影响。工程施工出现的安全问题,归根到底是建筑市场混乱、行为不规范的结果。在金融危机的形势下,上建设项目会有经济风险,业主为降低建设投资风险不按照建设程序办事, 规避政府主管部门的监管,违法组织工程招标,肢解分包工程或暗箱操作选定工程施工单位,随意压低工程造价,违反规律压缩施工工期,有意拖欠工程款;施工责任主体不具备安全施工条件或没有相应资质的擅自承担施工任务,或违法将工程挂靠转包,谋取不正当利益,使工程施工没有安全保障;工程建设中设计、施工、监理等单位不执行强制性标准, 对安全工作指导、管理、监督不力。上述种种行为,均是引发安全事故的根本原因。4. 过度着眼于经济利益,轻视安全工作,是金融危机下容易产生的问题。由于金融危机冲击,建筑施工利润下降,收益减少。施工企业为了实现经济效益这个硬指标,着力于追求盈利,一切以经济利益为先,甚至把节省安全投入作为创收的途径, 忽视施工本质安全,不去挖掘安全管理潜在的效益, 将安全工作流于形式。这些行为势必扭曲施工人员的思想,淡化安全管理的意识,使“安全第一,预防为主”变成一句空话,造成安全工作处于十分被动状态。5. 经济不景气,人心不定,管理跟不上,施工现场的危险因素冒头。经济环境不好,对建筑施工的安全管理必然带来一定影响,导致施工现场危险源抬头。在建筑安装工程中常见的危险因素有:一是一线作业人员的安全防护意识薄弱,安全操作技能差,无证上岗、违章施工、冒险作业的现象时有发生;二是安全防护设施质量低劣,安全帽、安全带、安全网、触电保护器等假冒伪劣防护产品在工地上普遍使用;三是安全防护措施不落实,“四口、五临边”的防护似有实无,形同虚设;四是脚手架和操作平台搭设不规范,构配件缺陷严重仍“带病”使用,架身整体刚性和稳定性差,脚手板未满铺,防护栏杆无设置;五是临时用电设计不符合技术要求, 电线乱拉乱接现象严重,保护接地(接零)线松脱,漏电保护开关失灵;六是起重吊装作业任意发包给没有资质的队伍,安全措施不到位,施工作业险象环生。三、解决安全管理新问题的对策措施建筑安装工程是建设项目的配套和附属工程,属专业总包或分包的范围,受项目总承包或土建总承包管理,在项目或土建总包的统一组织下开展施工,既要由土建提供建筑安装的条件,又要为土建、装修施工等专业提供协作和配合。针对建筑安装工程在金融危机形势下安全管理工作出现的新问题,提出对策措施如下:1. 加强建设工程管理力度, 规范建设主体行为,为实现安全有效管理打好基础。一是做好项目前期的策划论证工作,不符合安全生产条件的项目坚决不准开工;二是严格执行工程许可制度,保证工程建设资金到位,对建设资金不足或资金不到位的项目,暂缓或停止开工;三是政府部门对建筑市场招投标活动要加强监管,对违法肢解工程尤其是易被肢解的建筑安装工程、随意压低工程造价、设定不合理施工工期等不利施工安全的行为要严厉打击; 四是严厉查处建设工程垫资、带资的经营活动,运用法治和行政干预的有效手段解决好工程拖欠款问题。2. 加强建筑市场准入的管理,规范市场竞争行为,强化企业主体安全责任制。一是完善施工企业的安全评价工作,将安全生产必备的条件如安全管理架构、人员设置、安全装备等列入建筑企业资质标准范围,提高安全生产的资质水平;二是严格总分包安全制度,落实总、分包的安全责任,杜绝以包代管、包而不管的行为;三是强化法人代表是企业安全生产第一责任人意识,加大对安全生产法律法规的贯彻力度;四是严格实施建安工程安全生产费用专款专用,加强对建安工程安全投入的监督管理,对不按规定进行安全生产投入的建设工程要严处重罚;五是加强对建筑市场安全生产的执法力度,维护工程施工安全。3. 加强政策调控引导, 规范施工安全管理行为,建立安全生产长效管理机制。充分运用市场规律,建立激励手段,将安全生产评价及其考核结果同工程招投标、企业评优、资质等级等环节挂钩,凡是在建筑工地安全工作中取得优异成绩或被评为安全文明“双优”工地的企业,在招投标和评定优质工程、先进单位时给予加分,提高安全工作的含金量;对安全管理差、导致发生安全事故的单位,予以吊扣、降低甚至取消资质的处罚。根据建筑安装工程的特点,加强现场“五项安全制度”:一是安全生产责任制度,落实建设、监理、施工单位的安全责任;二是现场施工人员安全培训教育和交底制度, 增强员工的安全意识和安全技能;三是安全设施“三同时”制度,建筑安装现场安全设施与主体工程同时设计、同时生产、同时投入使用;四是施工机械设备安全准入制度,特别是对特种设备坚持申报备案管理,把好进场关;五是安全保险制度,即为建筑安装现场施工人员购买建筑.四、世界金融危机下房地产业发展的思考:世界经济危机将加速我国房地产业和世界接轨 2008年世界经济危机以来,因为世界建筑业普遍低迷,而中国房地产市场相对较好,随着中国在建设领域进一步扩大开放,外商进入中国房地产市场的时机已经成熟,因此我们必须有充足的心理准备。此前,外商(港商较多)在北京、上海、深圳等城市与内地企业联合,开发了较多的土地项目,已引起了众多房地产商的注意与兴趣。出于对中国房地市场的长期看好,港资还在内地大规模储备土地。实现住宅产业化,是国际房地产市场发展的必然趋势。住宅产业化,就是让住宅建设融入社会化大生产的模式来进行发展,将开发、设计等各个环节组合起来、集成起来,进行规模化生产。其可归纳为“六化”,即连续化、标准化、集团化、规模化、一体化、机械化。有专家认为,随着国外先进技术与优良产品的进入,将在四个方面提升中国住宅产业化的水平:一是将加快促进中国住宅规范标准向国际化靠拢;二是带动中国生产技术的提高;三是生产管理体制将会有较大变革;四是大量建筑师、设计人员的涌入,不仅带来了先进的规划设计理念与先进的社会化专业设计分工,而且会对前期的项目策划工作、中介工作、保险银行业的投入产生重大的影响。房地产业的特点将会更加明显 将来房地产市场会呈现如下几个特点:第一,住房理念从生存型向舒适型转变,房地产的生产方式从速度、规模型向质量效益型转变,讲品牌、重舒适、重环境、重质量成为住宅发展关键;第二,随着住房建设的动力机制的变化,个人成为最大的购房军团。人口增加、城市化进程加快与人们要求改善住房的愿望,成为住房发展的三大动力;第三,房地产市场日趋规范,国家通过强化市场的宏观调控与整顿规范建筑市场,实现优胜劣汰,资质低的房地产开发企业将无法生存;第四,虽然国外企业可能不会首先直接参与房地产开发,但是会大量介入金融、评估、代理、咨询等与房地产有关的业务,这无疑会促进国内的房地产运作按国际规范与标准进行。第五,房地产业的科技含量会进一步提高,产品更新换代会加快。将来住房将必须具备节水、节能、环保与智能化的基本特征。第六,开发商会从当初简单的追求利润、质量演变为追求科技与人才,这也必将促进住宅的更新换代与开发质量的进一步提高。海外业内人士也纷纭看好中国未来的房地产市场,他们对中国大陆的房地产行业持乐观看好的态度。 房地产业既要靠市场调节,更要靠政府宏观控制 破解房地产业发展中的问题,就目前而言,不管是发达国家,还是发展中国家,或者转轨经济的国家都采用了一种所谓的“混合经济”模式,既有市场调节,又有政府调节。面对刚性的住房需求与日益增长的投资需求,在政府难以同步增加土地供应量的同时,要达到房价理性上涨的目的,应适当抑制需求,即采取信贷与税收等政策,提高购买的门槛,并加大长期持有房产的成本。政府既要帮企业培育好房地产市场,更要加强房地产行业的引导和管理。政府要出台新的调控措施,强势房地产业的管理 。大幅度提高购房的首付比例 在政府大力解决保障性住房需求(特别是廉租房)的前提下,不再对第一套房实施优惠信贷政策,大幅度提高首付可以在相当程度上抑制非生存性居住需求,比如冒进需求、恐慌性需求、投机需求等等,受到影响最大的是那些以杠杆原理融资买房的人,这些人或是以目前能力不应买大房新房的人群,或是职业炒房者,把这两类人群挡在门槛之外,正是加大首付的用意所在。利用好税费经济杠杆 在免除多余原始购置房产税费的条件下,加大持有环节税收,实施普遍的按照房屋面积递增的房产持有税,目的是随面积递增而增大长期持有成本,使得买房在资产保值增值方面的不确定性大大增加,改变买房必赚的预期。参照国外经验,尽快出台符合我国国情的物业税,加大持有成本,使得更多的住房不是用来投资而是用来居住,而随着面积增加而递进式增加纳税额的做法,对于炒家与富人而言,可以在很大程度上消除其以投资盈利为目标的买多房、买豪奢房的行为。使他们能够将多余的资金投入到实业中去,对社会及就业都有直接益处。长期持有成本增加,还可以使二手商品房源数量激增,使租金处于平稳状态,租房比买房更合算。这样,会有更多人倾向于租房,而不是超越自身实际购买能力提前购房。此时住宅市场供不应求的局面将大为改观。五、结语:目前的世界金融危机,对中国建筑业而言,既是挑战,更是难得的机遇,我们要迎接挑战,抓住机遇,调整思路,更新观念,开拓创新。我们有理由相信:金融危机的暴风雨过后,中国建筑业迎来的必定是灿烂的明天。

收费便宜。。广州萤火虫商业写作室。进我百度空间

建筑工程作为与人们生产生活息息相关的工程,与整个国家经济的发展、人民生活的改善有着密切的关系。下面是我带来的关于建筑工程技术 毕业 论文题目的内容,欢迎阅读参考!建筑工程技术毕业论文题目(一) 1、软土地基上基础的处理 措施 2、拟建建筑物地质差异较大时的地基处理措施 3、结构设计中梁柱的交接处理 方法 4、结构设计中基础梁的设计处理方法 5、砌体结构房屋产生裂缝的处理措施 6、重力式挡土墙安全问题的研究 7、防止高层建筑基础不均匀沉降的措施 8、工程项目施工的组织研究 9、软弱地基的处理方法 10、地形地貌对建筑体型和层高的影响研究 11、建筑物三缝合一的处理方法研究 12、解决屋面渗漏问题的方法 13、论建筑与人 文化 的协调统一 14、论建筑设计与结构设计的协调统一 15、底层商场的设计处理方法 16、电梯轿箱基础与框架独立柱基的设计处理方法研究 17、深基础支护结构的设计与施工方法 18、框架结构中楼梯与框架梁柱的连接方法研究 19、提高普通建筑物的保温隔热措施 20、保证工程预算准确性的措施 建筑工程技术毕业论文题目(二) 1 浅谈企业从事工程总承包面临的问题 2 试述工程建设项目施工索赔的艺术 3 关于房地产开发成本管理的初探 4 浅谈施工方案与工程项目施工质量的关系 5 试论建筑工程监理应如何确保施工安全 6 论述工程量清单计价模式下的造价控制与管理 7 浅析如何搞好工程建设监理工作 8 试述施工现场基础工程质量控制 9 浅谈工程项目主要成本管理与控制 10 试述工程管理项目中的成本控制和品质管理 11 关于做好项目工程造价全过程的控制 12 浅谈网络计划技术在项目管理中的应用 13 浅谈建设工程项目的造价管理 14 论述工程成本的影响因素及控制对策 15 论述工程建设项目投资中的造价控制 16 论述可行性研究在建设中的作用 17 浅析工程项目投资管理 18 试论建设工程项目质量管理与控制 19 浅谈房地产开发中的工程成本控制 20 浅谈工程建设项目的技术变更管理 建筑工程技术毕业论文题目(三) 1. 浅谈如何做好工程项目的施工质量管理 2. 发包人如何做好工程合同管理 3. 建筑工程项目施工风险防范分析 4. 我国工程监理业存在的问题及对策讨论 5. 关于施工企业实施低成本的战略讨论 6. 浅谈大型工程项目的信息化管理 7. 双代号时标网络计划在建筑施工进度控制中的应用 8. 施工企业如何应对清单环境下的成本管理 9. 浅论如何加强施工项目的成本管理 10. 信息管理在施工管理中的应用 11. 关于工程项目成本管理的预测与控制 12. 浅谈工程索赔对减少工程经营风险的作用 13. 浅谈如何有效的进行工程造价管理 14. 浅谈施工阶段工程项目成本的有效控制 15. PDCA循环管理在建设工程管理中的应用 猜你喜欢: 1. 2017年工程管理毕业论文题目 2. 大专建筑工程技术论文题目 3. 建筑工程技术毕业论文范文 4. 建筑工程技术论文参考文献 5. 建筑工程技术管理毕业论文

相关百科

热门百科

首页
发表服务