工程造价毕业论文英译

1. The Cost Control of the Entire Engineering Project Process in Line with International Standards2. A Brief Introduction to Project Cost Management of Construction Enterprises

Construction Cost Audit ReportFor Pasta & Pizza Salvo Co., Ltd. Project佼佼意人食品(上海)有限公司松江区书山路55号A1厂房装修工程结算审核咨询报告To: Pasta & Pizza Salvo Co., Ltd.佼佼意人食品(上海)有限公司:Entrusted by Pasta & Pizza Salvo Co., Ltd.(The “Client” or the “Property Owner”), Beijing Zhongruiyuehua Project Cost Consulting Co.,Ltd. (The “Auditor” or “We”) has performed a construction cost audit on the completed factory decoration project of A1, No.55 Shushan Road, Songjiang District, Shanghai. During the auditing period, Shanghai Jinsha Construction & Installation Co., Ltd. (The “Contractor”) did not provide the complete information for settlement verification. Under the circumstance that we did not have the complete information, we have reviewed and verified the actual on-site work amount of the factory at A1, No.55 Shushan Road.受贵司委托对松江区书山路55号A1厂房装修工程进行已完工程结算审核咨询,在委托期间由于总包施工企业上海金厦建筑安装工程有限公司(以下简称施工方)不予以配合,未提供完整的结算审核资料。我们在施工企业提供的资料不完整的情况下,受业主委托对书山路55号A1厂房现场所发生的实际工程量予以复核。I. Auditor’s Statement一、工程审核委托说明In accordance with the construction contract, the property owner shall review and verify the proposed settlement provided by the contractor and give feedback. However, the contractor refused to provide complete information for settlement verification. The property owner has engaged us, the project cost consulting company, to audit the actual work amount and construction cost for this project on its behalf. Therefore, our calculated construction cost is based on the information provided by property owner and actual on-site measurement; and our audit result is only to provide a professional opinion to the property owner as a reference. If the contractor provided fully comprehensive information for settlement verification, we will charge the client differently in accordance with the service agreement.根据施工合同的要求,业主方应对施工方上报的结算申请予以复核,并回复意见。由于施工方拒绝提供完整的结算资料。本公司依据业主方的单方面委托,以专业身份代替业主按实审核已完工程造价,故本报告仅为本公司根据业主方提供的相关信息及现场实地丈量情况计算的工程造价,其审核结果为提供给业主方结算的参考意见,如施工方另行提供结算资料,我们将根据委托协议,进行调整。II. Construction Cost Audit Basis二、工程审核依据1. This audit report is in accordance with “Shanghai Construction and Decoration Project Budget Quota (2000)”, “Shanghai Installation Project Budget Quota (2000)”, and other related quotas, current documents, and provisions issued by Shanghai Construction authority.1.本审核咨询书依据《上海市建筑和装饰工程预算定额(2000)》、《上海市安装工程预算定额2000》等上海市建设主管部门颁发的有关工程造价的与“2000”定额相配套的其他现行文件和规定执行。2. In this audit report, the additional charge rate of 6% is in accordance with “Shanghai Construction Cost Information.”2.本审核咨询书增加项目工程造价取费费率取定根据上海市《上海市工程造价信息》所刊登之费率取定如下:装修工程综合费率按6%计取。3. In this audit report, man-hour rate and partial main materials are calculated using the average method in accordance with “Shanghai Construction Cost Information;” all other materials without market price guide are referred to current market price and the actual condition of construction. 3.本审核咨询书人工费单价及部分主要材料价格根据施工期间《上海市工程造价信息》中所刊登价格按算术平均值计算,无市场指导价的材料均按市场实价并结合本工程的实际情况进行计取。4. Construction contracts, sub contracts, and other related agreements with sub-contractors; 4.建设施工合同、分包合同、与分包单位的结算协议;5.Bid documents and tender documents; 5.招标文件、投标文件;6.Design papers and deepened description, work amount, specific brand requirement, and other related specifications; 6.设计图纸及设计深化说明、工程量、指定品牌要求及其相关说明;7.Related laws and regulations; 7.有关法律、法规;8.Information provided by the client and other related verifications. 8.委托单位提供的资料及其相关依据证明。III. Construction Cost Audit Procedure三、工程审核咨询程序With the cooperation of the client, we have familiarized with the project and conducted on-site measurement, recalculation, and verification on the work amount. We have made deductions for the unperformed items on the full-responsibility non-negotiable agreement; and also made adjustment for approved additional items. In our performance of the construction cost audit, we have followed the relevant laws and regulations. Based on the information collected during the course of practice, the construction contract and quotas, we confirm that the content of the report reflects our objective and professional opinions.审核咨询方在甲方的密切配合下,熟悉相关资料,对完成的工程量进行现场丈量和计算核对,对包干闭口价施工企业漏项予以增减,对后增项目予以认可的做出调整,审核咨询人员按照合法的程序,严格依据合同和定额,客观公正予以审核咨询。IV. Construction Cost Audit Declaration 四、工程审核说明For the construction contract is a full-responsibility non-negotiable agreement, we have conducted on-site investigation and audited each item stated in the contract. We have made below deductions for the items that did not meet the contractual requirement:由于甲、乙双方签订的合同为包干闭口价,依据现场实际情况,我们对合同内的项目行逐项审核,实际现场施工方没按合同和设计要求施工的项目,我们予以扣除;For the materials with specific brand name requirement, we have made temperate price adjustment according to the market price if the contractor did not meet the requirements. For the materials without specific brand name requirement, we have treated them as disputable item.设计要求使用指定品牌及型号的材料,如果施工企业不按此规定执行的,我公司暂按市场价格予以调整,对于品牌、型号非设计招标要求的,列入有争议款项计取;The repeatedly charged items have been deducted from the final calculations (Please refer to Construction Cost Audit Declaration).重复上报的工作量予以扣除。(详见工程审核说明)V. The Purpose of Construction Cost Audit五、工程审核的目的The purpose of this report is to audit the construction and decoration work performed by the contractor for the factory of A1, No. 55 Shushan Road, Songjiang District. The audit includes review and verification the actual work amount according the construction contract; recalculate costs; disclosure and adjustment for unperformed work, repeatedly charged works, and works that did not meet contract terms or specific design requirement; and provide final conclusions.如实反映出松江区书山路55号A1厂房装修施工企业已完项目及不应计取合同范围内未施工的内容、重复上报项目、未按合同中约定及图纸设计品牌指导应扣除的造价,给予最终结论。VI. Construction Cost Audit Result六、工程审核咨询结果The project’s final settlement price reported by the contractor is 10,055,476.06 RMB. (This settlement price includes the payment of 1,309,318.60 RBM to the original contractor, Shanghai Huiling Construction and Decoration Co., Ltd.) Because of the particularity of this project, the settlement is composed by two parts. One part is the work load completed by the contractor according to the construction contract. The amount is 4,025,950.64 RMB, which has been approved by the property owner. Another part is the work that was altered from the construction contract and original design. The amount is approximately 2,000,000.00 RMB. The contractor failed to provide justification for the alteration; therefore the altered work has not been approved by the property owner. This amount is categorized as a disputable item. In summary, the disputable deduction amount for this project is 4,720,206.76 RMB; the undisputable deduction amount for this project is 2,720,206,76 RMB.本工程施工企业上报结算金额为人民币:10055476.06元,大写:壹仟零伍万伍仟肆佰柒拾陆元零陆分;(含施工单位确认且已支付给原总包单位:上海汇陵建筑装饰有限公司1,309,318.60元)对于本工程结算的特殊性,本工程结算分两部分组成,一部分为施工单位按照合同要求已完工的工程量,业主方经审价后认可的金额为:4025950.64元,大写:肆佰零贰万伍仟玖佰伍拾元陆角肆分;另一部分是施工单位未按照合同和设计要求变更工作的,应业主方不予认可且施工单位也未提供变更依据的金额约为人民币:200万,故列入争议项目。因本工程的特殊性其核减金额(含有争议的款项)为人民币:4720206.76元,大写:肆佰柒拾贰万零贰佰零陆元柒角陆分,不含争议款项其核减金额为人民币:2720206,76元,大写:贰佰柒拾贰万零贰佰零陆元柒角陆分。The contractor has completed the work amount of 4,025,950.64 RMB according to the contract. However, this project has not been given the final acceptance; and the property owner still has some objections regarding the quality problems. Therefore, the amount of 4,025,950.64 RMB in this audit report does not represent the quality standard accepted by the client. The client still reserves the right to request the contractor for compensation or repair work due to quality problems. (就施工单位按照合同已完成的工程量4025950.64元,鉴于本工程至今未进行竣工验收,且业主方就工程质量尚存异议,故本报告审定的工程价款并不代表业主方认可相关工程质量,业主方保留进行质量索赔和要求施工单位返工返修的权利。)资料来源:华东建设造价预算网

不光是题目吧,还要翻译摘要捏

一二楼的翻译句子,很中文试。翻译英文不一定要一个字字的按顺序翻译下去。要翻译到老外一看就懂才是关键。《与国际接轨的全过程工程造价控制》“Entire Process of Project Cost Control in Construction” - In International Standard《浅谈建筑施工企业项目成本管理》A Brief Introduction to Project Cost Management in Construction.

工程造价毕业论文工程造价控制

工程造价是指进行某项工程建设所花费的全部费用,其核心内容是投资估算、设计概算、修正概算、施工图预算、工程结算、竣工决算等等。工程造价的主要任务:根据图纸、定额以及清单规范,计算出工程中所包含的直接费(人工、材料及设备、施工机具使用)、企业管理费、措施费、规费、利润及税金等等。以一份建筑工程造价毕业论文为例,一般包括的主要内容为绪论、国家工程造价的现状、工程造价管理、全面造价的管理等内容组成,其中以绪论讲述的工程造价的目的及意义:目的:对我国工程造价管理现存的主要问题进行分析研究,找出相应的补救措施或解决办法,使工程造价管理水平有一定提高,保证项目投资管理目标的实现,力求在各个建设项目中能更加合理地使用人力,物力,财力,从而取得较好的投资效益和社会效益。意义:(1)促进我国建设工程造价管理现存的一些问题的解决;针对我国建设工程造价管理现状,发现存在的问题,对这些问题进行分析研究,找出有助于部分问题的解决办法。(2)缓和我国建设资金的巨大需求与有限供给之间的矛盾;我国人口多,底子薄,生产率低,每年能提供的建设资金极为有限,每年固定资产投资与发达国家相比或者按人均计算都是较低的,目前,我国经济发展对建设资金的需求越来越强烈,特别是能源、交通、原材料,通讯等基础工业和基础设施的建设资金严重不足,这已成为我国经济迅速发展的主要障碍,因此,迫切需要加强项目的投资控制,合理使用人力、物力、财力,求得最大的投资效益。研究造价管理就是要想办法把投资成本控制在预算范围内,以最大限度的节约资金。(3)规范建筑工程造价市场;建筑工程造价的确定是有是有科学依据的,不是凭空想象或大概估算。但是在现阶段建筑市场中经常有贪利的建筑企业夸大多要,或是建设单位资金不足却要大兴土木,出现非正常压低工程造价的情况,造成了建筑市场的混乱,严重扰乱了市场秩序。因此,加强建设工程造价管理有利于规范建筑工程造价市场。(4)减少社会财富流失和浪费;随着我国改革开放和向市场经济转变,城市建设日新月异的发展,其中由国家或集体出资兴建的项目占有相当大的比例,因此,如何控制国有资产的恰当利用是一个非常重要的问题。如果完全按市场情况来确定工程造价,可能会出现建设单位盲目定价,施工企业漫天要价,中介单位无章可循的情况,这势必导致整个建筑市场的混乱,造成国有资产的投资和浪费,尤其是国家重点建设项目工程量大,施工时间长,工程复杂,更易造成造价管理上的混乱,造成国有资产不必要的浪费和流失。另外,由于国有企业的改制和改造,一些企业为了发展也在进行各种改建和扩建,控制这些国有工程的造价也是一个非常重要的问题,合理控制工程造价能为企业节约大量资金。更多关于标书代写制作,提升中标率,点击底部客服免费咨询。

工程硕士论文:浅谈工程造价在建筑工程中的作用

【摘要】 工程造价时建筑工程的一大内容,这是由于造价控制效率的高低直接影响了建筑工程的经济效益。工程单位应做好造价控制工作,对各个环节的成本投入严格控制,这才是现代工程管理的最终任务。为保证整个建筑工程造价控制在合理的范围内,需不断完善工程项目生产全过程的技术管理和经济管理。针对这些,本文重点分析了建筑工程造价控制的相关问题。

【关键词 】建筑工程 造价控制 管理

市场经济体制的变革使得建筑行业成为投资热点,这对于建筑工程造价有着促进作用。工程造价管理直接影响了建筑投资的经济利益,对整个市场经济发展及单位个体经营都有促进作用。从实际情况看,我国的建筑工程造价管理质量较低,工程成本资金投入较多,工程造价管理体系中还需要面临更多的问题,阻碍了建筑行业的持续发展。

一、降低建筑工程造价的意义

工程造价涉及到多个方面的内容,如:建筑安装工程费用、设备器具的购置费、其它费用等等。建设工程造价管理是工程单位日常管理的重点,直接影响了建筑工程创造的经济价值。从工程单位角度看,只有针对工程项目生产全过程实施技术管理和经济管理,才能达到预期的施工效果。

建筑工程造价管理效率的高低,对于整个工程项目投资有着很大的影响,不仅影响了经济投资效益,也关系着工程单位的生存发展。因建设项目规模大,建设周期长,技术难度高,资源消耗多,为充分显现出经济效益价值,必须要保证投资的准确性。如果工程单位造价政策失误,则将导致多个方面的经济损失。因而,为了实现工程造价合理控制,必须要在各个施工阶段进行多次计价,参照合理的操作流程控制造价。

二、管理建筑工程造价需坚持的原则

1、协调关系,控制质量。这里的“关系”是指工程造价与施工质量的关系。工程造价主要是结束一个项目需投入的人工、机械、材料等的综合费用,按照投资方、设计方、施工方、承包方、审计方等多个单位的性质,需要投入的造价成本也不一样。如:投资估算、设计概算、施工图预算、承包合同价、结算价、竣工结算等。工程质量主要是工程完成后,建筑的使用性能要和图纸标准相符合,各项技术参数都要达到图纸上的标准。考虑到工程造价与工程质量之间的联系,也使工程项目的寿命周期跟随工程造价与工程质量的变化而改变,我们对于工程造价的控制更加严格。需要注意的是投资建设工程项目不能仅重视减少造价而节省资金,对于工程项目必须的成本投入应全面开支,这样可避免因节省成本而使得工程费用缺少,导致施工作业难以顺利进行。

2、更新观念,优化管理。价值工程可以看成是价值分析,这些对于改善建筑内部质量有着重要意义。对建筑工程各项功能实施分析评价,从多个方面减小工程成本,这是每个工程单位所追求的`。在建筑设计环节里,把工程项目的功能要求与投资相互结合,按照工程施工的具体要求,借助于有效的措施减少成本投入,这是每个施工单位要积极思考的。

三、建筑工程各阶段的造价控制与管理措施

1、决策阶段的造价控制与管理。投资决策时期的最大任务在于对项目开展全面的可行性分析,以确定选择的方案能否投入到实际工作中。工程处于该时期时,对工程造价管理必须完成的任务包括确定方案、编制计划、投资估算等。投资估算在整个项目工程里有着很大的作用,其是项目决策、设计、施工、竣工决算等环节的主要依据,对建设项目总投资有决定性作用。决策时期单位双方要根据自己的角度考虑,在错综复杂的关联和因素制定出符合需要的方案,然后再根据方案情况合理估价。而投资估算的准确性将会关系着工程项目实施的成效。这就需要工程单位能立足于实际情况,安排专业水平高的单位进行投资估算工作。

2、设计阶段的造价控制与管理。设计工作是工程建设的灵魂,对处理技术与经济关系的操作环节有指导意义,对于工程造价控制作用尤为显著。工程方案的优化直接影响了建设项目一次性投资额大小,且在建成交付使用后会对项目创造的经济效益产生作用。审查设计单位制定的方案时,建设单位必须要做好设计方案的优化工作。从长期工程建设情况看,项目实施之前对方案进行优化改进能降低的成本金额占75%左右,这些都提醒工程单位要想从根本上降低工程造价,则需将工作重点放在前期方案优化工作上。利用不同的方案优化措施,能促进施工工艺流程的简单化,避免材料、设备、资源上的浪费,从多个方面实现资金的节约。

3、招投标阶段的造价控制与管理。工程单位在编制招标文件时必须综合多个角度考虑,让代建单位、投标方对工程造价的控制更加便捷。需把设计内容放宽,各种资金使用情况必须要经过专业的审计师鉴定。对于项目承包单位,除了要考虑其施工技术外,还需要重点考察其给出的承包价格。此外,我们需要对清单报价调整进行相关的规定,在工程量清单中工程量出现错误,工程变更造成工程量与合同中规定的出现误差时,需要在资金上适当添加,同时对规费、税金等及时改变。这是为了保证工程造价的稳定性,以免出现过大的变动而影响到造价管理。建设单位签订承包合同尤为重要,需要将重点内容在合同里明确规定。结合建筑市场的实际情况,对项目施工时运用到的材料成本严格控制,避免各方面因素造成的造价过高问题。

四、结语

总之,建筑工程造价管理是建筑项目不可缺少的部分,在施工中要做好多个方面的施工准备,将整个成本投资控制在有效范围内,以实现工程项目创造更大的经济效益。施工单位需积极结合科学技术原理和经济及法律手段,处理好工程作业的各项任务。对不同时期的建筑施工,要充分采取有效地策略控制造价,根据市场经济变化趋势制定造价管理方案,最终实现经济效益最大化。

参考文献:

[1]柯洪.工程造价计价与控制[M].北京:中国计划出版社,2006.4.

[2]詹玉玲.浅谈如何控制建筑工程造价[J].石河子科技,2006(1):48—49.

[3]徐彬.浅析建筑工程造价的控制与管理[J].科技信息,2006(7).

[4]刘秀凤.浅谈建筑工程造价的合理有效控制与探索[J].科技咨询导报,2007(4).

工程造价毕业论文外文翻译

转自百度道友:《2. Engelhardt,Gary V.“House Price and Home Owner Saving Behavior”. Regional Science and Urban Economics,26,1996.pp.313-336. 3. Engelhardt,Gary V.“House Price and The Decision to Save for Down Payments.” Journal of Urban Economics,36,1994.pp.209-237. 4. Karl E. Case ,John M. Quigley, Robert J. Shiller. “Comparing Wealth Effects: The Stock Market versus The Housing Market”. University of California,Berkeley. 2003, SepTEMber, pp.1-15. 5. Levin,Laurence.“Are Assets Fungible? Testing the Behavioral Theory of Life-Cycle Savings”.Journal of Economic Organization and Ehavior, 36,1998.pp.59-83. 6. Milton. Friedman.“ A Theory of The Consumption Function. Princeton University Press, PrinCETon”.1957. 7. Nikola,Dvornak and Marion Kohler.“Housing Wealth ,Stock Market Wealth and Consumption : A Panel Analysis for Australia”.Reserch Discussion Paper ,Jul.2003。 8. Starr-McCluer,Martha.“The Stock Market Wealth and Consumer Spending”.Mimeo, Federal Reserve Board of Governors,1999. 9. Skinner, Jonathan.“Housing Wealth and AgGREgate Saving”.Regional Science and Urban Economics,19,1999.pp.307-324. 10. Yoshikawa,Hiroshi and Fumio Ohtake.“Female Labor Supply,Housing Demand ,and The Saving Rate in Japan”.European Economic Review,33,1989.pp.997-1030.”》0|评论

一二楼的翻译句子,很中文试。翻译英文不一定要一个字字的按顺序翻译下去。要翻译到老外一看就懂才是关键。《与国际接轨的全过程工程造价控制》“Entire Process of Project Cost Control in Construction” - In International Standard《浅谈建筑施工企业项目成本管理》A Brief Introduction to Project Cost Management in Construction.

1. The Cost Control of the Entire Engineering Project Process in Line with International Standards2. A Brief Introduction to Project Cost Management of Construction Enterprises

Construction Cost Audit ReportFor Pasta & Pizza Salvo Co., Ltd. Project佼佼意人食品(上海)有限公司松江区书山路55号A1厂房装修工程结算审核咨询报告To: Pasta & Pizza Salvo Co., Ltd.佼佼意人食品(上海)有限公司:Entrusted by Pasta & Pizza Salvo Co., Ltd.(The “Client” or the “Property Owner”), Beijing Zhongruiyuehua Project Cost Consulting Co.,Ltd. (The “Auditor” or “We”) has performed a construction cost audit on the completed factory decoration project of A1, No.55 Shushan Road, Songjiang District, Shanghai. During the auditing period, Shanghai Jinsha Construction & Installation Co., Ltd. (The “Contractor”) did not provide the complete information for settlement verification. Under the circumstance that we did not have the complete information, we have reviewed and verified the actual on-site work amount of the factory at A1, No.55 Shushan Road.受贵司委托对松江区书山路55号A1厂房装修工程进行已完工程结算审核咨询,在委托期间由于总包施工企业上海金厦建筑安装工程有限公司(以下简称施工方)不予以配合,未提供完整的结算审核资料。我们在施工企业提供的资料不完整的情况下,受业主委托对书山路55号A1厂房现场所发生的实际工程量予以复核。I. Auditor’s Statement一、工程审核委托说明In accordance with the construction contract, the property owner shall review and verify the proposed settlement provided by the contractor and give feedback. However, the contractor refused to provide complete information for settlement verification. The property owner has engaged us, the project cost consulting company, to audit the actual work amount and construction cost for this project on its behalf. Therefore, our calculated construction cost is based on the information provided by property owner and actual on-site measurement; and our audit result is only to provide a professional opinion to the property owner as a reference. If the contractor provided fully comprehensive information for settlement verification, we will charge the client differently in accordance with the service agreement.根据施工合同的要求,业主方应对施工方上报的结算申请予以复核,并回复意见。由于施工方拒绝提供完整的结算资料。本公司依据业主方的单方面委托,以专业身份代替业主按实审核已完工程造价,故本报告仅为本公司根据业主方提供的相关信息及现场实地丈量情况计算的工程造价,其审核结果为提供给业主方结算的参考意见,如施工方另行提供结算资料,我们将根据委托协议,进行调整。II. Construction Cost Audit Basis二、工程审核依据1. This audit report is in accordance with “Shanghai Construction and Decoration Project Budget Quota (2000)”, “Shanghai Installation Project Budget Quota (2000)”, and other related quotas, current documents, and provisions issued by Shanghai Construction authority.1.本审核咨询书依据《上海市建筑和装饰工程预算定额(2000)》、《上海市安装工程预算定额2000》等上海市建设主管部门颁发的有关工程造价的与“2000”定额相配套的其他现行文件和规定执行。2. In this audit report, the additional charge rate of 6% is in accordance with “Shanghai Construction Cost Information.”2.本审核咨询书增加项目工程造价取费费率取定根据上海市《上海市工程造价信息》所刊登之费率取定如下:装修工程综合费率按6%计取。3. In this audit report, man-hour rate and partial main materials are calculated using the average method in accordance with “Shanghai Construction Cost Information;” all other materials without market price guide are referred to current market price and the actual condition of construction. 3.本审核咨询书人工费单价及部分主要材料价格根据施工期间《上海市工程造价信息》中所刊登价格按算术平均值计算,无市场指导价的材料均按市场实价并结合本工程的实际情况进行计取。4. Construction contracts, sub contracts, and other related agreements with sub-contractors; 4.建设施工合同、分包合同、与分包单位的结算协议;5.Bid documents and tender documents; 5.招标文件、投标文件;6.Design papers and deepened description, work amount, specific brand requirement, and other related specifications; 6.设计图纸及设计深化说明、工程量、指定品牌要求及其相关说明;7.Related laws and regulations; 7.有关法律、法规;8.Information provided by the client and other related verifications. 8.委托单位提供的资料及其相关依据证明。III. Construction Cost Audit Procedure三、工程审核咨询程序With the cooperation of the client, we have familiarized with the project and conducted on-site measurement, recalculation, and verification on the work amount. We have made deductions for the unperformed items on the full-responsibility non-negotiable agreement; and also made adjustment for approved additional items. In our performance of the construction cost audit, we have followed the relevant laws and regulations. Based on the information collected during the course of practice, the construction contract and quotas, we confirm that the content of the report reflects our objective and professional opinions.审核咨询方在甲方的密切配合下,熟悉相关资料,对完成的工程量进行现场丈量和计算核对,对包干闭口价施工企业漏项予以增减,对后增项目予以认可的做出调整,审核咨询人员按照合法的程序,严格依据合同和定额,客观公正予以审核咨询。IV. Construction Cost Audit Declaration 四、工程审核说明For the construction contract is a full-responsibility non-negotiable agreement, we have conducted on-site investigation and audited each item stated in the contract. We have made below deductions for the items that did not meet the contractual requirement:由于甲、乙双方签订的合同为包干闭口价,依据现场实际情况,我们对合同内的项目行逐项审核,实际现场施工方没按合同和设计要求施工的项目,我们予以扣除;For the materials with specific brand name requirement, we have made temperate price adjustment according to the market price if the contractor did not meet the requirements. For the materials without specific brand name requirement, we have treated them as disputable item.设计要求使用指定品牌及型号的材料,如果施工企业不按此规定执行的,我公司暂按市场价格予以调整,对于品牌、型号非设计招标要求的,列入有争议款项计取;The repeatedly charged items have been deducted from the final calculations (Please refer to Construction Cost Audit Declaration).重复上报的工作量予以扣除。(详见工程审核说明)V. The Purpose of Construction Cost Audit五、工程审核的目的The purpose of this report is to audit the construction and decoration work performed by the contractor for the factory of A1, No. 55 Shushan Road, Songjiang District. The audit includes review and verification the actual work amount according the construction contract; recalculate costs; disclosure and adjustment for unperformed work, repeatedly charged works, and works that did not meet contract terms or specific design requirement; and provide final conclusions.如实反映出松江区书山路55号A1厂房装修施工企业已完项目及不应计取合同范围内未施工的内容、重复上报项目、未按合同中约定及图纸设计品牌指导应扣除的造价,给予最终结论。VI. Construction Cost Audit Result六、工程审核咨询结果The project’s final settlement price reported by the contractor is 10,055,476.06 RMB. (This settlement price includes the payment of 1,309,318.60 RBM to the original contractor, Shanghai Huiling Construction and Decoration Co., Ltd.) Because of the particularity of this project, the settlement is composed by two parts. One part is the work load completed by the contractor according to the construction contract. The amount is 4,025,950.64 RMB, which has been approved by the property owner. Another part is the work that was altered from the construction contract and original design. The amount is approximately 2,000,000.00 RMB. The contractor failed to provide justification for the alteration; therefore the altered work has not been approved by the property owner. This amount is categorized as a disputable item. In summary, the disputable deduction amount for this project is 4,720,206.76 RMB; the undisputable deduction amount for this project is 2,720,206,76 RMB.本工程施工企业上报结算金额为人民币:10055476.06元,大写:壹仟零伍万伍仟肆佰柒拾陆元零陆分;(含施工单位确认且已支付给原总包单位:上海汇陵建筑装饰有限公司1,309,318.60元)对于本工程结算的特殊性,本工程结算分两部分组成,一部分为施工单位按照合同要求已完工的工程量,业主方经审价后认可的金额为:4025950.64元,大写:肆佰零贰万伍仟玖佰伍拾元陆角肆分;另一部分是施工单位未按照合同和设计要求变更工作的,应业主方不予认可且施工单位也未提供变更依据的金额约为人民币:200万,故列入争议项目。因本工程的特殊性其核减金额(含有争议的款项)为人民币:4720206.76元,大写:肆佰柒拾贰万零贰佰零陆元柒角陆分,不含争议款项其核减金额为人民币:2720206,76元,大写:贰佰柒拾贰万零贰佰零陆元柒角陆分。The contractor has completed the work amount of 4,025,950.64 RMB according to the contract. However, this project has not been given the final acceptance; and the property owner still has some objections regarding the quality problems. Therefore, the amount of 4,025,950.64 RMB in this audit report does not represent the quality standard accepted by the client. The client still reserves the right to request the contractor for compensation or repair work due to quality problems. (就施工单位按照合同已完成的工程量4025950.64元,鉴于本工程至今未进行竣工验收,且业主方就工程质量尚存异议,故本报告审定的工程价款并不代表业主方认可相关工程质量,业主方保留进行质量索赔和要求施工单位返工返修的权利。)资料来源:华东建设造价预算网

工程造价毕业英文论文题目

5. Cost Estimation 5.1 Costs Associated with Constructed Facilities The costs of a constructed facility to the owner include both the initial capital cost and the subsequent operation and maintenance costs. Each of these major cost categories consists of a number of cost components. The capital cost for a construction project includes the expenses related to the inital establishment of the facility: Land acquisition, including assembly, holding and improvement Planning and feasibility studies Architectural and engineering design Construction, including materials, equipment and labor Field supervision of construction Construction financing Insurance and taxes during construction Owner's general office overhead Equipment and furnishings not included in construction Inspection and testing The operation and maintenance cost in subsequent years over the project life cycle includes the following expenses: Land rent, if applicable Operating staff Labor and material for maintenance and repairs Periodic renovations Insurance and taxes Financing costs Utilities Owner's other expenses 输入限制,不能全部发给你,参考以下网址 或交流,还有很多,不能全部收录。Project Management and CostJim SlomanChief Executive and DirectorMI AssociatesFormer Chief Operating OfficerSydney Organising Committee for the Olympic GamesAustralia这篇的长度合适PDF8页

还说的好蛋糕好帅哥和福建的高度和的话才几个机会干哈是经常的回复啊师傅好多个法儿干热风固然是降低攻击攻击宏观环境根据国家和工会及供货价格就换个环境

论工程造价与现场管理的关系,论工程索赔的管理。论造价成本分析的作用。从实际工作经验想的。工程造价肯定与索赔啊,现场管理有关的嘛。造价不做成本分析怎么可能,进大点的地产都要求会这个。

学术堂整理了十五个关于工程造价的论文题目,供大家参考:1、浅谈定额计价与清单计价的异同2、探讨低价中标在建筑工程中的合理应用3、如何编制一份高质量的工程量清单4、浅谈建设项目施工招投标5、建设工程项目信息管理研究6、浅谈工程项目风险管理7、浅谈建筑工程合同价款的确定与调整8、建设工程违约责任分析9、工程量清单计价与传统报价模式比较研究10、浅谈投标报价策略及报价技巧11、建筑施工企业如何加强工程造价管理12.工程设计对工程造价的影响13、注重工程结算提高索赔意识14、编制预结算过程中几个疑难问题之我见15、运用预算电算化软件的一些体会

工程造价毕业论文构造柱

毕业设计,听到这个词的时候,心里是多么不舍、纠痛的感觉。原来转眼间,我们的匆匆三年一晃又过去了,真的还没有准备好出去外面工作,自己心里没有什么长远的目标。回想踏进岭南校门的那一刻起,心里还是如此的兴奋,要在这里给自己给下美好的回忆。

短短的两个多月的毕业设计,却是结束我们来大学的最后一堂课,繁琐而充实的毕业设计,锻炼了我们这个专业的耐心、耐性、认真的工作态度,毕业设计作为我们大学学习专业知识的一种综合应用能力,是一种综合的再学习、再提升的过程,这一过程的很大程度上培训了我们的学习能力、团队合作精神和独立思考能力。在这个毕业设计的任务,就是为我们出来工作知识的一个巩固,如何解决自己遇到的问题,从中积累新的知识实践经验,为我日后专业的工作岗位奠定了坚实的基础。

这次我选择的毕业设计是广州市民航职业技术学院工程的造价,其中包括钢筋算量、图形算量、工程套价。此次的毕业设计让我真实的接触了一个造价员的工作,从以往的学习理论到实践的跨越,虽然有很多的方面还是需要指导老师的讲解,但是过程都是自己手动完成,对于我们来说是一个不错的挑战和学习的机会。

我的毕业设计的工程主要步骤如下:

1、了解项目地址、项目立项、图纸总说明、合同条款等等涉及有关的内容;

2、熟悉图纸。熟悉图纸是一个计算工程量的前提条件,只有把图纸了解清楚了,才能在工程计算中避免很多问题,更准确的算出工程量。

3、计算工程量。计算工程量大的方向分为三个:钢筋算量、图形算量、工程量套价。

钢筋算量计划安排的时间是第七周(10月15日)交中期结果:

①桩承台、承台梁

②各层楼的柱

③各层楼的梁

④各层楼的板

图形算量、工程量套价第十四周(12月5日)前完成:

①土石方、垫层

②填充墙工程计算,分内墙和外墙。外墙按中心线计算,内墙按净长线计算。

③画门窗

④直行楼梯

⑤装修房间。包括(墙面、墙裙、天棚、吊顶、踢脚、地面)

在设置基础的桩承台的时候,独立基础钢筋该如何布置,布置的对不对,也是考验我们的一个比较大的难题,横向受力钢筋、纵向的受力钢筋、标高时是多少,在指导老师的指导下,认真的完成了。所说的钢筋算量,就是验证你个人对钢筋平法的熟悉程度,柱子中的纵筋、箍筋;梁的支座筋、架立筋、构造筋、箍筋,在梁的布置的时候,也是比较烦恼的,因为很多梁,但是cad图纸直接导进去又不可以直接识别,只可以每条梁的点选识别,把梁的跨数、支座和原位标注等的,也是花费了比较多的时间;还有板的钢筋也是这样,负筋和受力筋,布置的板的范围是比较重要的一点,记得自己把范围布错的时候,钢筋单方大了很多,在指导老师的检查先,还是把问题给解决了。

在算基础挖土方的时候,要考虑到基础放坡与不放坡的问题。在定额中清楚的表述了:基础开挖的深度1.5米以上的要考虑放坡,并且要考虑是人工挖土还是机械挖土,因为要根据不同的工作方法选择不同的放坡系数。房间装修就是把房间的所有部件,设置好了,还有墙体要封闭,有些地方没有墙体的,可以用虚墙代替,然后一个个点上去就好。套价的重点就是准确的计算各个部分分部分项工程量,对主要材料进行调价,计算工程造价;我们缺乏的就是对施工工艺的了解,如何熟练的运用定额计算规则进行对各个子目进行套价,这是套价的关键点。根据广联达计价软件广东定额套子目取费,得出了最终的一份完整的施工图预算。

通过在做这一个毕业设计的这一段时间里,自己真正动手去做,发现了很多问题,可以发现问题,通过耐心的听指导老师的讲解,和同学之间的讨论,得出结果,这就不是问题了。在计算基础的时候,独立基础的形状标高,这都是我遇到的难题,因为我对于实体工程不够了解,在算柱、梁、板的时候也是容易把其中的标高弄错,特别是套价的时候,对于施工的工艺,还有定额子目不了解,等等这些问题,都是我们今后需要更加努力去学习的。在学校的最后一堂课就这样就结束了,往后的人生将迎接更大的挑战,只有不断的提高自己的知识结构,才能立足社会,达到自己的目标。

随着毕业设计的结束,原来转眼间,我们的匆匆四年一晃又过去了,自己真的还没有准备好出去外面工作,自己心里没有什么长远的目标。回想踏进昆工校门的那一刻起,心里还是如此的兴奋,要在这里给自己给下美好的回忆。短短的两个多月的毕业设计,却是结束我们来大学的最后一堂课。

繁琐而充实的毕业设计,锻炼了我们这个专业的耐心、耐性、认真的工作态度。毕业设计作为我们大学学习专业知识的一种综合应用能力,是一种综合的再学习、再提升的过程,这一过程的很大程度上培训了我们的学习能力、团队合作精神和独立思考能力。在这个毕业设计的任务,就是为我们出来工作知识的一个巩固,如何解决自己遇到的问题,从中积累新的知识实践经验,为我日后专业的工作岗位奠定了坚实的基础。

这次我的毕业设计是嵩明大队新建执法业务用房招标控制价编制,其中包括钢筋算量、图形算量、工程套价。此次的毕业设计让我真实的接触了一个造价员的工作,从以往的学习理论到实践的跨越,虽然有很多的方面还是需要指导老师的讲解,但是过程都是自己手动完成,对于我们来说是一个不错的挑战和学习的机会。

我的毕业设计的工程主要步骤如下:

1、了解项目、图纸总说明、合同条款等等涉及有关的内容;

2、熟悉图纸。熟悉图纸是一个计算工程量的前提条件,只有把图纸了解清楚了,才能在工程计算中避免很多问题,更准确的算出工程量。

3、计算工程量。计算工程量我们是每个人有不同的任务,我负责的就是楼梯、构造柱的工程量计算。

在计算过程中,最繁琐最难的就是钢筋的工程量计算,每一根钢筋都要找出来,每一根钢筋都不一样需要分别计算。而在这次毕业设计中我所有的钢筋弯钩都是按照180度计算的。在这个过程中,同学和老师给了我很大帮助,耐心地指导我,和我讲解问题。

4、通过在做这一个毕业设计的这一段时间里,自己真正动手去做,发现了很多问题,可以发现问题,通过耐心的听指导老师的讲解,和同学之间的讨论,得出结果,这就不是问题了。

在计算基础的时候,独立基础的形状标高,这都是我遇到的难题,因为我对于实体工程不够了解,在算柱、梁、板的时候也是容易把其中的标高弄错,特别是套价的时候,对于施工的工艺,还有定额子目不了解,等等这些问题,都是我们今后需要更加努力去学习的。在学校的最后一堂课就这样就结束了,往后的人生将迎接更大的挑战,只有不断的提高自己的知识结构,才能立足社会,达到自己的目标。

时光如流水飞逝,两个多月过去了,经过我们的努力我们小组的毕业设计也完成了。回想起做毕业设计的整个过程,其中有苦也有甜,艰辛的同时又充满乐趣。然而,不管怎么样,我们总是收获良多的。

这次毕业设计的内容是:一是,编制工程量清单及其招标控制价;二是,编制造价指标;三是,编制建筑工程投标文件及施工合同。毕业设计按分组的方式进行,每六个人组成一个小组,并且选出一个小组组长,每个小组要求独立完成整个毕业设计。小组长按照我们的能力、擅长的地方给我们每人分配了任务,我负责的是地上的混凝土工程模板工程部分,还有一部分钢筋。

我们按照各阶段的任务规划各自努力完成,在这些过程中,遇到不懂的就去查找资料,或者向老师请教,或者和同学一起交流探讨,从中我注意到了一些我所忽略的比较细的问题,也改正了一些错误的地方。而在我们小组共同的能力下,很快我们就把工程量计算完了。

在完成了工程量计算这一部分的工作内容后,我觉得自己又从新将自己曾经学习过的知识再次学习了一遍,对于各个工程量的计算规则,又有了进一步的熟悉。在这么的过程中,每一步都是自己亲自做过的,遇到的问题也非常多,在经过遇到问题,思索问题到解决问题的过程中,收获是最多的。以往没有注意到的问题,都在这一次的毕业设计中得以体现,这培养了我的细心,耐心和专心。指导老师给予的指导、同学的帮助让我受益良多,无论是理论工作上的计算,还是实际现场施工操作,老师都给我们做了详细的分析,让我在计算各个工程量时更能理论结合实际,更合理地计算工程量。在未来的定额计价阶段里,我还有很多的知识需要学习,还需要更加努力、认真,尽自己最大能力完整地完成这一毕业设计。对我而言,算量过程最难的部分要数钢筋的计算了。由些地方,我们要参照图集,钢筋在支坐处的锚固长度,和在中间的搭接长度,还有要分清钢筋的种类,直筋,弯筋,吊筋和箍筋等等形式.

另外,在计算模板工程的时候也出现了一些自己没有意识到的错误。就是在套清单和定额的时候,柱子的支撑如果超过3.6米那么就要另外再套一个每超一米而增加的定额。而我们所算的楼层中一和二层层高都是超过3.6米的,然而我都只套了一个定额。而且一层和二层的是套一个清单,其他层也套一个清单。如果不是老师审查发现提醒我们,我们很多人都要忽略了。

经过两个月时间的毕业设计,我获益匪浅,从中学到了很多新知识,既有对已有知识和技能的巩固,又有对新知识的理解和掌握,同时也提高了我的思考能力总结能力。这次毕业设计的整个过程,我觉得深受教益,主要有以下几点:

1.在这次毕业设计中,我通过上网查找资料、翻书,还有请教老师同学来解决其中所遇到的困难,这对我来说不仅是对所学知识的理解、巩固和加深,而且增强了运用所学知识解决实际问题的能力,更让我更加深刻地明白不懂就要问做人要谦虚这一道理,也增强了我与他人的友好沟通能力。

2.在这次毕业设计,我学会了更加熟练掌握算量软件及其计价软件的应用。

3.此次毕业设计中,我完成一部分就返回整理检查,发现了许多或大或小的错误,针对这些错误我请教老师同学并认真改正。这让我更加明白做什么事情一定要认真仔细谨慎,特别是算量计价,需要多检查几遍。

4.在这次毕业设计中,我了解了许多以前从未接触过的知识,开阔了视野,增长了见识,为以后的工作打下了坚实的基础。

5.通过这次毕业设计,培养我们综合分析问题和解决问题的能力,达到学会查阅图集、各种手册以及询价的综合能力;培养我们理论联系实际,踏实、严谨、认真的工作作风,以及工程造价人员必备的全局观念,经济观念和质量观念,学会编制造价指标分析。

6.在这次毕业设计中,使我更深刻的认识到团队合作精神的重要性,这是完成一份工作所必需的,也是作好一份工作的前提。学会了做人、学会了如何与他人共处、学会了适应社会,为将来我们上岗就业打下了坚实的基础。

本次设计总体来说还是比较成功,但是还存在着一些问题有待继续努力。一是,对于一些基本的知识点的认识理解不够完成,总是容易出现错漏,运用时更加不够熟练,因而也导致我在算量时速度比较慢。例如对一些计算规则记得不熟甚至有些完全不记得,这样就必须浪费时间去翻书,计算的时候就没有那么顺利了。还有个别知识点我理解得不够透彻,有一些也因为上课时没注意听所以都不了解,具体的在算量中就出现了这样或那样的问题。虽然本设计还有许多地方需要改进和完善。但是我还会努力的完成它,争取做得更优秀。二是、本次毕业设计中出现的问题也体现了本人还不够细心谨慎,没有多次进行检查,对于一些明显错误的地方没有仔细认识到,从而老师审查时就出现许多需要再重新修改计算的地方。这使我十分羞愧,但是也使我得到了教训,在以后的工作中我会更加仔细谨慎。为了改正缺点,加强对所学知识的运用,以及掌握更多的知识,我将在以后的学习和工作中更加努力学习,不断的完善自我,提高自我。

在这次毕业设计中,我非常感谢同学们的帮助,尽管有些问题是那么浅显你们也不会嘲笑我而是认真滴解释,所以,我很感激你们,在你们不懂的地方我也非常愿意伸出我的手。另外,我也非常感谢老师们的辛苦指导,不管我们遇到什么样的难题,问的问题与多么繁琐,老师们都耐心一遍遍告诉我们,所以我的内心充满对老师的敬意与感激。

毕业设计总结

时间过得飞快,转眼两个多月过去了,繁琐而充实的毕业设计画上圆满了句号。毕业设计作为我们学生在学校学习的最后一个环节,是对我们所学基础知识和专业知识的一种综合应用,是一种综合的再学习、再提升的过程,这一过程在很大程度上培养了我们的学习能力和独立思考能力。所以两个多月的时间,是对我们两年来所学的知识进行了一个汇总。任务虽然繁重但很充实,不但使我们的知识得到了巩固,在解决疑惑和探讨问题的时候,我们也从中学到新的知识,积累实践经验,这为我们将来走向工作岗位奠定了坚实的基础。

我们的毕业设计是对**********综合楼进行预算,其中包括安装部分和土建部分。之前我们也做过一套图纸,但都是在课堂上由各科老师的一点点指导下完成的,所以这次完全由我们自己动手完成,对我们来说也是个挑战。

我的任务是安装的给排水,消防水和全部板钢筋。在做给排水和消防水的时候,我首先做的是熟悉好图纸,把设计总说明图例目录看懂,包括使用什么材料和安装方法,然后看系统图,平面图和大样图,一步一步去地了解和熟悉。图纸有些地方是需要做改的,在设计变更那里给出了,不过有几个地方还是有疑问,例如在系统图上的管和平面图上的不一致,我们向老师提出疑问,老师也给出统一标准。在计算过程过程中,必须要熟悉计算规则才能下手,例如冷水管道计算到与洗脸盆、洗手盆、洗涤盆、坐便器连接的角阀处,所有卫生洁具的

排水管道则计算到楼地面;在计算消防系统管道工程量时,不扣除管件、阀门和各种组件所占长度。为了完成工程量计算这一部分的工作内容,我觉得自己又重新将自己学习过的知识再次复习了一遍,对各个工程量的计算规则,又有了进一步的熟悉。在这一过程中培养了我的专心、细心和耐心。在套清单和定额的时候,需要参考图纸,但也有些是没有明确给出,只能套相近的或补充定额,这也是考验自己对专业知识的熟悉程度的时候了。在计算过程中,总会出现各种各样的问题,而我又解决不了时,我总会请教其他同学,他们也都会给我耐心地解答。有些问题拿

捏不准时,我们也会互相商量,积极参与讨论,把问题逐渐明朗化,这不仅增进了我们同学间的友谊,也使我从他们身上学会了许多东西。

接下来就是板钢筋的计算,首先做的还是要熟悉图纸,了解它的抗震等级和混凝土的等级,还有梁板的保护层厚度,这些在后面钢筋的锚固长度和弯折长度等地方都必须用到。板筋需要计算板底筋,上部纵向钢筋,支座负筋,端支座负筋,跨板支座负筋,等等,在熟悉图纸的过程中,在脑海里形成一个立体图,对自己的计算也会有一定的帮助。计算的时候,因为基础知识不够扎实,计算规则容易混淆,经常会粗心大意,时不时发现自己出现了这样或那样的错误,而且有些是很低级的,例如,计算根数的时候忘了减两端起步距离,支座负筋的总长度计算又忘了加上弯折,这些问题表面看起来不是很大,但是一个工程累计下来可能就会相差很多,而且钢筋是结构工程中非常重要的一种材料,经常会对整个项目的成本管理的好坏和盈亏产生非

常关键的影响,所以在钢筋的计算上也不能马马虎虎,否则可能造成很大的损失。因此,不管在学习上,还是工作中我们都必须保持严谨的态度。钢筋的手算多而且繁杂,有时候会产生厌烦疲倦的`情绪,这时候我会选择适当地放松一下,毕竟一项工程不能一下子就能做好的,打打球或唱唱歌,保持健康活力和积极的心态,那样我们工作起来,效率才会更高。

同时,在这次毕业设计中,我还通过观看广联达钢筋抽样软件的视频教程,学习到了如何将CAD图导入广联达钢筋抽样软件中,并识别汇总,看似简单,但真正操作起来,问题很多,例如导图的时候图纸出现错误,轴网显示不出来,识别不了轴网,只能自己重新画个轴网,再通过CAD图定位,将它和导进来的CAD图重合在一起,而且如果要识别板的话,必须首先识别好柱子和梁。因为每一层都不一定一模一样,还要分层识别。经过慢慢摸索,也能够很好地掌握了,感觉自己又收获了一项技能,很充实。我觉得这是一个自学的过程,在以后岗位工作中也要不断学习,努力提高自己的知识和综合素质,这样才能走得更高更远。

在这个繁琐而又充实的两个多月里,为了更好地完成任务,不断查阅了大量相关资料,与同学们交流经验,并向老师悉心请教等,不仅巩固了所学的知识,还使自己学到了不少新知识,也培养了我独立工作的能力,虽然艰辛,但努力和收获是成正比的。通过这次毕业设计,使我对本专业知识有了更深的了解和掌握,让我在即将走向社会工作增添了一份信心。

毕业在即,我们也将走向各自的工作岗位,回首两年的学习生活,我深深体会到了学院为我们的成材付出的艰辛劳动,在此我要向他们表示深深的谢意和崇高的敬意!

此致

敬礼

毕业设计总结

毕业设计对于每个大学生来说是一门必修课程,在大学这一个求学阶段只有一次。面对这一次难得的机会,虽然我也想很轻松的渡过大四的下半学期,但是我还是想挑战自己,检验一下自己真正的实力和潜力,很好的完成这次毕业设计,为美好的大学生活画上圆满的句号。毕业设计跟我们平时上的基础课或者是专业课不同,它是一个课题,要用到很多综合性的知识,最重要的是让学生体验一下做工程研究的整个过程。毕业,最重要的一个过程,最能把理论知识运用到实践当中的过程就数毕业设计了。

这次我选择的毕业设计课题是舞钢市嘉禾小区一号楼施工图预算。开题过去已经将近两个月了,在毕业指导老师吴信平老师的悉心指导和严厉督促下,我不但按时完成了工作量,还对自己所做的课题内容有了更进一步了解。这次毕业设计让我获得了从理论到实践的跨越。

在这一阶段里,从开始的确定选题,书写开题报告,到逐项计算工程量,到套定额组价,让我对自己即将从事的专业有了新的认识。我的毕业设计的课题主要步骤是: 1、收集资料,比如说:《河南20xx工程量清单综合单价》,《建筑抗震设计规范》,《平顶山市工程造价信息第六期》

2、熟悉图纸。熟悉图纸是计算工程量的前提条件,只有把图纸熟悉透彻了才能在计算工程量的时候避免很多的问题。

3、计算工程量。计算工程量包括以下几个部分:

a、土石方计算(基础计算)

b、基础垫层计算—基础主体混凝土计算—基础梁计算—基础砌体计算—基础回填—土方运输

c、填充墙工程量计算,分内墙和外墙。外墙按中心线计算,内墙按净长线计算

d、各层柱、梁、板混凝土工程量计算

e、屋面工程。

f、楼地面工程。按平方米计算。

g、外墙装饰,按外墙装饰材料不同划分区域。内墙装饰,天棚装饰,柱、梁抹灰,屋面装饰

h、散水,天沟,暗沟,露台等零星工程计算

i、脚手架计算,模板计算,钢筋工程量计算

j、套工程量定额,做工料分析表

k、写编制依据整理文字等

l、毕业设计结束

在算基础挖方的时候,考虑到基础放坡与不放坡的问题。根据所选课题所设计的基础土质是三类土土,在深度达到1.5米的时候,就要考虑放坡,并且要选择是人工挖土还是机械挖土,因为要根据不同的工作方法选择不同的放坡系数。基础算地基梁挖方的时候有一个问题是最值得注意的——就是它的挖方量并不直接等于梁的长宽高相乘再加上一个工作面的体积,而是要减去两个独立基础两边的放坡长度。这也就是说地基梁的挖方其实是一个梯形的体积。在砖石砌体结构时,外墙和内墙都要减去梁的高度,因为我们的项目是属于框架结构,墙体属于填充墙。钢筋和支模是最大的问题,因为施工图的钢筋表示方法是平法表示,所以我们要参照03G-101,钢筋在支坐处的锚固长度,和在中间的搭接长度,还有要分清钢筋的种类,直筋,弯筋,吊筋和箍筋等等形式.在算模板工程量的时候,要考虑到周转次数,和一些细节上的问题。

完成了工程量计算这一部分的工作内容,我觉得自己又从新将自己曾经学习过的知识再次学习了一遍,对于各个工程量的计算规则,又有了进一步的熟悉。在这么的过程中,每一步都是自己亲自做过的,遇到的问题也非常多,在经过遇到问题,思索问题到解决问题的过程中,收获是最多的。以往没有注意到的问题,都在这一次的毕业设计中得以体现,这培养了我的细心,耐心和专心。指导老师给予的指导、同学的帮助让我受益良多,无论是理论工作上的计算,还是实际现场施工操作,老师都给我们做了详细的分析,让我在计算各个工程量时更能理论结合实际,更合理地计算工程量。在未来的定额计价阶段里,我还有很多的知识需要学习,还需要更加努力、认真,尽自己最大能力完整地完成这一毕业设计。