转眼间大学生活即将结束,大家都知道毕业前要通过最后的毕业论文,毕业论文是一种、有准备的检验大学学习成果的形式,那么优秀的毕业论文是什么样的呢?下面是我精心整理的施工组织设计毕业论文参考文献,欢迎阅读与收藏。
[1]韦诗琦.市政道路施工质量管理问题及对策研究[J].绿色环保建材,2019(07):136.
[2]何康.浅谈施工总承包工程成本控制管理[J].低碳世界,2019(07):325-326.
[3]刘聪,高楠.案例教学在给排水施工组织与管理课程中的应用探析[J].智库时代,2019(33):226-227.
[4]傅巧玲.信息化技术在《建筑施工组织编制与实施》课程教学中的应用与创新[J].居舍,2019(21):47+89.
[5]谢丽萍.建筑工程质量管理中重点问题及解决策略[J].居舍,2019(21):166.
[6]戴松.公路桥梁施工组织设计及其施工管控策略分析[J].价值工程,2019,38(20):27-29.
[7]刘炫炀,刘德湘.施工组织设计在建筑施工管理中的重要性探讨[J].建材与装饰,2019(20):152-153.
[8]赵伟.成倍节拍流水和无节奏流水在建筑施工中的应用[J].居舍,2019(20):82.
[9]王菁,曹广祝,李诗平.珠海市横琴口岸C区桩基工程施工组织设计[J].中国水运(下半月),2019,19(07):232-233.
[10]周建文.高速公路工程造价预算控制措施[J].交通世界,2019(17):151-152.
[11]陈瑞.CDIO理论结合BIM技术在施工组织学教学中的应用探讨[J].科教文汇(上旬刊),2019(07):73-75.
[12]刘军.电解区域桩基施工组织设计研究[J].江西建材,2019(06):155+157.
[13]徐国军.监理工程师在建筑工程质量保险新形势下的作用[J].建筑与预算,2019(06):31-33.
[14]祁波.加强园林绿化工程造价全过程控制的措施分析[J].智能城市,2019(12):91-92.
[15]柴文革,李文利.土木工程专业施工组织设计类毕业设计实践教学探析[J].北京城市学院学报,2019(03):40-44.
[16]黄常青.解析建筑施工组织设计在实际工程中的应用[J].低碳世界,2019,9(06):115-116.
[17]吴宁.施工组织设计对建筑工程经济中造价的影响[J].住宅与房地产,2019(18):23.
[18]蔡旻璐.装配式高层住宅建筑施工组织设计的优化[J].住宅与房地产,2019(18):76-77.
[19]周桂州.市政工程给排水施工管理探讨[J].住宅与房地产,2019(18):163.
[20]张杰.“公路施工组织与概预算”教学改革[J].西部素质教育,2019,5(12):203+205.
[21]董旭.建设单位如何加强EPC项目的管理[J].天然气化工(C1化学与化工),2019,44(03):103-105.
[22]陈飞龙.枢纽互通式立交施工期交通组织设计[J].中国标准化,2019(12):122-123.
[23]沈建平.成都项目混凝土地坪一次成型施工管理和成本管理[J].建材与装饰,2019(17):119-120.
[24]何振堂.分析建筑深基坑工程的施工监理控制[J].建材与装饰,2019(17):142-143.
[25]李让勤.施工阶段工程造价失控的因素分析[J].建材与装饰,2019(17):162-163.
[26]杨勇刚.施工现场临时用电的各种隐患及纠正措施[J].建材与装饰,2019(17):241-242.
[27]李娜.电网建设项目工程结算问题及解决策略[J].建材与装饰,2019(17):236-237.
[28].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(06):768.
[29]刘飞虎,廖勇,赵宇,辜斌,习兰云,陈强.基于BIM的施工组织辅助决策系统的研发及应用[J].土木建筑工程信息技术,2019,11(03):29-32.
[30]杨凯.建筑给排水工程中施工质量管理研究[J].工程与建设,2019,33(03):469-470.
[31]刘飞.探讨现代园林绿化施工与养护管理技术[J].农家参谋,2019(12):143.
[32]王艳华,熊平,庞向锦,崔梦轩,余洪亮.工程总承包项目全过程管理流程解析[J].项目管理技术,2019,17(06):110-114.
[33]徐胜男.施工阶段工程造价影响因素及控制措施[J].项目管理技术,2019,17(06):138-141.
[34]周雪芳.下穿既有铁路站场立交桥施工组织设计意见设计要点[J].科技风,2019(16):15-17.
[35]王李.基于施工BIM应用的工程招标评标标准研究[J].黄冈师范学院学报,2019,39(03):115-119.
[36]张玉成.建筑施工企业对工程质量的管理方法[J].价值工程,2019,38(16):8-10.
[37]钟万春.建筑工程管理运作中存在的问题与对策研究[J].居舍,2019(16):15.
[38]马毅.公路工程造价控制中存在的问题及应对策略[J].交通世界,2019(16):138-139.
[39]谢宏伟.建筑工程经济预算与成本控制研究[J].中外企业家,2019(16):106.
[40]冯宇.海上风电勘测设计存在的问题及优化思路浅析[J].科技视界,2019(16):28-29+40.
[41]张臻.以技术管理为支撑[J].施工企业管理,2019(06):88-90.
[42]董可青.浅议施工阶段工程造价控制[J].知识经济,2019(18):85-86.
[43]李江.港珠澳大桥钢桥面铺装精细化施工组织方案[J].中国公路,2019(11):135-137.
[44]张莉,权雅萍,祁雪花.如何做好施工准备工作[J].中国金属通报,2019(05):114-116.
[45].施工组织设计如何编细编实[J].中国招标,2019(21):42-44.
[46]何源涛.探讨建筑工程施工质量的监理控制要点[J].智能城市,2019,5(10):101-103.
[47]黄冠.建筑装饰工程施工过程的质量控制探述[J].智能城市,2019,5(10):158-159.
[48]叶庆鹏.建筑工程施工现场临时用电安全管理分析[J].建筑技术开发,2019,46(10):84-85.
[49]苟树生.柯克牙河流域水雨情预警系统工程建设中施工组织及质量控制措施分析[J].地下水,2019,41(03):174-175+211.
[50]薛家斌.施工企业投标文件的编制[J].中小企业管理与科技(下旬刊),2019(05):45-46.
[51]张娜.小型灌溉工程施工组织设计分析[J].陕西水利,2019(05):199-200.
[52]吴湘利.水利工程设计概算质量的影响因素探讨[J].湖南水利水电,2019(03):118-119.
[53]杜金龙,陈贵德.浅谈桥梁施工组织设计的编制[J].黑龙江交通科技,2019,42(05):205-206.
[54].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(05):640.
[55]彭洪元,陈诚.烘背水库大坝枢纽主体工程施工组织设计[J].水利规划与设计,2019(05):96-99.
[56]马星敏.隧道施工成本管理与控制策略探析[J].智库时代,2019(19):58-59.
[57]邓斯妮.建设工程项目造价管控的要点与方法探析[J].工程技术研究,2019,4(09):130-131.
[58]杨建华.工程内业在工程预结算中的重要性[J].四川建材,2019,45(05):228-229.
[59]郭标.邻近铁路营业线施工安全的分析及对策研究[J].中小企业管理与科技(上旬刊),2019(05):42-43.
[60]张永旺.建设工程电子招标数据应用场景分析[J].中国管理信息化,2019,22(09):159-161.
[61]贾帅. 古建筑修缮工程项目绩效评价研究[D].郑州大学,2019.
[62]冯彦维. 浅谈施工组织设计优化措施[A]. .水与水技术(第9辑)[C].:辽宁省水利学会,2019:3.
[63]张震.灵石东山供水县域小水网供水施工组织设计[J].山西水利,2019,35(04):32-33.
[64]黄澍.现场管理水平对施工管理的影响分析[J].住宅与房地产,2019(12):137+178.
[65]罗亮.塔式起重机在工程施工中合理选择及定位分析[J].设备监理,2019(04):48-50.
[66]李长城.建筑工程施工项目的精细化管理分析探讨[J].中国标准化,2019(08):19-20.
[67]马莉.建筑工程施工组织设计存在的问题及改进措施分析[J].居舍,2019(12):103.
[68].全套工程技术交底辨析[J].中国招标,2019(15):33-36.
[69]董子豪.建筑施工组织设计研究与探讨[J].四川水泥,2019(04):81.
[70]张跃飞.论土建施工管理中存在的问题与对策研究[J].四川水泥,2019(04):171.
[71]原培.全过程造价管理在土建工程中的有效应用[J].四川水泥,2019(04):208.
[72]张宇.探讨桥梁施工监控中BIM技术的应用[J].四川水泥,2019(04):64.
[73].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(04):512.
[74]曹武,罗平,陈崇德.永圣渡槽拆除重建工程施工组织评价研究[J].小水电,2019(02):64-68.
[75]李裔通.浅谈施工组织设计在工程地质勘察施工过程中的应用[J].中小企业管理与科技(中旬刊),2019(04):53-54.
[76]刘星.建筑工程现场施工技术管理研究[J].中外企业家,2019(11):102.
[77]孙悦.道路施工组织优化设计研究--以长春路西段为例[J].智能城市,2019,5(07):88-89.
[78]文靓.浅谈铁路工程施工项目成本管理[J].中国集体经济,2019(11):59-60.
[79]邓德学,徐新瑞.基于模糊决策理论的工程评标方法研究[J].山西建筑,2019,45(10):218-219.
[80]吕强华,广晓平.城市道路施工期间交通组织设计方法研究[J].甘肃科技纵横,2019,48(03):47-50.
[81]江运河,季雯雯.工程预算造价管理中的主要问题及应对策略[J].居舍,2019(09):12.
[82]单传忠.房屋建筑与装修施工组织分析[J].住宅与房地产,2019(09):32+38.
[83]古江林.浅析在建矿井停缓建期的施工组织安排[J].陕西煤炭,2019,38(02):160-162.
[84]林森.设计施工一体化条件下的保通交通组织方案研究[J].北方交通,2019(03):57-60.
[85]王文静,许念勇.基于BIM技术和递进式思想的“施工组织”课程设计全过程设计[J].教育教学论坛,2019(12):92-93.
[86]周怡安.将BIM技术融入高职实训教学的研究--以工程造价专业为例[J].辽宁高职学报,2019,21(03):76-79.
[87]习明星.新时代高速公路施工组织设计[J].中国公路,2019(06):98-99.
[88]毛钟豪.关于建筑工程资料管理的探讨[J].现代物业(中旬刊),2019(03):49.
[89]崔亚杰.浅谈姚江船闸施工组织设计与概预算[J].南方农机,2019,50(05):260.
[90]崔垒.浅析沙特阿拉伯地区施工组织设计特点[J].中国水能及电气化,2019(03):56-58.
[91]李勤.交通安全设施工程施工要点及临时施工期交通组织设计[J].建筑技术开发,2019,46(05):20-21.
[92]王金.施工组织设计在建筑工程中的应用[J].四川水泥,2019(03):49.
[93]徐娟.施工组织设计对建筑工程经济中造价的影响[J].中国市场,2019(09):101+113.
[94]文玲.浅谈施工组织设计对工程施工成本的影响[J].中小企业管理与科技(上旬刊),2019(03):36-37.
[95]王甲.施工现场临时安全用电组织设计[J].中外建筑,2019(03):174-175.
[96]孟耀东. 扬尘治理背景下的施工阶段工程造价控制研究[D].郑州大学,2019.
[97]张志燕.浅述公路桥梁施工组织设计及施工管理[J].中国标准化,2019(04):84-85.
[98]谭支博.探究施工组织设计对水利水电工程造价影响[J].山东工业技术,2019(05):123.
[99]赵雯雯.河流下游段治理工程的施工组织设计与环境治理策略探讨[J].内蒙古水利,2019(02):25-26.
[100]贾晓雷.桥梁施工组织设计及施工管理有效策略分析[J].工程技术研究,2019,4(04):186-187.
[101]刘国超.浅析目前建筑工程造价管理存在的问题及其对策[J].绿色环保建材,2019(02):212+214.
[102]郭婧.合理施工组织设计对施工图预算及工程造价的影响[J].住宅与房地产,2019(06):50.
[103]付彬.特长小段面引水隧洞开挖施工组织及安全措施应用[J].建材与装饰,2019(06):274-276.
[104]尹文兴.建筑工程项目施工阶段的质量控制探讨[J].建材与装饰,2019(06):13-14.
[105]张健.浅析项目监理日志记录内容[J].山西建筑,2019,45(06):208-209.
[106]吴晓萌.临时工程成本控制常见问题与对策[J].工程经济,2019,29(02):10-13.
[107]钟升明,杨星一,兰洁.基于BIM技术的城市轨道交通工程精细化施工管理研究[J].城市建筑,2019,16(05):119-121.
[108]艾江林,陈然,向家林,毛四海.浅谈工程项目成本控制[J].城市建筑,2019,16(05):175-176+192.
[109]李畅.论施工方建设工程项目管理的重点任务及其管理措施[J].住宅与房地产,2019(05):155-156.
[110]张金艳.公路桥梁施工组织设计及其施工管控[J].交通世界,2019(Z2):122-123.
[111].欢迎订购2017年合订本和精品建筑图书[J].建筑技术,2019,50(02):256.
[112]董璐.公路桥梁施工组织设计和施工管理策略研究[J].工程技术研究,2019,4(03):159-160.
[113]刘晓峰.基于BIM技术的施工过程管理在建筑施工组织课堂教学中的应用研究[J/OL].品牌研究:1-2[2019-07-31].https://doi.org/10.19373/j.cnki.14-1384/f.20190129.004.
[1]宋亚平,陈硕.浅谈水利工程施工组织设计的优化[J].科技展望,2017,03:52-53.
[2]张春红.有关水利工程施工中导截流施工技术的探讨[J].科技展望,2017,04:36.
[3]祁天龙,张欢.试论水利水电工程施工管理措施[J].科技展望,2017,02:180.
[4]常仲达.水利工程施工中防渗技术的实践探究[J].科技展望,2017,04:109.
[5]王鹏.水利水电工程施工中的新技术及环境保护策略分析[J].科技展望,2017,03:24.
[6]刘鹏.水利工程施工组织管理质量控制的有效性探讨[J].科技展望,2017,02:41.
[7]袁卫兵.水利施工中软土地基处理技术探讨[J].珠江水运,2017,02:74-75.
[8]黄永明.探究水利施工中水坝堤防堵口施工技术要点[J].黑龙江水利科技,2016,10:96-97+138.
[9]李新根.水利施工中软土地基处理的方法分析[J].黑龙江水利科技,2016,10:105-107.
[10]白晓昱.水利工程施工中常见的问题和解决方案[J].山东工业技术,2017,02:108-109.
[11]张会.浅谈水利水电工程的基础施工技术[J].科技创新与应用,2017,01:243.
[12]翟志刚.刍议水利水电工程中的水闸施工技术[J].科技创新与应用,2017,03:218.
[13]赵佳欣.水利工程施工阶段造价控制要点分析[J].黑龙江科技信息,2017,03:205.
[14]汪沫.试论如何实现水利水电建筑工程施工质量的有效控制[J].黑龙江科技信息,2017,03:208.
[15]刘兵旗.水利施工中的混凝土裂缝的原因分析及防治措施[J].四川水泥,2017,01:210.
[16]任杰.水利水电工程防渗技术施工要点分析[J].中国新技术新产品,2017,03:95-96.
[17]刘寿辉,孙士玲,李爱青.混凝土施工技术在水利施工中的应用价值[J].珠江水运,2017,01:80-81.
[18]余洁,徐煜亮.水利工程监理对施工阶段质量控制分析[J].智能城市,2017,01:290.
[19]姜永鹏.水利工程施工安全隐患及预防管理分析[J].技术与市场,2017,01:118.
[20]张益民.水利施工中混凝土裂缝的分析及控制[J].中国水能及电气化,2017,01:10-13.
[21]杨育红.试论农田水利的U形渠道防渗施工[J].黑龙江科技信息,2017,02:230.
[22]杨旭亮.浅谈水利工程施工中基坑排水需关注的问题[J].科技创新与应用,2017,06:225.
[23]龚昱文.试论水利水电施工中土石坝筑坝工程的主要工艺[J].江西建材,2017,04:124.
[24]王强.浅谈农田水利施工建设技术水平的提高[J].科技创新与应用,2017,06:217.
[25]张晓祥.浅析水利工程中灌注桩施工工艺[J].黑龙江科技信息,2017,04:195.
[26]徐欢.水利工程施工总布置动态信息可视化方法研究[J].黑龙江科技信息,2017,04:228.
[27]吕继辉.浅谈水利工程滑模施工技术[J].科技经济导刊,2017,03:65+57.
[28]王正东.分析水利水电工程施工质量管理研究[J].江西建材,2017,05:117+121.
[29]李伟.如何提高水利工程施工现场管理质量[J].黑龙江科学,2017,02:120-121.
[30]李彩凤.试论加强水利施工技术控制措施[J].黑龙江科学,2017,02:128-129.
[31]周亚鹏.水利施工管理中存在的问题及解决对策探究[J].中小企业管理与科技(上旬刊),2017,02:67-68.
[32]杨松.水利施工中碾压混凝土施工的技术要点[J].绿色环保建材,2017,01:166.
[33]王晓明.浅议水利工程施工管理[J].黑龙江科技信息,2017,01:237.
[34]王洪兴.水利工程施工建设对生态环境的影响[J].河南水利与南水北调,2017,02:12+19.
[35]高鹏,戴洪巧.水利工程施工管理特点及质量控制刍议[J].河南水利与南水北调,2017,02:85-86.
[36]谢良.浅析水利工程施工管理特点及质量控制策略[J].农业科技与信息,2017,04:111+114.
[37]邱亚平.水利工程施工中土方填筑技术分析[J].黑龙江科技信息,2017,05:160.
[38]胡福来.水利工程中浆砌石工程的施工技术分析[J].黑龙江科技信息,2017,05:181.
[39]邓怡强.水利施工中钻孔灌注桩施工关键技术与质量管理思考[J].黑龙江水利科技,2016,12:164-166.
[40]安军,霍云晶.农业工程中水利项目大体积混凝土施工关键技术[J].农业工程技术,2017,02:38.
[41]吴凤林.有关水利施工工程中开挖支护技术的分析[J].黑龙江科技信息,2017,06:226.
[42]李钱军.加强水利施工中水闸施工管理的`途径探析[J].珠江水运,2017,04:67-68.
[43]徐鸿昊.水利工程施工中软土地基处理技术浅析[J].工程建设与设计,2017,06:29-30.
[44]王洪兴.混凝土工程在水利施工中的质量控制重点研究[J].工程建设与设计,2017,06:140-141.
[45]杨晓晖.浅谈围堰技术在水利施工工程中的应用[J].中国新技术新产品,2017,08:90-91.
[46]张永生.水利工程中桥梁钻孔灌注桩施工技术的研究[J].科技创新与应用,2017,09:223.
[47]高原,刘付涛.浅谈水利水电施工对于施工导流和围堰技术的运用[J].科技创新与应用,2017,09:225.
[48]孙庆凤.水利工程施工管理质量控制分析[J].农业与技术,2017,05:53-54.
[49]刘兆虎.农田水利施工中的水土保持工作[J].科技创新与应用,2017,09:227.
[50]余鹏.探讨水利施工技术现状及改进措施[J].江西建材,2015,24:187+190.
[51]刘点,张海忠.水利施工中水坝堤防堵口施工技术研究[J].安徽水利水电职业技术学院学报,2015,04:27-29.
[52]李涛.水利施工中水闸施工管理的实践路径思考[J].科技创新与应用,2016,04:208.
[53]徐立建.浅谈水利施工钻孔灌注桩施工技术[J].科技创新与应用,2016,04:221.
[54]钱治国.探究水利施工中软土地基处理技术[J].中国新技术新产品,2016,04:113.
[55]尚琰.水利施工钻孔灌注桩施工技术解析[J].建材与装饰,2015,50:248-249.
[56]于兴龙,于兴平,王作强.水利施工新技术应用现状及发展趋势[J].山东水利,2016,01:44+46.
[57]许天君.水利施工过程的质量监测方法[J].科技创新与应用,2016,07:210.
[58]郑彬鹏.水利施工钻孔灌注桩施工技术探讨[J].科技创新与应用,2016,07:223.
[59]苏力坦古力·吾买尔.关于水利施工管理中的创新性研究[J].北京农业,2016,03:124-125.
[60]李秀玉.水利施工中水闸施工的管理措施分析[J].科技与企业,2016,04:16-17.
[61]杜妮.基于改进LEC法的水利施工现场危险源识别及防控对策[J].吉林水利,2016,04:59-62.
[62]李景春.水利施工中的混凝土裂缝控制措施探讨[J].水利技术监督,2016,02:43-44+67.
[63]李艳丽.水利施工中混凝土的浇筑过程及后期养护[J].黑龙江科学,2016,09:36-37.
[64]张玉才.水利施工中滑模技术的应用[J].中国新技术新产品,2016,09:109-110.
[65]管晋莉.刍议水利施工企业人事行政管理与思想政治工作的相关性[J].中小企业管理与科技(中旬刊),2016,04:9-10.
[66]杨升.水利施工钻孔灌注桩施工技术解析[J].甘肃农业,2016,09:41-42.
[67]常永春.加强水利施工安全管理的有效途径[J].智能城市,2016,07:161.
[68]吴航.刍议水利施工中混凝土裂缝的防治技术[J].江西建材,2016,18:148+150.
[69]熊国华,王鹏.水利施工中大体积混凝土抗裂技术研究[J].江西建材,2016,19:130-131.
[70]李燕.试析水利施工中的滑模技术[J].科技创新与应用,2016,22:223.
[71]刘双强,张一君.水利施工中混凝土裂缝的主要原因及防治对策分析[J].企业技术开发,2016,17:151+157.
[72]于磊,朱孝克.探讨水利施工中软土地基处理技术的重要性及应用[J].山东工业技术,2016,15:86.
[73]朱冰.基于水利施工管理现状以及改进策略研究[J].吉林水利,2016,10:57-59+62.
[74]笪贤汉.浅谈水利施工中混凝土裂缝的防治技术[J].建材与装饰,2016,33:233-234.
[75]江庆华.浅谈水利施工中的混凝土裂缝控制[J].江西建材,2016,23:118+117.
[76]黄玉芳.水利施工物资供应管理与施工经济效益[J].建材与装饰,2016,33:254-255.
[77]陶山.水利施工中的混凝土裂缝的原因及预防对策[J].江西建材,2016,23:136-137.
[78]涂业斌.水利施工管理重点事项探究[J].建筑技术开发,2016,08:70-71.
[79]马贵友.动态联盟模式下水利施工分包价格制定探析[J].吉林水利,2016,11:21-24.
[80]付萍.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,01:172.
[81]肖小勇.基于水利工程施工管理的创新对策探析[J].江西建材,2015,02:124-125.
[82]张薇,韩宇舟.浅析水利施工中软土地基施工技术[J].科技创新与应用,2015,01:119.
[83]胡云鹏.试论水利施工中的安全隐患与措施[J].科技创新与应用,2015,05:133.
[84]郎海彦.浅谈如何提高水利施工技术确保工程质量[J].科技创新与应用,2015,07:129.
[85]陈钢.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,06:131.
[86]常瑞松.水利施工管理中存在的安全风险及改进对策分析[J].四川水泥,2015,05:279.
[87]罗向天.水利施工中碾压混凝土施工技术研究[J].山西建筑,2015,14:215-216.
[88]张来军.对水利施工钻孔灌注桩施工技术的探析[J].科技资讯,2015,09:79.
[89]高存晓.水利施工中水闸施工的管理措施[J].四川水泥,2015,06:248.
[90]李轶.水利工程混凝土施工技术及其质量控制策略[J].黑龙江水利科技,2015,04:174-176.
[91]李勇,黄长权.探究水利工程施工质量及控制措施[J].科技经济市场,2015,08:181-182.
[92]徐建英.长沙水利施工工程中的测绘过程的优化定位措施分析[J].工程经济,2015,05:65-70.
[93]周莳备.水利施工技术的现状分析及改进措施[J].山西建筑,2015,23:214-215.
[94]夏云东.水利工程施工质量管理策略探究[J].建筑与预算,2015,06:31-33.
[95]范维君.水利施工中碾压混凝土施工技术探究[J].科技创新与应用,2015,24:219.
[96]李海强,段刘勇.水利施工中混凝土浇筑过程及后期养护的探讨[J].河南水利与南水北调,2015,14:35-36.
[97]李立志.水利施工企业安全生产标准化建设途径探讨[J].吉林水利,2015,08:55-57.
[98]薛士海.水利施工中软土地基处理技术[J].企业导报,2015,13:44+97.
[99]王万钧.水利施工机械设备的管理探讨[J].科技经济市场,2015,10:195-196.
[100]陈风英.关于水利施工管理中的创新性研究[J].农业科技与信息,2015,18:96-97+107.
[101]王孝兰.营业税改增值税改革对水利施工企业的影响及应对策略分析[J].财经界(学术版),2015,20:346-347.
[102]黄仁兴,冯是明.解析水利施工中混凝土施工[J].河南水利与南水北调,2015,20:6-7.
[103]魏远东.工程模糊集理论在水利工程施工导流中应用研究[D].黑龙江大学,2015.
土建专业毕业论文参考文献
紧张又充实的大学生活即将结束,众所周知毕业前要通过最后的毕业论文,毕业论文是一种比较正规的、有准备的检验学生学习成果的形式,毕业论文应该怎么写才好呢?以下是我帮大家整理的土建专业毕业论文参考文献,欢迎大家借鉴与参考,希望对大家有所帮助。
1.NorBerg-Schulz,场所精神—迈向建筑现象学[M],华中科技大学出版社,2012;
2.杨·盖尔,交往与空间[M],北京:中国建筑工业出版社,2002;
3.K.Lynch,城市意向[M],北京:华夏出版社,2001;
4.童林旭,地下空间与城市现代化发展,北京:中国建筑工业出版社,2005;
5.刘晓晖、杨宇振,商业建筑[M],武汉:武汉大学出版社,1999;
6.曾坚、陈岚、陈志宏.,现代商业建筑的规划与设计[M],天津:天津大学出版社,2002;
7.杨贵庆,城市社会心理学[[M],上海:同济大学出版社,2000;
8.布恩(美),心理学原理和应用[M],知识出版社,1985;
9.魏伦杰,张卫华,关注城市地下商业建筑的安全性与舒适性[J].四川建筑,2007年第27卷;
10.I.L.Mcharg,设计结合自然[M],北京:中国建筑工业出版社,1992;
11.高履泰,光环境的'剖析,北京建筑工程学院.照明工程学报2000(04);
12.王紫雯、涂银霞,城市居住环境中的人文要素研究—以杭州市的人居环境调查为例,建筑学报,2002.1.p40;
13.韩晶,张宇星,城市流线空间连续性设计的方法.规划师,2004,09:90-93;
14.童林旭,地下空间概论(一),地下空间,2004年3月,24(1):133-142;
15.童林旭,地下空间与未来城市,地下空间与工程学报,2005年06月,1(3):323-328;
16.束昱、彭方乐,地下空间研究的新领域一一地下环境心理学、地下空间,1990,10(3);
17.王保勇,束昱,影响城市地下空间环境的因素分析,同济大学学报,2000,28(6):656-660;
18.陈秋琼,改善室内空气环境的几种方法,上海建设科技,2000,03;
19.[美]吉迪恩·S·格兰尼,[日]尾岛俊雄.城市地下空间设计,北京:中国建筑工业出版社,2005;
20.赵景伟,城市化进程中的人居环境与地下空间利用.隧道建设,2008,28(2);154-157;
21.陈育霞,诺伯格·舒尔茨的“场所和场所精神”理论及其批判,长安大学学报,2003,20(4);30-33;
22.郭红、莫鑫,诺伯格·舒尔茨的场所理论评析,四川建筑,2004,24(5);
23.胡映东,场所精神的回归,山西建筑,2007,33(18):26-27;
24.费彦,现象学与场所精神,武汉城市建设学院学报,1999,16(4);25.李道增,环境行为学概论[M],北京:清华大学出版社,1999;
26.刘力,商业建筑[M],北京:中国建筑工业出版社,1999;
27.(丹)扬·盖尔、拉尔斯·吉姆松,公共空间·公共生活[M],北京:中国建筑工业出版社,2003;
28.赵慧宁、赵军,现代商业环境设计与分析[M],南京:东南大学出版社,2005;
29.鲁睿,商业空间设计[M],北京:知识产权出版社,2006;
30.张伟.,商业建筑[M],北京:中国建筑工业出版社,2006;
1、腾智明,朱金铨编著.《混凝土结构及砌体结构》.中国建筑工业出版社,199
2、黄棠.王效通主编.《结构设计原理(上册)》.中国铁道出版社,1999
3、邵全,韦敏才.《土力学与基础工程》.重庆大学出版社出版,1997
4、王祖华主编.《混凝土及砌体结构》.华南理工大学出版社,1993
5、王萍主编.《混凝土结构及砌体结构》.大连理工大学出版社,2000
6、李国强.《建筑结构抗震设计》.中国建筑工业出版社,2002
7、朱彦鹏主编.《混凝土结构设计原理》.重庆大学出版社,2002
8、黄双华主编.《房屋结构设计》.重庆大学出版社,2001
9、陈树华主编.《建筑地基基础》.哈尔滨工程大学出版社,2003
10、侯治国主编.《砼结构》.武汉工业大学出版社,1999
11、胡乃君主编.《建筑结构课程设计指导》.武汉工业大学出版社,2001
12、沈满生、苏三庆主编.《高等学校建筑工程专业毕业设计指导》.中国建筑工业出版社,2000
13、贾韵绮、王毅红主编.《工业与民用建筑专业课程设计指南》.中国建筑工业出版社,1994
14、陈登鳌主编.《建筑设计资料集(1、2、3、8、9)》.中国建筑工业出版社出版,1994
15、《新版建筑工程勘察设计规范汇编》.北京:中国建筑工业出版社,2002
16、同济大学、西安建筑科技大学、东南大学、重庆建筑大学编.《房屋建筑学》中国建筑工业出版社,1997
[1]徐晋仙.建筑施工中施工组织设计的重要性[J].科技向导,2010,(26):73.
[2]李润成.编制投标施工组织设计的几点建议[J].山西建筑,2012,(6):74-75.
[3]李海涛.工程投标中的施工组织设计编制[J].技术市场,2011,(6):295.
[4]王革新.施工组织设计的作用与编制[J].甘肃科技纵横,2007,(1):54.
[5]聂迎春.浅谈施工组织设计在工程施工中的重要作用[J].科技创新指导,2010,(2):29.
[6]林瑞.优化施工组织设计合理确定工程造价[J].水利水电工程造价,2007,(3):25.
[7]宋玮.施工组织设计与工程造价[J].水利水电工程造价,2007,(2):41.
[8]吴永昌.简述安全、质量、进度、投资之间的关系[J].经济师,2010,(6):233.
[9]陈兵.浅谈建筑施工组织设计[J].企业研究,2011,(20):183.
[10]齐新红.浅谈施工组织设计编制及其重要性[J].建工论坛,2010,(23):181.
[11]石爱萍.浅谈季节性施工的管理[J].科技情报开发与经济,2011,(11):225.
[12]王坤.浅谈施工组织设计编制要点[J].探索经验,2010,(3):76.
[13]王清洲,刘淑艳.施工组织设计对工程成本的影响[J].山西建筑,2006,(13):21.
[1]王亚军.交通土建工程项目中的路基路面施工技术研究[J].西部交通科技,2016(4):43-45.
[2]史经会.基于交通土建工程路基路面施工的关键技术研究[J].江西建材,2016(12):143-144.
[3]张奕宝.交通土建工程路基路面施工的关键技术[J].价值工程,2015(9):151-152.
[4]梁飞.交通土建工程路基路面施工的关键技术分析[J].企业科技与发展,2015(17):65-66.
[1]陈剑勇.土建施工工程中的电气安装技术浅析[J].中国城市经济.2010(07)
[2]徐建文.浅谈水暖工程中土建的施工配合[J].山西建筑.2010(20)
[3]罗新刚.论建筑工程土建施工现场管理的优化策略[J].科技致富向导.2011(24)
[4]彭毅.电气安装工程与土建工程的施工配合[J].西部探矿工程.2005(S1)
[5]梁笑娴.建筑工程施工管理及技术分析[J].中小企业管理与科技(下旬刊).2010(07)
[6]董服松.建筑施工中裂缝控制技术分析[J].中国新技术新产品.2010(12)
[7]郭建功.建筑工程中的预埋件施工流程及要求[J].科技传播.2011(11)
[8]陈冉.浅析影响建筑施工安全的原因及防控措施[J].科技资讯.2007(12)
施工组织设计毕业论文参考文献:[1]徐晋仙.建筑施工中施工组织设计的重要性[J].科技向导,2010,(26):73.[2]李润成.编制投标施工组织设计的几点建议[J].山西建筑,2012,(6):74-75.[3]李海涛.工程投标中的施工组织设计编制[J].技术市场,2011,(6):295.[4]王革新.施工组织设计的作用与编制[J].甘肃科技纵横,2007,(1):54.[5]聂迎春.浅谈施工组织设计在工程施工中的重要作用[J].科技创新指导, 2010,(2): 29.[6]林瑞.优化施工组织设计合理确定工程造价[J].水利水电工程造价,2007,(3):25.[7]宋玮.施工组织设计与工程造价[J].水利水电工程造价,2007,(2):41.[8]吴永昌.简述安全、质量、进度、投资之间的关系[J].经济师,2010,(6):233.[9]陈兵.浅谈建筑施工组织设计[J].企业研究,2011,(20):183.[10]齐新红.浅谈施工组织设计编制及其重要性[J].建工论坛,2010,(23):181.
去园景人网站搜搜看,里面有很多的施工组织设计的范文,希望能帮到你!
论公路工程项目投标施工组织设计编制要点论文关键词:工程投标;施工组织设计;编制 论文摘要:施工组织设计是工程投标中的主要工作之一,也是工程项目投标文件的主要组成部分。本文总结投标施工组织设计编制经验,为施工企业在投标过程中提高投标文件质量,提出了自己的一些见解和建议。 目前,在工程建设领域通过投标的方式来承接工程任务,已成为施工企业承接工程任务的主要途径。投标施工组织设计编制水平的高低是直接关系到施工企业能否中标的关键,同时又是商务报价和拟订合同文件中相关条款的基础资料,也是施工单位指导拟建工程施工全过程的各项施工活动的技术、经济、组织、协调和控制的综合性文件。因此在实际投标中,要求投标施工组织设计科学合理、有效统一,同时满足招标文件所规定的要求,给工程中标以有力保障。因此,我们在编制投标施工组织设计时要从整体上体现企业的综合实力和技术水平,为业主提供一个客观地反映工程实际,又具有新意,能引起业主兴趣的施工组织设计。 一、编制投标施工组织设计的阶段划分 当投标单位接到招标文件后,无论招标文件要求时间的长短,应将标投标施工组织设计的编制工作分为四个阶段进行。 第一阶段为投标工作的组织建立, 此阶段投标单位应根据招标文件和拟建工程的要求,组织技术、商务、金融等专业人员建立投标班子,制定投标文件编制全过程策划书,落实人员职责分工。 第二阶段为投标工作的调研收集信息等准备阶段,根据投标专业分工不同进行探勘现场和外业调查,研究招标文件和图纸,搜集相关资料,汇总审核答疑文件,参加投标答疑会; 第三阶段为编制阶段,这一阶段根据招标招标文件的时间、人员、内容、设备、成本、文字编辑等要求进行详细编制、审核、组拼为主要工作; 第四阶段为评审阶段、装订、送标、并按规定时间参加正式开标会议。 二、投标施工组织设计的目录编制 目录实际上代表了投标施工组织设计的结构和顺序,它反映了编制者的思路,应充分做到标题明确,段落有致,详略得当,上下关联,便于查阅。同时按章、节、条、款、项依次排序标注,主次分明,达到先入为主的效果,使专家评委一目了然。 三、确定投标施工组织设计的编制内容 投标施工组织设计编制内容应按以下主要内容进行编制: (1)工程概况:主要包栝工程特点,结构特征,地下管线,地理位置,施工条件,自然气候等内容。 (2)施工部署:主要包栝项目组织机构及人员资质,项目管理及质量、安全、成本、环保等管理体系的建立,质量、安全、工期、成本、文明施工等管理目标,施工总体方案,施工总工期控制,分项工程施工强度分析,施工程序和施工顺序,施工段划分,分承包形式,分项工程施工强度分析和总工期控制,实验检验批划分,特殊过程确定和质量控制点的设置,可追溯性范围的确定等内容。 (3)施工准备:主要包栝工程施工项目组织准备,施工技术准备,施工物资准备,施工机械设备准备,临时设施准备,施工现场准备,施工队伍(劳动力)准备,安全准备等内容。 (4)资源配置:主要包栝工程项目各专业管理人员需用量计划,主要材料,油料及构配件需用量计划,施工机械设备需用量计划,测量、试验、检验仪器需用量计划,交通、通讯设备需用量计划,临时搭建的设备、材料需用量计划,安全生产设备需用量计划及安全生产标牌设置计划等内容。 (5)施工方案和主要分布分项工程施工方法:主要包栝施工测量、路基工程、路面工程、桥涵工程、绿化、交安设施等内容。根据这些施工内容,结合工程特征,按不同专业和分部分项施工的先后顺序,确定先进、合理、可行的施工方案和方法。其主要施工应本着技术先进、经济合理的原则,分别按投标项目内容的施工工艺流程、施工流水段划分、施工工种的优化组合、施工机械的组织、施工材料的组织、施工工序安排、流水施工组织、场内外施工条件等方面,确定符合工程实体和符合招标文件实质性要求的有效方案。主要施工方法原则上应按生产要素和4M1E质量因素,对不同的施工工作内容分别按工作准备、施工程序、工作备配、操作工艺、作业方法、工序衔接、质量控制、成品保护、施工注意要点等方面进行科学合理的编制。(6)施工平面布置图:主要包括搅拌站及现场临时设施布置、现场围栏,现场运输道路布置,材料、构件的堆放,现场钢筋、模板、零部件加工场地布置,施工机械位置安排,现场施工用电设置及其施工用水设计,现场排水、边施工边通车段的交通管制与标志设置、通车段临时道路与便桥的设置安排等。 (7)施工总进度计划:施工进度计划主要包括网络图计划,横道图、斜线图、图象进度表、立面图等计划形式。对项目对、工期长、规模大、技术复杂、分包单位多的工程,可以采用四种以上的形式编制进度计划。一般工程可采用一至二种形式编制进度计划。施工总进度计划以施工网络计划中的关键线路和横道图进度计划为主,各专业队分段流水作业计划以横道图和斜线图为主,构造物某专业工程施工进度的行列、区段、层次则以横道图和图象进度表为主。 (8)主要技术施工措施:主要包括质量保证措施,安全生产保证措施,特殊过程和关键工序控制措施,质量通病防治措施,过程控制纠偏措施,成品保护措施,节能环保措施,人群健康防护措施,文明施工保证措施,冬雨季施工保证措施等。 (9)施工协调:主要包括建设行政主管部门协调,建设单位协调,设计单位协调、监理单位协调,检测试验单位协调,施工材料、构备件供应单位协调,分承包单位协调和施工现场人、机、料、法、环综合协调等内容。 (10)工程回访:主要包括国家(合同)规定的质保期内,组织巡视、检查、检测、维修、返修、返工等工作的承诺和实施办法。 四、编制投标施工组织设计的注意事项 编制投标施工组织设计时,一是要着重反映企业综合实力和技术水平;二是对招标文件要透彻理解,做到考虑全面,充分响应招标文件,并使编制的投标文件紧扣招标文件的规定;三是要收集多种技术资料,做好调查研究工作;四是对制定的施工总体部署和施工方案力求科学性、经济性、实效性,对投标工程项目的主导施工过程、关键部位、特殊部位等施工方法的编制应充分体现企业的技术优势,从抽象到具体、从整体到局部的系统工作,形成系列化的投标文件,使业主和评委能居此判断投标人的技术能力和可知信程度;五是要与商务标相配合,互通信息,以免自相矛盾;六是力求摆正编制者与读者的关系,不掺杂对第三者的褒贬内容;七是要注意文字编排质量,加强内部校核、评审工作,以防条理不清、行文错误等现象出现,给评审者造成一定的困惑;八是要留有事后变更的依据,以免给自己带来被动;九是要将已编制好的投标组织设计备份,以便查阅和参考,同时对投标文件编制软件和建立的电子文档加密。 五、建立投标施工组织设计素材库 按照所策划的章、节、条、款、项的位置进行编号,将其大量相同的内容在项目未知情况下,提前编制出来,并收集多种类型的素材,分门别类地储存在素材库里,同时也应将投标工程的地质情况、工程特点、结构特征、单位造价、工种施工强度、材料、设备、周转材料、零星材料、物流运距和报价清单等一同保存在素材库里,作为今后的投标文件编制的分析依据和投标决策参考,以提高编制投标施工组织设计的工作效率,同时也为投标工程项目中标后编制施工组织设计奠定基础。 六、结语 总之,编制投标组织设计既要突出重点,简明扼要,可操作性强,又要主次分明、有根有据、图文并茂,帧装美观,还要覆盖投标工程的方方面面,并遵循技术规律和主客观条件,充分发挥组织、计划、控制、激烈的作用,达到顺利中标的目标。 参考文献: [1]中华人民共和国招投标法[M].北京: 中国法制出版社,2000 [2]工程建设招投标管理办法 [3] 公路工程国内招标文件范本.[M].交公路发[2003]94号.北京:人民交通出版社,2003
施工组织设计是施工企业积极参与市场竞争,承揽建设项目,编制投标文件的重要组成部分。下文是我为大家整理的关于工程施工组织设计 毕业 论文的 范文 ,欢迎大家阅读参考!工程施工组织设计毕业论文篇1 《分析公路桥梁工程施工组织设计》 摘要:根据国家经济建设十二五的规划,高速公路建设作为带动经济、惠民的基建项目,也得到了前所未有的发展。桥梁施工组织设计作为高速公路建设的重要组成部分,结合公路施工的特点如何编制出即保质量又经济的精细化公路桥梁施工组织设计,是高速公路建设中的重点工作。 关键词:公路桥梁工程;施工组织设计 引言: 随着我国经济的飞速发展,使高速公路建设成本、质量控制也被人越来越关注,桥梁作为公路中重要组成部分,随着交通运输量的显著提高 ,其保证质量在公路建设中的重要性也颇显突出,而桥梁施工组织设计对保证工程质量起到了关键的作用。 1.工程概况 本工程为某高速公路河口至双凤段第十四合同段,位于郁南县境内,路线经历洞镇农林村,沿线X472县道、村道及机耕便道经过,交通不方便。本合同段全长10.8km,起迄里程为K87+850~K92+150,总工期要求26个月,其中桥梁18个月。桥梁工程:含有大中桥梁11座,依里程桩号分别为龙庆宫高架桥、石排口高架桥、竹粒高架一桥、竹粒高架二桥、RK90+412中桥、RK90+545中桥、白石岭中桥、路下寨高架桥、路下寨跨线桥、大用跨线桥、连城河大桥。 现以连城河大桥和路下寨跨线桥为例介绍工程概况: 1.1连城河大桥(里程:K98+600~K99+120) 连城河大桥在路线上处于整体式路基段,左、右幅桥梁布置不等长,在大桩号处有40m长属于半路半桥设计,左幅中心里程K98+840,桥跨组合12×40,桥长481.2m,右幅中心里程K98+855,桥跨组合13×40,桥长521.2m,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ180cm、φ200cm,桩长为16 m~44m,桩基性质属嵌岩桩与摩擦桩,桩基共56根。 墩柱 采用实心薄壁单墩式桥墩,墩高1.5 m~30 m,墩柱宽度均为3.2m,厚度分为两种,分别为160 cm厚墩柱配两根φ180cm桩基及180cm厚墩柱配两根φ200cm桩基,墩顶为变截面盖梁,桥台为柱式台。 上部构造 40m预应力砼先简支后连续刚构T梁 1. 2路下寨跨线桥(里程:K95+090~K95+560) 本桥主线跨县道X472,路线上处于整体式路基段,由于起点连接黄茅冲隧道,桥梁前段对应隧道路线设置,中央分隔带为0.5m,然后渐变到3m,左幅中心里程K95+325,桥跨组合30+11×40,桥长474.1m,右幅中心里程K95+327,桥跨组合26+11×40,桥长470.1m,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ230cm、φ250cm,桩长为11 m ~40m,桩基性质属嵌岩桩与摩擦桩,桩基共54根。 墩柱 立柱直径为φ180cm、200cm,采用双柱式桥墩,柱高度为14 m ~52m,桥台为柱式台。 上部构造 40 m预应力简支后连续刚构T梁 2.公路桥梁工程施工组织设计的内容 施工组织设计是指导整个施工工程全过程的经济文件,简单的说可以包括施工准备和施工过程中两大块,单位工程施工组织设计是指出具体施工 方法 技术指导的文件。工程施工组织设计的内容主要包括了以下几点: 2.1施工准备实施计划 施工准备实施计划是保证工程圆满完成的必要准备,它主要包括现场准备、技术准备、机械设备、材料工具以及相关配件准备等,在技术准备中应该要指出季节性施工项目的安排详情,整个施工准备实施计划必须注明工作单位、工作量、各项任务完成进度等,必须以纸质文件给出。 2.2施工方案、施工方法及其技术 措施 施工方案、施工方法及其技术措施是施工组织设计的核心部分,这部分需结合工程施工现场实际情况与设计施工目的,以及达到何种标准等来进行设计,这部分内容主要包括制定施工顺序、细化施工项目、估定施工工程量以及工人劳动量、计算机械设备等施工工具的使用量,以及各个分项工程的施工时间之间的配合,要保证施工工期满足合同所要求。 2.3实物工程量 根据施工现场的具体情况,如地质水文条件等,并结合设计文件的要求来精确计算各个分项工程的工作量情况。 2.4各项需用量计划 根据精确计算出的实物工程量与施工进度要求来制定各项计划用表,主要包括机械设备、材料以及劳动力所需等计划用表,各项需用量计划是施工各阶段的准备阶段,它是开启整个工程施工的钥匙。 2.5施工设计图 施工设计图也是工程施工组织设计中的一个重要部分,它指明了整个工程的结构,施工技术人员需结合设计图来进行施工。 2.6各项经济技术指标 各项经济技术指标是关系到施工单位经济利益的关键所在,远超指标会使施工单位利益受损,不达标便不能满足设计需求。在施工过程中,需要认真的按照施工规范、操作规程和设计文件来进行施工,才能保证各项经济技术指标到一个理想效果。 3.如何做好公路桥梁工程施工组织设计 在做好每个细节工作,保证不出现上述常见问题的同时,如何做好公路桥梁工程施工组织设计,一直是工程施工人员所需要解决的问题。当前的社会的竞争十分激烈,在施工单位中亦是如此,施工企业要想健康而快速的发展,做好工程施工组织设计是施工企业亟待解决的问题,以下几点可以有效帮助做好公路桥梁工程施工组织设计: 3.1高度重视施工图设计文件的施工要求 编制人员要充分了解施工图设计文件的相关要求,分析工程的特点,针对工程特殊部分及其工艺要求,来制定切实可靠的施工措施。 3.2扩大施工组织设计的深度和范围 在完成 文章 前面所述的内容基础上,可评估出设计图纸的合理性及经济性,扩大技术积累,加快技术转化,实现设计与施工技术的一体化。 3.3加强施工组织设计编制人员的 教育 培训 施工组织设计文件质量的高低很大程度上取决于施工组织设计编制人员的水平。在当今社会如此高速发展的情况下,提高施工技术人员的水平,对任何一个施工单位起来说都是十分重要的,加强其教育培训能起到很好的促进作用。 3.4管理者的思想观念要适应现代社会的发展 二十一世纪是进入高速发展的信息化年代,管理者只有不断去适应现代化发展的需要,才能对施工组织设计注入符合新时代的血液,才能带领着团队不断前进。 4.结语 做好公路桥梁工程施工组织设计能有效提高工程施工效率,也成为了施工单位提高经济效益有效手段,同时,它还是衡量施工单位施工技术水平和管理水平的一个重要标志。 工程施工组织设计毕业论文篇2 《浅析园林绿化工程施工组织设计》 摘要:本文通过对园林绿化工程施工组织设计实践与研究,分析了在园林绿化施工组织设计中存在的问题,提出施工组织设计是工程施工中最关键的步骤之一,施工组织设计应充分考虑施工实际,并就如何进一步加强施工组织设计进行了探讨。 关键词:园林绿化;工程施工;组织设计 施工组织设计是进行施工管理的纲领性文件,是施工技术与施工项目管理有机结合的产物,对于能否实现科学施工具有战略指导和战术管理的双重意义。针对园林绿化工程这样的“简易工程”,更加需要全面、正确的认识施工组织设计的前瞻性和科学性,认真结合工程实际,科学、合理地进行编制和优化,并在后续施工中认真加以贯彻落实,确保设计意图的实现。近年来,随着国家对工程招投标的强制规范,绝大部分招标单位都把施工组织设计作为选择中标单位的重要依据之一,这一方面强化了投标单位认真做好施工组织设计的意识,但另一方面我们也清醒的认识到不少单位的施工组织设计脱离工程实际,以应付中标为目的,为以后的施工管理埋下了隐患。 一、园林绿化工程施工组织设计中存在的问题 1.违规编制施工组织设计。 根据相关规定,施工组织设计必须存入施工档案,接受建设单位以及上级主管部门的检查,而现在一些施工单位为了应付检查,往往等到施工开始甚至是竣工验收前才草草进行编制,一些监理工程师违规进行签字,完全违背了施工强制规定。这种以应付检查为目的编制的施工组织设计,根本起不到指导施工的作用,同样没有规范施工组织设计指导下的园林施工也必然是难以达标的。 2.施工组织设计编制脱离实际。 一些单位即便按照规定提前编制了施工组织设计,但在编制过程中脱离施工实际,简单抄袭工艺流程和一些流于形式的内容,不对施工具体进行详细科学的论证,特别是有针对性的防范风险的具体措施更是缺乏,以致在施工出现问题后查找施工组织设计一无所获。 3.施工组织设计内容不规范。 主要体现在,①编制依据存在问题。要么编制依据没有体现,要么依据的规定文件已经过期,要么把一些 经验 做法作为依据。②编制内容不完整。施工方案、工艺要求不具体;对特殊过程和关键步骤描述不清楚;内容缺乏层次,前后逻辑混乱。③文件引用不规范。文件名称与原文不符;没有所引用的条款号,施工时查找难度大。④没有按照相关规定进行审核、审批。 二、园林绿化工程施工组织设计的原则及内容 进行园林绿化工程的组织施工设计,要确定重点,保证进度,为建设总进度保留相当的余地;要重视前期的施工准备,科学、全面的预见施工过程中可能存在的问题及需求;要科学选择施工方法,特别是针对不同季节、不同植物施工要合理选择施工工艺;充分利用正式工程,尽量减少暂设工程。施工组织设计主要有:编制说明,包括业主提供的施工图、有关政策和文件规定、招标书、施工单位相关情况,编制要求、相关标准规范、编制原则等;工程概况,包括工程概述、工程范围、施工现场条件等;人力及资源、机械保证措施,包括施工组织、施工部署、主要管理人员及简历、劳动力计划、劳动力保证措施、材料保证措施、资金保证措施、施工机械设备情况;工程进度计划及工期保证措施,包括总工期、开竣工具体日期以及人材机投入、组织施工方面、进度控制办法等。 三、施工组织设计优化 1.施工方案的优化。 园林工程建设涵盖土方工程、给水及排水工程、水景工程、园路工程、假山工程、 种植 工程、供电工程等内容,要以选择合理的施工方案为编制核心,充分借鉴国内外先进的技术和经验,尽量使用先进的技术和方法,提高施工效率、降低施工成本,根据工程实际特点,将技术可行性及经济合理性统一起来。对可能采用的施工方法进行技术经济评价,选择最佳方案。按照工程实际,结合人材机、施工方法等,科学选定主要工程的施工方案。针对具体园林绿化工程可参考以下工序:验收场地、场地清理、定点放线、挖树穴、种植、养护、补植、移交。对于反季节种植、古树名木移栽、南北植物互种、景观土建等技术性要求较高、危险性较大的施工内容,还需制订专项施工方案,增强针对性。同时园林植物都是有生命的,这一点在编制施工组织设计时尤为重要,要根据植物的习性确定种植和养护方案,这样才能提高成活率。 2.施工组织机构及人员的优化。 施工组织机构需明确工程分几个工程组完成,以及各工程组的所属关系及负责人,真正做到事事有人负责、人人有事负责。人员安排要根据施工进度计划,按时间顺序安排,要选派专业化的职工队伍,对施工人员的组织结构进行系统安排。 3.施工组织设计质量衡量标准的优化。 要根据施工实际选择合理的施工质量衡量标准,不能一概求告、求全作为具有生命特征的建设施工项目,至少需经历种植施工、养护施工两个时期,施工周期往往超过一年,施工质量要充分考虑这两个施工期的各自特点,合理加以安排。园林绿化工程的施工组织设计标准一定要充分考虑植物的生长周期,确保选用标准的科学合理。 4.施工组织设计编制工具的优化。 随着信息技术迅速发展,电脑和网络在工程制图、预算管理等方面发挥了巨大的作用,但限于施工管理人员的认识还不到位,目前信息技术在工程管理领域的应用还不尽如人意。电脑和网络可以及时、高效的获得各种信息并快速加以处理,大大加快施工组织设计编制速度,编制质量也更有保障。目前,随着项目经理负责制的落实,项目经理现场管理水平越来越受到重视,这就要求企业建立自己的项目管理信息系统,以全面客观的收集现场施工信息,及时发现各类问题,对施工组织设计进行再优化,使施工过程更加符合设计意图和施工实际,确保项目按计划完成。 5.不同施工时期的优化。 施工单位中标后,要加强和建设单位的交流和沟通,充分了解建设单位的意图,也要让建设单位充分了解施工过程,通过沟通选择最优化的施工组织设计。还要特别注意查找原设计过程中的不足,并加以优化,以降低施工成本,提高施工效益。进场后,项目经理等要组织人员对施工图纸进行认真审核,对设计的增大施工要素配置、降低施工难度、达不到环保和质量要求、缺乏安全保障等方面进行优化。施工开始后,对施工的现实情况越来越明晰,对发现的设计不符合实际等情况如需变更设计,需要收集充分的资料,认真加以分析,改动并得到监理签认。同时还要注意相关注意事项,尊重科学和事实,补充完善实施性施工组织设计。 随着城镇化的不断加快,人们对园林绿化的要求越来越高,这就给施工组织设计提出了更高的要求。因此无论是施工单位,还是建设单位都必须高度重视施工组织设计,认真做好施工组织设计,同时在施工过程中还要不断优化,只有这样才能保证工程的顺利进行。 参考文献: [1]常莹.浅谈园林工程的特点及管理[J].今日科苑,2007,(7):22-23. [2]孟令树.优化施工组织设计[J].海河水利.2009,(2). [3]陈宗平.ISO9001标准在园林企业的应用与推广[J].南方农业,2010,(4):64-66. 工程施工组织设计毕业论文篇3 《公路施工组织设计》 摘要: 近些年,国家对基础性建设的投入越来越大,我们的公路建设也日益增多。公路工程是一项综合性、系统性较强的工程,是集路基、路面、路线、桥涵、隧道等于一体的综合体系。随着经济社会的发展和施工工艺的不断进步,人们对公路工程的要求也更加严格。为了保证公路建设的正常施工,就需要工程设计按时按量完成。而如何处理好质量与工期的矛盾则是公路设计者面临的难题。本文对公路工程设计的重要性,步骤等进行一个分析研究。 关键词: 公路工程;设计;系统性;施工工艺;项目;质量;分析 0 引言 随着我国经济的发展,我国公路交通运输等行业都飞速发展起来,为了使等级较低的村道、乡道等交通满足人们日益增长的交通需求,我们就对高速公路、省干线公路等进行完善;各省市县对较低等级的山区公路和城镇道路的改建也日益重视起来,增加投资建设资金等方面,以此来完善公路交通网的建设。在公路提级改建项目中,山区地形由于地质复杂,在升级过程中路线布设受平纵横断面等条件和影响因素诸多;我们根据已完成的各级公路提级改建项目设计过程中的一些经验,对公路提级改建中总体及路线设计有以下几点认识,希望对今后的公路项目建设和提级改造项目建设能起到一定的指导作用。 1 施工组织设计重技术轻管理的现象严重 我国公路建设项目传统的施工组织设计一般包括的内容有:工程概况、施工技术方案、施工进度计划、资源供应计划、施工平面图设计等。尽管有的施工组织设计编制了技术组织措施的内容,但也仅从确保工程质量、安全、进度方面提出了相应的保证措施,工程技术性措施较强,管理措施较为薄弱,可操作性差,组织措施、经济措施及合同措施不力。因此,这样的施工组织设计是一种工程技术性的施工组织文件。 ①缺少施工部署措施工程项目的施工,在市场经济条件下,施工企业通过招投标获取项目,企业法人就是项目法人,而施工项目经理是企业法人在项目上的全权代理人。施工项目经理在施工前要与施工企业法人签订项目管理目标 责任书 ,界定项目经理在项目实施中应达到的质量、安全、进度、成本、环保、文明施工的目标,明确项目经理的责、权、利。因此,项目经理部必然要通过各种管理手段和措施对其目标、施工组织、总包与分包和资源供应进行规划,做出施工部署措施,而过去那种编制施工组织设计的作法就不能适应了。 ②缺少风险管理措施项目施工中自然存在许多风险,有技术上的风险和非技术风险,如果工程项目在施工前没有对风险识别、分析,没有做出抗风险对策,导致的后果将是严重的,这已是许多工程施工证明了的事实。而过去那种施工组织设计的作法一旦项目遇到风险,则施工组织设计将是一纸空文,失去指导作用。 ③缺少全面的技术组保证措施在一般的实施性施工组织设计的技术组织措施中,仅有保证工程质量、安全、工期,冬雨季施工的措施,没有保证成本、环境保护、文明施工的措施,这是不全面的。 2 公路工程施工组织设计存在问题 尽管一些施工组织设计编制的内容措施,只从确保工程质量安全和进度等方面提出的相关的保证措施,但是也存在一些可操作性差等不足。因此,我们就要完善以下缺少的管理措施内容: 2.1 缺少风险管理措施 项目施工中存在很多风险,这就需要我们在工程项目施工前增强对风险的识别、分析能力,这样才能在有风险的时候进行风险对策,避免产生严重的后果。 2.2 缺少全面的技术组保证措施 在一般的施工组织设计的技术措施中,我们只保证工程质量、安全、工期,冬雨季施工等措施外,还要重视施工成本、环境保护、文明施工等方面措施。由于工程竞争激烈,就需要我们降低成本率来使企业获得更多的利润,因此我们在保证工程质量的全体下,必须要实现降低成本的计划。 2.3 缺少全面的施工组织设计技术经济指标 同项目的施工方案所达到的技术指标也会有所不同。因此,就需要我们对施工性项目的施工组织设计进行应有的评价和考核。在过去的施工组织设计者,由于操作的各不相同,就对评价项目、考核项目的施工组织水平带来了一定困难。 3 公路设计的影响因素 3.1 选线因素 在进行选线的时候,我们需要全方面进行考虑 ,尤其是对公路进行升级改造的时候,因为大多路线的走向已经基本确定了,我们在选线的时候在不影响原有线路的情况下选择更优的可行路线走向。 此外,改建项目设计中心线的位置可能为两种:当旧路基基本能满足改建断面的需求时,选择旧路中心线作为基准;当旧路基与改建断 面相 差较大时,选择旧路边线作为基准,两者都能很好的利用旧路基,这是相当重要的,这对道路标高的控制,施工方案有决定性作用。 3.2 平面设计因素 平曲线指标是视距及行车安全的首要影响因素,其要素应根据规范满足其组成要求。在平面设计中,其要点无非圆曲线半径、缓和曲线长度、超高加宽以及直线段长度等能否满足规范。在公路提级改建中,我们既希望能将平面线型严格满足规范要求以达行车安全,也希望在改建的过程中以人为本,注重环保,减少对山体环境的破坏,这就需要一个平衡点。 4 施工组织设计编制的步骤 由于施工工程项目的大小不同,所要求编制组织设计的内容也有所不同,但其方法和步骤基本大同小异,大致可按以下步骤进行。 4.1 收集编制依据文件和资料 ①工程项目设计施工图纸。②工程项目所要求的施工进度和要求。③施工定额、工程概预算及有关技术经济指标。④施工中可配备的劳力、材料和机械装备情况。⑤施工现场的自然条件和技术经济资料。 4.2 编写工程概况 主要阐述工程的概貌、特征和特点,以及有关要求等。 4.3 选择施工方案、确定施工方法 主要确定对工程施工的先后顺序、选择施工机械类型及其合理布置.明确工程施工的流向及流水参数的计算,确定主要项目的施工方法等(总设计还需先做出施工总体布署方案)。 4.4 制定施工进度计划 包括对分部分项工程量的计算、绘制进度图表。对进度计划的调整平衡等。 4.5 计算施工现场所需要的各种资源需用量及其供应计划(包括各种劳力、材料、机械及其加工预制品等)。 4.6 绘制施工平面图 4.7 其他 提出对有关工得的质量通病和易于发生安全问题的环节。订出防治措施、制定降低成本(如节约劳力、材料、机具及临时设施费等)的具体措施、超奖减罚等的具体要求和技术经济指标。 5 加强公路工程施工设计规范化管理对策 我国加入WTO组织后,给我国建筑行业带来机遇和挑战,主要表现在以下两个方面的竞争,即技术水平和管理水平竞争。为了适应新形势下的发展,就要各施工管理部门掌握现代管理方法并加以利用,以此保证自己在竞争中有足够的实力。随着计算机及 网络技术 的迅速发展,各个行业在辅助管理上都运用计算机的功能进行操作,因此就需要掌握现代计算机技术等知识,因为所有的竞争归根到底还是知识和人才的竞争,所以还需要多一些人才的培养计划。 6 小结 在编制施工组织的时候,我们既要重视科学的管理,还要讲究经济效益。因此,就需要我们在不同的条件下对不同的施工对象采取不同的管理措施。在策划重点的时候还要根据实际情况出发,这样才能制定出规范性强、符合业主质量需求的施工组织设计方案,并且能够因地制宜的对各个阶段的施工进行全面的指导。 参考文献: [1]石冠跃.浅谈公路工程设计中对工程地质勘察资料(数据)的分析、论证及其应用[J].石河子科技,2004(01). [2]李勇.公路工程建设中勘测设计存在的问题及影响因素分析[J].中国新技术新产品,2011(02). [3]孙爱民.关于如何合理控制公路工程造价的探讨[J].科技信息,2011(07). [4]公路工程设计变更管理办法[J].交通标准化,2005(08). 猜你喜欢: 1. 建筑施工毕业论文范文 2. 施工组织设计实训心得体会 3. 工程施工组织设计论文 4. 施工组织设计实习心得 5. 建设施工组织论文
框架桥(涵)施工作业指导书一、编制依据1、根据XXXXX标段设计图;2、根据铁道部和交通部现行的设计规范、施工规范、验收标准等有关文件。3、铁道部门已推行成熟的施工方法。4、有关现场踏勘调查资料,水文地质调查资料。5、从事类似铁路工程中积累的施工经验、技术总结及现有的施工力量和机械设备、装备情况。二、框架桥施工1、施工准备依据工程设计文件的要求,选择适用于工程的模板(木模或钢模)进行模板设计,并按“规范”要求计算相应荷载。设计模板时,模板的几何尺寸要符合设计文件的尺寸要求,并保证结构构件各部位相应位置的准确。模板本身及支承系统,计算时要考虑足够的强度、刚度和稳定性,能可靠地承受混凝土荷载和施工荷载,不产生破坏或质量要求标准以外的变形。在选择模板时,模板的构造和拼合连接要便于安装和拆除,以利于多次周转使用。模板工程设计完成后,应由设计的技术人员向专业的模板制作班组进行技术交底,交底的内容主要有以下几点:(1) 工程对象,模板工程量和完成任务的时间。(2) 模板拼装,支承系统布置、节点处理、预埋件、预留孔洞和插筋的处理方法。(3) 模板制作质量和安全措施。(4)对特殊设计的结构构件,绘制模板构造图和安装接点构造图,并配合模板班组在模板上绘制出大样图。模板班组经技术交底后,还应认真熟悉模板设计图,并做好模板施工作业的分工准备和备料工作。2、施工方法2.1、模板制作大型定型钢模板可向符合国家标准的生产厂家进行定购,采购人员应严把进货质量关,可按程序文件的要求进行控制。木模板的制作,首先选用适当厚度木材加工成需要的板、方材,然后按设计图纸在模板上进行放样、制作,并在现场进行模板的拼装,符合设计要求后方可装运到工地。对于复杂的结构,可先按设计图纸做出小模型,经技术人员确认后,再在模板上放出大样,可由熟练的技工按规范要求进行加工,加工好后,一定要先拼装,符合设计后才能运到工地。制作模板的质量要求:(1)保证砼结构和构件各部分设计形状、尺寸和相互间位置正确。(2)模板必须具有足够的强度、刚度和稳定性,能承受新浇筑混凝土的重力、侧压力及施工中可能产生的各项荷载。(3)模板拼缝应严密,不能出现大于1mm以上的缝隙,制作简单,安装方便,便于拆卸和多次使用。(4)能与混凝土结构和构件的特征、施工条件和浇筑方法相适应。(5)模板表面应光滑,无凹凸不平状,模板的拼接台阶错缝不得大于2mm。2.2、钢筋制作(1)钢筋制作钢筋应在钢筋加工场地内进行加工,按框架涵钢筋设计尺寸要求分批下料,下料应把需要焊接的钢筋的焊接接头长度计算在内。钢筋在加工弯制前应调直,表面的油渍、漆污、水泥浆和用锤敲击剥落的浮皮、铁锈等应清除干净。钢筋应平直,无局部折曲。加工后的钢筋表面不应有削弱钢筋截面的伤痕,其弯制和末端的弯钩应符合设计要求。弯制钢筋宜从中部开始,逐步弯向两端,弯钩应一次弯成。钢筋加工的允许偏差不得超过下表:序号 名 称 允许偏差(mm)1 受力钢筋顺长度方向的全长 ±102 弯起钢筋的弯起位置 ±20(2)钢筋接头处理钢筋焊接接头应保证接头在同一截面上的接头数量不得超过此截面钢筋总数的50%,相邻接头位置错开50cm以上。钢筋接头一般采用焊接和铁线绑扎。焊接应采用闪光对焊或电弧焊连接,并以闪光对焊为主。用于受拉杆件中的钢筋,不论其直径大小,均采用焊接接头。钢筋接头的焊接工艺、焊机型号、焊接参数、焊接质量以及焊工的培训等要求,均应符合规范要求,具体操作详见《钢筋焊接作业指导书》。焊接接头应满足设计强度要求,且应取样分别做拉力及冷弯试验。焊缝密实,用小锤敲击接头时,钢筋发出与基本钢材同样的清脆声。在确无条件施行焊接时,对直径25mm及以下的钢筋方可采用绑扎搭接。绑扎接头的搭接长度(由两钩端部切线算起)不得小于规范规定,且接头应设置在钢筋承受应力较小处,并应分散布置,并避开钢筋弯曲处,距弯曲点不应小于10d。弯起钢筋的焊接接头不得在弯起钢筋的斜距段。(3)钢筋安装安装钢筋时,钢筋的位置和砼保护层的厚度应符合设计要求。在钢筋和模板之间应用与混凝土同标号的水泥砂浆垫块支垫,垫块厚度应小于净保护层厚度。垫块应相互错开成梅花型布置,并不得横贯保护层的全部截面。绑扎和焊接的钢筋,在运输、安装和浇筑砼过程中,不得出现变形、裂焊和松脱现象。钢筋绑扎必须结实牢固,布放位置准确无误。钢筋接头不应在同一平面内,应按规定相互错开。2.3、基坑排水基坑排水采用改沟导流、汇水井抽水或井点法排水的排水方法。对于在施工期间有水流的沟渠处修建排水涵时,先在该涵基坑顶缘以外适当位置修建临时导坑排水沟将地表水流引排,基坑内排水一般采用排水沟与汇水井相结合集中抽水的方法,对于基坑处在砂性土壤中时可采用井点法排水。2.4、模板安装模板安装前,要复核安装模板的标高及中心线位置,保证模板安装位置、标高符合设计要求。模板板扇的高度和宽度根据实际情况而定,模板厚5cm。单块板扇用木板钉在肋木上制成,肋木断面10×12cm、间距1m左右。板扇之间的连接用短肋木钉在肋木接头处来连接。板扇连接后,在肋木外侧加设钢管架支撑。模板在安装过程中,要注意拼缝严密,防止漏浆。安装完后,要认真涂涮脱模剂。整体模板一般采用现场拼装,拼装后对每块模板安装的先后顺序进行编号,安装时按编号逐一进行安装,模板底面应平整,接缝应严密。安装完后,必须认真涂涮脱模剂。2.5、混凝土灌注(1)检查钢筋安装和模板安装情况。在浇筑混凝土前,必须清除模板内的所有杂物,以保证所浇筑混凝土质量。(2)在浇筑混凝土时,若混凝土的入模高度大于2m,就必须采用溜槽或窜筒输送混凝土入模。(3)入模混凝土施工必须采用插入式振捣器捣固,插入式振捣器的移动间距不宜大于振捣器作用半径的1.5倍,且插入下层混凝土内的深度宜为50~100mm,每一振点的振捣延续时间宜为20~30s,振捣器的插入距模板边缘距离宜为10~15cm。(4)混凝土应尽可能的一次连续浇筑完成,若施工接缝不可避免时,接缝周边应预埋接缝钢筋,钢筋直径不得小于16mm,钢筋间距不得大于钢筋直径的20倍,埋入、露出长度不得小于直径的30倍。2.6、模板拆除拆除模板的时间应按混凝土施工及验收规范的规定执行。拆除的顺序是先拆侧模,后拆承重的底模,拆顶板时应架设临时支撑,如整体拆除时,应先挂好吊绳,然后再拆回形销。拆下的模板连接件应放入工具箱内,不得乱丢,拆下的模板不得高空投掷,必须逐块传递到地面。拆除的模板应及时清除模板上的灰浆,并在指定地点堆放整齐,钢模板应作好防锈措施。2.7、施工注意事项(1)模板安装时,模板的支撑必须牢固,支撑必须支撑在坚硬的岩层上,严禁在混凝土施工时有模板跑模现象。(2)所有模板的安装均不能使用从混凝土中穿过的拉杆。2.8、质量控制(1)所有原材料进场应进行试验并经监理工程师验收合格后方可使作。(2)模板的安装位置、几何尺寸必须满足设计结构物的要求,经自己“三检”合格报监理工程师检查复核合格后方可进行下一道工序的施工。(3)框架桥混凝土每100m3做一组试件,不足100m3也要做一组,且每个工作台班也不少于一组,试件混凝土强度必须符合设计要求。(4)框架桥各部位允许偏差和检验方法如下:序号 项目 允许偏差(mm) 检验方法1 轴线偏位 20 全站仪2 流水面高程 +20 0 水平仪3 孔径 20 尺量检查4 涵顶高程 ±15 水平仪5 涵长 +100 -50 尺量检查6 涵身厚度 +10 -5 尺量检查7 涵身接缝错台 3 尺量检查3、安全、环保水保措施3.1、安全措施(1)框架桥如为深基坑施工,在施工过程中若发现基坑有滑移裂纹应及时撤出所有工作人员并通知现场管理人员,现场管理人员根据实际发生情况应采取相应的应急措施。(2)在框架桥施工中,每道工序由固定的小组施工完成。(3)所有工作人员严禁上下重叠作业,工作人员在高于地面2m以上的高处作业时,所有工作人员必须系上安全带。(4)施工人员必须戴安全帽,严禁穿拖鞋、赤脚、酒后上岗作业。(5)框架桥基坑施工四周必须设置安全防护围栏,高度不得低于1m,并在显眼位置处做好警示标识牌。3.2、环保水保措施(1)尽量少占或绕避林地、耕地,保护原有树木及地表植被,临时用地范围的耕地采取措施复耕。(2)弃土场要先挡护后弃碴,防止泥沙冲刷污染农田、河流。(3)施工场地内修建施工排水系统并确保畅通,工地废水排放前先经沉淀,并采取必要的净化措施处理后方可排放,有害物质要定点存放并按有关规定处理。(4)运输可能产生粉尘的车辆配备挡板及棚布,防止粉尘飞落,减少对生产人员和当地居民造成危害,必要时进行洒水。(5)工程完工后及时清理现场垃圾,做到文明退场。
毕业设计论文施工组织设计文献综述施工组织设计的作用是对拟建工程施工的全过程实行科学的管理的重要手段。通过施工组织设计的编制,可以全面考虑拟建工程的各种施工条件,扬长避短,拟定合理的施工方案,确定施工顺序、施工方法、劳动组织和技术经济的组织措施,合理地统筹安排拟定施工进度计划,保证拟建工程按期投产或交付使用;也为拟建工程的设计方案在经济上的合理性,在技术上的科学性和实施工程上的可能性进行论证提供依据;还为建设单位编制基本建设计划和施工企业编制施工计划提供依据。施工企业可以提前掌握人力、材料和机具使用上的先后顺序,全面安排资源的供应与消耗;可以合理确定临时设施的数量、规模和用途;以及临时设施、材料和机具在施工场地上的布置方案。如果施工组织设计编制的合理,能正确反映客观实际,符合建设单位和设计单位的要求,并且在施工过程中认真地贯彻执行,就可以保证工程的顺利进行,取得好、快、省和安全的效果,早日发挥基本建设投资的经济效益和社会效益。60年代我们的施工组织措施采用的苏联的管理模式,随着我国的经济的增长,我们建筑业的发展,我们的施工项目管理也不断的更科学,70到80年代施工组织设计在我国全面的推广,经过我们不断的实践、探索、研究,使之我们现在的施工组织更科学更协调,经济上更合理 以往我们强调工程开工前必须有施工组织设计,否则不得开工,但有相当多的工程虽然编制了施工组织设计,但实际执行却不如人意,甚至有的根本无法实施。许多年来,施工组织设计的编制往往是由个别人编写,在很大程度上造成与材料、机械、劳动力等部门的脱节,使施工组织设计开始就先天不足,到项目实施过程中,由于编制者与实施者的分离,无法起到指导作用的施工组织设计只能束之高阁。所以我们认识了不足之处对于实施方案的编制组织,现在我们采取各部门共同参与的方法,并由项目技术负责人主编,使施工组织设计真正起到指导工程施工的作用。施工部署由单1转向了全面统筹工程的后续开展更顺利。 正 文杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004. 本书内容是根据本课程的教学基本要求并按照国家颁布的有关设计新规范、新标准编写的。全书共分十章,包括土的物理性质及工程分类,地基中的应力计算,土的压缩性与地基沉降计算,土的抗剪强度与地基承载力,土压力与土坡稳定,建筑场地的工程地质勘察,天然地基上浅基础设计,桩基础设计,地基处理,区域性地基等内容。本书可作为土建学科高等职业学校、高等专科学校建筑工程专业及相关专业的教学用书,也可作为相关工程技术人员的参考书。徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005本书以贯彻国家法规、规范为指导思想,从基础理论和实践应用人手,主要介绍 工程造价管理的相关理论和计算评价方法。本书共9章:第一章介绍工程造价概论, 解释了价格、造价的基本概念;第二章介绍工程造价的组成和计价方法,及工程量清 单计价规范的有关内容;第三章至第七章分别介绍了工程项目决策、设计、招标投标、 施工和竣工决算等不同阶段中,建设过程中工程造价确定和管理的实际操作内容;第八、九章介绍工程财务和工程造价管理相关法规的内容,这是作为从事工程造价管理工作的工程师们所必需掌握的基本知识。尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5.本书针对建设工程清单时期广大预算人员的学习需要,介绍了建筑工程预算书的编制内容和步骤,全面叙述了消耗量定额与清单计价的定额说明及工程量计算规则,重点阐述了应用例题的详细解答与完整的建筑工程的消耗量定额预算书和工程量清单投标报价书。内容共分三部分,包括:绪论,上篇——建筑工程消耗量定额计量与计价,下篇——建筑工程工程量清单计量与计价。本书逻辑清晰,图文并茂,强调理论与实践的关联,充分结合施工组织的实际,辅以大量实例,注重例题的合理化,支持启发性与交互式教学,力求实用。本书与《建设工程计价依据与方法》配套使用,学习过程中需配备参考文献所列书籍。本书可作为高职高专院校建筑类专业的选用教材,也可作为建筑企业管理培训教材,还可作为企事业单位中高层管理人员与技术人员的参考用书。姚刚.土木工程施工技术.北京:人民交通出版社,2005,3土木工程施工是土木工程专业的一门主干课。其主要任务是研究土木工程施工技术和施工组织的一般规律;土木工程中主要工种工程施工方法和工艺原理;施工项目科学的组织原理以及土木工程施工中的新技术、新材料、新工艺的发展和应用。新的《土木工程施工》教材阐述了土木工程施工的基本理论及其工程应用,在内容上力求符合国家现行规范、标准的要求,反映现代土木工程施工的新技术、新工艺及其新成就,以满足新时期人才培养的需要;在知识点的取舍上,保留了一些常用的传统工艺方法,注重纳入对工程建设有重大影响的新技术,突出综合运用土木工程施工及其相关学科的基本理论和知识,以解决工程实践问题的能力培养。教材在结构体系上有新的突破,具有创新和鲜明的时代特色。教材注重土木工程各专业领域知识的融合,使之成为一个有机的整体。教材层次分明、条理清楚、结构合理,既考虑了大土木工程专业的整体性,又结合现阶段课程设置的实际情况,在土木工程的框架内,建筑工程、道路工程、桥梁工程、地下工程等自成体系,便于组织教学。钱昆润等.建筑施工组织与计划.南京:东南大学出版社,2009本手册内容分为4大部分:一、建筑施工基础知识,包括建筑构造、施工测量、建筑材料、施工 实用结构计算;二、建筑施工技术,包括土建土施工及水暖、卫生、电器设备工程施工;三、建筑施工管理,包括定额与预算、施工组织设计、企业管理;四、建设监理知识及工程招标投标与合同管理。最后在附录中给出了施工常用资料及数据。中华人民共和国建设部.建设工程工程量清单计价规范.北京:中国计划出版社,2003本 规范是根据《中华人民共和国招标投标法》、建设部第107号《建设工程施工发包与承包计价管理办法》,按照我国工程造价管理改革的要求,本着国家宏观调控、市场竞争形成价格的原则制定的。 本规范在编制过程中,总结了我国建设工程工程量清单计价试点工作的经验,并借鉴了国外工程量清单计价的做法。本规范批准发布前广泛征求了有关施工单位、建设单位、工程造价咨询机构和工程造价、招标投标管理部门的意见,对其中主要问题进行了多次讨论和修改。 本规范共分五章和五个附录,包括总则、术语、工程量清单编制、工程量清单计价、工程量清单及其计价格式等。 Park Yj and A H-S.Mechanistic Seismic Damage model for reinforced Concrete.Journal of Structural Engineering,ASCE,vol.111,No4,2005The progressive collapse of the building structures due to accidents has become a hot research topic of civil engineering all around the world. The researches and designs on progressive collapse are based on accurately simulation for the failure process of whole structural systems. However, due to the complicated material and geometric nonlinearity and large computational workload in collapse simulation for a real reinforced concrete (RC) structure, normal finite element (FE) analysis with solid elements are not feasible in collapse researches. Hence, a fiber beam model is proposed in this work to simulate the collapse of RC frame. The fiber beam model is firstly verified with a collapse test of a planar RC frame. And then following the design process proposed in DoD 2005, the collapse processes of two typical Chinese 8-story RC frames with and without slabs respectively are simulated and compared. The influence of slabs on the progressive collapse behavior of structures is studied and the result proofs that the slabs can greatly improve the progressive collapse resistance of structures.DAVIDM.LEVINSON. Budget busts: The influence of demand in the construction market[J].Received 25 August2003.A new normalized damage index for evaluation of structural damage of reinforced concrete was developed based on the relation of demand and capacity. The proposed formulation combines two sources of damage: permanent deformation and strength deterioration due to cyclic loading during dynamic events. The new damage model is first verified for single components. Based on the compressive strains in the core concrete, tensile strains in the transverse hoops and a good photographic record of the component during stages of testing, damage limit states for serviceability, repairability/irrepairability and collapse are identified and correlated with the damage model. A global damage index is also proposed based on individual member damage indices, which uses a weighting scheme that assigns importance as a function of gravity loading. Finally, an inelastic design spectra is recommended for code development wherein the relationship between the natural period of the structure and the response reduction factor is quantified in terms of incurred structural damage.结 论建筑施工组织设计必须扩大深度和范围,对设计图纸的合理性和经济性做出评估,实现设计和施工技术的一体化。施工企业要建立施工组织设计总结与工法制度,扩大技术积累,加快技术转化,使新的技术成果在施工组织设计中得到应用。目前已是知识经济时代,信息技术在工程项目中已起到越来越大的作用,建筑施工企业应大力发展与运用信息技术,重视高新技术的移植和利用,拓宽智力资源的传播渠道,全面改进传统的编制方法,使信息在生产力诸要素中起到核心的作用,逐步实现施工信息自动化、施工作业机器化、施工技术模块化和系统化,以产生更大的经济效益,增强建筑施工企业的竞争力,从而使企业能在日益激烈的竞争中获得更好的生存环境。参考文献【1】 杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004.【2】 张雅麟.《建筑施工手册》.-2版。北京:中国建筑工业出版社,2008.1.【3】 姚谨英.《建筑施工技术》.-2版。北京:中国建筑工业出版社,2003.11【4】 张 建.《建筑材料与检测》.-北京:化学工业出版社,2003.5.【5】 李晓光.《建筑工程定额与预算》.中国电力出版社,2005,1.【6】 李 泉.《浅谈如何准确编制概算、有效控制投资》.工程经济,2000.6.【7】 姚 刚.《土木工程施工技术》.北京:人民交通出版社,2005,3【8】 徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005【9】 钱昆润. 建筑施工组织与计划.南京:东南大学出版社,2009【10】 尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5. 【11】 刘伊生.《工程造价管理与控制》. 江苏:东南大学出版社,2004,9.【12】 徐大国.《 工程造价的与控制》. 北京:计划出版社,2005【13】 姚 冰.《与国际接轨的全过程造价控制》. 北京:建筑工业出版社,2005,11.【14】 中华人民共和国建设部. 建设工程工程量清单计价规范.北京:中国计划出版社,2003【15】 DAVIDM.LEVINSON. Budget busts: The influence of demand in the construction market[J].Received 25 August2003.【16】 Park Yj and A H-S.Mechanistic Seismic Damage model for reinforced Concrete.Journal of Structural Engineering,ASCE,vol.111,No4,2005
施工组织设计文献综述参考
按照字面的意思,参考文献是文章或著作等写作过程中参考过的`文献。然而,按照GB/T 7714-2015《信息与文献 参考文献著录规则》”的定义,文后参考文献是指:“为撰写或编辑论文和著作而引用的有关文献信息资源。接下来由我为大家整理出施工组织设计文献综述参考,希望能够帮助到大家!
[1] 刘先觉. 现代建筑理论[M]. 北京:中国建筑工业出版社,1999.
[2] 未来农村住宅的理念.工程建设与设计,2004.
[3] 吴良镛. 建筑学的未来. 北京:清华大学出版社,1999.
[4]徐晋仙.建筑施工中施工组织设计的重要性[J].科技向导,2010,(26):73.
[5]李润成.编制投标施工组织设计的几点建议[J].山西建筑,2012,(6):74-75.
[6]李海涛.工程投标中的施工组织设计编制[J].技术市场,2011,(6):295.
[7]王革新.施工组织设计的作用与编制[J].甘肃科技纵横,2007,(1):54.
[8]聂迎春.浅谈施工组织设计在工程施工中的重要作用[J].科技创新指导, 2010,(2): 29.
[9]林瑞.优化施工组织设计合理确定工程造价[J].水利水电工程造价,2007,(3):25.
[10]宋玮.施工组织设计与工程造价[J].水利水电工程造价,2007,(2):41.
[11]吴永昌.简述安全、质量、进度、投资之间的关系[J].经济师,2010,(6):233.
[12]陈兵.浅谈建筑施工组织设计[J].企业研究,2011,(20):183.
[13]齐新红.浅谈施工组织设计编制及其重要性[J].建工论坛,2010,(23):181.
[14] 编写组.建筑施工手册(第三版). 北京:中国建筑工业出版社,200l.
[15] 郭立强,张文辉.面对信息时代的行政办公建筑小城镇建设,2003.
在工程项目中,施工组织设计是重要的组成部分,施工组织设计的内容,决定于它的任务和作用。下文是我为大家整理的关于工程施工组织设计论文的 范文 ,欢迎大家阅读参考!工程施工组织设计论文篇1 《浅析水利工程施工组织设计》 摘要:水利工程是一个国家的重中之重,其施工质量及进度对水利工程作用的发挥有着深远的影响,本文旨在对于水利工程的施工组织在设计方面进行探讨. 关键词:水利工程 设计 施工 一、水利工程施工组织设计定义 所谓的施工组织设计是论证设计能成为现实地可行性与经济性都合理的最基本的依据, 同时又受到自然条件与社会政治和经济的制约,这就使其成为了水利施工的整体设计规划和布置以及招标文件中的最基本依据。水利工程的建设到迄今为止还是凭借 经验 为主要技术的实践性学科在当前竞争异常激烈的社会中,加强和提高施工组织设计方面的认识和研究,都具有十分深远的意义。 二、水利工程的施工组织设计所发挥的重要意义和作用 作为拟建水利工程而进行施工筹建, 准备于施工的战略部署等的技术文件,施工组织的设计是有很重要的地位的。 1、是总体设计构成的一部分 现今我国的勘测设计机构有多个分局,如地质,测量,水文,谁能,实验,水工,施工, 机电,预算,这些都是勘测设计组成的部分,而且具有相互的依存,互相制约的特殊关系, 施工组织的设计和水工枢纽的布置以及结构形式的特征关系是较为紧密的,也不可分割, 欧美的一些国家水工,施工也都是一体化的,所以在总体设计的方案研究中,以上所述都要相互配合,相互协调,仔细的分析,认真的研究,这样才能得到技术的呃可行和经济合理地总体设计的方案。 2、是决策工程建设的重要因素 我们所说的工程建筑决策, 是除了区域内用电负荷,灌溉, 供水和综合利用的目标, 都需水文,机电的专业能够分别计算工程投资的效应外,还应对工程所处的地域内的自然条件, 社会经济, 财务来源及工期长短等进行分析计算,并最为提供工程建筑投资估算的依据, 其中水工和施工专业队工程的投资影响较大,特别是施工的专业,增加临建工程及施工期变化等静动态的投资,都作为经济的分析依据,有利于工程建设地合理决策。 3、是筹建工程贮备和布置的主要依据 工程的建设施工准备中,料场的规划,工程的设施,生活的建筑,施工的设备,物资器材和安装场地都是需要进行严格规划和布置的,且涉及到淹没,占地,移民和环保等项目是,承建单位依据施工组织设计来进行筹建于准备,方便做好总体的布置工作,且更为重要的是施工组织的设计是作为施工的指导有利于把握关键的程序并合理的协调资金,充分发挥劳动力,优质高产的按期完成分期的计划投资和相应的施工任务, 为工程的建设能提早发挥效益创造了良好的条件。 4、是承建与管理重要的依据 我国以往的工程建设都是以计划经济作为指导,采用的是指令式的分配工程设计和施工, 但是在当前的国家形式中,逐步的推行设计与施工的招投标方式,设计体制也要做出相应的转变,才能适应市场经济的快速发展。 其中施工组织设计的任务,就是要出了配合其他的设计专业做好技术的可行性发展和经济合理的安排的总体设计方案并提出可行性 报告 文件以外,更需要适应现代的投标方式,为业主提供招标技术的经济稳健作为招标的使用,且为工程的筹建,准备和施工的战略部署提供服务。所以施工组织的设计,不仅是业主作为招标技术的经济依据,还是承建单位进行施工战略部署与指导施工技术最有力的依据,其重要性不言而喻。 三、水利工程的施工组织设计的基本内容 由于工程的施工设计的阶段不同,所以施工设计又可分为标前设计(即投标前的设计) 和标后设计(也就是投标后的设计)。而如果按照施工组织设计的对象区分,施工组织设计有被分为了施工组织的总设计,单项的施工组织设计与分部施工组织设计。而施工组织设计的基本内容又包括了施工导流,施工工艺,施工的进度和施工的布置等。 (1)施工导流 水利工程是建于水源的河道之上,所以其施工与河水之间存在矛盾,而为了解决这个矛盾,必须将部分的河水甚至全部的河水都导走,形成干地施工条件,而且尽量的保证河流综合利用的条件不会因为施工而受到破坏,所以需要提出施工导流的专门设计。施工导流在水利工程设计里是选择坝址,枢纽布置,坝型结构和施工的 方法 ,施工进度以及施工的布置重要的因素,又是整个施工组织设计的中心环节。 所以它是施工工程的控制工期的主要关键, 也是影响工程的总投资重要的因素。水利工程的施工,是需要与自然的条件相适应的,所以其中最重要的就是其与水情规律要相适应。在一般的情况下,用于适应水情规律的费用要比改变水情规律的费用要少的很多,而且在很多的情况中,水情规律是很难改变甚至是无法改变的,那么施工导流就成为了主体工程的施工中控制的环节,且导流工程中,截流,排水,渡汛,封堵,拦洪和蓄水等方面都随之成为主体工程的施工控制因素。 很显然,若主体工程的施工程序和河流规律可以很好的适应,工程的进展较顺利,那么就可以节省开支, 但如果做不到这点,那么不仅会打乱施工的计划安排,以至于延误工期 加大开支,还可能造成事故导致被迫停工,严重影响水利工程的建设。在特殊的施工技术的装备情况中,水利工程建设的施工期限取决于工程的数量,同时还取决于施工导流的条件, 这样是因为导流的工程费用和施工期可以成反比,所以施工导流还是控制施工期限主要的因素。 需要特别说明的是,截流是我们施工导流的设计中很关键的环节,而且还时主体工程的施工开始的重要程序,在导流建筑物完建时,才具备了分流的条件,所以截流地先决条件是分流, 而且导流建筑 截流 措施 和挡水围堰共同实现了导流的工程。 (2) 施工方法 施工组织设计的根基就是施工的方法,它是由施工的技术,施工的顺序,施工的工艺在特定施工的装备下完成的。施工方法之所以重要是因为它是研究建筑物的结构后施工技术的可行性和经济性合理性的综合, 其研究的项目基本上是以下几种: 2.1 研究主体工程的建筑物其实施的顺序与方法的施工技术的特性。 2.2 研究主体工程的建筑物施工的顺序和施工导流所配合的实施状况技术的特性。 2.3 在特定的技术装备支持下,研究在施工的期限内所能达到低施工强度的合理指标。 2.4 研究研究所适应施工程序地施工平面和高程的场地的合理化布置。 2.5 研究所必要地技术物质的供应以及材料的消耗,为预算分析单价提供基础资料。 2.6 研究工程建设的施工安全, 质量, 进度和效益的科学管理施工的工艺和要求。 (3) 施工的进度 研究计划施工的进度就是从工程建设地施工准备的起始至竣工为止的,整个施工期内所有建筑物组成的各个单项的工程,其修建地施工程序,施工速度和技术的供应相互间的关系,并通过综合的协调平衡后所显示出的总体规划时间和强度的指标,目前所做的进度计划其表示的形式有横线图,斜线图和网络图。那么在施工进度的计划研究中,所着重需解决的问题有: 3.1 要合理的划分施工的程序。就是在水利工程中,对施工程度影响较大的时段,需对其进行合理的划分,如截流,渡汛,封堵,拦洪和蓄水期都要进行分析,才能恰当的安排并的到合理划分。 3.2 施工机械化的水平。机械装备需要适应工程所处的自然条件与建筑物的特性,施工机械装备的程序对施工强度有影响,并会直接影响到施工的速度和工程进展。 3.3 关键施工期的控制。通过水利工程的建筑实践可以发现,如果河道的截流起始时和后期的第一个经历的枯水季的施工期,则控制了整个工程进度的交换,所以在安排进度的计划的同时,要对截流前导流的建筑物与截流后的坝体施工和方法都进行充分的论证,包括截流,基坑排水和基础处理,坝体填筑,这样才能达到合理的安全渡汛,划分关键的施工期控制。 3.4 经济投资的效应。因为水利工程的项目多,工种复杂,工程量大,施工期长,远离城镇和投资巨大, 其进度的计划安排长春市有许多困难的,变化的因素又多,其进度计划和资财的投入,时间的价值关系都更为密切,且影响的程度也加大,这就需要进度的计划可以充分的利用资财以达到最佳的经济效应。 工程施工组织设计论文篇2 《浅谈编制建筑工程施工组织设计》 摘要:本文结合工作实际,列析了在建筑工程施工组织设计编制过程中应注意的情况,力求最有效、经济合理、有节奏、文明、安全地组织工程项目的施工,从而保质、保量、迅速、安全地实现工程项目。 关键词:编制;合理;科学安排 建筑工程施工组织设计是以整个建设项目或建筑群为对象,根据初步设计或扩大初步设计图以及其他有关资料和现场施工条件编制的,用以指导整个建设项目或群体工程进行施工准务和组织施工活动的全局性指导性文件。它是为施工企业建立施工条件、集结施工力量、组织物资资源的供应以及进行现场生产与生活临时设施规划的依据,也是施工企业编制年度施工计划和单位工程施工组织设计的依据,是建筑企业实现科学管理、保证最优完成施工任务的有效措施。 笔者在日常工作中,发现此部分内容的编制好坏决定了整个工程项目施工的合理性,对工程项目的完成度也起了重大作用。于是,针对编制建筑工程施工组织设计,谈论以下几点: 1、遵守相关法律法规 我国对于建筑工程施工颁布了一系列的法律法规,只有具备开工条件经有关部门审批后工程方可以开工,所以在编制施工组织设计时必须严格遵守法律法规,认真贯彻基本建设的有关规定,这是编制一切施工组织设计的基础条件。 2、严格执行施工程序 每个工程都有严格的施工程序,这是确保施工能够顺利进行的基础核心,如果违反了正常的施工程序,凭自己的主观臆想随意改变客观的施工程序,不仅起不到加快生产的目的,反而会酿成严重的安全后果。因此,在编制施工组织设计时,对于基本的项目施工程序是一定要严格遵守的,而且编制施工组织设计的人本身对于工程的实际施工也要有非常清晰的认识。 3、采取施工组织方案比较法 施工方案选择必须进行多方案比较,比较时务必做到实事求是,切忌在形式上论证某个既定的方案。比较的目的是优选,是在多个方案中选择最经济、最合理的方案。当前的施工新技术往往涉及设计与建材等方面的因素,各方面应密切配合。必须指出,采用新技术并非目的,目的是为了获得最优指标的方案。因此,必须从实际出发,决不能生搬硬套。对一些目前还行之有效的传统方法,只要在参加方案竞选中获得的指标是好的,仍然是优秀方案。当然,在方案比较中也要注意到并看准某项新技术的发展方向,如果某项新技术的推广由于受某种习惯影响或客观条件未成熟,使其效果不明显甚至不好,但只要最终方向是正确的,就要允许进行试点,在实践中以求改进,最终将会实现目标。 4、科学安排施工计划 施工计划是施工组织设计文件中最重要的组成部分,工地上一切资源需求量的计算与供应、各业务组织的安排及施工总平面图的布置等均要依据施工计划,施工计划是在优先确定的施工方案的基础上,根据具体工程的要求来安排的。 任何一个工程项目的施工计划,也就是各个分部分项工程、工种在该工程中的施工顺序,它们必须有一定的客观规律,即一系列的施工活动在工程的空间和时间上的统筹安排。有的应顺序先后衔接,有的可搭接施工,还有的相互之间要有一定时间的技术间歇等,这些就是施工的客观规律。为了缩短工期也可组织立体交叉或平行施工。有时为了得到某些资源的均衡,可组织流水施工或人为地延长、调整某一工种的持续时间。 此外,在工程的不同部位之间也有一个先后次序的问题,如一般是先地下、后地上;先做基础,后做主体结构,再做装饰工程等。但实际施工中如未有合理计划也会出现颠倒的情况,造成一系列的损失浪费。 5、采用先进的施工技术和设备 尽量采用先进的科学技术,努力提高施工水平。在建筑施工中,提高劳动生产率、缩短工期、提高工程质量、降低工程成本和消耗的关键是采用先进的施工技术,合理选择施工方案以及科学的组织方法,这在编制施工组织设计中应特别重视。这里要注意的是,一定要结合实际并在现有基础及水平上吸收国内外先进技术,一定要先收集信息,进行研究、分析,经试验成功后在应用,最后达到各项技术指标是优良的,操作是安全的,符合施工验收的各项标准。 6、确保工程质量和施工安全 “百年大计,质量第一”是施工现场常见的一句 标语 ,也是基本建设战线上特有的一句 口号 ,这是根据建筑产品的经济价值高、使用寿命长等特点提出的。因此,在编制施工组织设计时,要认真贯彻“质量第一”和“ 安全生产 ”的方针,严格按照施工验收规范和施工操作规程的要求,制订具体的保证质量和安全的措施,以确保工程顺利进行。同时,在整个工程施工过程中,要分阶段地进行质量、安全的 教育 、检查、 总结 和评比工作,使质量安全工作处于动态而有效的管理之中。 7、节约资源,降低成本 编制施工组织设计,应认真贯彻自力更生、勤俭建业的方针。各项技术措施,应符合企业自身的人力、物力、财力等情况,不贪大求洋,这样才能收到较好的技术经济效果。如因地制宜,就地取材,尽量减少临时设施,节约用地,努力降低工程成本。在编制施工组织设计时,应充分利用施工场地原有的设施,以减少临时设施费用。合理选用当地资源,合理安排物资运输、装卸与储存作业,减少物资运输量,避免二次搬运,精心进行场地规划布置,节约施工用地,降低一切非生产性开支和管理费用。 8、加强季节性施工措施 由于建筑施工不像在工厂车间里工作那样有比较稳定的工作地点和工作环境,而是露天作用、高空作业和野外作业,工作地点和环境不断变化,受外界制约因素较多。因此,编制科学、合理的施工计划,做好人力、物力的综合平衡调配,制订好冬季、雨季、高温季节等特殊施工技术措施,是决定工程能否顺利的基础。 例如,基础施工应尽可能避开雨季,以减少排水设施和排水费用,有利于工程连续施工;外墙装饰工程应可能辟开冬季低温施工,以减少防寒保暖费用和防止冻害事故的发生;在保证重点工程部分施工时,应适当穿插一些辅助和附属工程项目的施工,以扩大施工作业面,减少劳动力、机械设备的进退场次数;在劳动力使用和建筑材料供应上尽量避免时紧时松的现象。 参考文献 1. 黄淑森 、程建伟 建筑施工组织与项目管理 -北京:机械工业出版社,2012.1 工程施工组织设计论文篇3 《桥梁施工组织设计》 摘要:桥梁建设工程一般都是通过投标的形式承包给施工单位进行施工,因此施工单位需要编制施工组织设计,并按照施工组织设计进行施工,以保证建设质量及工期。因此施工组织设计的编制及贯彻施工对桥梁建设具有重要的影响,本文主要介绍了桥梁施工组织设计的编制和贯彻、检查及调整。 关键词:桥梁;编制;贯彻;检查; 1.桥梁施工组织设计的编制 桥梁工程在开工之前中标之后,施工组织设计是施工单位必须要编制的。对于实行总承包且有分承包的工程,总体施工组织设计由总承包单位负责编制,分包工程的施工组织设计由分包单位负责编制。合同工期及有关规定是施工组织设计编制的依据,同时为了切合实际和更加的合理还应该广泛的征求意见来自于各协作施工单位。 要进行专门的研究对于采用新工艺、新技术或者施工难度大及结构复杂的项目,必要的时候应该邀请有经验的专业工程技术人员和工人参加组成的专门会议,科学合理的各种措施和施工方案利用群体的智慧制定出来,可以打下坚实的群众基础为施工组织设计的编制和实施。 除了技术部门以外还应该充分发挥各职能部门的优势和作用来对桥梁施工组织设计进行编制,应该充分利用施工企业内部的人事、财力、安全和保卫、劳资、机械、材料等部门参与编制和审定,发挥管理优势和技术优势实现扬长避短,统筹安排。同时也可以使各职能部门做到心中有数在贯彻实施施工组织设计的过程中。 1.1桥梁施工组织设计的基本编制原则 一、基本建设的程序必须严格的进行执行。 必须对施工顺序进行科学合理的安排,为了统筹安排保证重点,应该把控制工期的工程项目重点突出。为了制定出的施工组织方案最合理应该尽量采用网络计划技术和流水施工的方法,可以做到施工的连续、节奏和均衡。二、为了确保全年的连续施工应该落实季节施工的措施,对在冬雨季节里施工的项目进行科学合理的安排并且应该尽可能的采用新工艺、新技术、新设备及新材料进行施工在条件允许的情况下。三、提出安全措施和技术措施来保证工程的质量。临时设施的规模应尽量减小在满足施工需要的情况下,为了减少物资的运输量应该合理储备物资;为了提高经济效益,使工程成本降低应该对施工平面图进行合理布置,实现用地减少,各项费用的节约。四、根据国家有关的环境保护法规,为了降低或者减少施工对环境的污染应该制定必要的措施,进行文明施工。 1.2桥梁施工组织设计的一般编制程序 不仅应采用正确合理的方法对桥梁施工组织设计进行编制,还应该采用可以的编制程序按照施工的客观规律,对各种影响因素进行协调处理,同时对有关信息的反馈多加注意。 一、经过对合同文件和设计文件的研究和分析必须进行相关的调查研究,对工程数量进行计算、对施工方案进行选择,确定施工方法。二、编订施工进度计划的,制定供应计划根据计算出的机具设备、材料和人工等资源的需要量,确定供热、供水、供电和临时工程计划同时制定好工地的运输组织。三、对施工平面图进行设计,确定施工组织的管理机构。四、编制技术措施计划,编制环保、文明、安全和质量施工措施计划,对主要的技术经济指标进行计算编写 说明书 。 2.桥梁施工组织设计的贯彻、检查和调整 2.1桥梁施工组织设计的贯彻 以下几方面是为了保证施工组织贯彻设施应该做好的工作: 1)施工组织设计的交底工作应该做好。 应该召开各级的技术和生产会议在工程开工之前,自上而下的将经过上级主管部门审批的施工组织设计逐级进行交底,对其内容、施工的关键工艺和有关的保证措施、技术质量要求进行详细的讲解。组织群众在施工工区、队及班组中进行讨论,为了完成任务拟定技术组织措施并且相应的决策应该做出。按照施工组织设计中确定的原则责成计划部门制定出切实可行的严密的施工计划,各施工工区均应下达施工计划,并进一步的分解施工计划,进行任务划分,各施工对和班组负责具体执行布置的任务;根据施工组织设计中确定的施工方案责成技术部门拟定科学合理和具体的施工工艺和技术实施细则,保证贯彻执行事故组织设计。 2)各项管理 规章制度 的制定。 施工企业的技术素质和管理素质以及经营管理的水平决定了能否顺利的贯彻施工组织设计。企业是否局域健全的各项管理规章制度是体现企业水平和素质的标志。企业要保证工程质量,使劳动生产率得到提高,防止漏洞和事故的出现,维持正常的生产秩序经过实践证明必须建立科学健全的管理规章制度。 3)技术经济承包制的推行。 推行技术经济承包制度在施工中可以使施工组织设计更好的贯彻。技术经济承包可以明确承发包双方的责任运用经济的方法和手段,这一重要手段用来保证承包目标实现,使监督和相互促进更加方便。为了全面贯彻施工组织设计在施工过程中把职工的物质利益和技术经济责任挂钩,做到奖惩分明是十分必要的。 4)把综合平衡和统筹安排做好。 在桥梁工程的施工过程中为了满足工程施工的需要和获得较好的经济效益应该保持合理的施工规划,把施工所需的物力、财力和人力统筹安排好。施工过程中存在着绝对的不平衡和相对的平衡,不平衡会因为施工中某一条件发生变化而产生。为了保证施工的连续性、均衡性和节奏性要及时对不平衡因素进行分析和研究,对各种专业工种和施工条件不断的进行反复综合及综合平衡使施工组织设计进一步完善。 2.2桥梁施工组织设计的检查 2.2.1检查主要指标的完成情况 一般采用将计划规定的指标与各项指标的完成情况相对比的比较法来进行检查施工组织设计提出的主要指标。工程的材料消耗、成本费用、进度和质量、机械使用等是检查的内容,把相应的施工进度、施工方法和施工内容的检查与主要指标检查相结合从中发现问题,找出差距提供依据给进一个分析原因。 2.2.2检查施工总平面图的合理性 在施工过程中存放机具和堆放材料,临时设施的建造,敷设管网和施工便桥便道都必须要根据施工总平面图的布置要求进行;文明施工的要求在施工现场还应符合。一般情况下不得随意改变施工总平面图,应及时制定改进方案在反向存在不合理性时,为了满足施工进展的需要报有关部门批准后进行修改。 2.2.3检查施工组织设计的执行情况 施工组织设计在施工过程中是否有违背原则的现象,以及预定的目标是否能实现等都需要在施工过程中进行必要的检查,为了使施工能按预定的方法、程序和方案开展维持正常的生产秩序非常的重要。 2.3桥梁施工组织设计的调整 工地上情况具有千变万化的特性,施工组织设计中一些原定方法、条件和程序有可能会在实施过程中发生改变因为各种原因,所以一些局部的调整是非常必要的。拟定改进的方案及措施主要是根据施工组织设计在执行过程中发现的问题及产生的原因;调整施工组织设计的有关指标或部分;为了使施工组织设计实现新平衡在新条件下对总平面图进行修改。 总结,桥梁施工组织设计对桥梁工程的全部施工生产活动进行了规划和部署,使得生产施工可以有效的、有秩序的进行;对可能出现的问题提前做好措施,保证顺利进行施工;施工组织设计贯彻落实到位才能连续性、节奏性和均衡性的进行桥梁工程施工,使桥梁施工可用最低的经济成本获得最大的技术经济效果。所以桥梁施工组织设计的编制及贯彻、检查和调整对桥梁施工至关重要。 参考文献:[1]李乐辉. 桥梁施工组织设计[J]. 中国新技术新产品,2010. [2]于旭东. 浅析公路桥梁施工组织设计和施工管理[J]. 科技创新与应用,2012. [3]毛庆虎. 浅析公路桥梁施工组织设计和施工管理[J]. 中国高新技术企业,2014. [4]孙朝晖. 桥梁施工组织设计的探讨[J]. 科技风,2009. 猜你喜欢: 1. 工程施工方案范文 2. 工程项目施工组织设计论文 3. 施工组织设计实训心得体会 4. 建设施工组织论文 5. 工程施工组织设计毕业论文 6. 建筑工程施工组织论文
施工组织设计是施工企业积极参与市场竞争,承揽建设项目,编制投标文件的重要组成部分。下文是我为大家整理的关于工程施工组织设计 毕业 论文的 范文 ,欢迎大家阅读参考!工程施工组织设计毕业论文篇1 《分析公路桥梁工程施工组织设计》 摘要:根据国家经济建设十二五的规划,高速公路建设作为带动经济、惠民的基建项目,也得到了前所未有的发展。桥梁施工组织设计作为高速公路建设的重要组成部分,结合公路施工的特点如何编制出即保质量又经济的精细化公路桥梁施工组织设计,是高速公路建设中的重点工作。 关键词:公路桥梁工程;施工组织设计 引言: 随着我国经济的飞速发展,使高速公路建设成本、质量控制也被人越来越关注,桥梁作为公路中重要组成部分,随着交通运输量的显著提高 ,其保证质量在公路建设中的重要性也颇显突出,而桥梁施工组织设计对保证工程质量起到了关键的作用。 1.工程概况 本工程为某高速公路河口至双凤段第十四合同段,位于郁南县境内,路线经历洞镇农林村,沿线X472县道、村道及机耕便道经过,交通不方便。本合同段全长10.8km,起迄里程为K87+850~K92+150,总工期要求26个月,其中桥梁18个月。桥梁工程:含有大中桥梁11座,依里程桩号分别为龙庆宫高架桥、石排口高架桥、竹粒高架一桥、竹粒高架二桥、RK90+412中桥、RK90+545中桥、白石岭中桥、路下寨高架桥、路下寨跨线桥、大用跨线桥、连城河大桥。 现以连城河大桥和路下寨跨线桥为例介绍工程概况: 1.1连城河大桥(里程:K98+600~K99+120) 连城河大桥在路线上处于整体式路基段,左、右幅桥梁布置不等长,在大桩号处有40m长属于半路半桥设计,左幅中心里程K98+840,桥跨组合12×40,桥长481.2m,右幅中心里程K98+855,桥跨组合13×40,桥长521.2m,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ180cm、φ200cm,桩长为16 m~44m,桩基性质属嵌岩桩与摩擦桩,桩基共56根。 墩柱 采用实心薄壁单墩式桥墩,墩高1.5 m~30 m,墩柱宽度均为3.2m,厚度分为两种,分别为160 cm厚墩柱配两根φ180cm桩基及180cm厚墩柱配两根φ200cm桩基,墩顶为变截面盖梁,桥台为柱式台。 上部构造 40m预应力砼先简支后连续刚构T梁 1. 2路下寨跨线桥(里程:K95+090~K95+560) 本桥主线跨县道X472,路线上处于整体式路基段,由于起点连接黄茅冲隧道,桥梁前段对应隧道路线设置,中央分隔带为0.5m,然后渐变到3m,左幅中心里程K95+325,桥跨组合30+11×40,桥长474.1m,右幅中心里程K95+327,桥跨组合26+11×40,桥长470.1m,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ230cm、φ250cm,桩长为11 m ~40m,桩基性质属嵌岩桩与摩擦桩,桩基共54根。 墩柱 立柱直径为φ180cm、200cm,采用双柱式桥墩,柱高度为14 m ~52m,桥台为柱式台。 上部构造 40 m预应力简支后连续刚构T梁 2.公路桥梁工程施工组织设计的内容 施工组织设计是指导整个施工工程全过程的经济文件,简单的说可以包括施工准备和施工过程中两大块,单位工程施工组织设计是指出具体施工 方法 技术指导的文件。工程施工组织设计的内容主要包括了以下几点: 2.1施工准备实施计划 施工准备实施计划是保证工程圆满完成的必要准备,它主要包括现场准备、技术准备、机械设备、材料工具以及相关配件准备等,在技术准备中应该要指出季节性施工项目的安排详情,整个施工准备实施计划必须注明工作单位、工作量、各项任务完成进度等,必须以纸质文件给出。 2.2施工方案、施工方法及其技术 措施 施工方案、施工方法及其技术措施是施工组织设计的核心部分,这部分需结合工程施工现场实际情况与设计施工目的,以及达到何种标准等来进行设计,这部分内容主要包括制定施工顺序、细化施工项目、估定施工工程量以及工人劳动量、计算机械设备等施工工具的使用量,以及各个分项工程的施工时间之间的配合,要保证施工工期满足合同所要求。 2.3实物工程量 根据施工现场的具体情况,如地质水文条件等,并结合设计文件的要求来精确计算各个分项工程的工作量情况。 2.4各项需用量计划 根据精确计算出的实物工程量与施工进度要求来制定各项计划用表,主要包括机械设备、材料以及劳动力所需等计划用表,各项需用量计划是施工各阶段的准备阶段,它是开启整个工程施工的钥匙。 2.5施工设计图 施工设计图也是工程施工组织设计中的一个重要部分,它指明了整个工程的结构,施工技术人员需结合设计图来进行施工。 2.6各项经济技术指标 各项经济技术指标是关系到施工单位经济利益的关键所在,远超指标会使施工单位利益受损,不达标便不能满足设计需求。在施工过程中,需要认真的按照施工规范、操作规程和设计文件来进行施工,才能保证各项经济技术指标到一个理想效果。 3.如何做好公路桥梁工程施工组织设计 在做好每个细节工作,保证不出现上述常见问题的同时,如何做好公路桥梁工程施工组织设计,一直是工程施工人员所需要解决的问题。当前的社会的竞争十分激烈,在施工单位中亦是如此,施工企业要想健康而快速的发展,做好工程施工组织设计是施工企业亟待解决的问题,以下几点可以有效帮助做好公路桥梁工程施工组织设计: 3.1高度重视施工图设计文件的施工要求 编制人员要充分了解施工图设计文件的相关要求,分析工程的特点,针对工程特殊部分及其工艺要求,来制定切实可靠的施工措施。 3.2扩大施工组织设计的深度和范围 在完成 文章 前面所述的内容基础上,可评估出设计图纸的合理性及经济性,扩大技术积累,加快技术转化,实现设计与施工技术的一体化。 3.3加强施工组织设计编制人员的 教育 培训 施工组织设计文件质量的高低很大程度上取决于施工组织设计编制人员的水平。在当今社会如此高速发展的情况下,提高施工技术人员的水平,对任何一个施工单位起来说都是十分重要的,加强其教育培训能起到很好的促进作用。 3.4管理者的思想观念要适应现代社会的发展 二十一世纪是进入高速发展的信息化年代,管理者只有不断去适应现代化发展的需要,才能对施工组织设计注入符合新时代的血液,才能带领着团队不断前进。 4.结语 做好公路桥梁工程施工组织设计能有效提高工程施工效率,也成为了施工单位提高经济效益有效手段,同时,它还是衡量施工单位施工技术水平和管理水平的一个重要标志。 工程施工组织设计毕业论文篇2 《浅析园林绿化工程施工组织设计》 摘要:本文通过对园林绿化工程施工组织设计实践与研究,分析了在园林绿化施工组织设计中存在的问题,提出施工组织设计是工程施工中最关键的步骤之一,施工组织设计应充分考虑施工实际,并就如何进一步加强施工组织设计进行了探讨。 关键词:园林绿化;工程施工;组织设计 施工组织设计是进行施工管理的纲领性文件,是施工技术与施工项目管理有机结合的产物,对于能否实现科学施工具有战略指导和战术管理的双重意义。针对园林绿化工程这样的“简易工程”,更加需要全面、正确的认识施工组织设计的前瞻性和科学性,认真结合工程实际,科学、合理地进行编制和优化,并在后续施工中认真加以贯彻落实,确保设计意图的实现。近年来,随着国家对工程招投标的强制规范,绝大部分招标单位都把施工组织设计作为选择中标单位的重要依据之一,这一方面强化了投标单位认真做好施工组织设计的意识,但另一方面我们也清醒的认识到不少单位的施工组织设计脱离工程实际,以应付中标为目的,为以后的施工管理埋下了隐患。 一、园林绿化工程施工组织设计中存在的问题 1.违规编制施工组织设计。 根据相关规定,施工组织设计必须存入施工档案,接受建设单位以及上级主管部门的检查,而现在一些施工单位为了应付检查,往往等到施工开始甚至是竣工验收前才草草进行编制,一些监理工程师违规进行签字,完全违背了施工强制规定。这种以应付检查为目的编制的施工组织设计,根本起不到指导施工的作用,同样没有规范施工组织设计指导下的园林施工也必然是难以达标的。 2.施工组织设计编制脱离实际。 一些单位即便按照规定提前编制了施工组织设计,但在编制过程中脱离施工实际,简单抄袭工艺流程和一些流于形式的内容,不对施工具体进行详细科学的论证,特别是有针对性的防范风险的具体措施更是缺乏,以致在施工出现问题后查找施工组织设计一无所获。 3.施工组织设计内容不规范。 主要体现在,①编制依据存在问题。要么编制依据没有体现,要么依据的规定文件已经过期,要么把一些 经验 做法作为依据。②编制内容不完整。施工方案、工艺要求不具体;对特殊过程和关键步骤描述不清楚;内容缺乏层次,前后逻辑混乱。③文件引用不规范。文件名称与原文不符;没有所引用的条款号,施工时查找难度大。④没有按照相关规定进行审核、审批。 二、园林绿化工程施工组织设计的原则及内容 进行园林绿化工程的组织施工设计,要确定重点,保证进度,为建设总进度保留相当的余地;要重视前期的施工准备,科学、全面的预见施工过程中可能存在的问题及需求;要科学选择施工方法,特别是针对不同季节、不同植物施工要合理选择施工工艺;充分利用正式工程,尽量减少暂设工程。施工组织设计主要有:编制说明,包括业主提供的施工图、有关政策和文件规定、招标书、施工单位相关情况,编制要求、相关标准规范、编制原则等;工程概况,包括工程概述、工程范围、施工现场条件等;人力及资源、机械保证措施,包括施工组织、施工部署、主要管理人员及简历、劳动力计划、劳动力保证措施、材料保证措施、资金保证措施、施工机械设备情况;工程进度计划及工期保证措施,包括总工期、开竣工具体日期以及人材机投入、组织施工方面、进度控制办法等。 三、施工组织设计优化 1.施工方案的优化。 园林工程建设涵盖土方工程、给水及排水工程、水景工程、园路工程、假山工程、 种植 工程、供电工程等内容,要以选择合理的施工方案为编制核心,充分借鉴国内外先进的技术和经验,尽量使用先进的技术和方法,提高施工效率、降低施工成本,根据工程实际特点,将技术可行性及经济合理性统一起来。对可能采用的施工方法进行技术经济评价,选择最佳方案。按照工程实际,结合人材机、施工方法等,科学选定主要工程的施工方案。针对具体园林绿化工程可参考以下工序:验收场地、场地清理、定点放线、挖树穴、种植、养护、补植、移交。对于反季节种植、古树名木移栽、南北植物互种、景观土建等技术性要求较高、危险性较大的施工内容,还需制订专项施工方案,增强针对性。同时园林植物都是有生命的,这一点在编制施工组织设计时尤为重要,要根据植物的习性确定种植和养护方案,这样才能提高成活率。 2.施工组织机构及人员的优化。 施工组织机构需明确工程分几个工程组完成,以及各工程组的所属关系及负责人,真正做到事事有人负责、人人有事负责。人员安排要根据施工进度计划,按时间顺序安排,要选派专业化的职工队伍,对施工人员的组织结构进行系统安排。 3.施工组织设计质量衡量标准的优化。 要根据施工实际选择合理的施工质量衡量标准,不能一概求告、求全作为具有生命特征的建设施工项目,至少需经历种植施工、养护施工两个时期,施工周期往往超过一年,施工质量要充分考虑这两个施工期的各自特点,合理加以安排。园林绿化工程的施工组织设计标准一定要充分考虑植物的生长周期,确保选用标准的科学合理。 4.施工组织设计编制工具的优化。 随着信息技术迅速发展,电脑和网络在工程制图、预算管理等方面发挥了巨大的作用,但限于施工管理人员的认识还不到位,目前信息技术在工程管理领域的应用还不尽如人意。电脑和网络可以及时、高效的获得各种信息并快速加以处理,大大加快施工组织设计编制速度,编制质量也更有保障。目前,随着项目经理负责制的落实,项目经理现场管理水平越来越受到重视,这就要求企业建立自己的项目管理信息系统,以全面客观的收集现场施工信息,及时发现各类问题,对施工组织设计进行再优化,使施工过程更加符合设计意图和施工实际,确保项目按计划完成。 5.不同施工时期的优化。 施工单位中标后,要加强和建设单位的交流和沟通,充分了解建设单位的意图,也要让建设单位充分了解施工过程,通过沟通选择最优化的施工组织设计。还要特别注意查找原设计过程中的不足,并加以优化,以降低施工成本,提高施工效益。进场后,项目经理等要组织人员对施工图纸进行认真审核,对设计的增大施工要素配置、降低施工难度、达不到环保和质量要求、缺乏安全保障等方面进行优化。施工开始后,对施工的现实情况越来越明晰,对发现的设计不符合实际等情况如需变更设计,需要收集充分的资料,认真加以分析,改动并得到监理签认。同时还要注意相关注意事项,尊重科学和事实,补充完善实施性施工组织设计。 随着城镇化的不断加快,人们对园林绿化的要求越来越高,这就给施工组织设计提出了更高的要求。因此无论是施工单位,还是建设单位都必须高度重视施工组织设计,认真做好施工组织设计,同时在施工过程中还要不断优化,只有这样才能保证工程的顺利进行。 参考文献: [1]常莹.浅谈园林工程的特点及管理[J].今日科苑,2007,(7):22-23. [2]孟令树.优化施工组织设计[J].海河水利.2009,(2). [3]陈宗平.ISO9001标准在园林企业的应用与推广[J].南方农业,2010,(4):64-66. 工程施工组织设计毕业论文篇3 《公路施工组织设计》 摘要: 近些年,国家对基础性建设的投入越来越大,我们的公路建设也日益增多。公路工程是一项综合性、系统性较强的工程,是集路基、路面、路线、桥涵、隧道等于一体的综合体系。随着经济社会的发展和施工工艺的不断进步,人们对公路工程的要求也更加严格。为了保证公路建设的正常施工,就需要工程设计按时按量完成。而如何处理好质量与工期的矛盾则是公路设计者面临的难题。本文对公路工程设计的重要性,步骤等进行一个分析研究。 关键词: 公路工程;设计;系统性;施工工艺;项目;质量;分析 0 引言 随着我国经济的发展,我国公路交通运输等行业都飞速发展起来,为了使等级较低的村道、乡道等交通满足人们日益增长的交通需求,我们就对高速公路、省干线公路等进行完善;各省市县对较低等级的山区公路和城镇道路的改建也日益重视起来,增加投资建设资金等方面,以此来完善公路交通网的建设。在公路提级改建项目中,山区地形由于地质复杂,在升级过程中路线布设受平纵横断面等条件和影响因素诸多;我们根据已完成的各级公路提级改建项目设计过程中的一些经验,对公路提级改建中总体及路线设计有以下几点认识,希望对今后的公路项目建设和提级改造项目建设能起到一定的指导作用。 1 施工组织设计重技术轻管理的现象严重 我国公路建设项目传统的施工组织设计一般包括的内容有:工程概况、施工技术方案、施工进度计划、资源供应计划、施工平面图设计等。尽管有的施工组织设计编制了技术组织措施的内容,但也仅从确保工程质量、安全、进度方面提出了相应的保证措施,工程技术性措施较强,管理措施较为薄弱,可操作性差,组织措施、经济措施及合同措施不力。因此,这样的施工组织设计是一种工程技术性的施工组织文件。 ①缺少施工部署措施工程项目的施工,在市场经济条件下,施工企业通过招投标获取项目,企业法人就是项目法人,而施工项目经理是企业法人在项目上的全权代理人。施工项目经理在施工前要与施工企业法人签订项目管理目标 责任书 ,界定项目经理在项目实施中应达到的质量、安全、进度、成本、环保、文明施工的目标,明确项目经理的责、权、利。因此,项目经理部必然要通过各种管理手段和措施对其目标、施工组织、总包与分包和资源供应进行规划,做出施工部署措施,而过去那种编制施工组织设计的作法就不能适应了。 ②缺少风险管理措施项目施工中自然存在许多风险,有技术上的风险和非技术风险,如果工程项目在施工前没有对风险识别、分析,没有做出抗风险对策,导致的后果将是严重的,这已是许多工程施工证明了的事实。而过去那种施工组织设计的作法一旦项目遇到风险,则施工组织设计将是一纸空文,失去指导作用。 ③缺少全面的技术组保证措施在一般的实施性施工组织设计的技术组织措施中,仅有保证工程质量、安全、工期,冬雨季施工的措施,没有保证成本、环境保护、文明施工的措施,这是不全面的。 2 公路工程施工组织设计存在问题 尽管一些施工组织设计编制的内容措施,只从确保工程质量安全和进度等方面提出的相关的保证措施,但是也存在一些可操作性差等不足。因此,我们就要完善以下缺少的管理措施内容: 2.1 缺少风险管理措施 项目施工中存在很多风险,这就需要我们在工程项目施工前增强对风险的识别、分析能力,这样才能在有风险的时候进行风险对策,避免产生严重的后果。 2.2 缺少全面的技术组保证措施 在一般的施工组织设计的技术措施中,我们只保证工程质量、安全、工期,冬雨季施工等措施外,还要重视施工成本、环境保护、文明施工等方面措施。由于工程竞争激烈,就需要我们降低成本率来使企业获得更多的利润,因此我们在保证工程质量的全体下,必须要实现降低成本的计划。 2.3 缺少全面的施工组织设计技术经济指标 同项目的施工方案所达到的技术指标也会有所不同。因此,就需要我们对施工性项目的施工组织设计进行应有的评价和考核。在过去的施工组织设计者,由于操作的各不相同,就对评价项目、考核项目的施工组织水平带来了一定困难。 3 公路设计的影响因素 3.1 选线因素 在进行选线的时候,我们需要全方面进行考虑 ,尤其是对公路进行升级改造的时候,因为大多路线的走向已经基本确定了,我们在选线的时候在不影响原有线路的情况下选择更优的可行路线走向。 此外,改建项目设计中心线的位置可能为两种:当旧路基基本能满足改建断面的需求时,选择旧路中心线作为基准;当旧路基与改建断 面相 差较大时,选择旧路边线作为基准,两者都能很好的利用旧路基,这是相当重要的,这对道路标高的控制,施工方案有决定性作用。 3.2 平面设计因素 平曲线指标是视距及行车安全的首要影响因素,其要素应根据规范满足其组成要求。在平面设计中,其要点无非圆曲线半径、缓和曲线长度、超高加宽以及直线段长度等能否满足规范。在公路提级改建中,我们既希望能将平面线型严格满足规范要求以达行车安全,也希望在改建的过程中以人为本,注重环保,减少对山体环境的破坏,这就需要一个平衡点。 4 施工组织设计编制的步骤 由于施工工程项目的大小不同,所要求编制组织设计的内容也有所不同,但其方法和步骤基本大同小异,大致可按以下步骤进行。 4.1 收集编制依据文件和资料 ①工程项目设计施工图纸。②工程项目所要求的施工进度和要求。③施工定额、工程概预算及有关技术经济指标。④施工中可配备的劳力、材料和机械装备情况。⑤施工现场的自然条件和技术经济资料。 4.2 编写工程概况 主要阐述工程的概貌、特征和特点,以及有关要求等。 4.3 选择施工方案、确定施工方法 主要确定对工程施工的先后顺序、选择施工机械类型及其合理布置.明确工程施工的流向及流水参数的计算,确定主要项目的施工方法等(总设计还需先做出施工总体布署方案)。 4.4 制定施工进度计划 包括对分部分项工程量的计算、绘制进度图表。对进度计划的调整平衡等。 4.5 计算施工现场所需要的各种资源需用量及其供应计划(包括各种劳力、材料、机械及其加工预制品等)。 4.6 绘制施工平面图 4.7 其他 提出对有关工得的质量通病和易于发生安全问题的环节。订出防治措施、制定降低成本(如节约劳力、材料、机具及临时设施费等)的具体措施、超奖减罚等的具体要求和技术经济指标。 5 加强公路工程施工设计规范化管理对策 我国加入WTO组织后,给我国建筑行业带来机遇和挑战,主要表现在以下两个方面的竞争,即技术水平和管理水平竞争。为了适应新形势下的发展,就要各施工管理部门掌握现代管理方法并加以利用,以此保证自己在竞争中有足够的实力。随着计算机及 网络技术 的迅速发展,各个行业在辅助管理上都运用计算机的功能进行操作,因此就需要掌握现代计算机技术等知识,因为所有的竞争归根到底还是知识和人才的竞争,所以还需要多一些人才的培养计划。 6 小结 在编制施工组织的时候,我们既要重视科学的管理,还要讲究经济效益。因此,就需要我们在不同的条件下对不同的施工对象采取不同的管理措施。在策划重点的时候还要根据实际情况出发,这样才能制定出规范性强、符合业主质量需求的施工组织设计方案,并且能够因地制宜的对各个阶段的施工进行全面的指导。 参考文献: [1]石冠跃.浅谈公路工程设计中对工程地质勘察资料(数据)的分析、论证及其应用[J].石河子科技,2004(01). [2]李勇.公路工程建设中勘测设计存在的问题及影响因素分析[J].中国新技术新产品,2011(02). [3]孙爱民.关于如何合理控制公路工程造价的探讨[J].科技信息,2011(07). [4]公路工程设计变更管理办法[J].交通标准化,2005(08). 猜你喜欢: 1. 建筑施工毕业论文范文 2. 施工组织设计实训心得体会 3. 工程施工组织设计论文 4. 施工组织设计实习心得 5. 建设施工组织论文
转眼间大学生活即将结束,大家都知道毕业前要通过最后的毕业论文,毕业论文是一种、有准备的检验大学学习成果的形式,那么优秀的毕业论文是什么样的呢?下面是我精心整理的施工组织设计毕业论文参考文献,欢迎阅读与收藏。
[1]韦诗琦.市政道路施工质量管理问题及对策研究[J].绿色环保建材,2019(07):136.
[2]何康.浅谈施工总承包工程成本控制管理[J].低碳世界,2019(07):325-326.
[3]刘聪,高楠.案例教学在给排水施工组织与管理课程中的应用探析[J].智库时代,2019(33):226-227.
[4]傅巧玲.信息化技术在《建筑施工组织编制与实施》课程教学中的应用与创新[J].居舍,2019(21):47+89.
[5]谢丽萍.建筑工程质量管理中重点问题及解决策略[J].居舍,2019(21):166.
[6]戴松.公路桥梁施工组织设计及其施工管控策略分析[J].价值工程,2019,38(20):27-29.
[7]刘炫炀,刘德湘.施工组织设计在建筑施工管理中的重要性探讨[J].建材与装饰,2019(20):152-153.
[8]赵伟.成倍节拍流水和无节奏流水在建筑施工中的应用[J].居舍,2019(20):82.
[9]王菁,曹广祝,李诗平.珠海市横琴口岸C区桩基工程施工组织设计[J].中国水运(下半月),2019,19(07):232-233.
[10]周建文.高速公路工程造价预算控制措施[J].交通世界,2019(17):151-152.
[11]陈瑞.CDIO理论结合BIM技术在施工组织学教学中的应用探讨[J].科教文汇(上旬刊),2019(07):73-75.
[12]刘军.电解区域桩基施工组织设计研究[J].江西建材,2019(06):155+157.
[13]徐国军.监理工程师在建筑工程质量保险新形势下的作用[J].建筑与预算,2019(06):31-33.
[14]祁波.加强园林绿化工程造价全过程控制的措施分析[J].智能城市,2019(12):91-92.
[15]柴文革,李文利.土木工程专业施工组织设计类毕业设计实践教学探析[J].北京城市学院学报,2019(03):40-44.
[16]黄常青.解析建筑施工组织设计在实际工程中的应用[J].低碳世界,2019,9(06):115-116.
[17]吴宁.施工组织设计对建筑工程经济中造价的影响[J].住宅与房地产,2019(18):23.
[18]蔡旻璐.装配式高层住宅建筑施工组织设计的优化[J].住宅与房地产,2019(18):76-77.
[19]周桂州.市政工程给排水施工管理探讨[J].住宅与房地产,2019(18):163.
[20]张杰.“公路施工组织与概预算”教学改革[J].西部素质教育,2019,5(12):203+205.
[21]董旭.建设单位如何加强EPC项目的管理[J].天然气化工(C1化学与化工),2019,44(03):103-105.
[22]陈飞龙.枢纽互通式立交施工期交通组织设计[J].中国标准化,2019(12):122-123.
[23]沈建平.成都项目混凝土地坪一次成型施工管理和成本管理[J].建材与装饰,2019(17):119-120.
[24]何振堂.分析建筑深基坑工程的施工监理控制[J].建材与装饰,2019(17):142-143.
[25]李让勤.施工阶段工程造价失控的因素分析[J].建材与装饰,2019(17):162-163.
[26]杨勇刚.施工现场临时用电的各种隐患及纠正措施[J].建材与装饰,2019(17):241-242.
[27]李娜.电网建设项目工程结算问题及解决策略[J].建材与装饰,2019(17):236-237.
[28].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(06):768.
[29]刘飞虎,廖勇,赵宇,辜斌,习兰云,陈强.基于BIM的施工组织辅助决策系统的研发及应用[J].土木建筑工程信息技术,2019,11(03):29-32.
[30]杨凯.建筑给排水工程中施工质量管理研究[J].工程与建设,2019,33(03):469-470.
[31]刘飞.探讨现代园林绿化施工与养护管理技术[J].农家参谋,2019(12):143.
[32]王艳华,熊平,庞向锦,崔梦轩,余洪亮.工程总承包项目全过程管理流程解析[J].项目管理技术,2019,17(06):110-114.
[33]徐胜男.施工阶段工程造价影响因素及控制措施[J].项目管理技术,2019,17(06):138-141.
[34]周雪芳.下穿既有铁路站场立交桥施工组织设计意见设计要点[J].科技风,2019(16):15-17.
[35]王李.基于施工BIM应用的工程招标评标标准研究[J].黄冈师范学院学报,2019,39(03):115-119.
[36]张玉成.建筑施工企业对工程质量的管理方法[J].价值工程,2019,38(16):8-10.
[37]钟万春.建筑工程管理运作中存在的问题与对策研究[J].居舍,2019(16):15.
[38]马毅.公路工程造价控制中存在的问题及应对策略[J].交通世界,2019(16):138-139.
[39]谢宏伟.建筑工程经济预算与成本控制研究[J].中外企业家,2019(16):106.
[40]冯宇.海上风电勘测设计存在的问题及优化思路浅析[J].科技视界,2019(16):28-29+40.
[41]张臻.以技术管理为支撑[J].施工企业管理,2019(06):88-90.
[42]董可青.浅议施工阶段工程造价控制[J].知识经济,2019(18):85-86.
[43]李江.港珠澳大桥钢桥面铺装精细化施工组织方案[J].中国公路,2019(11):135-137.
[44]张莉,权雅萍,祁雪花.如何做好施工准备工作[J].中国金属通报,2019(05):114-116.
[45].施工组织设计如何编细编实[J].中国招标,2019(21):42-44.
[46]何源涛.探讨建筑工程施工质量的监理控制要点[J].智能城市,2019,5(10):101-103.
[47]黄冠.建筑装饰工程施工过程的质量控制探述[J].智能城市,2019,5(10):158-159.
[48]叶庆鹏.建筑工程施工现场临时用电安全管理分析[J].建筑技术开发,2019,46(10):84-85.
[49]苟树生.柯克牙河流域水雨情预警系统工程建设中施工组织及质量控制措施分析[J].地下水,2019,41(03):174-175+211.
[50]薛家斌.施工企业投标文件的编制[J].中小企业管理与科技(下旬刊),2019(05):45-46.
[51]张娜.小型灌溉工程施工组织设计分析[J].陕西水利,2019(05):199-200.
[52]吴湘利.水利工程设计概算质量的影响因素探讨[J].湖南水利水电,2019(03):118-119.
[53]杜金龙,陈贵德.浅谈桥梁施工组织设计的编制[J].黑龙江交通科技,2019,42(05):205-206.
[54].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(05):640.
[55]彭洪元,陈诚.烘背水库大坝枢纽主体工程施工组织设计[J].水利规划与设计,2019(05):96-99.
[56]马星敏.隧道施工成本管理与控制策略探析[J].智库时代,2019(19):58-59.
[57]邓斯妮.建设工程项目造价管控的要点与方法探析[J].工程技术研究,2019,4(09):130-131.
[58]杨建华.工程内业在工程预结算中的重要性[J].四川建材,2019,45(05):228-229.
[59]郭标.邻近铁路营业线施工安全的分析及对策研究[J].中小企业管理与科技(上旬刊),2019(05):42-43.
[60]张永旺.建设工程电子招标数据应用场景分析[J].中国管理信息化,2019,22(09):159-161.
[61]贾帅. 古建筑修缮工程项目绩效评价研究[D].郑州大学,2019.
[62]冯彦维. 浅谈施工组织设计优化措施[A]. .水与水技术(第9辑)[C].:辽宁省水利学会,2019:3.
[63]张震.灵石东山供水县域小水网供水施工组织设计[J].山西水利,2019,35(04):32-33.
[64]黄澍.现场管理水平对施工管理的影响分析[J].住宅与房地产,2019(12):137+178.
[65]罗亮.塔式起重机在工程施工中合理选择及定位分析[J].设备监理,2019(04):48-50.
[66]李长城.建筑工程施工项目的精细化管理分析探讨[J].中国标准化,2019(08):19-20.
[67]马莉.建筑工程施工组织设计存在的问题及改进措施分析[J].居舍,2019(12):103.
[68].全套工程技术交底辨析[J].中国招标,2019(15):33-36.
[69]董子豪.建筑施工组织设计研究与探讨[J].四川水泥,2019(04):81.
[70]张跃飞.论土建施工管理中存在的问题与对策研究[J].四川水泥,2019(04):171.
[71]原培.全过程造价管理在土建工程中的有效应用[J].四川水泥,2019(04):208.
[72]张宇.探讨桥梁施工监控中BIM技术的应用[J].四川水泥,2019(04):64.
[73].欢迎订购2018年合订本和精品建筑图书[J].建筑技术,2019,50(04):512.
[74]曹武,罗平,陈崇德.永圣渡槽拆除重建工程施工组织评价研究[J].小水电,2019(02):64-68.
[75]李裔通.浅谈施工组织设计在工程地质勘察施工过程中的应用[J].中小企业管理与科技(中旬刊),2019(04):53-54.
[76]刘星.建筑工程现场施工技术管理研究[J].中外企业家,2019(11):102.
[77]孙悦.道路施工组织优化设计研究--以长春路西段为例[J].智能城市,2019,5(07):88-89.
[78]文靓.浅谈铁路工程施工项目成本管理[J].中国集体经济,2019(11):59-60.
[79]邓德学,徐新瑞.基于模糊决策理论的工程评标方法研究[J].山西建筑,2019,45(10):218-219.
[80]吕强华,广晓平.城市道路施工期间交通组织设计方法研究[J].甘肃科技纵横,2019,48(03):47-50.
[81]江运河,季雯雯.工程预算造价管理中的主要问题及应对策略[J].居舍,2019(09):12.
[82]单传忠.房屋建筑与装修施工组织分析[J].住宅与房地产,2019(09):32+38.
[83]古江林.浅析在建矿井停缓建期的施工组织安排[J].陕西煤炭,2019,38(02):160-162.
[84]林森.设计施工一体化条件下的保通交通组织方案研究[J].北方交通,2019(03):57-60.
[85]王文静,许念勇.基于BIM技术和递进式思想的“施工组织”课程设计全过程设计[J].教育教学论坛,2019(12):92-93.
[86]周怡安.将BIM技术融入高职实训教学的研究--以工程造价专业为例[J].辽宁高职学报,2019,21(03):76-79.
[87]习明星.新时代高速公路施工组织设计[J].中国公路,2019(06):98-99.
[88]毛钟豪.关于建筑工程资料管理的探讨[J].现代物业(中旬刊),2019(03):49.
[89]崔亚杰.浅谈姚江船闸施工组织设计与概预算[J].南方农机,2019,50(05):260.
[90]崔垒.浅析沙特阿拉伯地区施工组织设计特点[J].中国水能及电气化,2019(03):56-58.
[91]李勤.交通安全设施工程施工要点及临时施工期交通组织设计[J].建筑技术开发,2019,46(05):20-21.
[92]王金.施工组织设计在建筑工程中的应用[J].四川水泥,2019(03):49.
[93]徐娟.施工组织设计对建筑工程经济中造价的影响[J].中国市场,2019(09):101+113.
[94]文玲.浅谈施工组织设计对工程施工成本的影响[J].中小企业管理与科技(上旬刊),2019(03):36-37.
[95]王甲.施工现场临时安全用电组织设计[J].中外建筑,2019(03):174-175.
[96]孟耀东. 扬尘治理背景下的施工阶段工程造价控制研究[D].郑州大学,2019.
[97]张志燕.浅述公路桥梁施工组织设计及施工管理[J].中国标准化,2019(04):84-85.
[98]谭支博.探究施工组织设计对水利水电工程造价影响[J].山东工业技术,2019(05):123.
[99]赵雯雯.河流下游段治理工程的施工组织设计与环境治理策略探讨[J].内蒙古水利,2019(02):25-26.
[100]贾晓雷.桥梁施工组织设计及施工管理有效策略分析[J].工程技术研究,2019,4(04):186-187.
[101]刘国超.浅析目前建筑工程造价管理存在的问题及其对策[J].绿色环保建材,2019(02):212+214.
[102]郭婧.合理施工组织设计对施工图预算及工程造价的影响[J].住宅与房地产,2019(06):50.
[103]付彬.特长小段面引水隧洞开挖施工组织及安全措施应用[J].建材与装饰,2019(06):274-276.
[104]尹文兴.建筑工程项目施工阶段的质量控制探讨[J].建材与装饰,2019(06):13-14.
[105]张健.浅析项目监理日志记录内容[J].山西建筑,2019,45(06):208-209.
[106]吴晓萌.临时工程成本控制常见问题与对策[J].工程经济,2019,29(02):10-13.
[107]钟升明,杨星一,兰洁.基于BIM技术的城市轨道交通工程精细化施工管理研究[J].城市建筑,2019,16(05):119-121.
[108]艾江林,陈然,向家林,毛四海.浅谈工程项目成本控制[J].城市建筑,2019,16(05):175-176+192.
[109]李畅.论施工方建设工程项目管理的重点任务及其管理措施[J].住宅与房地产,2019(05):155-156.
[110]张金艳.公路桥梁施工组织设计及其施工管控[J].交通世界,2019(Z2):122-123.
[111].欢迎订购2017年合订本和精品建筑图书[J].建筑技术,2019,50(02):256.
[112]董璐.公路桥梁施工组织设计和施工管理策略研究[J].工程技术研究,2019,4(03):159-160.
[113]刘晓峰.基于BIM技术的施工过程管理在建筑施工组织课堂教学中的应用研究[J/OL].品牌研究:1-2[2019-07-31].https://doi.org/10.19373/j.cnki.14-1384/f.20190129.004.
[1]宋亚平,陈硕.浅谈水利工程施工组织设计的优化[J].科技展望,2017,03:52-53.
[2]张春红.有关水利工程施工中导截流施工技术的探讨[J].科技展望,2017,04:36.
[3]祁天龙,张欢.试论水利水电工程施工管理措施[J].科技展望,2017,02:180.
[4]常仲达.水利工程施工中防渗技术的实践探究[J].科技展望,2017,04:109.
[5]王鹏.水利水电工程施工中的新技术及环境保护策略分析[J].科技展望,2017,03:24.
[6]刘鹏.水利工程施工组织管理质量控制的有效性探讨[J].科技展望,2017,02:41.
[7]袁卫兵.水利施工中软土地基处理技术探讨[J].珠江水运,2017,02:74-75.
[8]黄永明.探究水利施工中水坝堤防堵口施工技术要点[J].黑龙江水利科技,2016,10:96-97+138.
[9]李新根.水利施工中软土地基处理的方法分析[J].黑龙江水利科技,2016,10:105-107.
[10]白晓昱.水利工程施工中常见的问题和解决方案[J].山东工业技术,2017,02:108-109.
[11]张会.浅谈水利水电工程的基础施工技术[J].科技创新与应用,2017,01:243.
[12]翟志刚.刍议水利水电工程中的水闸施工技术[J].科技创新与应用,2017,03:218.
[13]赵佳欣.水利工程施工阶段造价控制要点分析[J].黑龙江科技信息,2017,03:205.
[14]汪沫.试论如何实现水利水电建筑工程施工质量的有效控制[J].黑龙江科技信息,2017,03:208.
[15]刘兵旗.水利施工中的混凝土裂缝的原因分析及防治措施[J].四川水泥,2017,01:210.
[16]任杰.水利水电工程防渗技术施工要点分析[J].中国新技术新产品,2017,03:95-96.
[17]刘寿辉,孙士玲,李爱青.混凝土施工技术在水利施工中的应用价值[J].珠江水运,2017,01:80-81.
[18]余洁,徐煜亮.水利工程监理对施工阶段质量控制分析[J].智能城市,2017,01:290.
[19]姜永鹏.水利工程施工安全隐患及预防管理分析[J].技术与市场,2017,01:118.
[20]张益民.水利施工中混凝土裂缝的分析及控制[J].中国水能及电气化,2017,01:10-13.
[21]杨育红.试论农田水利的U形渠道防渗施工[J].黑龙江科技信息,2017,02:230.
[22]杨旭亮.浅谈水利工程施工中基坑排水需关注的问题[J].科技创新与应用,2017,06:225.
[23]龚昱文.试论水利水电施工中土石坝筑坝工程的主要工艺[J].江西建材,2017,04:124.
[24]王强.浅谈农田水利施工建设技术水平的提高[J].科技创新与应用,2017,06:217.
[25]张晓祥.浅析水利工程中灌注桩施工工艺[J].黑龙江科技信息,2017,04:195.
[26]徐欢.水利工程施工总布置动态信息可视化方法研究[J].黑龙江科技信息,2017,04:228.
[27]吕继辉.浅谈水利工程滑模施工技术[J].科技经济导刊,2017,03:65+57.
[28]王正东.分析水利水电工程施工质量管理研究[J].江西建材,2017,05:117+121.
[29]李伟.如何提高水利工程施工现场管理质量[J].黑龙江科学,2017,02:120-121.
[30]李彩凤.试论加强水利施工技术控制措施[J].黑龙江科学,2017,02:128-129.
[31]周亚鹏.水利施工管理中存在的问题及解决对策探究[J].中小企业管理与科技(上旬刊),2017,02:67-68.
[32]杨松.水利施工中碾压混凝土施工的技术要点[J].绿色环保建材,2017,01:166.
[33]王晓明.浅议水利工程施工管理[J].黑龙江科技信息,2017,01:237.
[34]王洪兴.水利工程施工建设对生态环境的影响[J].河南水利与南水北调,2017,02:12+19.
[35]高鹏,戴洪巧.水利工程施工管理特点及质量控制刍议[J].河南水利与南水北调,2017,02:85-86.
[36]谢良.浅析水利工程施工管理特点及质量控制策略[J].农业科技与信息,2017,04:111+114.
[37]邱亚平.水利工程施工中土方填筑技术分析[J].黑龙江科技信息,2017,05:160.
[38]胡福来.水利工程中浆砌石工程的施工技术分析[J].黑龙江科技信息,2017,05:181.
[39]邓怡强.水利施工中钻孔灌注桩施工关键技术与质量管理思考[J].黑龙江水利科技,2016,12:164-166.
[40]安军,霍云晶.农业工程中水利项目大体积混凝土施工关键技术[J].农业工程技术,2017,02:38.
[41]吴凤林.有关水利施工工程中开挖支护技术的分析[J].黑龙江科技信息,2017,06:226.
[42]李钱军.加强水利施工中水闸施工管理的`途径探析[J].珠江水运,2017,04:67-68.
[43]徐鸿昊.水利工程施工中软土地基处理技术浅析[J].工程建设与设计,2017,06:29-30.
[44]王洪兴.混凝土工程在水利施工中的质量控制重点研究[J].工程建设与设计,2017,06:140-141.
[45]杨晓晖.浅谈围堰技术在水利施工工程中的应用[J].中国新技术新产品,2017,08:90-91.
[46]张永生.水利工程中桥梁钻孔灌注桩施工技术的研究[J].科技创新与应用,2017,09:223.
[47]高原,刘付涛.浅谈水利水电施工对于施工导流和围堰技术的运用[J].科技创新与应用,2017,09:225.
[48]孙庆凤.水利工程施工管理质量控制分析[J].农业与技术,2017,05:53-54.
[49]刘兆虎.农田水利施工中的水土保持工作[J].科技创新与应用,2017,09:227.
[50]余鹏.探讨水利施工技术现状及改进措施[J].江西建材,2015,24:187+190.
[51]刘点,张海忠.水利施工中水坝堤防堵口施工技术研究[J].安徽水利水电职业技术学院学报,2015,04:27-29.
[52]李涛.水利施工中水闸施工管理的实践路径思考[J].科技创新与应用,2016,04:208.
[53]徐立建.浅谈水利施工钻孔灌注桩施工技术[J].科技创新与应用,2016,04:221.
[54]钱治国.探究水利施工中软土地基处理技术[J].中国新技术新产品,2016,04:113.
[55]尚琰.水利施工钻孔灌注桩施工技术解析[J].建材与装饰,2015,50:248-249.
[56]于兴龙,于兴平,王作强.水利施工新技术应用现状及发展趋势[J].山东水利,2016,01:44+46.
[57]许天君.水利施工过程的质量监测方法[J].科技创新与应用,2016,07:210.
[58]郑彬鹏.水利施工钻孔灌注桩施工技术探讨[J].科技创新与应用,2016,07:223.
[59]苏力坦古力·吾买尔.关于水利施工管理中的创新性研究[J].北京农业,2016,03:124-125.
[60]李秀玉.水利施工中水闸施工的管理措施分析[J].科技与企业,2016,04:16-17.
[61]杜妮.基于改进LEC法的水利施工现场危险源识别及防控对策[J].吉林水利,2016,04:59-62.
[62]李景春.水利施工中的混凝土裂缝控制措施探讨[J].水利技术监督,2016,02:43-44+67.
[63]李艳丽.水利施工中混凝土的浇筑过程及后期养护[J].黑龙江科学,2016,09:36-37.
[64]张玉才.水利施工中滑模技术的应用[J].中国新技术新产品,2016,09:109-110.
[65]管晋莉.刍议水利施工企业人事行政管理与思想政治工作的相关性[J].中小企业管理与科技(中旬刊),2016,04:9-10.
[66]杨升.水利施工钻孔灌注桩施工技术解析[J].甘肃农业,2016,09:41-42.
[67]常永春.加强水利施工安全管理的有效途径[J].智能城市,2016,07:161.
[68]吴航.刍议水利施工中混凝土裂缝的防治技术[J].江西建材,2016,18:148+150.
[69]熊国华,王鹏.水利施工中大体积混凝土抗裂技术研究[J].江西建材,2016,19:130-131.
[70]李燕.试析水利施工中的滑模技术[J].科技创新与应用,2016,22:223.
[71]刘双强,张一君.水利施工中混凝土裂缝的主要原因及防治对策分析[J].企业技术开发,2016,17:151+157.
[72]于磊,朱孝克.探讨水利施工中软土地基处理技术的重要性及应用[J].山东工业技术,2016,15:86.
[73]朱冰.基于水利施工管理现状以及改进策略研究[J].吉林水利,2016,10:57-59+62.
[74]笪贤汉.浅谈水利施工中混凝土裂缝的防治技术[J].建材与装饰,2016,33:233-234.
[75]江庆华.浅谈水利施工中的混凝土裂缝控制[J].江西建材,2016,23:118+117.
[76]黄玉芳.水利施工物资供应管理与施工经济效益[J].建材与装饰,2016,33:254-255.
[77]陶山.水利施工中的混凝土裂缝的原因及预防对策[J].江西建材,2016,23:136-137.
[78]涂业斌.水利施工管理重点事项探究[J].建筑技术开发,2016,08:70-71.
[79]马贵友.动态联盟模式下水利施工分包价格制定探析[J].吉林水利,2016,11:21-24.
[80]付萍.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,01:172.
[81]肖小勇.基于水利工程施工管理的创新对策探析[J].江西建材,2015,02:124-125.
[82]张薇,韩宇舟.浅析水利施工中软土地基施工技术[J].科技创新与应用,2015,01:119.
[83]胡云鹏.试论水利施工中的安全隐患与措施[J].科技创新与应用,2015,05:133.
[84]郎海彦.浅谈如何提高水利施工技术确保工程质量[J].科技创新与应用,2015,07:129.
[85]陈钢.水利施工钻孔灌注桩施工技术探究[J].黑龙江科技信息,2015,06:131.
[86]常瑞松.水利施工管理中存在的安全风险及改进对策分析[J].四川水泥,2015,05:279.
[87]罗向天.水利施工中碾压混凝土施工技术研究[J].山西建筑,2015,14:215-216.
[88]张来军.对水利施工钻孔灌注桩施工技术的探析[J].科技资讯,2015,09:79.
[89]高存晓.水利施工中水闸施工的管理措施[J].四川水泥,2015,06:248.
[90]李轶.水利工程混凝土施工技术及其质量控制策略[J].黑龙江水利科技,2015,04:174-176.
[91]李勇,黄长权.探究水利工程施工质量及控制措施[J].科技经济市场,2015,08:181-182.
[92]徐建英.长沙水利施工工程中的测绘过程的优化定位措施分析[J].工程经济,2015,05:65-70.
[93]周莳备.水利施工技术的现状分析及改进措施[J].山西建筑,2015,23:214-215.
[94]夏云东.水利工程施工质量管理策略探究[J].建筑与预算,2015,06:31-33.
[95]范维君.水利施工中碾压混凝土施工技术探究[J].科技创新与应用,2015,24:219.
[96]李海强,段刘勇.水利施工中混凝土浇筑过程及后期养护的探讨[J].河南水利与南水北调,2015,14:35-36.
[97]李立志.水利施工企业安全生产标准化建设途径探讨[J].吉林水利,2015,08:55-57.
[98]薛士海.水利施工中软土地基处理技术[J].企业导报,2015,13:44+97.
[99]王万钧.水利施工机械设备的管理探讨[J].科技经济市场,2015,10:195-196.
[100]陈风英.关于水利施工管理中的创新性研究[J].农业科技与信息,2015,18:96-97+107.
[101]王孝兰.营业税改增值税改革对水利施工企业的影响及应对策略分析[J].财经界(学术版),2015,20:346-347.
[102]黄仁兴,冯是明.解析水利施工中混凝土施工[J].河南水利与南水北调,2015,20:6-7.
[103]魏远东.工程模糊集理论在水利工程施工导流中应用研究[D].黑龙江大学,2015.