Spring river 蕴藏 abundant water power resources, among them piece the main purpose for valley segment suitable forly fixing set upping the water conservancy vital point, water conservancy vital point is a flood control to generate electricity. This text combination piece valley geography geology characteristics, hydrology characteristic, as to it's the water conservancy vital point proceeds first step design, vital point of basic data, main building that main contents include the vital point of a valley water conservancy arranges the project, foundation to handle and start construction the 导s to cut the 流 etc. the contents. Under the consideration the every kind of factor, choice B - B conduct and actions this vital point the engineering's 坝 stalk line, on the choice of the 坝 type, the right every kind of 坝 type proceeds 优 weakness the comparison is after, and join together this engineering of when ground characteristics, chose the concrete entity gravity the 坝 to be used as this water conservancy the vital point's 坝 调洪 calculates the adoption the method of widespread half illustrated manual table, at the project that compare three 调洪s the project after make sured a fit, get its design flood is rices, 校核 flood rice, certain 坝 crest high 程 is main building of this vital point be leak watered by 挡 water building, building, generate electricity the building, put the 空 building to machine-readable( gravity 坝 stability with should dint calculation procedure) with should dint and stability than the 核 is after, and have to out not 溢流 the 坝 's breadth of economic section, 坝 crest rice, high rice;Leak water practical WES curve, 消 of curve adoption of the 流 's way, 坝 crest of watch bore 溢 of building adoption can the way adopt the 挑流消 can;Factory premises 坝 the segment include the segment of three machine sets with the segment of a gearing field, factory premises adoption after the 坝 type;The deep bore conduct and actions of adoption puts the 空 building, bore figure to choose to use to have no to press the 坝 inside to start construction the 导流 choose to use the 导流 of two two pieceses the method, be designed spring river piece valley water conservancy vital point gave out aly completely by tie the narrow river bed 泄 the 流 , second periods are from the 导流 bottom bore 泄流 , project.有不能翻译的自己找找资料吧!