Abstract In recent years, with the construction of new urban areas and the acceleration of urban redevelopment, a large number of houses completed and put into use. These houses in the use of functional and quality will improve over the previous few years, the urban construction and raising the level of the people live and make a contribution. However, the construction quality of the product not only by the construction, design, construction, property management and other factors, but also by the quality of personnel, material quality, geological conditions, climate, time, and many other complex factors. From the all-round quality of the five factors affecting the project that people, materials, machinery (Machine), methods and environmental analysis of five areas discussed, while the whole process of construction of the Project at all stages of the design phase, bidding phase, construction phase (construction Preparation phase of quality control, quality control of the construction process) and completion of a sub-item on each and every process in the construction process management methods of quality control, quality inspection requirements, precautions, preventive measures such as quality problems to conduct a comprehensive Discussed, and proposed methods of quality control management and control points, the quality of the entire construction project to achieve the established objectives. Keywords: engineering; quality; projects; construction; acceptance; quality standards; technical measures; products.