比如毛衣、手套这些,如果是自己亲自织的,那就非常有意义了
现在有很多的手工陶瓷制品。这是可以自己在家里面diy做出来的,比如说纸杯,这样的手工品送给朋友是非常好的,而且朋友们肯定是非常喜欢。
外表看起来柔细的羊毛,表面覆盖着许多我们肉眼看不到的鳞片组织,当这些鳞片遇到热水时会张开、竖起。如果让鳞片相互纠结,且紧密地收缩在一起,再经过外力的挤压、摩擦、揉搓,羊毛就成为毡化的状态。不管是针毡法还是湿毡法,都是让羊毛上的鳞片相互纠结,将羊毛纠结化,然后挤压、搓捣、压实成毡。传统的擀制毛毡,就是利用这样的原理。
只要是手工,您亲自做的,不管是什么,我相信你女朋友都会很喜欢的,并且会很感动,认为你对他很用心
Extrusion molding process Thermoplastic plastic extrusion molding process is divided into four stages lesson. Plasticizing stage Through dry processing plastic raw materials by extruder hopper to join a nitrogen-treated barrel nitrogen-treated barrel, after the heating and screw rotation, paction and the mixing action below, by solid powder or aggregates into uniform melt with some liquidity for the process plastication. Extrusion stage Even with the plastic melt plastication screw rotation was sent to a nitrogen-treated barrel in front, screw rotation extrusion action by extrusion die, on a certain shape mouth mode and get section and mouth model shape continuous profiles consistent. Finalizes the design phase Thermoplastic plastics in leave immediately after mouth mode, extruded plastic continuous profiles for cooling and finalize the design, or plastic in self-respect under the action of will deformation, appear sag or distortion phenomenon. In most cases, qualitative and cooling is finish at the same time, only in extrusion various bar stock and pipe, just have a separate qualitative process, and the extrusion film, finalize the design process, no single etc, if only by cooling can be. Extrusion plank and sheet, sometimes by a pair of roller planish, while rise to finalize the design and cooling effect. Cooling generally USES air cooling or water cooling, cooling speed on the plastic parts surface roughness, size shape auracy etc performance has very big effect. Hard plastics (such as polystyrene, low density polyethylene and rigid PVC etc.) can't cooling too fast, otherwise easy to cause the residual stress, and affect the appearance of plastic parts quality; Soft or crystallization type requires plastic parts in time, lest plastics deformation cooling. Traction plastic parts. Coiling and cutting Plastics extruding the mouth mode since, usually because of pressure from mold and happen suddenly lifted after inflation phenomenon, and cooling shrinks will happen again, thus make the size and shape of the plastic parts changes. In addition, because plastics was continuous extrusion, self-respect is more and more big, if not guidance, can cause plastics stagnation, make plastic thing cannot be *** ooth extrusion. Therefore, in the cooling at the same time, we should continuously will plastics derivation, this is traction. Traction process one by extruder auxiliary device to plete. Traction Traction with extrusion 人教版新目标初二下英语同步辅导(一)初中二年级下un...初中二年级下Un... speed speed will adapt to, general traction speed slightly higher than the extrusion speed, so as to eliminate the plastics dimension change, at the same time for plastics proper stretching can improve the molding quality. Different plastics traction at different speeds. Usually film and monofilament traction speed can be quicker, its reason is drawing speed, the plastic parts decreased diameter and thickness, longitudinal strength increases, elongation fracture resistance reduction. For extrusion hard plastic parts, traction speed cannot big, usually takes will drag speed regulation within a certain range, and to be very evenly, otherwise it will affect its size uniformity and mechanical properties. Through the plastics class traction in cutting device aording to use requirement on cutting (such as rods, tubes, plate, sheet etc), or in coiling device made around a roll (such as film, monofilament, cables, etc). In addition, some plastic parts such as films etc, sometimes need to undertake post-processing, in order to improve dimensional stability.
很少有这样的,你还不如写一篇论文出来找个翻译帮你搞定,这样不是更好,找个老外也就一顿饭的钱
这里很多有模具专业词汇
三八九七六一二零七 QQ? 文献已发入你的QQ。
少数名族——蒙古族 蒙古族的传统饮食离不开肉和奶。肉以牛羊肉为主,奶以鲜牛奶为主。蒙古人还爱吃携带方便、耐饿的炒米。奶茶是他们终日离不了的饮料。 蒙古族的传统居室是蒙古包。蒙古包呈圆形尖顶,由圆形围壁和伞状顶架组成,外面覆以羊毛毡,再用毛绳固定。围壁、伞架均用木杆钉成。蒙古包可以拆卸搬运,极适于游牧生活的需要。 蒙古族的传统服饰是蒙古袍,右衽,镶边,身长宽大,高领长袖,带腰带,配皮靴。夏袍是棉丝质的单夹袍,多红、黄、深蓝色。冬袍是毛料面的羊皮袍。红、绿绸缎做腰带。 蒙古族实行一夫一妻制,讲求伦常,严格辈分。讲究由父母作主的聘婚制度,男到女家娶亲。结婚仪式过程讲究对歌、祝词。 这就是我国少数名族之一——蒙古族。 Minority of clans-Mongolia clan Mongolia the traditional food of clan cans not get away from meat and meat regards cow mutton as principle, the milk regards fresh milk as the mongols love eats to take convenience, bear to hungrily stir-fry a tea is the beverage that they all day long can not leave. Mongolia the traditional living quarters of clan is a yurt presents a circular point crest, is rounded wall and umbrella-like in shape crest by the circular to constitute, outside reply with the sheep felt, use a hair rope again to a wall, umbrella to all nail with the wood yurt cans di *** antle to unload a porterage and is suitable for the demand of nomad's way of life life very much. Mongolia the traditional dress of clan is Mongolia a tunic, right Ren, trim border, the height is generous, Gao Ling's long sleeve, take belt, go together with skin summer tunic is the list of cotton silk quality to clip tunic, much red, yellow, navy blue winter tunic is the sheepskin tunic of woolen material red and green silk ans stain does belt. Mongolia the clan practices monogamy and stresses Lun often, strict status of a attention to is hired by what parents made the decision to marry system, the male arrives female the house married rites process to pay attention to to the song and wish a phrase. This is one of minority of our country clans-Mongolia clan.
模板 和 拉杆
我发一首歌词翻译行吗? 是我自己翻译的,觉得挺伤感。 As follows: 我依然没有忘记你I'm Still Not Over You 发生什么了?怎么了?What's up? 我知道我们有段时间没有联系了I know we haven't spoken for a while 但是我一直都在想你But I was thinkin bout you 至少这样能让我微笑And it kinda made me *** ile 要说的太多了So many things to say 我把它们写进信纸里And I'll put em in a letter 这样对我来说可能容易一些And it might be easier 这样的话语也可能好听一些The words might e out better 你的妈妈身体还好吗?还有你的弟弟?How's your mother, how's your little brother? 他是不是还和你长得很像啊?Does he still look just like you? 好多事情我都想知道它们的答案So many things I wanna know the answers to 希望我能让时光倒流Wish I could press rewind 希望我能从头开始再写一遍And rewrite every line 写你和我之间的所有的故事To the story of me and you 你知道吗我一遍一遍的尝试Don't you know I've tried and I've tried 想擦掉你在我脑海中的痕迹To get you out my mind 但是我始终做不到But it don't get no better 日子一天一天的过去As each day goes by 我迷失了自我、不知所措And I'm lost and confused 我已经一无所有了I've got nothin to lose 希望你能很快收到我的来信Hope to hear from you soon 我依然没有忘记你 I'm still not over you 依然没有忘记你Still not over you 对不起,我真的不是想故意纠缠你Excuse me, I really didn't mean to ramble on 但是在你离开我之后我百感交集But there's a lot of feelings that still remain after you were gone 我猜想你认为我能将这些感觉置之脑后I guess you thought that I would put it all behind me 就像对待一个可笑的笑话或者是电视上的故事一样Like a silly joke, or somethin on the . 男孩 对我来说却是如此的不容易Boy it aint easy 每当我听到我们的歌曲When I hear our song 我能感受到以前的那种感觉I get that same old feeling 真希望我能让时间倒流Wish I could press rewind 让时光回到从前Turn back the hands of time 我不该告诉你这些And I shouldn't be telling you 你知道吗我一遍一遍的尝试Don't you know I've tried and I've tried 想擦掉你在我脑海中的痕迹To get you out my mind 但是我做不到But it don't get no better 日子一天一天的过去As each day goes by 我迷失了自我、不知所措And I'm lost and confused 我已经一无所有了I've got nothin to lose 希望能很快收到你的回信Hope to hear from you soon 我依然没有忘记你. I'm still not over you 依然没有忘记你Still not over you 你知道吗 我保留着所有你的照片Did you know I kept all of your pictures 一直都没有鼓起勇气将照片丢弃Don't have the strength to part with them yet 哦,不…Oh no.... 努力忘掉你的吻残留的感觉Tried to erase the way your kisses taste 但是有些事情是一个女孩永远都无法释怀的But some things a girl can never fet 想擦掉你在我脑海中的痕迹Don't you know I've tried and I've tried 但是我始终做不到But it don't get no better 日子一天一天的过去As each day goes by 我迷失了自我、不知所措And I'm lost and confused 我已经一无所有了I've got nothin to lose 希望能很快收到你的回信Hope to hear from you soon 我依然没有忘记你I'm still not over you 依然没有忘记你Still not over you
Beijing National Stadium (Bird's Nest/Olympic Stadium) The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design petition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the petition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a bined weight of 45,000 tonnes. The stadium will cost up to billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004. In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005. In depth The stadium's appearance is one of synergy, with no distinction made beeen the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven igs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008. The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without municating the insistent sameness of technocratic architecture dominated by large spans and digital screens. Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that aess the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces beeen the woven igs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof pletely weatherproof, but the roof has been omitted from the design in 2004. While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, . to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design. The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure. Beijing National Stadium Bird's Nest/Olympic Stadium Facility statistics Location Beijing Broke ground Dec 2003 Opened Unknown Closed N/A Demolished N/A Owner Surface Grass Construction cost billion yuan Architect Herzog & de Meuron ArupSport CAG Tenants Seating capacity 91,000 (80,000 Post Olympics) 水立方 National Swimming Center--Exquisite and Exciting "Water Cube" A semi-transparent "cube", with "bubbles" spread out all over its surface, is a shape very similar to the structure of "H2O", the outlook for the National Swimming Center at the 2008 Olympic Games. After the games, it will bee a recreational water park open to the public. In Chinese culture, water is an important natural element. It creates a calming atmosphere and inspires happiness. Taking full consideration of the functions of water in recreation and bodybuilding, designers have explored many ways for people of different age groups to appreciate its function. The design is called "Water Cube". Many creative designs have been employed in the creation of the swimming pools at the swimming center. Other high-tech facilities including optical devices used to define positions of athletes, and multiple-angle, three-dimensional screening systems are provided to help spectators enjoy petitions. The National Swimming Center, one of the three landmark buildings for the 2008 Beijing Olympic Games, is located inside the Beijing Olympic Park. Covering a total floor space of 50,000 square meters, it has 17,000 seats. The project costs about US$100 million. The center will be a venue for swimming, diving, synchronized swimming and water-polo games during the period of the Olympic Games. After the games, the center will bee a large water recreational center open to the public. In January 2003, Beijing started to solicit design schemes for the National Swimming Center. The international petition settled on "Water Cube" as the winning scheme. It is designed by the design consortium consisting of the China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co Ltd, PTW Architects (Australia) and Ove Arup (Australia). The National Swimming Center will be the only landmark Olympic venue that is constructed by donations from patriots from Overseas.
104 浏览 3 回答
286 浏览 6 回答
289 浏览 5 回答
238 浏览 4 回答
353 浏览 5 回答
151 浏览 5 回答
316 浏览 4 回答
102 浏览 3 回答
96 浏览 3 回答
197 浏览 6 回答
252 浏览 4 回答
238 浏览 7 回答
129 浏览 2 回答
331 浏览 4 回答
137 浏览 5 回答