On the control of cracks in the masonry works Chinese Abstract Due to the scarcity of land resources, the state has developed to promote the use of energy-saving wall materials, such as: autoclaved aerated concrete block wall, and other construction materials in place of clay brick. Autoclaved aerated concrete block as a new type of wall materials, with energy-saving, provincial soil, light, and other characteristics not only save energy, reduce the loss of land resources, but also has good insulation effect, to a large extent, reduce the project cost With the promotion of high value. However, due to its low strength, porosity, water absorption and high-volume, and other major features of its own workers as well as on the performance characteristics of the new materials are not familiar with the construction of improper operation, and other factors, the use of this material is masonry wall Prone to crack, which is a common problem in the construction industry, although not affect the structural safety of buildings affected, but it's beautiful, serious also a direct impact on the use. As a project management is our duty to ensure the quality of the cracks to prevent cracks in the control norms allow. Through the practice of groping and experiment, summed up the utility to better improve the cracks in the masonry is my main goal.The formation of cracks in the wall a number of factors, both foundation settlement, temperature changes, shrinkage deformation of reasons, there are structural design, materials and construction quality and project management. According to the most common cause of the cracks can be divided into four categories. The first is temperature fracture; Second, drying shrinkage cracks, or shrinkage cracks. As well as temperature and shrinkage cracks resulting from the common; Third, the design of the structure caused by cracks; Fourth, the quality of construction caused the cracks. There are many reasons for the cracks, it is necessary to control all aspects of the technical measures taken by on-site construction management practice to learn, how to deal with the crack I have a deeper understanding.