低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
公路工程地质信息 (一)强夯法处理液化地基的施工管理 江苏北部(如徐州、宿迁等)地区广泛分布废黄河泛滥沉积物,一般以亚砂土、亚粘土—细砂为主,埋层浅,地下水位高,天然地基承载力低,在地震作用下易产生液化现象。地基液化是引起构筑物破坏的主要形式,同时该地区又受到我省主要的地震危险带—郯庐地震带的影响,因此在该地区国道主干线京福、徐宿、连徐、宁宿徐、沂淮等高速公路建设中不可避免的遇到大面积液化地基处理问题。根据《公路工程抗震设计规范》(JTJ004—89),对高速公路必须进行液化地基处理,这是减轻地震灾害的根本性措施。因此,如何控制和管理好处理液化地基的施工,做到既经济有效又安全可靠,对保证高速公路建成后的正常运营、减轻地震灾害具有重大现实意义。 1 液化地基的国内外研究概况 地基液化分析与处理一直是土动力学的主要研究课题之一。液化一词最早见于1920年的《动力冲填坝》用来说明卡拉弗拉斯冲填坝的毁坏。1936年Casagrande首先给出了砂土液化的判别方法——临界孔隙比法。上世纪50年代,各国学者对砂土液化进行了广泛研究,主要包括:砂土液化的机理,砂土液化的预估方法,砂土液化的地基处理等。 所谓液化是指由于孔隙水压增加及有效应力降低而引起粒状材料(砂土、粉土甚至包括砾石)由固态转变成液态的过程。影响液化的因素有:①颗粒级配,包括粘粒、粉粒含量,平均粒径d50;②透水性能;③相对密度;④结构;⑤饱和度;⑥动荷载,包括振幅、持时等。 我国《工业与民用建筑抗震设计规范》(TJ11—78)根据1971年以前8次大地震的数据,参考美国、日本的有关研究成果给出了以临界标准贯入击数为指标的砂土液化判别公式。现行规范《建筑抗震设计规范》(GBJ11—89)通过对海城、唐山地震的系统研究,结合国外大量资料,对原规范进行了修改,采用了两步评判原则,并对临界标贯击数公式进行了修改,使之更符合实际。在国标《岩土工程勘察规范》(GB50021—94)中,对此又进行了补充,给出了液化比贯入阻力临界值和液化剪切波速临界值公式,用来进行液化判别。在公路工程中,基本上沿用上术两步评判原则,采用了临界标贯击数判别方法,并根据公路工程中的研究成果,给出了临界标贯击数的计算公式。这些规范在我国工程界得到了广泛应用。 2 高等级公路可液化地基处理方案的确定。 液化地基处理恰当与否,关系到整个工程的质量、投资和进度。因此其重要性已越来越多地被人们所认识。对于高速公路这样大面积处理可液化土而言,强夯法和干振碎石桩法是首选的处理手段。当全液化地基路段较长,需处理面积大,公路沿线外缘较近范围内无村庄,无重要构造物时,强夯法是比较理想的地基处理方法。 强夯法处理地基是20世纪60年代末Menard技术公司首先创立的,该方法将80…400kN重锤从落距6—40m处自由落下,给地基以冲击和振动,从而提高地基土的强度并降低其压缩性。强夯法常用来加固碎石、砂土、粘性土、杂填土、湿隐性黄土等各类地基土。由于其具有设备简单、施工速度快、适用范围广、节约三材、经济可行、效果显著等优点,经过20多年来的应用与发展,强夯法处理地基受到各国工程界的重视,并得以迅速推广,取得了较大的经济效益和社会效益。 由于强夯处理的对象(即地基土)非常复杂,一般认为不可能建立对各类地基土均适合的具有普遍意义的理论,但对地基处理中经常遇到的几种类型土,还是有规律可循的。实践证明,用强夯法加固地基,一定要根据现场的地质条件和工程作用要求,正确选用强夯参数,一般通过试验来确定以下强夯参数: (1)有效加固深度:有效加固深度既是选择地基处理方法的重要依据,又反映了处理效果。 (2)单击夯击能:单击夯击能等于锤重×落距。 (3)最佳夯击能:从理论上讲,在最佳夯击能作用下,地基土中出现的孔隙水压力达到土的自重压力,这样的夯击能称最佳夯击能。因此可根据孔隙水压力的叠加值来确定最佳夯击能。在砂性土中,孔隙水压力增长及消散过程仅为几分钟,因此孔隙水压力不能随夯击能增加而叠加,可根据最大孔隙水压力增量与夯击次数关系来确定最佳夯击能。 夯点的夯击次数,可按现场试夯得到的夯击次数和夯沉量关系曲线确定,应同时满足下列条件:(①夯坑周围地面不应发生过大隆起;②不因夯坑过深而发生起锤困难;③每击夯沉量不能过小,过小无加固作用。夯击次数也可参照夯坑周围土体隆起的情况予以确定,就是当夯坑的竖向压缩量最大,而周围土体的隆起最小时的夯击数。对于饱和细粒土,击数可根据孔隙水压力的增长和消散来决定,当被加固的土层将发生液化时的击数即为该遍击数,以后各遍击数也可按此确定。 (4)夯击遍数:夯击遍数应根据地基土的性质确定,地基土渗透系数低,含水量高,需分3—4遍夯击,反之可分两遍夯击,最后再以低能量“搭夯”一遍,其目的是将松动的表层土夯实。 (5)间歇时间:所谓间歇时间,是指相邻夯击两遍之间的时间间隔。Menard指出,一旦孔隙水压力消散,即可进行新的夯击作业。 (6)夯点布置和夯点间距:为了使夯后地基比较均匀,对于较大面积的强夯处理,夯击点一般可按等边三角形或正主形布置夯击点,这样布置比较规整,也便于强夯施工。由于基础的应力扩散作用,强夯处理范围应大于基础范围,其具体放大范围,可根据构筑物类型和重要性等因素考虑确定。 夯点间距可根据所要求加固的地基土性质和要求处理深度而定。当土质差、软土层厚时应适当增大夯点间距,当软土层较薄而又有砂类土夹层或土夹石填土等时,可适当减少夯距。夯距太小,相邻夯点的加固效应将在浅处叠加而形成硬层,影响夯击能向深部传递。 3 强夯法处理液化地基的质量控制与管理 施工单位选择 对参与施工的强夯施工单位,各施工标段中标单位要先审查其施工资质、信誉和业绩,并附有前业主对该单位的书面评价报告;任何单位不得将强夯分包给个人施工。各中标单位将经初步筛选合格的施工队伍形成书面推荐报告,经驻地监理审核后,上报主管部门,经批准后方可进场。进场后不得再分包或转包,否则,驻地监理工程师将责令分包单位立即退场,损失自负。 施工准备 编写施工组织设计,经驻地监理组审查,监理组提出书面审查意见,报总监代表审批同意方可施工。 施工管理 (1)施工单位要按设计图要求编制夯点编号图,编号图要清晰、规范、科学。 (2)施工单位必须制定严格的安全管理措施,现场操作人员必须戴安全帽,并对施工机械定期作安全检查。在强夯区四周要设置醒目的危险警告标志和安全管理措施,不允许行人和非施工车辆进入强夯区,以确保操作员、过往行人和车辆的安全。 (3)施工单位要对强夯机械进行编号,每台强夯机械必须持有监理组发放的《施工许可证》方可进行强夯施工。 (4)施工单位除在强夯机械上挂《施工许可证》外,还必须挂有《机械操作主要人员》和《施工技术参数》两块醒目的牌子,进行机械操作的主要人员必须挂牌上岗。 (5)施工单位要制定施工要点供现场人员执行。 (6)铺设垫层前要对原地面进行清表并整平,且要按每20米一个断面,每个断面5个规定测点,测量清表后标高。 (7)用水准仪测量垫层铺设前、后的对应测点标高,初步确定垫层厚度,每20米一个断面,每个断面5个规定测点,再按每断面挖1处深坑,进一步确定垫层厚度(控坑必须在测点位置上)。 (8)垫层宽度按每20米一处用钢尺丈量。 (9)按设计要求进行夯点布置,夯点定位布置用钢尺按100%的频率丈量。 (10)夯锤必须过磅称重。夯击能在强夯施工前必须检测,并满足设计要求。每夯击100次,用钢尺量一次夯锤落距。 (11)施工单位必须及时排出夯坑内积水。 (12)主、副、满夯的间隙时间要根据现场情况作必要的调整,但间隙时间必须满足72小时。需要调整间隙时间由现场监理工程师确定。 (13)遇到不需拆迁的高压电线时,施工单位必须安排集中施工的方案,市高指向供电部门申请临时停电。 (14)施工人员要认真做好强夯施工记录,记录要求清楚、真实。 (15)施工人员必须注意观察已处理路段,发现异常情况及时报告驻地监理组和有关部门。 (16)在强夯区内的构造物必须在强夯完成后,才能进行构造物的下部施工。 4 用强夯法处理砂土液化地基的质量检验评定 基本要求 碎石垫层的碎石规格和质量必须符合设计要求。强夯施工必须按夯击点确定的技术参数进行。以各个夯击点的夯击数作为施工控制数值。 实测项目表 表1 强夯法处理砂土液化地基实测项目表 项次 检查 项目规定值 或允许偏差 检查方法和频率 规定分 1 夯击能 不小于设计 1次/工点查施工记录 15 2 夯击次数 符合设计 查施工记录 15 3 垫层厚度 不小于设计 4处/200m 15 4 垫层宽度 不小于设计 4处/200m 15 5 标贯击数 符合设计 2处/工点 20 6 瑞利波 ≥200m/s 1处/工点 20 注:(1)标准贯入试验,按需3点/5000�且不少于3点进行。孔位随机 布置。特殊地段适当加密。 (2)瑞利波法(SSW)按1点/40m,在中心线两侧各15m处交叉布点。 外观鉴定 (1)填筑碎石垫层前必须清表、整平,无明显凸凹点,整平不符合要求扣2分。 (2)夯坑内积水应及时排除,不符合要求扣2分。 (3)夯后场地应平整,无局部隆起,不符合要求扣2分。 分项工程质量等级评定 (1)分项工程评分在85分及以上者为优良;70~85分者为合格;70分以下者为不合格。 (2)若标贯击数、瑞利波不合格时,则该分项工程不合格,可进行加固处理,再重新评定其质量等级。 5 结语 在京福、徐宿、宁宿徐等高速公路液化地基强夯加固的施工实践中,由于建设、监理及施工单位的高度重视,严格按有关质量要求和“施工指导意见”进行控制,尤其对强夯参数的确定都是经反复试验论证后,选择合适的参数指导施工,使强夯法处理液化地基段达到了设计要求,从已建成的高速公路处理路段的工后路基沉降观测看,处理段液化地基强夯加固达到了预期目的。
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
质量是人类社会文明程度的标志,尤其是建设工程质量问题直接关系到人民群众的生命财产安全,关系着国家和民族的形象。下文是我为大家搜集整理的关于建设工程项目质量管理论文的内容,欢迎大家阅读参考!
浅析建设项目工程质量管理
摘要:现代工程项目质量管理有别于传统的质量管理,它是一种系统的、全面的、动态的质量管理 方法 ,本文从通过对建筑项目质量管理现状的分析,提出完善建筑工程项目质量管理的思路和对策,为完善项目质量管理提供参考和决策依据。
关键词:建设项目;现状;质量管理;施工工序管理
1 建筑施工项目质量管理的重要性
现代工程项目正在朝着大型化、规模化、现代化的方向发展,项目的复杂度较之以往呈指数级倍增,在建设投资力度不断增加的情况下,工程项目的质量、进度需要通过更严格的监控和管理,才能得到保证。
施工项目质量的优劣,不但关系到工程的适用性,而且还关系到人民生命财产的安全和社会安定。因此在工程建设过程中,加强质量管理,确保国家和人民生命财产安全是施工项目管理的头等大事。
2 建筑工程质量管理的现状
在建筑市场竞争日益激烈的情况下,一些施工企业片面追求经济效益,不重视质量管理体系的建设,工程项目的质量管理手段落后,不重视事前计划和事中控制,不能实现全面、全过程的动态质量管理.
建筑市场不规范
一些地方政府和建筑主管部门对国家有关建筑市场的行政规定和管理要求贯彻不到位,落实不到位,甚至不落实,存在有法不依,执法不严,违法不纠的现象.有的业主不管工程大小,结构难易、层次高低,都指明要一级以上企业参与投标,要一级建造师、一级项目经理承担施工任务,结果抹杀了差别化竞争,使高低资质、大小企业同时涌向一个工程项目,造成了市场的无序化竞争,加重了市场秩序的混乱。
同时,派生出施工方无资质挂靠有资质,低资质挂靠高资质,建造师资格证书出借等诸多违法违规行为,从而进一步加剧了建筑市场的不规范运行.由于建筑业属于劳动密集型行业,主要依靠手工作业和简单的辅助工具,市场准入壁垒低,许多缺少资本的小企业和个人大量涌入。
参加人员质量意识差
质量意识是人们对质量的认识和态度的综合表现.这是保证工程质量的前提,也是搞好质量管理的第一关。企业高层领导对质量问题没有高度重视,把企业目标重点定在利润、进度上,没有树立起只有高质量才能带来高效益的超前意识,导致管理层及基层工作人员没有明确的质量目标。
目前大多建筑公司领导对“质量第一”的 口号 讲的多,落实的少,而把主要目标锁定在抓进度、保工期上,对质量如何进一步提高很少重视.公司管理层质量意识不强,从而使质量监督层的工作得不到充分重视,使他们不能充分发挥作用。
建设单位行为不规范
由于长期计划经济体制的影响,很多建设工程的业主并不是合格的市场主甚至不是完全的法人主体,在建设工程项目时,存在很多不规范行为.有的建设单位不是完全的法人主体,建设资金的使用、施工单位选择、建筑标准的选择等,都不能自主决定,经常受到其主管单位的影响,无法承担发包方应承担的责任和任务,缺乏市场意识,破坏与承包方的平等交易关系。
阻碍市场机制的发展,而且投资责任机制不健全,片面追求低造价,片面追求高标准,短工期,这些都阻碍了工程质量.建设单位分包工程,致使一个项目中有两个或两个以上的施工队伍,施工水平的差异及现场缺乏统一管理,使施工质量无法保证.按照国家现行的建筑质量评定标准,单位工程中如果有一个分项或分部工程不合格,那么整个单位工程就被评为不合格工程。
设计单位行为不规范
建筑质量发生问题,一般都认为是施工质量出现问题,实际上其中一些问题是由于设计不到位造成的。现在很多设计单位实行的是谁承揽工程谁设计,这样在单位内部形成固定搭配,形成这几个人对某一类设计非常熟练,但如果遇到不熟悉的工程,其他设计人员又不易介入,致使设计单位的设计优势及专业之间的互补优势得不到充分发挥,影响设计质量。
另外建委设计质量监督站,对设计质量的监测是每年抽验,这样致使很多建筑设计得不到及时检测,为设计质量事故埋下隐患。
4 施工工序管理
施工工序的质量控制最基本的内容是工序质量的控制,工序质量控制的目的就是要发现偏差和分析影响工序质量的制约因素,并消除制约因素,使工序质量控制在一定范围内,以确保每道工序的质量。工序质量控制是过程质量控制的基本点,是现场质量控制的核心内容。
质量控制点的设置
质量控制点就是根据对重要的质量特性需要进行重点控制的要求,而选择的质量控制重点部位、重点工序或薄弱环节。设置质量控制点,是对质量进行预控的有力 措施 。在施工前应根据工程的特点,结合施工中各环节或部位的重要性、复杂性、精确性,全面、合理地选择质量控制点,在加强一般工序质量控制的同时,采取有效的控制方法,对关键工序和特殊工序进行重点控制,保证工序经常处于受控状态。
在设置质量控制点时,首先要对施工的工程对象进行全面分析、比较,以明确质量控制点;然后进一步分析所设置的质量控制点在施工中可能出现的质量问题或造成质量隐患的原因,针对隐患的原因,相应地提出对策措施予以预防。
质量控制点的涉及面较广,根据工程特点,视其重要性、复杂性、精确性、质量标准和要求,可能是结构复杂的某一工程项目,也可能是技术要求高、施工难度大的某一结构构件或分项、分部工程,也可能是影响质量关键的某一环节中的某一工序或若干工序。
总之,无论是操作、材料、机械设备、施工顺序、技术参数、自然条件、工程环境等,均可作为质量控制点来设置,主要是视其对质量特征影响的大小及危害程度而定。质量控制点设置的对象主要有以下几个:
关键的分部分项工程
如剪力墙结构中的钢筋工程、大体积混凝土工程等。
关键的工程部位
如民用建筑的卫生间,关键设备的设备基础及一些关键的隐蔽工程等。
薄弱环节
即经常发生或容易发生质量问题的施工环节,或承包商施工质量控制无把握的环节。如一些常见的质量通病(渗、漏水问题);又如对新工艺、新材料,新技术的应用,由于建筑单位初次施工,缺乏 经验 ,必须作为重点加以控制。
关键工序
如混凝土浇筑中的振捣,它对浇筑质量影响很大,又如CFG桩的钻孔,对确保其施工质量至关重要。
关键工序的关键质量特性
如混凝土的强度,回填土的含水量、灰缝的饱满度等。
关键质量特性的关键因素
主要为人、材料、机械、环境和方法,如重型构件吊装的关键因素是人和机械,砌筑砂浆强度的关键是材料。
质量控制点的实施
质量控制点设置后,要对质量控制点进行管理、实施,这样才能使质量控制点发挥其作用。在质量控制点的实施中应按如下要求进行:
有计划地组织进行过程质量审核,对审核的内容、时间、频次、人员等作出具体的部署,每年一般不得少于两次;
审查各接口部门的工作质量,接口部门之间的衔接应其有连续性和稳定性;
把质量控制点的设置及控制措施进行交底,务必使相关人员真正了解,并树立以预防为主的思想,形成书面的质量控制的交底文件;
质量管理人员要配合监理工程师在施工现场进行重点指导、检查、验收,对关键的质量控制点要进行旁站监理;
严格要求操作人员按作业指导书进行认真操作,保证各环节的施工质量;(6)按规定做好检查,认真记录检查结果,取得准确客观的第一手数据,形成书面的质量控制文件;
运用数理统计技术进行过程能力分析和缺陷分析,找出过程质量控制存在的问题,采取有效的纠正或预防措施,不断地改进和提高过程质量控制能力。
施工过程中的质量检查
施工中的质量检查是进行施工质量控制的重要手段。质量控制人员通过质量检查或旁站监控,来确保工序的施工质量符合合同规定的质量要求,避免质量事故的发生。因此,质量控制人员要高度重视施工过程中的质量检查,其重点主要是以下几方面:
严格按方案施工
对每个方案的实施都应通过方案提出、讨论→编制→审核→修改→定稿(审批)→交底→实施几个步骤进行。
施工中有了完备的施工组织设计和可行的施工方案,以及操作性强的技术交底,就能保证全部工程整体部署有条不紊,施工现场整洁规矩,机械配备合理,人员编制有序,施工流水不乱,分部工程方案科学合理。施工操作人员应严格执行施工方案的要求,将极有力地保证工程的质量和进度。
实行“三检制”和检查验收制度、执行过程质量执行程序
为了能够使“三检制”充分发挥作用,在施工过程中,应坚持检查上道工序、保障本道工序、服务下道工序,做好自检、互检、交接检,坚持上道工序不合格就不能转入下道工序的施工原则,这样一环扣一环,环环不放松,以工序质量确保工程质量。
如模板安装和钢筋绑扎这道工序完成后,应在质量控制人员对模板安装质量和钢筋规格、数量及绑扎质量等进行检查,形成质量检查文件签字认可后,才允许混凝土浇筑。这样就形成了分包自检、总包复检、监理验收的三级
检查制度。
成品保护质量检查
由于各工种交叉频繁,对于成品和半成品,容易出现二次污染、损坏和丢失,影响工程进展,增加额外费用。制定成品(半成品)保护的主要措施,并设专人负责成品保护工作。在施工过程中对易受污染、破坏的成品和半成品要进行标识和防护,质量控制人员应对成品保护质量经常进行巡视检查,要求分包单位对成品采取“护、包、盖,封”保护措施,发现现有保护措施损坏的,要及时恢复。
工序交接检要采用书面形式由双方签字认可,由下道工序作业人员和成品保护负责人同时签字确认,并保存工序交接书面材料。另外,为保护成品,还应合理安排施工顺序,防止后道工序损坏或污染前道工序。
5 结语
随着市场的对外开放,国内企业也面临着走出去的问题,如何提高企业竞争力已经成为建筑企业急待解决的问题.我们要以提高企业质量管理水平为契机,努力营造我国建筑企业竞争优势,增强企业的市场竞争力。
参考文献:
[1].刘新宇,浅谈建筑工程施工质量控制[J].中国建设信息,2006(06).
262 浏览 4 回答
161 浏览 2 回答
351 浏览 4 回答
223 浏览 5 回答
106 浏览 5 回答
325 浏览 5 回答
94 浏览 5 回答
274 浏览 6 回答
304 浏览 5 回答
190 浏览 3 回答
116 浏览 5 回答
237 浏览 4 回答
220 浏览 4 回答
359 浏览 3 回答
233 浏览 5 回答