The book sticks to the West江惠东Dam Project Environmental Impact Assessment Report (Graduation Project version. Because of conditions, as a reference book compiled from large amounts of data, data used in monitoring non-author). Report on the use of the general pattern of the EIA report, based on general, regional overview of engineering analysis environment, the status quo of environmental quality monitoring and evaluation, environmental impact prediction and evaluation of pollutant control measures, site selection analysis of a reasonable, clean production and the total control analysis, public participation, environmental impact of economic profit and loss analysis, environmental management and monitoring and analysis, conclusions and recommendations prepared by the order of the preparation 。Listed by the EIA is based on the use of, in principle, the evaluation factors, work such as grading and evaluation criteria, introduced hydraulic engineering related to natural, social and ecological overview of the project carried out a detailed analysis. The state of the environment through the project's monitoring and evaluation, found that apart from the part of river basin water environment over some indicators, the work environment in the vicinity of the targets to achieve the basic requirements of relevant standards; through the forecast engineering environment, although some factors do not meet standards However, some measures taken to meet the basic requirements - this book lists some of the pollutants prevention and control to do the work of the spirit of the EIA, the book also had total control of cleaner production and analysis, public participation in the work of the projects carried out environmental impact analysis of economic profit and loss. Finally, the EIA and gives a summary of recommendations and concluded: "This project meets the overall river basin planning, site selection and reasonable efficiency is obvious that environmental damage is limited. So from the point of view of environmental protection, water conservancy江惠东West branch Project construction is feasible. "