编制拆装一类的方案,主要应该考虑施工环境、
塔吊
高度、塔吊旋转半径,需要吊车配合的要考虑配合吊车的站位、旋转半径等等。再有,现在的塔吊基本上都是那种自升降式的。
在毕业论文的写作过程中,指导教师一般都要求学生编写提纲。从写作程序上讲,它是作者动笔行文前的必要准备;从提纲本身来讲,它是作者构思谋篇的具体体现。所谓构思谋篇,就是组织设计毕业论文的篇章结构。因为毕业论文的写作不像写一首短诗、一篇散文、一段札记那样随感而发,信手拈来,用一则材料、几段短语就表达一种思想、一种感情;而是要用大量的资料,较多的层次,严密的推理来展开论述,从各个方面来阐述理由、论证自己的观点。因此,构思谋篇就显得非常重要,于是必须编制写作提纲,以便有条理地安排材料、展开论证。有了一个好的提纲,就能纲举目张,提纲挚领,掌握全篇论文的基本骨架,使论文的结构完整统一;就能分清层次,明确重点,周密地谋篇布局,使总论点和分论点有机地统一起来;也就能够按照各部分的要求安排、组织、利用资料,决定取舍,最大限度地发挥资料的作用。
有些学生不大愿意写提纲,喜欢直接写初稿。如果不是在头脑中已把全文的提纲想好,如果心中对于全文的论点、论据和论证步骤还是混乱的,那么编写一个提纲是十分必要的,是大有好处的,其好处至少有如下三个方面:
永年县东杨庄乡东杨庄总校杨士平同志做事不公平,为什么绩效工资,领导首先考虑个人呀,并且校长和副校长还有会计都要比一线教师高的多呀,这不公平,还说先扣完他们的,剩下的才是教师的,并且对教师的要求很严格那他们自己呢?还不是花贪污教师们的钱,带领所有校长去旅游,哈哈,太不公平了,还不让教师花自个的钱去旅游,这公平吗?我觉得杨士平、牛排、刘永丰、齐建困、杨红印、刘建勋等都应检讨
Thirty thousand spring water power plant is located 4 kilometers north of TuLuFan Railway Station, the east longitude 34 ° 40 ', north latitude 53 ° 30'; climate has adequate light, hot summer and cold winter, less rain; the river rises in the mountains along the peaks Bogda, floods due to heavy rain; power plant at the surface is gravel, seismic design intensity is 6 degree. Thirty thousand spring water power plant design uses vertical layout, i.e. water turbine shaft and the generator are arranged in the same vertical plane. Hydraulic turbine model for 240-LJ-140, the installed capacity of 10200KW, TSL325/36-20 type of generator, turbine installation height is 1036.0m. The main contents of the design include the design of roof structure of hydropower station workshop layout, workshop, crane beam calculation, structure calculation, calculation of plant and machine pier with the hood using reinforced concrete ribbed structure of integral casting. Plate for each span is 2.2 meters five span beam; work secondary beams as each span of 8 meters of the three cross beams; beams are arranged between the span of 10.5 meters single span beam; beam for the span of 10.5 meters single span beam. Crane beam is divided into two parts and installation work, adopt independent reinforced concrete beam T type section. Architecture as the main part of the design, under the roof, the crane load and structure weight of Liang Chuanlai, and to the large volume of concrete building structure. Workshop of frame column in reinforced concrete structure, internal force calculation of general methods according to structural mechanics. The pier of the cylindrical pier more common. Because the stress is smaller, the pier and wind cover according to the constructional reinforcement.