首页

> 期刊投稿知识库

首页 期刊投稿知识库 问题

人工翻译技术论文参考文献

发布时间:

人工翻译技术论文参考文献

掌桥网站有PDF自动翻译以及人工翻译。掌桥的翻译工具专注于学术翻译服务。利用先进的解析技术,可以高效快速的翻译文献。不过是要收费的。

翻译资料参考文献格式

参考文献是在学术研究过程中,对某一著作或论文的整体的参考或借鉴。下面是我整理的翻译资料参考文献格式,欢迎阅读参考!

一、参考文献的类型

参考文献(即引文出处)的类型以单字母方式标识,具体如下:

M——专著         C——论文集       N——报纸文章

J——期刊文章      D——学位论文     R——报告

对于不属于上述的文献类型,采用字母“Z”标识。

对于英文参考文献,还应注意以下两点:

①作者姓名采用“姓在前名在后”原则,具体格式是: 姓,名字的首字母. 如: Malcolm Richard Cowley 应为:Cowley, M.R.,如果有两位作者,第一位作者方式不变,&之后第二位作者名字的首字母放在前面,姓放在后面,如:Frank Norris 与Irving Gordon应为:Norris, F. & I.Gordon.;

②书名、报刊名使用斜体字,如:Mastering English Literature,English Weekly。

二、参考文献的.格式及举例

1.期刊类

【格式】[序号]作者.篇名[J].刊名,出版年份,卷号(期号):起止页码.

【举例】

[1] 王海粟.浅议会计信息披露模式[J].财政研究,2004,21(1):56-58.

[2] 夏鲁惠.高等学校毕业论文教学情况调研报告[J].高等理科教育,2004(1):46-52.

[3] Heider, E.R.& D.C.Oliver. The structure of color space in naming and memory of two languages [J]. Foreign Language Teaching and Research, 1999, (3): 62 – 67.

2.专著类

【格式】[序号]作者.书名[M].出版地:出版社,出版年份:起止页码.

【举例】[4] 葛家澍,林志军.现代西方财务会计理论[M].厦门:厦门大学出版社,2001:42.

[5] Gill, R. Mastering English Literature [M]. London: Macmillan, 1985: 42-45.

3.报纸类

【格式】[序号]作者.篇名[N].报纸名,出版日期(版次).

【举例】

[6] 李大伦.经济全球化的重要性[N]. 光明日报,1998-12-27(3).

[7] French, W. Between Silences: A Voice from China[N]. Atlantic Weekly, 1987-8-15(33).

4.论文集

【格式】[序号]作者.篇名[C].出版地:出版者,出版年份:起始页码.

【举例】

[8] 伍蠡甫.西方文论选[C]. 上海:上海译文出版社,1979:12-17.

[9] Spivak,G. “Can the Subaltern Speak?”[A]. In C.Nelson & L. Grossberg(eds.). Victory in Limbo: Imigism [C]. Urbana: University of Illinois Press, 1988, pp.271-313.

[10] Almarza, G.G. Student foreign language teacher’s knowledge growth [A]. In D.Freeman and J.C.Richards (eds.). Teacher Learning in Language Teaching [C]. New York: Cambridge University Press. 1996. pp.50-78.

5.学位论文

【格式】[序号]作者.篇名[D].出版地:保存者,出版年份:起始页码.

【举例】

[11] 张筑生.微分半动力系统的不变集[D].北京:北京大学数学系数学研究所, 1983:1-7.

6.研究报告

【格式】[序号]作者.篇名[R].出版地:出版者,出版年份:起始页码.

【举例】

[12] 冯西桥.核反应堆压力管道与压力容器的LBB分析[R].北京:清华大学核能技术设计研究院, 1997:9-10.

7.条例

【格式】[序号]颁布单位.条例名称.发布日期

【举例】[15] 中华人民共和国科学技术委员会.科学技术期刊管理办法[Z].1991—06—05

8.译著

【格式】[序号]原著作者. 书名[M].译者,译.出版地:出版社,出版年份:起止页码.

三、注释

注释是对论文正文中某一特定内容的进一步解释或补充说明。注释前面用圈码①、②、③等标识。

四、参考文献

参考文献与文中注(王小龙,2005)对应。标号在标点符号内。多个都需要标注出来,而不是1-6等等 ,并列写出来。

谷歌翻译是不错的

格式如下:

[序号] [原著作者国籍]原著作者. 书名[M]. 译者. 出版地: 出版社, 出版年份: 起页码-止页码

你这个的写需要出版年限出版社一类信息,可以参考以下例子。

例如:

[1] [美]玛格丽特,维萨(M. Visser). 饮食行为学: 文明举止的起源,发展与含义[M]. 刘晓媛. 北京:电子工业出版社, 2015.

参考文献类型

参考文献类型及文献类型,根据GB3469-83《文献类型与文献载体代码》规定,以单字母方式标识:

专著M ; 报纸N ;期刊J ;专利文献P;汇编G ;古籍O;技术标准S ;

学位论文D ;科技报告R;参考工具K ;检索工具W;档案B ;录音带A ;

图表Q;唱片L;产品样本X;录相带V;会议录C;中译文T;

乐谱I; 电影片Y;手稿H;微缩胶卷U ;幻灯片Z;微缩平片F;其他E。

翻译论文翻译参考文献吗

我们学校没有要求翻译参考文献,但是要按照正常的格式写在后面,比如毕业论文要求参考文献是国标,而有些杂志有自己的参考文献格式。

是需要的,因为摘要和参考文献是期刊的一部分。

这个一般不用。如果要是发文章的话,有的编辑部要求文献中英两种都有。

可以翻译的,具体看你学校是怎么样定的,有的是不需要的

科技类文章翻译参考文献

这要看你翻译的这篇文献做什么用。如果是学术交流,一般情况下人名和参考文献名都不要译,译了别人反而不好查找相应的人和文献。但如果你翻译的这篇文章用在正式的报告,或是给领导看的文件,或是发表在报刊上,都最好译成汉语。例如,如果是用在电视台的新闻中,外国人名当然要译,否则播音员怎么念呢?从来没听到播音员念外国总统的名字是用英语或其他语言的。在有些情况下,可以用汉语译,然后在括号里把英文原文注上,参考文献也可以这样。

高手解答!着急帮你做

格式如下:

[序号] [原著作者国籍]原著作者. 书名[M]. 译者. 出版地: 出版社, 出版年份: 起页码-止页码

你这个的写需要出版年限出版社一类信息,可以参考以下例子。

例如:

[1] [美]玛格丽特,维萨(M. Visser). 饮食行为学: 文明举止的起源,发展与含义[M]. 刘晓媛. 北京:电子工业出版社, 2015.

参考文献类型

参考文献类型及文献类型,根据GB3469-83《文献类型与文献载体代码》规定,以单字母方式标识:

专著M ; 报纸N ;期刊J ;专利文献P;汇编G ;古籍O;技术标准S ;

学位论文D ;科技报告R;参考工具K ;检索工具W;档案B ;录音带A ;

图表Q;唱片L;产品样本X;录相带V;会议录C;中译文T;

乐谱I; 电影片Y;手稿H;微缩胶卷U ;幻灯片Z;微缩平片F;其他E。

可以的百度学术可以找到参考文献,输入关键词,在输入年份,就能找到相对应的参考文献。如果不知道参考文献格式要求,可以百度搜,参考文献自动生成器。直接按着填就出来了。 百度搜索参考文献自动生成器,按着里面填,点生成参考文献就出来了。 参考文献标准格式参考文献类型:专著[M],论文集[C],报纸文章[N],期刊文章[J],学位论文[D],报告[R],标准[S],专利[P],论文集中的析出文献[A]电子文献类型:数据库[DB],计算机[CP],电子公告[EB]电子文献的载体类型:互联网[OL],光盘[CD],磁带[MT],磁盘[DK]A:专著、论文集、学位论文、报告[序号]主要责任者.文献题名[文献类型标识].出版地:出版者,出版年.起止页码(可选)[1]刘国钧,陈绍业.图书馆目录[M].北京:高等教育出版社,1957.15-18.B:期刊文章[序号]主要责任者.文献题名[J].刊名,年,卷(期):起止页码[1]何龄修.读南明史[J].中国史研究,1998,(3):167-173.[2]OU J P,SOONG T T,et al.Recent advance in research on applications of passive energy dissipation systems[J].Earthquack Eng,1997,38(3):358-361.C:论文集中的析出文献[序号]析出文献主要责任者.析出文献题名[A].原文献主要责任者(可选).原文献题名[C].出版地:出版者,出版年.起止页码[7]钟文发.非线性规划在可燃毒物配置中的应用[A].赵炜.运筹学的理论与应用——中国运筹学会第五届大会论文集[C].西安:西安电子科技大学出版社,1996.468.D:报纸文章[序号]主要责任者.文献题名[N].报纸名,出版日期(版次)[8]谢希德.创造学习的新思路[N].人民日报,1998-12-25(10).E:电子文献[文献类型/载体类型标识]:[J/OL]网上期刊、[EB/OL]网上电子公告、[M/CD]光盘图书、[DB/OL]网上数据库、[DB/MT]磁带数据库[序号]主要责任者.电子文献题名[电子文献及载体类型标识].电子文献的出版或获得地址,发表更新日期/引用日期[12]王明亮.关于中国学术期刊标准化数据库系统工程的进展[8]万锦.中国大学学报文摘(1983-1993).英文版[DB/CD].北京:中国大百科全书出版社,1996.作者.题名[D].所在城市:保存单位,发布年份.李琳.住院烧伤患者综合健康状况及其影响因素研究[D].福州:福建医科大学,2009. 其他的:作者.题名[J].刊名,年,卷(期):起止页码.沈平,彭湘粤,黎晓静,等.临床路径应用于婴幼儿呼吸道异物手术后的效果[J].中华护理杂志,2012,47(10):930-932. 作者.书名[M]. 版次.出版地: 出版者,出版年:起止页码.胡雁.护理研究[M].第4版.北京:人民卫生出版社,2012:38. 作者.题名[N].报纸名,出版日期(版次).丁文祥.数字革命与国际竞争[N].中国青年报,2000-11-20(15). 作者.题名[EB/OL].网址,发表日期/引用日期(任选).世界卫生组织.关于患者安全的10个事实 [EB/OL].其他: [R]、[P]、[A]、[C]、[Z]等。

建筑工程技术论文文献英语翻译

Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and services.A general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general contractor.Sometimes, in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the owner.Sometimes also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the homes.Administration of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and construction.Construction contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their trade.During construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent intervals.In addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building code.Following is a description of the basic traditional construction procedure for a multistory building.After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway departments.The general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to proceed.Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.Field offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted away.Next, the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is drained.Major construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of personnel.As the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and cleaned.The owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。

1.1钢筋混凝土 素混凝土是由水泥、水、细骨料、粗骨料(碎石或;卵石)、空气,通常还有其他外加剂等经过凝固硬化而成。将可塑的混凝土拌合物注入到模板内,并将其捣实,然后进行养护,以加速水泥与水的水化反应,最后获得硬化的混凝土。其最终制成品具有较高的抗压强度和较低的抗拉强度。其抗拉强度约为抗压强度的十分之一。因此,截面的受拉区必须配置抗拉钢筋和抗剪钢筋以增加钢筋混凝土构件中较弱的受拉区的强度。 由于钢筋混凝土截面在均质性上与标准的木材或钢的截面存在着差异,因此,需要对结构设计的基本原理进行修改。将钢筋混凝土这种非均质截面的两种组成部分按一定比例适当布置,可以最好的利用这两种材料。这一要求是可以达到的。因混凝土由配料搅拌成湿拌合物,经过振捣并凝固硬化,可以做成任何一种需要的形状。如果拌制混凝土的各种材料配合比恰当,则混凝土制成品的强度较高,经久耐用,配置钢筋后,可以作为任何结构体系的主要构件。 浇筑混凝土所需要的技术取决于即将浇筑的构件类型,诸如:柱、梁、墙、板、基础,大体积混凝土水坝或者继续延长已浇筑完毕并且已经凝固的混凝土等。对于梁、柱、墙等构件,当模板清理干净后应该在其上涂油,钢筋表面的锈及其他有害物质也应该被清除干净。浇筑基础前,应将坑底土夯实并用水浸湿6英寸,以免土壤从新浇的混凝土中吸收水分。一般情况下,除使用混凝土泵浇筑外,混凝土都应在水平方向分层浇筑,并使用插入式或表面式高频电动振捣器捣实。必须记住,过分的振捣将导致骨料离析和混凝土泌浆等现象,因而是有害的。 水泥的水化作用发生在有水分存在,而且气温在50°F以上的条件下。为了保证水泥的水化作用得以进行,必须具备上述条件。如果干燥过快则会出现表面裂缝,这将有损与混凝土的强度,同时也会影响到水泥水化作用的充分进行。 设计钢筋混凝土构件时显然需要处理大量的参数,诸如宽度、高度等几何尺寸,配筋的面积,钢筋的应变和混凝土的应变,钢筋的应力等等。因此,在选择混凝土截面时需要进行试算并作调整,根据施工现场条件、混凝土原材料的供应情况、业主提出的特殊要求、对建筑和净空高度的要求、所用的设计规范以及建筑物周围环境条件等最后确定截面。钢筋混凝土通常是现场浇注的合成材料,它与在工厂中制造的标准的钢结构梁、柱等不同,因此对于上面所提到的一系列因素必须予以考虑。 对结构体系的各个部位均需选定试算截面并进行验算,以确定该截面的名义强度是否足以承受所作用的计算荷载。由于经常需要进行多次试算,才能求出所需的 3 截面,因此设计时第一次采用的数值将导致一系列的试算与调整工作。 选择混凝土截面时,采用试算与调整过程可以使复核与设计结合在一起。因此,当试算截面选定后,每次设计都是对截面进行复核。手册、图表和微型计算机以及专用程序的使用,使这种设计方法更为简捷有效,而传统的方法则是把钢筋混凝土的复核与单纯的设计分别进行处理。 1.2土方工程 由于和土木工程中任何其他工种的施工方法与费用相比较,土方挖运的施工方法与费用的变化都要快得多,因此对于有事业心的人来说,土方工程是一个可以大有作为的领域。在1935年,目前采用的利用轮胎式机械设备进行土方挖运的方法大多数还没有出现。那是大部分土方是采用窄轨铁路运输,在这目前来说是很少采用的。当时主要的开挖方式是使用正铲、反铲、拉铲或抓斗等挖土机,尽管这些机械目前仍然在广泛应用,但是它们只不过是目前所采用的许多方法中的一小部分。因此,一个工程师为了使自己在土方挖运设备方面的知识跟得上时代的发展,他应当花费一些时间去研究现代的机械。一般说来,有关挖土机、装载机和运输机械的唯一可靠而又最新的资料可以从制造厂商处获得。 土方工程或土方挖运工程指的是把地表面过高处的土壤挖去(挖方),并把它倾卸到地表面过低的其他地方(填方)。为了降低土方工程费用,填方量应该等于挖方量,而且挖方地点应该尽可能靠近土方量相等的填方地点,以减少运输量和填方的二次搬运。土方设计这项工作落到了从事道路设计的工程师的身上,因为土方工程的设计比其他任何工作更能决定工程造价是否低廉。根据现有的地图和标高,道路工程师应在设计绘图室中的工作也并不是徒劳的。它将帮助他在最短的时间内获得最好的方案。 费用最低的运土方法是用同一台机械直接挖方取土并且卸土作为填方。这并不是经常可以做到的,但是如果能够做到则是很理想的,因为这样做既快捷又省钱。拉铲挖土机。推土机和正铲挖土机都能做到这点。拉铲挖土机的工作半径最大。推土机所推运的图的数量最多,只是运输距离很短。拉铲挖土机的缺点是只能挖比它本身低的土,不能施加压力挖入压实的土壤内,不能在陡坡上挖土,而且挖。卸都不准确。 正铲挖土机介于推土机和拉铲挖土机的之间,其作用半径大于推土机,但小于拉铲挖土机。正铲挖土机能挖取竖直陡峭的工作面,这种方式对推土机司机来说是危险的,而对拉铲挖土机则是不可能的。每种机械设备应该进行最适合它的性能的作业。正铲挖土机不能挖比其停机平面低很多的土,而深挖坚实的土壤时,反铲挖土机最适用,但其卸料半径比起装有正铲的同一挖土机的卸料半径则要小很多。在比较平坦的场地开挖,如果用拉铲或正铲挖土机运输距离太远时,则装有轮胎式的斗式铲运机就是比不可少的。它能在比较平的地面上挖较深的土(但只能挖机械本身下面的土),需要时可以将土运至几百米远,然后卸土并在卸土的过程中把土大致铲平。在挖掘硬土时,人们发现在开挖场地经常用一辆助推拖拉机(轮式或履带式),对返回挖土的铲运机进行助推这种施工方法是经济的。一旦铲运机装满,助推拖拉机就回到开挖的地点去帮助下一台铲运机。 斗式铲运机通常是功率非常大的机械,许多厂家制造的铲运机铲斗容量为8 m³,满载时可达10 m³。最大的自行式铲运机铲斗容量为19立方米(满载时为25 m³),由430马力的牵引发动机驱动。 翻斗机可能是使用最为普遍的轮胎式运输设备,因为它们还可以被用来送混凝土或者其他建筑材料。翻斗车的车斗位于大橡胶轮胎车轮前轴的上方,尽管铰接式翻斗车的卸料方向有很多种,但大多数车斗是向前翻转的。最小的翻斗车的容量大约为0.5立方米,而最大的标准型翻斗车的容量大约为4.5m³。特殊型式的翻斗车包括容量为4 m³的自装式翻斗车,和容量约为0.5 m³的铰接式翻斗车。必须记住翻斗车与自卸卡车之间的区别。翻斗车车斗向前倾翻而司机坐在后方卸载,因此有时被称为后卸卡车。 1.3结构的安全度 规范的主要目的是提供一般性的设计原理和计算方法,以便验算结构的安全度。就目前的趋势而言,安全系数与所使用的材料性质及其组织情况无关,通常把它定义为发生破坏的条件与结构可预料的最不利的工作条件之比值。这个比值还与结构的破坏概率(危险率)成反比。 破坏不仅仅指结构的整体破坏,而且还指结构不能正常的使用,或者,用更为确切的话来说,把破坏看成是结构已经达到不能继续承担其设计荷载的“极限状态”。通常有两种类型的极限状态,即: (1)强度极限状态,它相当于结构能够达到的最大承载能力。其例子包括结构的局部屈曲和整体不稳定性;某此界面失效,随后结构转变为机构;疲劳破坏;引起结构几何形状显著变化的弹性变形或塑性变形或徐变;结构对交变荷载、火灾和爆炸的敏感性。 (2)使用极限状态,它对应着结构的使用功能和耐久性。器例子包括结构失稳之前的过大变形和位移;早期开裂或过大的裂缝;较大的振动和腐蚀。 根据不同的安全度条件,可以把结构验算所采用的计算方法分成: (1)确定性的方法,在这种方法中,把主要参数看作非随机参数。 (2)概率方法,在这种方法中,主要参数被认为是随机参数。此外,根据安全系数的不同用途,可以把结构的计算方法分为: (1)容许应力法,在这种方法中,把结构承受最大荷载时计算得到的应力与经过按规定的安全系数进行折减后的材料强度作比较。 (2)极限状态法,在这种方法中,结构的工作状态是以其最大强度为依据来衡量的。由理论分析确定的这一最大强度应不小于结构承受计算荷载所算得的强度(极限状态)。计算荷载等于分别乘以荷载系数的活载与恒载之和。 把对应于不乘以荷载系数的活载和恒载的工作(使用)条件的应力与规定值(使用极限状态)相比较。根据前两种方法和后两种方法的四种可能组合,我们可以得到一些实用的计算方法。通常采用下面两种计算方法: 确定性的方法,这种方法采用容许应力。 概率方法,这种方法采用极限状态。 至少在理论上,概率法的主要优点是可以科学的考虑所有随机安全系数,然后将这些随机安全系数组合成确定的安全系数。概率法取决于: 2.1 Reinforced Concrete Plain concrete is formed from a hardened mixture of cement ,water ,fine aggregate, coarse aggregate (crushed stone or gravel),air, and often other admixtures. The plastic mix is placed and consolidated in the formwork, then cured to facilitate the acceleration of the chemical hydration reaction lf the cement/water mix, resulting in hardened concrete. The finished product has high compressive strength, and low resistance to tension, such that its tensile strength is approximately one tenth lf its compressive strength. Consequently, tensile and shear reinforcement in the tensile regions of sections has to be provided to compensate for the weak tension regions in the reinforced concrete element. It is this deviation in the composition of a reinforces concrete section from the homogeneity of 答题实属不易,请楼主谅解,求采纳~

Modern architecture, not to be confused with 'contemporary architecture', is a term given to a number of building styles with similar characteristics, primarily the simplification of form and the elimination of ornament. While the style was conceived early in the 20th century and heavily promoted by a few architects, architectural educators and exhibits, very few Modern buildings were built in the first half of the century. For three decades after the Second World War, however, it became the dominant architectural style for institutional and corporate building. 1. Origins Some historians see the evolution of Modern architecture as a social matter, closely tied to the project of Modernity and hence to the Enlightenment, a result of social and political revolutions. Others see Modern architecture as primarily driven by technological and engineering developments, and it is true that the availability of new building materials such as iron, steel, concrete and glass drove the invention of new building techniques as part of the Industrial Revolution. In 1796, Shrewsbury mill owner Charles Bage first used his ‘fireproof’ design, which relied on cast iron and brick with flag stone floors. Such construction greatly strengthened the structure of mills, which enabled them to accommodate much bigger machines. Due to poor knowledge of iron's properties as a construction material, a number of early mills collapsed. It was not until the early 1830s that Eaton Hodgkinson introduced the section beam, leading to widespread use of iron construction, this kind of austere industrial architecture utterly transformed the landscape of northern Britain, leading to the description, "Dark satanic mills" of places like Manchester and parts of West Yorkshire. The Crystal Palace by Joseph Paxton at the Great Exhibition of 1851 was an early example of iron and glass construction; possibly the best example is the development of the tall steel skyscraper in Chicago around 1890 by William Le Baron Jenney and Louis Sullivan. Early structures to employ concrete as the chief means of architectural expression (rather than for purely utilitarian structure) include Frank Lloyd Wright's Unity Temple, built in 1906 near Chicago, and Rudolf Steiner's Second Goetheanum, built from 1926 near Basel, Switzerland. Other historians regard Modernism as a matter of taste, a reaction against eclecticism and the lavish stylistic excesses of Victorian Era and Edwardian Art Nouveau. Whatever the cause, around 1900 a number of architects around the world began developing new architectural solutions to integrate traditional precedents (Gothic, for instance) with new technological possibilities. The work of Louis Sullivan and Frank Lloyd Wright in Chicago, Victor Horta in Brussels, Antoni Gaudi in Barcelona, Otto Wagner in Vienna and Charles Rennie Mackintosh in Glasgow, among many others, can be seen as a common struggle between old and new. 2. Modernism as Dominant Style By the 1920s the most important figures in Modern architecture had established their reputations. The big three are commonly recognized as Le Corbusier in France, and Ludwig Mies van der Rohe and Walter Gropius in Germany. Mies van der Rohe and Gropius were both directors of the Bauhaus, one of a number of European schools and associations concerned with reconciling craft tradition and industrial technology. Frank Lloyd Wright's career parallels and influences the work of the European modernists, particularly via the Wasmuth Portfolio, but he refused to be categorized with them. Wright was a major influence on both Gropius and van der Rohe, however, as well as on the whole of organic architecture. In 1932 came the important MOMA exhibition, the International Exhibition of Modern Architecture, curated by Philip Johnson. Johnson and collaborator Henry-Russell Hitchcock drew together many distinct threads and trends, identified them as stylistically similar and having a common purpose, and consolidated them into the International Style. This was an important turning point. With World War II the important figures of the Bauhaus fled to the United States, to Chicago, to the Harvard Graduate School of Design, and to Black Mountain College. While Modern architectural design never became a dominant style in single-dwelling residential buildings, in institutional and commercial architecture Modernism became the pre-eminent, and in the schools (for leaders of the profession) the only acceptable, design solution from about 1932 to about 1984. Architects who worked in the international style wanted to break with architectural tradition and design simple, unornamented buildings. The most commonly used materials are glass for the facade, steel for exterior support, and concrete for the floors and interior supports; floor plans were functional and logical. The style became most evident in the design of skyscrapers. Perhaps its most famous manifestations include the United Nations headquarters (Le Corbusier, Oscar Niemeyer, Sir Howard Robertson), the Seagram Building (Ludwig Mies van der Rohe), and Lever House (Skidmore, Owings, and Merrill), all in New York. A prominent residential example is the Lovell House (Richard Neutra) in Los Angeles. Detractors of the international style claim that its stark, uncompromisingly rectangular geometry is dehumanising. Le Corbusier once described buildings as "machines for living", but people are not machines and it was suggested that they do not want to live in machines. Even Philip Johnson admitted he was "bored with the box." Since the early 1980s many architects have deliberately sought to move away from rectilinear designs, towards more eclectic styles. During the middle of the century, some architects began experimenting in organic forms that they felt were more human and accessible. Mid-century modernism, or organic modernism, was very popular, due to its democratic and playful nature. Alvar Aalto and Eero Saarinen were two of the most prolific architects and designers in this movement, which has influenced contemporary modernism. Although there is debate as to when and why the decline of the modern movement occurred, criticism of Modern architecture began in the 1960s on the grounds that it was universal, sterile, elitist and lacked meaning. Its approach had become ossified in a "style" that threatened to degenerate into a set of mannerisms. Siegfried Giedion in the 1961 introduction to his evolving text, Space, Time and Architecture (first written in 1941), could begin "At the moment a certain confusion exists in contemporary architecture, as in painting; a kind of pause, even a kind of exhaustion." At the Metropolitan Museum of Art, a 1961 symposium discussed the question "Modern Architecture: Death or Metamorphosis?" In New York, the coup d'état appeared to materialize in controversy around the Pan Am Building that loomed over Grand Central Station, taking advantage of the modernist real estate concept of "air rights",[1] In criticism by Ada Louise Huxtable and Douglas Haskell it was seen to "sever" the Park Avenue streetscape and "tarnish" the reputations of its consortium of architects: Walter Gropius, Pietro Belluschi and the builders Emery Roth & Sons. The rise of postmodernism was attributed to disenchantment with Modern architecture. By the 1980s, postmodern architecture appeared triumphant over modernism, including the temple of the Light of the World, a futuristic design for its time Guadalajara Jalisco La Luz del Mundo Sede International; however, postmodern aesthetics lacked traction and by the mid-1990s, a neo-modern (or hypermodern) architecture had once again established international pre-eminence. As part of this revival, much of the criticism of the modernists has been revisited, refuted, and re-evaluated; and a modernistic idiom once again dominates in institutional and commercial contemporary practice, but must now compete with the revival of traditional architectural design in commercial and institutional architecture; residential design continues to be dominated by a traditional aesthetic. 选我的谢谢

人工智能技术论文参考文献

“人工智能”是大学本科自动化专业所开设的一门专业选修课,为了能够调动自动化专业的学生对本课程学习的积极性,对《人工智能》这门专业选修课程的 教学 方法 进行了探索和 总结 。以下是我整理分享的关于人工智能结课论文的相关 文章 ,欢迎阅读!

对《人工智能》专业选修课教学的几点体会

摘要:“人工智能”是大学本科自动化专业所开设的一门专业选修课,为了能够调动自动化专业的学生对本课程学习的积极性,提高《人工智能》专业选修课的教学效果,我们结合近几年的实际教学 经验 ,从优选教材、考核方式、教学内容调整、教学手段的改进和实践教学等方面对《人工智能》这门专业选修课程的教学方法进行了探索和总结。

关键词:人工智能 优选教材 考核方式内容 手段 实践

人工智能(Aritificial Intelligence,英文缩写为AI)是一门综合了应用数学、自动控制、模式识别、系统工程、计算机科学和心理学等多种学科交叉融合而发展起来的的一门新型学科,是21世纪三大尖端技术(基因工程、纳米科学、人工智能)之一。它是研究智能机器所执行的通常与人类智能有关的职能行为,如推理、证明、感知、规划和问题求解等思维活动,来解决人类处理的复杂问题。人工智能紧跟世界社会进步和科技发展的步伐,与时俱进,有关人工智能的许多研究成果已经广泛应用到国防建设、工业生产、国民生活中的各个领域。在信息网络和知识经济时代,人工智能现已成为一个广受重视且有着广阔应用潜能的前沿学科,必将为推动科学技术的进步和产业的发展发挥更大的作用。因此在我国的大中专院校中开展人工智能这门课的教学与科研工作显得十分紧迫。迄今为止,全国绝大多数工科院校中的自动控制、计算机/软件工程、电气工程、机械工程、应用数学等相关专业都开设了人工智能这门课程。南京邮电大学自动化学院自2005年成立至今,一直将“人工智能”列为自动化专业本科生的选修课程,到目前为止已经有八年的历史了。由于南京邮电大学是一所以邮电、通信、电子、计算机、自动化为特色的工科院校,因此,学校所开设的许多专业都迫切需要用人工智能理论和方法解决科研中的实际问题。在问题需求的推动下,南邮人经过多年的努力工作,在人工智能科研方面取得了丰硕的成果,如物联网学院所开发的现代智能物流系统、自动化学院所开发的城市交通流量控制与决策系统,为本课程的开设提供了典型的教学案例。我们结合近几年的实际教学经验,从优选教材、考核方式、教学内容调整、教学手段的改进和实践教学等方面对人工智能课程教学方法进行了总结归纳。

一、优选教材

目前,国内有关人工智能课程的中英版教材种类非常多,遵循实用、简单、够用的原则,再经过授课老师和学生们的共同调研,我们选用由中南大学蔡自兴教授主编的《人工智能及其应用》第三版作为南邮本课程的授课教材。本书覆盖的人工智能知识体系比较全面,包含知识表示、搜索推理、模糊计算、专家系统等。本书主要针对计算机、自动化、电气工程等本科专业的学生所编写,内容基础,难度适中。蔡教授所编写的这本教材全面地介绍了人工智能的研究内容与应用领域,做到了内容新颖、简单易懂、兼顾基础和应用,受到了全国广大师生们的一致好评,多年的教学实践证明我们所选择的教材是恰当的、正确的。

二、考核方式

在全国大部分高等院校,“人工智能”这门课大都选择开卷考试的方式来进行考核。为了强化学生对人工智能这门课基础知识的掌握,南京邮电大学自动化学院选用闭卷考试的方式来进行考核。为了打消部分学生想在期末闭卷考试中通过作弊手段来完成人工智能这门课考核的侥幸心理,我们加强了对学生平时考勤成绩、课下作业成绩和实验成绩的考核,从而杜绝了“一纸定成绩”的现象。我们对人工智能这门课的最后期末成绩是按如下权重来划分的:平时考勤成绩占10%、课下作业成绩占10%、实验成绩占20%、最后的期末考试卷面成绩只占60%。为了克服国家现行 教育 体制的弊端,避免学生“机械式”地的应对教学和考试,我们对考试题型进行了调整,不再是以往的填空、选择、简答等题型,而是改为以解决实际问题为导向的应用题型为主,这样学生只需要在理解授课内容的基础上利用自己的思维来解题就可以了,这也体现了国家目前正在提倡的应用型教学导向。

三、教学内容调整

对于本科生而言,人工智能这门课程所需要讲授的内容实在太多,由于课时所限,我们必须精简教学内容,让学生在掌握基础知识的同时,也能够了解它的具体应用。因此,我们将人工智能这门课程的教学内容分为两个部分:第一部分是基本理论和方法,包括人工智能的概述、知识表示方法、确定性推理方法等;第二部分为人工智能研究成果的具体应用,包括神经元网络计算、模糊智能计算、专家知识库系统、机器语言学习等。通过对教材内容的合理调整和安排,使得授课计划能够比较全面地覆盖了人工智能这门课程的基本知识点,从而满足了学生们的求知需求。

四、教学手段的改进

(一) 激发学生的学习兴趣

经过长时间的教学我们发现,在选修“人工智能”这门课程时,每个学生的心中所想各有不同,这些学生在刚开始学习时兴趣还比较强烈,但随着教学内容变得越来越抽象,学生逐渐对这本课的学习失去了信心,甚至上课时间不去听课,使授课教师对教学也渐渐失去了信心,导致恶性循环,严重影响了教学质量。针对这种现象,我们认为,在开课前充分激发学生的学习兴趣是很有必要的。我们要结合学校的实验条件,开课前给学生演示“机器人医疗服务”实验,通过该实验的演示,让学生们看到机器人能够给病人提供多项人性化的服务,理解人工智能技术在开发医疗服务机器人多项关键技术中的应用,让学生在开课前能够对本课程的学习产生极大的兴趣,实践证明这种方法是有效的。

(二) 借助多媒体教学

多媒体教学是现代教学过程中一种非常重要的形式,它往往根据教学目的和学生们的特点,通过合理的设计、选择教材内容,应用公式、图形、文字、视频等多种媒体信息进行有机组合并通过电脑和投影机显示出来,与传统教学手段相结合,形成合理的教学过程结构,达到最优化的教学效果。人工智能这门课具有针对性强、内容抽象、公式繁琐等特点,学生学习起来比较困难,为了让学生生动、形象地学习该课程,我们在教学过程中充分利用了多媒体技术来组织教学。例如在课堂教学过程中播放南邮自动化学院梁志伟博士带领学生所开发的“智能 足球 机器人”比赛片段;让学生在线观看北京大学工学院谢广明博士带领学生所开发的“自主视觉机器鱼”录像片段等。在讲解某些重要的求解算法时,借助Matlab软件和投影机,直接展现该算法的求解过程,从而改善了课程教学的形式,提高了教学质量。 (三)提倡课堂 辩论

我们在教学过程中打破了传统的“老师讲课学生听课”的教学模式,多次组织课堂辩论,辩论的主题包括人工智能研究过程中出现的技术困惑、人工智能研究成果转化中的市场前景等。如组织了“电脑PK人脑”“电脑是否让电视消失”“电脑的未来发展方向在哪里”等一系列 辩论会 。经过激烈的辩论,无论正方还是反方都感觉自己收获很大,增长了知识,开阔了眼界。在教学过程中通过将学生由“被动听课”角色变换为“主动参与”角色,大大地调动了学生的学习积极性,从而提高了课堂教学质量。

五、实践教学

实践教学是课堂教学不可缺少的重要组成部分,通过让学生亲自动手实验来对理论知识进行检验和应用是目前国内外各个大学提高学生综合素质、增强学生市场竞争力的重要手段。人工智能实验教学的目的是让学生通过亲自动手体会授课中的各种智能控制算法,从而使学生能够更加形象地掌握课本知识。人工智能教学计划安排了4学时实验课,设置了“传教士和野人过河”“机器人路径规划”这两个人工智能问题,要求学生独立完成这2个实验题目的编程,并书写实验 报告 。通过实验,学生动手实践了课堂上所掌握的理论知识,加深了对智能算法的理解。

人工智能是一门实用性较强的课程,我们总结了近几年来的教学经验,从优选教材、考核方式、教学内容调整、教学手段的改进和实践教学五个方面对人工智能课程教学进行了总结。从学生的反馈来看,我们所总结的教学经验对于指导新教师讲授“人工智能”这门课程具有积极的作用,需要指出的是,我们仍有很多不足之处,需要在以后的教学过程中不断努力完善,提高自己的教学能力,争取更好的教学效果。

参考文献

[1]蔡自兴,徐光佑.人工智能及其应用[M].北京:清华大学出版社,2003.

[2]路小英,周桂红,赵艳等.高等农业院校《人工智能》课程的教学研究与实践[J].河北农业大学学报:农林教育版,2007,9(4):66-68.

[3]马建斌,李阅历,高媛. 人工智能课程教学的探索与实践[J].河北农业大学学报:农林教育版,2011,13(3):330-332.

[4]赵海波.人工智能课程教学方法的探讨[J].科技信息,2011,(7):541.

[5]张廷,杨国胜.“人工智能”课程教学的实践与探索[J].课程与教学,2009(11):133-134.

本研究得到了江苏省2011年度研究生双语授课教学试点项目—“模式识别与智能系统”项目经费的资助。

下一页分享更优秀的<<<人工智能结课论文

Arjovsky M, Bottou L, Gulrajani I, et al. Invariant Risk Minimization[J]. arXiv: Machine Learning, 2019. 该文献为华为人工智能竞赛第一题的参考文献。 本文引入了不变风险最小化的方法(IRM),作为一种学习范例,用于估计多个分布之间的不变相关性。为了实现这一目标,IRM学习了一种数据的表达,使得在这种数据表达之上的最优分类器可以匹配所有的训练分布。通过理论和实验,我们展示了IRM学习到的不变性如何与控制数据的因果结构相关联,并实现了分布外的泛化。 我们考虑数据集 ,该数据集来自不同环境 。这些环境描述不同环境下测得的同一组随机变量。数据集 来自环境e,包含一些独立同分布的样本,分布为 。那么,我们的目标是使用这些多个数据集学习预测器 ,该模型可以很好的应用于相似环境 。也即,我们要最小化下式:其中 是环境e中的风险值。这里 包含了所有可能的实验条件,包括观测的和假设的。考虑下面这个结构模型:通过 预测 ,在环境e中,我们采用最小二乘预测 ,我们回归 ,得到 和 ;回归 ,得到 , ;得到 和 。使用 回归是我们的第一个不变相关性,也即该回归预测效果不依赖于环境e。相反,第二个和第三个回归的预测效果依赖环境的变化。这些变化的(虚假的)相关性不能很好的推广到测试环境中。但并不是所有的不变性都是我们所关心的,比如从空集特征到Y的回归是不变的,但却没有预测效果。 是唯一的在所有环境 中不变的预测规则。进一步,该预测也是跨环境的对目标变量取值的因果解释。换句话说,这对目标变量随输入的变化提供了一种准确的描述。这是令人信服的,因为不变性是一个可检验的量,我们可以通过它发现因果关系。我们将在第4节详细讨论不变性和因果性的关系。但是首先,如何学习得到不变性,因果的回归?我们先回顾现有技术的一些局限性: 第一,我们可以直接使用所有的训练数据进行学习,使用所有特征来最小化训练误差。这就是传统的Empirical Risk Minimization(ERM)方法。在这个例子中,如果训练环境具有很大的 ,那么ERM方法将赋予 一个很大的正系数,这就远离了不变性。 第二,我们可以最小化 ,一种鲁棒性的学习策略,其中 是一个环境基准。设置这些基准为0就表明最小化在不同环境中的最大误差。选择这些基准是为了防止对嘈杂的环境为主导的优化。例如,我们可以选择 ,来最小化不同环境间的最大解释方差。虽然很有价值,但这就等同于鲁棒性的学习会最小化环境训练错误加权平均值。即选择最优的 ,使得 最小化。但是对于混合训练环境具有很大的 ,会给 赋予较大参数,但是测试环境可能具有较小的 。 第三,我们可以采取一种自适应策略来估计在所有环境中具有相同分布的数据表达 。这对于上述例子是不可能的,因为 的分布在不同的环境中是不同的。这就说明了为什么技术匹配的特征分布优势会增加不变性的错误形式。 第四, 我们可以紧跟这种不变性因果预测技术。这些变量的子集用于回归每一个环境,在所有环境中都会产生相同的回归残差。匹配残差分布不适用于上述例子,因为Y的噪声随环境发生变化。 总之,对于这个简单的例子都很难找到不变的预测。为了解决这个问题,我们提出了IRM方法,这是一种学习范式,可以提取跨多个环境的非线性不变预测变量,从而实现OOD泛化。 用统计学的话讲,我们的目标就是学习不同训练环境中不变的相关性。对于预测问题,这就意味这需要找到一种数据表达,使得在该数据表达之上的最佳分类器在不同的环境中都相同。可按如下定义方式: 定义3:考虑一种数据表达 ,如果有一个分类函数 适用于所有环境,则可导出的跨环境 的不变预测器 ,也即对于任意的 ,都有 。 为什么上述定义等价于与目标变量的相关性稳定的学习特征?对于损失函数如均方误差和交叉熵,最优的分类器可以写为条件期望。一种数据表达 可以产生的跨环境不变预测当且仅当对于 的所有焦点h处,对于任意的 ,都有 。 我们认为不变性的概念与科学中常用的归纳法是相抵触的。实际上,一些科学发现都可以追溯到发现一些不同的但潜在的相关现象,一旦用正确的变量描述,它们似乎遵循相同精确的物理定律。严格遵守这些规则表明它们在更广泛的条件下仍有效,如果牛顿的苹果和星球遵循相同方程,那么引力就是一件事。 为了从经验数据中发现这些不变性,我们引入了IRM方法,不仅具有好的预测结果,还是跨环境 的不变预测器。从数学上,可转为为如下优化问题(IRM):这是一个有挑战性的两级优化问题,我们将其转化为另一个版本(IRMv1):其中 是整个不变预测器, 是一个标量和一个固定的虚拟分类器,梯度形式惩罚是用来衡量每个环境e中虚拟分类器的最优性, 是预测能力(ERM)和预测 不变性的平衡调节参数。 我们将(IRM)中的硬性约束转化为如下的惩罚性损失:其中函数 表示了 使得 达到最小化的程度, 是平衡预测能力和不变性的超参数。在实际应用中,我们希望 关于 和 是可微的。 下面我们考虑 为线性分类器这一特殊情况。当给定数据表达 ,我们可以由 写出:且我们希望这两个线性分类器的差异越小越好,即 。我们将该方法用到3.1中的实例中,令 , ,则c控制了这个数据表达多大程度上依赖 。我们做出不变性损失随c的变化图见图1,发现 在 处是不连续的,而当c趋于0而不等于0时,利用最小二乘法计算 的第二个量将趋于无穷,因此出现了图1中蓝线的情况。图1中黄线表明在最小二乘中添加强的正则化不能解决这一问题。 为了解决这些问题,我们将最小二乘求 中的矩阵求逆去除,并按如下方式计算不变性损失:按照这种方式,得到图1绿线所示的情况。可见 是平滑的(它是 和 的多项式函数)。并且,当且仅当 时, 。 我们通过 最小化选择出的 是不唯一的,实际上对于可逆映射 ,我们可以重写不变预测器为:这意味着我们可以任意选择非零 作为不变预测器。因此,我们可以将搜索限制在给定 的所有环境最优分类的数据表达上。即:当 时,对于线性 ,上式的解 将趋于(IRM)的解 。 前文我们提出 是一个有效的分类器选择,这种情况下只有一部分的数据起作用。我们通过给出线性不变预测器的完整特征来说明这个悖论。下面的理论中的矩阵 ,为数据特征函数,向量 为最优分类器, 为预测向量 。 定理4:对于所有 ,令 为损失函数。一个向量 可以写为 ,其中 对于所有环境e,使得 同时达到最小,当且仅当对于所有环境e, 。所以,任何线性不变预测器可以被分解为不同秩的线性表达。特别的,我们研究 的情况,则有:后文将证明,不管我们是否限制IRM搜索秩为1的 ,这种形式的分解将会引入高秩的数据表达矩阵,且是分布外泛化的关键。 3.2.4通过加入不变性损失和均方误差得到最终的IRMv1模型,可以写出一般的风险方程 ,其中 是一种可能的非线性数据表达。这种表达在任何损失下都最优匹配于常值分类器 。如果 返回的目标空间 具有多个输出,我们将它们全部乘以标量分类器 。 当使用小批量梯度下降估计目标(IRMv1)时,可以得到平方估计范数的无偏估计:其中 和 是环境e中的两个大小为b的随机小批量样本, 为损失函数,PyTorch例子见附件D。 假设不变最优分类器w是线性的有多严格?一种说法是只要给予足够灵活的数据表达 ,就可以将不变预测器写为 。然而,强制执行线性不变性可能使得非不变预测惩罚 等于0。例如,空数据表达 允许任何w为最优值。但是,当 时,这样产生的预测器 不是不变的。ERM项会丢弃这种无效的预测器。通常,最小化ERM项 将驱动 以至于将 在所有预测器中达到最优,尽管 是线性的。 针对这个研究,我们也为未来的的研究提出了几个问题。是否存在不会被ERM和IRM丢弃的非不变预测器?如果将w放宽到可从非线性中选取将有什么好处?我们如何构造非线性不变量不变性的惩罚函数 ? 新提出的IRM方法使得在训练环境 中具有更低的误差和不变特性。什么时候这些条件可以将不变性推广到所有环境中呢?更重要的时,什么时候这些条件可以使得在全部环境 中具有更低的误差,并导致分布外的泛化呢?并且在一个更基础的水平,统计不变性和分布外的泛化如何与因果理论中的概念相关? 到目前为止,我们已经忽略了如何将不同环境应该与分布外的泛化相联系。这个问题的答案要追溯到因果理论。我们假设来自所有环境中的数据共享相同的基础结构方程模型。 定义5:控制生成向量 的结构方程模型 是一组结构方程: 其中 被称为 的双亲, 是独立于噪声的随机变量。如果 ,可记为“ causes ”。我们可以据此来绘制因果图,每个 看作节点,如果 ,则就有从 到 的一条边。我们假设该图是无环的。 根据因果图的拓扑顺序,运行结构方程 ,我们可以从观测分布 的得到一些样本。同样,我们还可以以不同的方式操纵(干预)一个唯一的SEM,以e为指标,来得到不同但相关的 。 定义6:考虑一个 。用干预e作用到 上(包括替换一个或几个方程)以得到干预 ,结构方程为: ,若 或者 ,则变量 是一种干预。 类似的,通过运行干预 的结构方程,我们可以从干预分布 中得到一些样本。例如我们可以考虑在例1中干预 ,控制它为趋于0的常数,因此将 的结构方程替换为 。每个干预e都产生了一个干预分布为 的新环境e。有效的干预e不会损坏太多的目标变量Y的信息,从而形成了大环境 。 先前的工作考虑的是有效的干预不会改变Y的结构方程,因为对方程的任意干预都不可能预测。在这个工作中,我们也允许改变Y的噪声,因为在真实问题中会出现变化的噪声水平,这些并不会影响最优的预测规则。我们将其形式化如下: 定义7:考虑一个 控制随机向量 ,以及基于X预测Y的学习目标。那么,所有的环境集合 由干预产生的所有干预分布 得到。只要(i)因果图是无环的,(ii) ,(iii) 保持有限方差,则该干预 是有效的。 如果在定义 中考虑环境特定的基线,条件(iii)可以去除,与哪些出现在鲁棒性学习目标 相似。我们留下一些分布外泛化的其它量化作为以后的工作。 先前定义了因果性和不变性之间建立的基础联系。另外,可以证明一个预测 是跨环境 的不变预测,当且仅当它能达到最佳的 ,当且仅当它只使用Y的直接因果双亲来预测,也即, 。本节的其它部分将根据这些思想去展示如何利用跨环境的不变性实现所有环境中的分布外的泛化。 IRM的目的就是建立一种可以产生out-of-distribution的预测,也即,实现在整个环境 中具有更低的误差。为此,IRM致力于在环境 中同时减少误差以及保证不变性。这两者之间的桥梁由如下两步实现:第一步,可以证明 环境中更低的误差和不变性将导致 中更低的误差。这是因为,一旦估算出在环境 中数据表达 产生的不变预测 , 的误差将控制在标准误差界中。第二步,我们测试其余条件使得在环境 中具有更低的误差,即在什么条件下,训练环境 中的不变性意味着所有环境 中的不变性? 对于线性IRM,我们回答这个问题的起点是不变因果预测理论(ICP)。这里,作者(书40)证明了只要数据(i)是高斯分布的,(ii)满足线性的SEM,(iii)从特定类型的干预中得到,那么ICP重获目标的不变性。定理9表明即使上述三个假设都不成立,IRM也能学到这种不变性。特别的,我们容许非高斯数据,将观测结果作为稳定和虚假相关性的变量的线性变换来处理。 定理的设定如下。 有一个不变相关性变量 ,它是一个未观察的潜在变量,具有线性关系为 , 独立于 。我们能观测到的是 ,它是 和另一个与 和 任意相关的变量 的干扰组合。简单的使用 回归将不计后果的利用了 (因为它给出了关于 和 额外的虚假的信息)。为了实现分布外的泛化,数据表达必须丢弃 且保留 。 在展示定理9之前,我们需要先做一些假设。为了学习有用的不变性,必须要求训练环境具有一定程度的多样性。一方面,从大数据集中随机抽取两个子集样本并不会导致环境的多样性,因为这两个子集服从相同的分布。另一方面,以任意变量为条件将大数据集分割可以产生多样性的环境,但是可能会引入虚假相关性且破坏我们需要的不变性。因此,我们需要包含足够多样性且满足基本不变性的训练环境。我们将这种多样性需求形式化为需要环境在linear general position。 假设8:训练环境 在linear general position的程度为r, , ,且对于所有的非零 :直观上,这种linear general position的假设限制了训练环境共线性的程度。每个处在linear general position的新环境都将其不变解空间减少一个自由度。幸运的是,理论10表明不满足一个linear general position的叉积 集合为0。使用这种linear general position的假设,我们通过IRM学习的不变性可以从训练环境转化到全部环境。 下面这个定理表明,如果在 中找到一个秩为r的数据表达 导出的不变预测 ,且 在linear general position的程度为r,那么 将是整个环境

相关百科

热门百科

首页
发表服务