首页

毕业论文

首页 毕业论文 问题

工程预决算优秀毕业论文

发布时间:

工程预决算优秀毕业论文

电算化会计信息系统的内部控制研究摘 要:随着计算机在会计领域的应用与普及,会计信息系统由传统手工会计信息系统发展到电算化会计信息系统。由此,加强会计信息系统的内部控制,不断探索适合电算化环境的内部控制措施与方法成了当前企业要解决的首要问题。 关键字: 会计信息系统;控制措施;方法 ;内部控制Abstract: With the computer in the accounting field of application and popularization of, accounting information systems from the traditional manual accounting information system developed to Computerized Accounting Information System. Thus, accounting information system to strengthen internal control, and continuously probe for computerization of the internal control environment measures and methods has become a current business problem to be solved first and word: accounting information systems;control measures; Ways ; Internal Control绪 论 随着电子信息产业的不断发展,会计电算化在社会经济中的运用越来越广泛,随之而来的如何发展我国的会计电算化的问题也越来越引起人们的关注。会计电算化是以电子计算机为主的现代电子技术和信息技术应用到会计实务的简称,是电子计算机代替人工,实现报帐、记帐、算帐、查帐以及部分需由人工完成的对会计信息(数据)的统计、分析、判断乃至提供决策的过程。它的使用,使会计人员从繁重的手工劳动中解脱出来,节约了大量的人力、物力和时间,具有运算速度快、存储容量大、数据高度共享、检索查询速度快捷、编制报表简单、数据分析准确等特点,核算手段和财务管理决策的现代化使收集、整理、传输、反馈的会计信息更准确、更及时,提高了会计分析决策能力,为管理者提供所需的会计信息,更好地实现其参与管理、决策的职能。一、 电算化会计特征(一) 信息系统的特征所谓信息系统就是指从数据的收集、存储、处理到传输使用的整体。电算化会计系统是指对会计数据的收集、存储、处理与报告使用会计信息的管理信息系统。该信息系统可分为三个不同层次结构,分别为不同管理层服务。会计数据处理系统结构(ADPS)为操作层服务;会计管理信息系统结构(AMIS)为中层管理服务:会计决策支持系统结构(ADSS)为高层服务。同时,会计管理信息系统又是企业管理信息系统的一个重要子系统。(二)数据集中存放和管理的特征 “电算化会计”改变传统会计数据重复记录分散存放而带来的弊端,采用先进的数据库及数据仓库技术,实现了数据分类集中存放,既保证了数据的可靠性,又可从此完全取消各种会计明细分类账和对账操作,实现数据共享。(三)人机交互作用的特征“电算化会计”可理解为一个由人、计算机、数据及程序组成的系统。因为它不仅具有核算的功能还具有管理和控制的功能,所以,它离不开人的交互作用,尤其是预测和辅助决策的功能必须在管理人员的控制下完成。因此,电算化会计系统不应该是一个“儍瓜型”的仿真系统,而应该是一个人机交互作用的“智能型”的管理信息系统。 “电算化会计”是会计学进入信息时代的发展,它是会计学、电脑与信息技术、企业管理及经济计量学等学科相互交叉结合后产生的综合性学科。从某种意义上说,“电算化会计”是为了满足现代企业制度的需要,应用现代科技与方法对传统会计进行改造和整合后产生的能适应信息化社会要求的新型应用型学科。 二、 电算化环境下内部控制系统风险分析(一) 软件开发和设计中存在的风险 现有的通用财务软件中,由于财务信息软件开发人员考虑问题不够全面,在财务软件开发过程中,难以与实际工作中的一些情况相吻合,开发的软件存在微小漏洞,给犯罪分子以可乘之机,正是这一空隙,犯罪分子运用技术化、智能化等高科技手段进行犯罪活动。(二)人为风险虽然企业应用现代化管理工具替代了陈旧落后、繁琐的手工核算,减轻了会计人员的重复劳动,但企业管理者在思想观念上没能及时转变,严格而科学管理往往只停留在形式上。犯罪分子利用内部防范制度的薄弱环节,不惜以身试法,利用合法身份,滥用或盗用操作密码进行越权操作,从而达到侵吞企业财产的目的。例如密码过于简单、电算主管授权没有严格按照要求办理、财务系统中的初始数据和记账凭证的修改没能按规定进行等。(三)计算机安全风险虽然企业应用现代化管理工具替代了陈旧落后、繁琐的手工核算,减轻了会计人员的重复劳动,但企业管理者在思想观念上没能及时转变,严格而科学管理往往只停留在形式上。犯罪分子利用内部防范制度的薄弱环节,不惜以身试法,利用合法身份,滥用或盗用操作密码进行越权操作,从而达到侵吞企业财产的目的。例如密码过于简单、电算主管授权没有严格按照要求办理、财务系统中的初始数据和记账凭证的修改没能按规定进行等。三、 会计电算化对企业内部控制制度的影响 内部控制是企业单位在会计工作中为维护会计数据的可靠性、业务经营的有效性和财产完整性而制定的各项规章制度、组织措施管理方法、业务处理手续等控制措施的总称。会计电算化使传统的会计系统组织机构、会计核算形式及内部控制制度等发生了很大变化,其中对企业内部控制制度的影响最为明显。主要表现在以下几个方面:(一)控制方式发生改变,由单一制度控制转为程序控制和制度控制手工会计系统中,内部控制的方式主要是人员的内部牵制制度。会计电算化后,会计帐务的集中化处理,使会计部门传统的内部控制措施如编制科目汇总表、凭证汇总表,试算平衡的检查,总账、明细账的核对等自然而然地消失了。取而代之的计算机内部控制措施,如凭证借贷平衡校验,余额发生额平衡检查。随着远程通讯技术的发展,会计信息的网上实时处理成为可能,业务事项可以在远离企业的某个终端机上瞬间完成数据处理工作。例如昔日应由会计人员处理的有关业务事项,现在可能由其他业务人员在终端机上一次完成,昔日应由几个部门按预定的步骤完成的业务事项,能集中在一个部门甚至一个人完成。会计电算化后企业的内部控制制度是由人通过会计软件来实现的,由人员和计算机相结合来共同完成。 (二)控制对象发生改变控制对象发生改变,由对人的控制为主转变为对人、机控制为主手工会计系统中,内部控制的对象主要是会计对象、工作情况、信息处理方法和处理程序等。企业的经济业务发生均记录于纸张之上,并按会计数据处理的不同过程分为原始凭证、记账凭证。会计电算化后,会计凭证转变为以文件、记录形式储存在磁性介质上,使会计核算无纸化,修改数据不留痕迹。随着电子商务、网上交易、无纸化交易等的推行,每一项交易发生时,有关该项交易的有关信息由业务人员直接输入计算机,并由计算机自动记录,原先使用的每项交易必备的各种凭证、单据被部分地取消了,原来在核算过程中进行的各种必要的核对、审核等工作有相当一部分变为由计算机自动完成了。(三)加大了控制舞弊、犯罪的难度手工会计系统中,会出现由于会计人员的粗心大意、疲劳或处理环节过多等而产生的无意错误。会计电算化系统后,输入数据正确、计算机程序正确和设备正常运转三者具备才能保证财务信息的准确性,如果上述的任何一方出现差错,就会使处理结果错误。现实中,由于储存在计算机磁性媒介上的数据容易被篡改,有时甚至能不留痕迹地篡改,加以数据高度集中,未经授权的人员有可能通过计算机和网络浏览全部数据文件,复制、伪造、销毁企业重要的数据,因此,计算机犯罪具有很大的隐蔽性和危害性,会计电算化系统中发现计算机舞弊和犯罪的难度较之手工会计系统更大。 由于控制方法,对象等方面的变化,企业原有的内部控制制度已不能适应电算化会计系统的要求,因此进一步完善企业内部控制制度已刻不容缓。计算机会计系统的内部控制是一个范围大、控制程序复杂的综合性控制,完善会计电算化内部控制的基本思路为:坚持明确分工、相互独立、互相牵制、相互制约的安全管理原则,建立系统的人工与机器相结合的控制机制,使会计电算化运行的每一个过程都处于严密控制之中。四、 会计电算化存在的主要问题(一) 兼容性差由于各个系统都是自行开发,各自使用不同的操作平台和支持软件,数据结构不同,编程风格各异各软件公司为技术保密,相互没有交流和沟通,没有业界的协议,自然也就没有统一的数据接口,很难在不同系统上实现数据共享。(二) 系统内部衔接性差由于当前许多财会软件都着重开发帐务处理与报表管理,对于其他诸如成本核算、市场预测等功能开发力度较小,使得在处理此类问题时,需先将财会管理的有关数据输出,经人工核算后再重新输入,就是说从一个处理系统(模块)到另一个处理系统(模块),不能自动转换数据格式,直接使用基础数据。这不仅啬了工作量,而且因为由人工核算、人工输入等人为因素,必然增加出错机率,使得财会软件不能充分发挥它的管理功效和预测功能。在这种意义上,只能称它为“加电的帐本”。(三) 数据保密性、安全性差很多时候,财务上的数据,是企业的绝对秘密,在很大程度上关系着企业的自下而上与发展,但几乎所有的软件系统都在为完善会计功能和适应财务制度大伤脑筋,却没有几家软件认真研究过数据的保密问题。所谓的加密,也无非是对软件本身的加密,防止盗版。另处在进入系统时加上些诸如用户口令、声音监测、指纹辨认等检测手段和用户权限设置等限制手段,不能真正起到数据的保密作用。安全性上,更是难如人意,系统一旦瘫痪,或者受病毒侵袭,或者突然断电,很难从容恢复原来的数据。(四) 实用性不强在某种程度上,财会软件因为只实现了会计功能,并没有实现预想的管理及预测功能,以至于它的出现,仅是减少了会计的工作量,或者说减少了会计而已,并没有产生真正的经济效益和管理效益,那末,它的风靡,或多或少就有“赶时髦”的嫌疑(五) 开发者与使用者的矛盾早期的软件,是由程序员专门开发,它虽然能实现用户的数据处理的要求,但对财务工作的实质以及用户使用水平都没能准确定位,使这些软件很难使用;现在是程序员与会计专业人员共同开发,但也仅仅是从用户界面、系统平台、报表处理等问题上做文章,不能满足用户实际需要。在我国,计算机热起来大约不到十年,而且真正普及应用也不过三五年,或者说现在仍然没有达到普及水平。人们对它的认识,自然不尽相同。即使厂家在安装会计软件时都作了系统的培训,但对也许从未接触过计算机的会计们来说,它怎么也不如算盘和笔好用,而且需要极端小心,一旦出错,可能就会使自己很长时间的工作成果付诸东流。五、 电算化会计信息系统的内部控制措施与方法(一) 从控制的形式上看1 、制度控制制度控制,即完备有效的内部控制制度是电算化内部控制的基本保证。俗话说:“没有规矩,不成方圆”。每一事物的产生,都有其内在的运行规则,会计电算化代替手工也同样有自己独特运行规则,需要一套完备的制度来约束。2 、组织机构控制随着会计电算化的快速发展,会计机构也应作相应的调整,如人员岗位责任制:人员岗位包括基本会计岗位和电算化岗位,其中基本会计岗位分为会计主管、出纳、核算、稽核和档案人员等。而电算化会计岗位则是操作员、电算维护员、电算主管。以上两种工作岗位不得兼任,还要明确软件开发人员、维护人员不能兼任操作员。建立各岗位人员的岗位责任制度,分工合理,责任明确。各岗位都得到一定的授权,并用密码控制,防止非法操作,越权操作。这样各岗位人员互相制约和互相牵制,从而防止违法行为的发生和及时发现错误。3 、程序的设计和操作控制软件的研制、开发一定要规范,开发、研制的软件必须进行全面、深入的调查,科学系统地分析和设计,必须符合财政部发布的《会计核算软件基本功能规范》的要求。开发、研制出的软件在投入运行前必须经上级有关部门的评审、鉴定,软件的有关文档资料必须齐全。会计电算化操作应严格遵循会计业务和处理流程进行,在会计软件中设置防止重复操作、遗漏操作和误操作的控制程序。4、 数据的输入、输出和安全控制会计电算化系统主要是由数据整理、数据输入、数据处理、数据通讯、数据保存,数据输出几个部分构成。在这些环节中分析出现风险的可能性,分析系统设计过程中是否在实现各个功能时嵌入相应的内部控制措施,嵌入的内部控制措施是否发挥作用,对于一些潜在的可预见风险是否在系统中采取预防措施,是否对不可预见风险的处理留有系统空间等等。由此保证各个环节的数据准确、有效和全过程会计电算化的安全完整。在会计电算化工作中,电脑原始数据是由人工事先进行审核和确认后输入计算机内的,因而自动处理数据的准确性完全依赖原始数据输入时的准确性。会计资料是单位的绝对机密,一旦泄露将给单位带来不应有的损失,而磁性介质的可复制性又使会计资料极易泄露而不易发现。故会计电算化系统的输出不论是磁性文件还是打印资料,输出后均应立即受到严格管理,以防被人窃取和篡改。存载数据介质本身可能存在安全性能以及蓄意的计算机病毒的侵害是危害数据安全的两大重要隐患。5、会计处理控制要健全企业内部定期检查制度,对会计资料定期检查,主要检查全计电算化账务处理正确与否,看是否遵照会计法规行事,审核费用签字是不是符合本单位的内控制度要求,凭证附件是否完整等。审核计算机内部数据与书面资料的一致性,如输出的工资单与职工花名册进行对照检查,防止错发工资等。(二)从电算化系统的内部控制内容来看1、 加强制度建设,增强制度意识纯粹的制度建设,如果没有有效的执行,也就等于没有了制度。我们一方面在加强制度建设的同时,应该进一步增强财务人员的制度意识,保证执行力。当然,建立健全的会计电算化制度,是电算化正常运行的首要任务,包括建立会计电算化操作基本要求、会计电算化数据备份及软盘管理制度、网络维护和计算机病毒防治制度、电算化微机档案管理制度等。加强领导、组织和规划,加强财务人员有关制度意识的教育,不仅仅是企业会计信息化发展的要求,更是企业会计电算化安全、有效运行的保证。2、 加强程序操作记录单位应建立日常操作记录制度,记录操作时间,操作人员姓名,操作内容等。另外,软件的修改是难以避免的,对会计软件进行修改应经过周密计划和严格记录,修改过程的每一个环节都必须设置必要的控制,修改的原因和性质应有书面形式的报告,经批准后才能实施修改,所有与软件修改有关的记录都应该打印后存档。3、 加强会计人员职能控制由于会计电算化功能的相对集中,我们必须制定相应的组织和管理控制,明确职责分工,加强组织控制,将系统中不相容的职责进行分离,以相应的管理规章对系统中的各类人员进行严密分工。通过设立一种相互稽核、相互监督和相互制约的机制来保障会计信息的真实和可靠,减少发生错误和舞弊的可能性。职责分工首先是会计电算化使用部门与业务部门的职责相分离(业务部门指产生原始数据的部门或人员),尽可能保持不相容职能(如业务授权、执行、保管和记录)的分离,其次是财务部门电算化岗位内部的职责分离。通过进行内部职责分工,以补救不相容职能集中化的不足。例如在手工会计信息系统中其岗位设置一般为会计主管、出纳、稽核、会计核算各岗等基本会计工作岗位。会计信息管理人员负责日常成本核算工作,资产管理人员负责工程及固定资产管理,资金管理人员负责资金的筹集,预算管理人员负责各项资金预算、成本预算以及工程预决算等,会计主管人员负责各项经济业务的合规、合法性审核,出纳人员负责资金的结算,以上各岗位按照会计制度规定实行不相容岗位分离。在实行电算化后,各项职能分工均按照会计制度相关规定进行,有电算主管或系统管理员按照不相容岗位分离的原则对上述电算岗位设置相应的功能权限、账套权限、操作时间权限等。在功能权限设置上负责审核人员,不赋予制证权限,不兼任出纳工作,对业务的真实性、合法性以及完整性负责。制证人员赋予审核权限,出纳人员不赋予除固定资产管理之外的其他工作,电算主管和系统管理员负责日常监督、系统安全运行、数据安全以及协调各工作人员关系等。会计档案人员负责数据光盘、系统光盘及各类纸制资料的保管工作,但系统光盘和数据光盘应分开保管。4、 加强会计人员的电算化培训工作会计电算化信息系统应在开发阶段就要对使用该系统的有关人员进行培训,提高其对系统的认识和理解,以减少系统运行后出错的可能性。外购的商品化软件应要求软件开发公司提供足够的培训机会和时间。在系统运行前对有关人员进行的培训,不仅仅是系统的操作培训,还应包括让这些人员了解系统投入运行后新的内部控制制度、会计信息系统运行后的新的凭证流转程序、会计信息的进一步利用和分析的前景等。5、 加强程序操作流程控制为了保证信息处理质量,减少产生差错和事故的概率,应制定相应的上机守则与操作规程,规范程序操作。上机守则主要是对电脑机房内工作所作的一般性规定。操作规程则是提出了会计业务计算机处理过程的具体操作步骤和具体要求,包括各种操作命令、各种设备的使用说明以及非常情况的处理等。对日记账和已结账业务设置不可修改或逆操作程序,要修改必须通过编制记账凭证冲正或补充登记来更正,以保证会计数据的完整性、真实性。6、 加强安全管理和控制电算化会计信息系统的安全控制是指如何采取有效的内部控制方法和措施来保证系统和数据的安全,保证系统可靠地运行。系统的安全控制包括系统的接触控制、后备控制和环境安全控制等内容。具体包括:严格按照会计人员岗位设置相应的操作权限,对不相容岗位进行严格分离。对电算主管、各操作人员、系统维护人员、程序开发人员等的密码设置做严密规定,禁止设置简易的密码,防止不相关人员盗用。建立日常数据备份制度,采用两种以上方式定期对数据进行备份,备份方式包括:服务器和工作站双重备份、数据整体备份和分模块备份。 定期对财务信息系统进行维护,采取应有的“病毒”防御措施,定期进行杀“毒”,防止“病毒”入侵。 禁止财务工作站与互联网相连,切断“病毒”入侵系统可能途径,对数据的输入进行严格管理,输入数据时,应经过相关人员的检查无“病毒”后方可输入。 各级操作人员发生变动时,除了按照规定做好会计人员交接工作外,还应对用户登录名称和密码数据文件进行备份,并防止用户名和密码被盗用。7、 档案管理控制进行微机档案管理控制可以有效保证数据的可恢复性,在计算机系统受到损坏情况下,可以及时恢复财务数据,保证会计资料不会丢失,同时也保证了会计工作的正常运转。具体控制措施有:建立计算机档案管理制度,注册名、科目体系、报表数据来源、运算关系、勾稽关系等各种初始化资料应作为档案保存。 每月所有的账簿、科目汇总表、清理账户清单、辅助账页应及时分类归档保存。 所有光盘、软盘备份应贴好明细标签归档,妥善保管,作为档案资料保存。做好对会计电算化档案的防磁、防火、防潮和防尘工作,重要会计档案应准备双份,存放于两个不同的地点。同时,定期对磁性介质保存的会计档案进行检查,定期进行复制,防止由于磁性介质损坏,而使会计档案丢失。8、 加强内部审计内部审计是内部控制系统的重要组成部分,也是电算化会计下实施内部会计监督的一种手段。在会计电算化环境下,由于审计对象的表现形式发生了改变,对内部审计提出了更高、更严格的要求。首先应加大对审计人员的高层次培训,如网络系统、电算化信息系统等方面培训,使审计人员能适应会计信息化审计需要。其次,由于审计人员的能力有限,不可能对诸多领域全方位了解,故应在外聘请专家协助审计。比如参与软件的开发阶段的可能性分析,软件运行环节升级可靠性审计、日常处理是否符合内部控制要求等。最后,我们在制定完备的控制制度的同时,如果没有有限的执行,是徒劳。从目前的国内形式来看,由于执行力不够,导致内部控制制度失效时有发生,所以在制定制度的同时,应加强执行力建设。结论随着电子技术和网络技术的飞速发展,会计电算化的普及程度也越来越高,内部会计控制中的新问题和新课题将不断出现。对会计风险的深入研究,必将使在会计电算化下形成新的会计理论和方法得到进一步完善和发展,也使得电算化会计环境下的内部控制制度不断地调整、改善,真正做到保证会计信息的真实性、完整性和可靠性,为企业做出正确的决策提供有效的信息,给企业创造良好的会计效益。参考文献: [1]张英明 IT环境下会计信息系统内部控制研究[J] 中国会计电算化,2002 [2]王景新,郭新平 计算机在会计中的应用[M] 北京:经济管理出版社,1998 [3]会计电算化工作规范[M] 财政部经济科学出版社,1996 [4]商新虹 会计电算化系统舞弊的防范与控制[J] 会计之友,2001

随着市场经济的不断发展,会计核算、会计分析和会计信息反馈对经营盈亏的影响和作用越来越大,对会计改革和财会人员提出了更高的要求。提高会计人员素质,以满足新形势对会计改革的需要,是实施《会计法》的关键,我们认为,会计人要尽快实行六个转变。 一、在知识结构上,由“窄浅型”向“广深型”转变?? 目前,大多数在职财会人员知识水平具有较大的局限性:一是知识面偏窄,较少了解本专业之外的相邻知识和各类新兴的边缘知识;二是有系统专业知识的人才也比较少。目前财会队伍中还有不少人未能掌握系统工程、价值工程、电子计算机应用技术等现代科学的管理方法。这样的知识现状已很难适应会计改革的要求。改革的不断深入,迫切要求每个财会人员努力拓宽知识面,认真学习专业知识,不断掌握先进的科学技术,使之成为纵横均衡的“广深型”的财务管理人才。 二、在业务能力上,由“单一型”向“多能型”转变?? 一专多能,是提高管理效能的重要手段。为此,每个财会人员必须掌握管理学的基本原理,熟练掌握本专业必备的基础知识、基本方法和基本技能;善于运用经济管理及现代管理知识、方法和手段,解决财会工作中的各种问题;对处理各种具体问题要具有较强的应变能力。财会部门要建立财会人员业务档案,以增强财会人员的使命感,保证每个财会人员在胜任本职工作的同时,向多能型方向发展,使财会人员逐步达到能够独挡一面,达到一专多能的业务水平。 三、在实际工作中,由“学问型”向“实用型”转变?? 近几年来,各类财经院校为财会队伍输送了一些新的血液,这无疑使财会队伍的整体化水平有较大的提高。但文凭、学问与工作能力并不能划上等号。因此,各单位要尽力在提高财会人员的调查研究、组织管理、处理具体事务等能力上多下功夫。一方面,要多让新上任的财务人员深入实际,独立完成一些工作任务,提高他们发现问题、分析问题和解决问题的能力;另一方面,要有目的地让新上任的财会人员处理一些日常事务性工作。通过处理比较繁琐的、不同类别的、经常会碰到的具体工作,来提高他们的办事能力,以促使财会人员尽快由“学问型”向“实用型”转变。 四、在日常工作中,由“繁琐型”向“科学型”转变?? 财会人员整天忙于报账、算账、记账,主要精力被日常事务性工作所牵制的现象,是与会计改革发展方向很不适应的,亟待改进。努力采用现代科学技术,用先进的科学技术武装自己,这是新形势下加强财务管理工作的一项重要方针。财会人员必须掌握先进的科学技术,学会应用计算机处理财会工作,确保财会工作从繁琐的事务工作中解脱出来。 五、在工作效率上,由“辛苦型”向“效益型”转变?? 各级财会部门要尽力在提高财会人员的工作效率上下功夫,努力提高财会工作效率。每个财会人员都要养成良好的工作作风。一方面,对各项工作要严肃认真,谨慎细致,防止差错,避免出现无效劳动;另一方面,对各项工作要迅速、及时、抓紧、抓好,不懒散,不拖拉,保证日清月结,避免工作积压。各单位要对工作效益高、贡献大的财会人员进行必要的奖励;对工作平庸,无所作为的人员要调离财会工作岗位,以强化他们在工作上的高效率观念。 六、在工作职能上,由“反映型”向“决策型”转变 随着商品经济的发展,经济管理工作对财务核算、财务分析和财务信息反馈的依赖性越来越大。财会人员单纯算账、报账、记账已满足不了会计改革工作的需要。每个财会人员必须以高度的责任感和使命感,积极利用会计信息,为企业领导制定经济决策提供可靠的依据和保证

浅谈建设工程造价管理》 浅谈建设工程造价管理》 学 学 系 班 学 生: 校: * * 学 院 别:经济与工商管理系 级: 号: 指导老师: 指导老师: 1 **学院 2008 届毕业论文 第1章 研究目的和意义 1. 研究目的 绪论 对我国工程造价管理现存的主要问题进行分析研究, 找出相应的补救措施或解决 办法,使工程造价管理水平有一定提高,保证项目投资管理目标的实现,力求在各个 建设项目中能更加合理地使用人力,物力,财力,从而取得较好的投资效益和社会效 益。 2. 研究意义 (1)促进我国建设工程造价管理现存的一些问题的解决; 针对我国建设工程造价管理现状,发现存在的问题,对这些问题进行分析研究, 找出有助于部分问题的解决办法。 (2)缓和我国建设资金的巨大需求与有限供给之间的矛盾; 我国人口多,底子薄,生产率低,每年能提供的建设资金极为有限,每年固定资 产投资与发达国家相比或者按人均计算都是较低的,目前,我国经济发展对建设资金 的需求越来越强烈,特别是能源、交通、原材料,通讯等基础工业和基础设施的建设 资金严重不足,这已成为我国经济迅速发展的主要障碍,因此,迫切需要加强项目的 投资控制,合理使用人力、物力、财力,求得最大的投资效益。研究造价管理就是要 想办法把投资成本控制在预算范围内,以最大限度的节约资金。 (3)规范建筑工程造价市场; 建筑工程造价的确定是有是有科学依据的,不是凭空想象或大概估算。但是在现 阶段建筑市场中经常有贪利的建筑企业夸大多要, 或是建设单位资金不足却要大兴土 木, 出现非正常压低工程造价的情况, 造成了建筑市场的混乱, 严重扰乱了市场秩序。 因此,加强建设工程造价管理有利于规范建筑工程造价市场。 (4)减少社会财富流失和浪费; 随着我国改革开放和向市场经济转变,城市建设日新月异的发展,其中由国家或 集体出资兴建的项目占有相当大的比例,因此,如何控制国有资产的恰当利用是一个 非常重要的问题。如果完全按市场情况来确定工程造价,可能会出现建设单位盲目定 价, 施工企业漫天要价, 中介单位无章可循的情况, 这势必导致整个建筑市场的混乱, 造成国有资产的投资和浪费,尤其是国家重点建设项目工程量大,施工时间长,工程 复杂,更易造成造价管理上的混乱,造成国有资产不必要的浪费和流失。另外,由于 国有企业的改制和改造,一些企业为了发展也在进行各种改建和扩建,控制这些国有 工程的造价也是一个非常重要的问题,合理控制工程造价能为企业节约大量资金。 2 **学院 2008 届毕业论文 研究的主要内容工程造价管理以合理确定,有效控制,提高效益这个基本内容为中心,每部分内 容所包含的知识非常之多,由于受本人自身因素以及外界条件的一些限制,本课题并 不注重于怎样对成本造价进行合理确定和有效控制等微观问题的研究 ,而主要侧重 于从宏观上探讨工程造价管理的体制、制度以及方法等方面存在的缺陷与不足,进行 深入分析, 力求找到部分问题的解决办法。 另外, 本文还提到全面造价管理这个概念, 它包括全过程、全要素、全风险、全团队造价管理四个方面。全面造价管理是一种相 对较新的管理理念,任何新生理论都需要用实践来证实,本文只简单提到全面造价管 理的相关概念、理论和方法,至于深层次的问题,就留待建筑界的学术高手去探讨和 证实。 工程造价与工程造价管理概论 1.工程造价 工程造价是指建设某项工程项目所花费的全部费用。 我们所指的造价管理即是对 建设项目在投资决策阶段、设计阶段、招标投标阶段和项目实施阶段以及建设结算阶 段实行全过程的管理,把建设项目的投资控制在批准的投资限额内,保证项目管理目 标的实现,以求能在建设项目中合理地使用人力、物力、财力,取得较好的投资效益 “由文献[1,1-40]可知”。 2.工程造价管理 工程造价管理是指遵循工程造价的运动规律和特点,运用科学、技术原理和经济 及法律等管理手段,解决工程建设活动中的工程造价确定与控制,技术与经济,经营 与管理等实际问题,力求合理使用人力、物力和财力,达到提高投资效益的全部业务 行为和组织活动。工程造价管理的基本内容是合理确定,提高效益,有效控制。随着 科学技术的迅猛发展,面临的竞争日益激烈。WTO规则对我国工程造价管理模式形成 巨大的冲击,必须对我国目前的工程造价管理体制进行改革创新,以适应经济全球化 和知识经济时代的要求,即:逐步建立以市场形成价格为主的价格机制。改革现行的 工程不实之处管理方式,实行量价分离,逐步建立起由工程定额作为指导的通过市场 竞争形成工程造价的机制。 政府的管理职能应从原来的微观管理方式转变为宏观调控 为主,实现国家对消耗量标准的宏观管理,制定统一的工程项目划分,工程量计算规 则,为逐步实行工程量清单报价创造条件“由文献[1,1-40]可知”。 我国工程造价管理的历史、现状及发展趋势 1. 历史 1950-1957 年,是与计划经济相适应的概预算定额制度建立时期。1949 年新中国 成立以后,百废待兴,全国面临着大规模的恢复重建工作,为合理确定工程造价,用 好有限的基本建设资金,引进了前苏联一套概预算定额管理制度,先后颁布了一系列 规定和办法,建立健全了概预算工作制度,确立了概预算在基本建设工作中的地位, 3 **学院 2008 届毕业论文 同时对概预算的编制原则、内容、方法和审批、修正办法、程序等做了规定,确立了 对概预算编制依据实行集中管理为主的分级管理原则。 1957-1966 年,是概预算定额管理制度被削弱的阶段。在中央放权的背景下,概 预算与定额管理权限也全部下放, 造成现在全国工程量计量规则和定额项目在各地区 不统一的现象。各级基建管理机构的概预算部门被精简,设计单位概预算人员减少, 只算政治账,不讲经济账,概预算控制投资作用被削弱,投资大撒手之风逐渐滋长。 尽管在短时期内也有过重整定额管理迹象,但总的趋势并未改变。 1966-1976 年,是概预算定额管理工作遭到严重破坏的阶段。造成设计无概算, 施工无预算,竣工无决算,投资大敞口。 1976-90 年代初,是造价管理工作整顿和发展的时期。全国颁布一系列推动概预 算管理和定额管理发展的文件,并颁布几十次预算定额、概算定额、估算指标,全过 程工程造价管理概念逐渐为广大造价管理人员接受, 对推动建筑业改革起到了促进作 用。 2. 现状 90 年代初至今,随着我国改革开放的发展和社会主义市场经济体制的建立,建 筑工程的管理受到了极大的冲击,打开国门走出去,引进先进科学的管理模式,人们 开始重新认识有关工程造价管理问题。由于我国实行的是概预算定额管理模式,普遍 存在的问题是建筑工程造价难以客观真实地得到反映,概算超估算,预算超概算,决 算超预算,突破计划投资的项目比比皆是。由于工程投资的确定缺乏科学合理性,导 致工程实施中存在诸多问题。 党的十一届三中全会以来,随着经济体制改革的深入和对外开放政策的实施,以 及社会主义市场经济体制的建立, 开始建立健全适合于社会主义市场经济发展的工程 造价管理体系与模式,使工程造价的管理趋于科学合理。但是我国的工程造价管理体 制一直沿用前苏联模式,是适应计划经济模式下的管理体制,目前已经不适应市场经 济的发展,与西方发达国家相比还有很大差距。工程造价管理改革的目的是为了建立 适应我国社会主义市场经济体制所需的,具有中国特色的新的工程造价管理机制,目 前还有许多问题有待解决,至于这些问题具体是什么,以及采取什么样的解决措施, 将在正文部分进行阐述。 3. 发展趋势 加入 WTO,我国经济进入了世界经济一体化的轨道,这可以说是我国的第二次 对外开放。其发展趋势有 2 个方面,一是工程造价管理的国际化,二是工程造价管 理的信息化“由文献[2,51-53]可知” 。 (1)国际化趋势 随着加入 WTO 中国经济日益深刻融入全球市场,跨国公司和跨国项目越来越 多,许多项目要通过国际招标、咨询或 BOT 方式运作。同时,我国企业走出国门在 4 **学院 2008 届毕业论文 海外投资和经营的项目也在增加。随着国内市场国际化,国内外市场全面融合,外国 企业必定利用其在资本、技术、管理、人才、服务等方面的优势,挤占我国国内市场, 尤其是工程总承包市场。 工程造价管理国际化趋势的另一个表现在于国际间的学术交 流日益频繁。 (2)信息化趋势 伴随着 Internet 走进千家万户,知识经济时代的供应链管理、客户关系管理、知 识管理、企业资源计划管理在工程管理中形成的协同办公模式,推动了工程造价管理 的信息化发展趋势。 工程造价管理的信息化发展趋势给工程造价管理带来很多新的特 点,工程造价管理越来越依赖于电脑手段,其竞争从某种意义上讲已成为信息战。目 前西方发达国家己经在工程造价管理中运用了计算机网络技术,通过网上招投标,开 始实现了工程造价管理网络化、 虚拟化。 另外, 工程造价管理软件也开始被大量使用, 同时还有专门从事工程造价管理软件开发研究工作的软件公司。 种种迹象表明工程造 价管理将更多的依靠电脑技术和网络技术,未来的工程造价管理必将成为信息化管 理。 本章小结本章概括性的介绍了研究本课题的目的和意义有以下几点: 促进我国建设工程造 价管理现存的一些问题的解决;缓和我国建设资金的巨大需求与有限供给之间的矛 盾;规范建筑工程造价市场;减少社会财富流失和浪费。研究的主要内容是从宏观上 探讨工程造价管理的体制、制度以及方法等方面存在的缺陷与不足,进行深入分析, 力求找到部分问题的解决办法。另外,本章还提到全面造价管理这个概念,它包括全 过程、全要素、全风险、全团队造价管理四个方面。文章第三节介绍了工程造价管理 的基础理论,第四节则是对我国工程造价管理的发展过程进行了一定的归纳和总结, 并指出我国的工程造价管理必将向着国际化和信息化趋势发展。 5 **学院 2008 届毕业论文 第 2 章 我国工程造价管理现存的问题 中外工程造价管理模式比较目前国际上通用的工程造价管理模式主要有英国、美国、日本模式。研究与国际 惯例接轨问题,主要是研究工程造价管理模式之间存在的差异和解决途径[3][4]。 1. 工程造价的政府管理 在国外,按项目投资来源的不同。一般可划分为政府投资项目和私人投资项目。 政府对建设工程造价管理主要采用间接手段, 对政府项目和私人项目实施不同力度和 深度的管理,重点控制政府投资项目。对于私人投资项目,国外一般都采取政府不干 预工程造价管理的方式。政府对私人投资项目主要是进行政策引导和信息指导,由市 场经济规律调节,体现了政府对工程造价的宏观管理和间接调控。 我国工程造价管理制度的建立始于1950年, 我国政府引进了前苏联的概预算定额 管理制度,改革开放以来,我国概预算定额管理模式发生了很大的变化。但是,随着 我国经济发展水平的提高和经济结构的日益复杂,计划经济的内在弊端逐步暴露出 来。传统的与计划经济相适应的概预算定额管理制度,实际上是工程造价实行政府行 政指令的直接管理,这种政府行使的工程造价管理职能强调定额作为政府的法定行 为,强调政府主管部门对工程定额含量、工程取费及其费率的指令性,使得建筑产品 的价格严重脱离了价值,遏制了竞争,抑制了生产者和经营者的积极性与创造性。 2. 工程造价的社会咨询 美国的工程造价咨询机构,有政府创办的机构,也有民办机构以及大型企业创办 的机构。其中尤以民办咨询机构为多,他们起着不可低估的重要作用,正在充当着政 府、业主和承包商的代理人和顾问,承担工程项目管理和工程造价的确定与控制等方 面的服务.美国的咨询公司十分注意历史资料的积累和分析整理,建立起一套造价资 料积累制度,同时注意服务效果的反馈,形成了信息反馈、分析、判断、预测一整套 的科学管理体系。 我国的工程造价管理先后由投资单位、施工单位、建设单位多头负责,工作互不 衔接,投资失控状况相当严重。目前,大多数造价咨询机构服务内容单一,有的侧重 于项目可行性研究, 进行工程估算; 有的侧重于扩充设计评估, 进行工程概预算审核; 有的侧重于协助业主进行施工招投标;有的侧重于竣工结算的审查。一个项目前后有 几家咨询机构介入,彼此不连贯,不利于工程造价咨询向纵深方向发展。 3. 工程造价的计价模式 国外对工程适价的管理是以市场为中心的动态的控制。 对造价计划执行中所出现 的问题及时分析研究,及时采取纠正措施,这种强调项目实施过程中的造价管理的做 法,体现了造价控制的动态性,并且重视造价管理所具有的随环境、工程进展以及价 格等变化而调整造价的控制标准和控制方法的动态特征。 日本在借鉴英国工料测量师 6 **学院 2008 届毕业论文 协会的基础上努力发展社会咨询业,并充分发挥社团的作用,使估价业务作为一个专 业在实践中得以发展和提高,逐步使估价的业务规模化、系统化。咨询企业是靠自己 的技术知识和经验为客户提供无形服务的。 我国长期以来采用的是定额计价法。 它强调在社会主义计划经济基础上的供求关 系和分配制度,在几十年来的国家经济建设中起到了不可替代的作用。经逐步的探索 和完善已自成一体。这种方法确定工程造价主要是由国家有关部门确定造价定额、规 定费用构成和颁布价格及费率标准来完成的。 工程设计部门在编制工程造价方面的主 动性、创造性不高,责任感不强他们只注重套定额指标,不考虑市场动态。 4.工程造价的信息化管理 在美国,建筑造价指数一般由一些咨询机构和新闻媒介来编制,在多种建筑造价 信息来源中,《工程新闻纪录》(Engineering News Record简称ENR)中的造价指标是 比较重要的一种。美国工程造价信息反馈系统也较为完善,国内的各工程公司十分注 意收集工程造价管理各个阶段中的工程造价资料, 并把向有关部门提供造价信息资料 视为一种应尽的义务,他们不仅注意收集造价资料,也派出调查人员进行实地考察, 使其所获得的资料较为翔实,从而保证了造价管理的科学性。 我国的工程造价信息化管理还不够健全, 全国范围内的造价信息网络系统尚未建 立。 我国工程造价管理现存的问题通过上一节内容的比较分析可以发现, 我国的工程造价管理与西方发达国家相比 还有很大差距,工程造价管理工作还有许多问题有待解决。 有关法律法规不健全前全国最高人民法院院长肖扬说 “我国 2010 年基本形成较为完善的法律体系[5]” 。 目前,我国各行各业的法律法规体制都存在着很多缺陷,建筑业亦是如此,尽管 我国已经制定了与工程造价管理相关的法律法规,但是由于各方面的原因,这些法律 法规还不够健全,特别是加入 WTO 后,我国的法律仍然存在与 WTO 组织有关法律不符 的地方。因此,加强行业立法,与国际惯例接轨已成为当务之急。 工程造价政府管理不完善工程造价政府管理的不完善性主要体现在:工程造价管理条块分割,政出多门, 协调配合乏力以及管理主体不明确等。 从基本建设程序和我国的管理体制讲,建设项目全过程分为投资决策阶段、设计 阶段、建设项目发包阶段和建设实施阶段。建设工程造价需分阶段分别进行计价,要 分别编制投资估算、设计概算、施工图预算和竣工决(结)算等,其主管部门分别为计 委、规委、建委等,政府各相关部门各自为政,各立章法,客观上存在相互间必要的 联系和有效的协调配合不够,常出现文件规定不一致,前后脱节,甚至相互矛盾,间 接导致工程造价“三超”(结算超预算、预算超概算、概算超投资估算)严重等问题。 7 **学院 2008 届毕业论文 其主要原因在于管理体制不顺畅、不协调、改革不同步、不配套,传统观念和因循守 旧思想的束缚,没有形成对工程造价的统一协调管理。另外,就管理主体而言,主要 体现在国家(或各级政府部门)在管理整个工程造价活动中身份不明确,一方面是宏 观政策的制定者,作为市场管理主体的角色出现;另一方面在政府投资项目(公共工 程)中是具体的投资者,作为建设市场的一方直接参与具体建设项目的管理。这种双 重角色无疑导致了各级政府或主管部门在工程造价管理体系中职责含混不清或重复 交叉。 工程建设项目造价全过程综合管理意识薄弱我国现行的工程造价管理大多是阶段性的管理模式, 业内人士普遍缺乏建设项目 造价全过程综合管理的意识,特别是项目前期造价管理薄弱。造价业内人士历来把建 设工程造价管理的重点放在工程项目的实施阶段,注重承包造价、建设实施过程中的 造价变更和结算, 往往忽视了立项阶段和设计阶段的造价管理工作。 再者, 建设单位、 设计单位、施工单位缺乏统一的造价管理目标和相互沟通,建设单位在立项阶段,往 往从主观意愿出发,对工程立项缺乏科学的论证,估算不足,造成缺口。设计单位在 设计阶段虽作了工程概算,甚至细化到预算,但由于缺少对设计方案造价指标的控制 约束, 导致设计保守、 投资偏高。 监理单位受项目业主的委托对项目实施监督与管理, 往往只局限于施工阶段的质量与进度管理,很少介入投资决策分析,监理人员只是偏 重于对施工过程质量、进度负责,对造价方面考虑得很少,尤其在涉及到项目变更、 现场签证时,不能将质量、进度、经济三方面有效地统筹起来考虑。从而直接导致长 期以来我国建筑工程项目“三超”现象的普遍存在,严重困扰着建筑工程项目投资效 益管理。 工程造价计价模式不适应市场经济的需要现行的工程计价模式的特点可以归纳为一个字“套”,即套定额。简而言之,工 程造价从业人员根据工程图纸计算出工程量,然后套定额单价,求得直接费,再根据 直接费套用有关定额取费费率,求得工程造价。这种计价模式在计划经济时代是发挥 了一定的作用,但目前已不能适应市场经济发展和进一步开放市场的需要,暴露出越 来越多的弊病: (1)不利于政府职能的转变。建筑业属于一般竞争性行业,但建筑市场最重要的 要素——价格却带有明显的行政色彩,即政府定价色彩过浓。政府对工程造价的控制 和干预反映为市场经济条件下政府权力的越位。 (2)不利于微观主体的充分竞争。企业作为市场竞争的主体,却不是企业产品定 价的主体,工程造价按企业资质等级或工程类别取费,按社会平均劳动水平定价的这 套做法,阻止了企业参与完全的市场竞争,压抑了企业的创造力和活力,从而制约了 企业在市场经济条件下的飞速发展和壮大。 8 **学院 2008 届毕业论文 工程造价信息化管理落后随着工程造价管理改革的不断深入, 在市场竞争中形成的工程造价机制正逐步完 善,工程造价管理也朝着适应市场需要的方向发展。伴随信息技术的发展,我国工程 造价管理信息化的基本框架已经初步建立, 以计算工程造价为核心的工程造价系列软 件日趋完善,为工程造价管理及相关活动提供信息和服务的网站不断增多。因此,工 程造价管理信息化建设有了一定的基础,但同时也存在着一些不容忽视的问题。 1. 工程造价信息资源管理缺乏系统性 目前对工程造价信息的采集加工和传播缺乏统一规则,统一编码和系统分类,信 息系统开发与资源拥有之间处于相互封闭,各自为战状态。其结果是无法达到信息资 源共享的优势。更多的管理者满足于目前的纸上信息,忽略信息深加工。 2. 工程造价信息采集处理方法落后 采集技术落后,信息分类标准不统一,数据格式和存取方式不一致,使得对信息 资源的远程传递加工处理变得非常困难,信息资源的内在质量很难提高,信息维护更 新速度慢,不能满足信息市场的需要,落后于信息化社会的要求。 3. 信息网建设有待完善 现有工程造价网多为定额站或咨询公司所建,网站内容主要为定额发布,几个信 息,相关文件转发,招投标信息发布,企业或公司介绍等;网站只是将已有的造价信 息在网站上显示出来,缺乏对这些信息的整理与分析。 本章小结本章通过对国内外工程造价管理模式的比较, 总结出我国工程造价管理现存的一 些问题如下:有关法律法规不健全; 工程造价政府管理不完善; 工程建设项目造价 全过程综合管理意识薄弱;工程造价计价模式不适应市场经济的需要;工程造价信息 化管理落后等。 9 **学院 2008 届毕业论文 第 3 章 工程造价管理 我国工程造价管理机制 1.工程造价管理体制的建立 工程造价管理体制随着新中国的成立而建立。在 20 世纪 50 年代,我国引进了前 苏联的概预算定额管理制度,设立了概预算管理部门,并通过颁布一系列文件,建立 了概预算工作制度,同时对概预算的编制原则、内容、方法和审批、修正办法、程序 等作出了明确的规定。 从 20 世纪 50 年代后期开始直至十年动乱期间, 概预算定额管理工作遭到严重破 坏。概预算和定额管理机构被撤消,大量基础资料被销毁。 从 1977 年起,国家恢复建设工程造价管理机构。经过 20 多年的不断深化改革, 国务院建设行政主管部门及其他各有关部门、 各地区对建立健全建设工程造价管理制 度,改进建设工程造价计价依据做了大量工作。 2.工程定额管理制度 长期以来,我国实行投资体制的集权管理模式,政府既是宏观调空的主体,又是 微观的项目建设者,因此以统一的定额作为国家造价管理的主要手段和依据十分有 效,所以我国的工程造价管理制度主要体现为工程定额管理制度。这种定额管理制度 起源于前苏联模式—与高度集中的产品经济相适应的基本建设概预算制度, 强调的是 计划价格和消耗标准的统一,所以形成了以定额为基础的工程造价计价方法,即由国 家、行业或地区规定统一的工程量计算规则。工程实体消耗标准,施工措施性消耗标 准,劳动力、材料、机械的单价,依据这些标准编制工程造价。我国现行的工程造价 计价依据是建设部标准定额司[99]1 号文件《建设工程施工发包与承包价格管理暂行 规定》 ,从规定中可以看出,目前我国的工程计价方法仍以国家、行业或地区统一的 定额为基础。 3.工程造价管理机构 我国的工程造价管理机构为多部门、多层次的管理机构体系。国家工程造价归口 领导机构是国家建设部标准定额司,其主要职责是组织制定工程造价管理的有关法 规、制度并贯彻实施,组织制定和监督指导全国统一经济定额和部管行业经济定额, 负责全国工程造价咨询单位的资质管理和工程造价专业技术人员的职业资格准管理。 各工业部一般在基建计划司或建设协调司中设立处级标准定额处(专业定额站) ,其 主要职能是制定、修编各类工程建设定额,负责本系统的工程造价管理工作。国务院 机构改革后,该机构的职能正在弱化。省、直辖市、自治区建设行政主管部门下设的 工程造价管理站为地方级工程造价管理机构,除了对计价依据—定额、取费标准、计 价制度等有直接管理权外,不少机构还有价格管理权。各级计划、财政管理部门也设 立了工程造价管理机构, 主要负责对政府投资项目的工程结算审核、 工程款支付审核, 10 **学院 2008 届毕业论文 并在一定程度上享有定额的发布和编审权, 其他还有审计部门、 物价部门、 工商部门、 监察部门、检查部门也从不同角度参与了工程造价的管理工作。 4.工程造价咨询机构和造价工程师 随着市场经济的进一步深化,我国工程造价管理机构逐渐从政府机构中分离,成 立了具有独立法人地位的工程造价咨询机构,为社会提供造价咨询。如设计院的工程 经济处、建设银行的工程造价咨询处,以及依建设部 75 号令《工程造价咨询单位管 理办法》成立的造价咨询机构等。由造价工程师为主体组建的工程造价事务所或发达 国家的中介机构将是未来工程造价咨询的主要力量。我国 1996 年开始了造价工程师 培训工作,1997 年开始了全国造价工程师职业资格的考试,造价工程师在工程造价 管理的各种岗位上发挥着日益重要的作用。 工程计价模式 1. 工程计价概念 工程计价就是估算工程造价。由于工程造价具有单件计价,多次计价、动态价、 组合计价和市场定价等特点,工程计价的内容、方法及表现形式也就有很多不同。业 主或其委托的咨询单位编制的工程估算、设计单位编制的概算、咨询单位编制标底、 承包商及分包商提出的报价,都是工程计价的不同表现形式。 2. 工程计价模式 (1) 建设工程定额计价模式 建设工程定额计价是我国长期以来在工程价格形成中采用的计价模式, 是国家通 过颁布统一的估价指标、概算指标、概算定额、预算定额和相应的费用定额,对产品 价格进行有计划管理的一种方式。在计价中以定额为依据,按定额规定的分部分项子 目,逐项计算工程量,套用定额单价(或单位估价表)确定直接费用,然后按规定取 费标准确定构成工程价格的其他费用和利税,获得建筑安装工程价格。建设工程概预 算书就是根据不同设计阶段设计图纸和国家规定的定额、 指标及各项费用取费标准等 资料,预先计算和确定的新建、扩建、改建工程全部投资额的技术经济文件。由建设 工程概预算书所确定的每一个建设项目、单项工程或单位工程的建设费用,实质上就 是相应工程的计划价格。 (2)工程量清单计价模式 工程量清单计价方法,是建设工程招投标中,按照国家统一的工程量清单计价规 范, 招标人或委托具有资

4月20日 20:45 随着城市建设和公路建设的不断升温,土木工程专业的就业形势近年持续走高。找到一份工作,对大多数毕业生来讲并非是难事,然而土木工程专业的就业前景与国家政策及经济发展方向密切相关,其行业薪酬水平近年来更是呈现出管理高于技术的倾向,而从技术转向管理,也成为诸多土木工程专业毕业生职业生涯中不可避免的瓶颈。如何在大学阶段就为“钱”途做好准备,找到正确的职业发展方向呢?木土工程专业大体可分为道路与桥梁工程与建筑工程两个不同的方向,在职业生涯中,这两个方向的职位既有大体上的统一性,又有细节上的具体区别。总体来说,土木工程专业的主要就业方向有以下几种:1、工程技术方向代表职位:施工员、建筑工程师、结构工程师、技术经理、项目经理等。代表行业:建筑施工企业、房地产开发企业、路桥施工企业等。就业前景:就像我们看到身边的高楼大厦正在不断地拔地而起、一条条宽阔平坦的大道向四面八方不断延伸一样,土木建筑行业对工程技术人才的需求也随之不断增长。2004年进入各个人才市场招聘工程技术人员的企业共涉及到100多个行业,其中在很多城市的人才市场上,房屋和土木工程建筑业的人才需求量已经跃居第一位。随着经济发展和路网改造、城市基础设施建设工作的不断深入,土建工程技术人员在当前和今后一段时期内需求量还将不断上升。再加上路桥和城市基础设施的更新换代,只要人才市场上没有出现过度饱合的状况,可以说土木工程技术人员一直有着不错的就业前景。典型职业通路:施工员/技术员-工程师/工长、标段负责人-技术经理-项目经理/总工程师。年薪参考:施工员/技术员:万~万元;工长:万~4万元;技术质量管理经理:万~7万元;项目经理:5万~10万元;专家建议:随着我国执业资格认证制度的不断完善,土建行业工程技术人员不但需要精通专业知识和技术,还需要取得必要的执业资格证书。工程技术人员的相关执业资格认证主要有全国一、二级注册建筑师、全国注册土木工程师、全国一、二级注册结构工程师等。需要注意的是,这些执业资格认证均需要一定年限的相关工作经验才能报考,因此土木工程专业的毕业生即使走上工作岗位后也要注意知识结构的更新,尽早报考以取得相关的执业资格。想要从事工程技术工作的大学生,在实习中可选择建筑工地上的测量、建材、土工及路桥标段的路基、路面、小桥涵的施工、测量工作。2、设计、规划及预算方向代表职位:项目设计师、结构审核、城市规划师、预算员、预算工程师等。代表行业:工程勘察设计单位、房地产开发企业、交通或市政工程类**机关职能部门、工程造价咨询机构等。就业前景:各种勘察设计院对工程设计人员的需求近年来持续增长,城市规划作为一种新兴职业,随着城市建设的不断深入,也需要更多的现代化设计规划人才。随着咨询业的兴起,工程预决算等建筑行业的咨询服务人员也成为土建业内新的就业增长点。典型职业通路:预算员-预算工程师-高级咨询师。年薪参考:预算员:万~3万元;预算工程师:万~6万元;城市规划师:4万~7万元建筑设计师:4万~10万元;总建筑设计师:25万元以上。专家建议:此类职位所需要的不仅是要精通专业知识,更要求有足够的大局观和工作经验。一般情况下来说,其薪酬与工作经验成正比。以建筑设计师为例,现代建筑还要求环保和可持续发展,这些都需要建筑设计师拥有扎实的功底以及广博的阅历,同时善于学习,并在实践中去体会。目前,市场上对建筑设计人才大多要求5年以上的工作经验,具有一级注册建筑师资质,并担任过大型住宅或建设工程开发的设计。此类职位也需要取得相应的执业资格证书,如建筑工程师需要通过国家组织的注册建筑师的职业资格考试拿到《注册建筑师资格证书》才能上岗,预算工程师需要取得注册造价师或预算工程师资格。另外,从事此类职业还需要全方面地加强自身修养,如需要熟悉电脑操作和维护,能熟练运用CAD绘制各种工程图以及用P3编制施工生产计划等,有的职位如建筑设计师还需要对人类学、美学、史学,以及不同时代不同国家的建筑精华有深刻的认知,并且要能融会贯通,锻造出自己的设计风格。这些都需要从学生时代开始积累自己的文化底蕴。实习时应尽量选取一些相关的单位和工作,如房地产估价、工程预算、工程制图等。3、质量监督及工程监理方向代表职位:监理工程师代表行业:建筑、路桥监理公司、**工程质量检测监督部门。就业前景:工程监理是近年来新兴的一个职业,随着我国对建筑、路桥施工质量监管的日益规范,监理行业自诞生以来就面临着空前的发展机遇,并且随着国家工程监理制度的日益完善有着更加广阔的发展空间。典型职业通路:监理员—资料员—项目直接负责人-专业监理工程师-总监理工程师。年薪参考:现场监理员:万~万元;项目直接负责人:万~4万元;专业监理工程师:3万~5万元;总监理工程师:4万~8万元。专家建议:监理行业是一个新兴行业,因此也是一个与执业资格制度结合得相当紧密的行业,其职位的晋升与个人资质的取得密切相关。一般来说,监理员需要取得省监理员上岗证,项目直接负责人需要取得省监理工程师或监理员上岗证,工作经验丰富、有较强的工作能力。专业监理工程师需要取得省监理工程师上岗证,总监理工程师需要取得国家注册监理工程师职业资格证。木土工程专业的大学生想要进入这个行业,在校期间就可以参加省公路系统、建筑系统举办的监理培训班,通过考试后取得监理员上岗证,此后随工作经验的增加考取相应级别的执业资格证书。在实习期间,可选择与路桥、建筑方向等与自己所学方向相一致的监理公司,从事现场监理、测量、资料管理等工作。4、公务员、教学及科研方向代表职位:公务员、教师代表行业:交通、市政管理部门、大中专院校、科研及设计单位。就业前景:公务员制度改革为普通大学毕业生打开了进入**机关工作的大门,路桥、建筑行业的飞速发展带来的巨大人才需要使得土木工程专业师资力量的需求随之增长,但需要注意的是,这些行业的竞争一般较为激烈,需要求职者具有较高的专业水平和综合素质。年薪参考:高校教师:万~万元;中等专业学校教师:万~3万元;普通公务员:2万~万元。专家建议:想要从事此类行业,一方面在校期间要学好专业课,使自己具有较高的专业水平,另一方向特别要注意理论知识的学习和个人综合素质的培养,使自己具备较高的普通话、外语、计算机水平和较好的应变能力。 At 20:45 on April 20 with the urban construction and rising highway construction, civil engineering profession continue to move up the employment situation in recent years. Find a job, for the majority of graduates is not difficult, however, the employment prospects of civil engineering with national policy and direction of economic development is closely related to the pay levels of their industry in recent years is showing a tendency of management than technology , and the shift from technology management, has also become a lot of civil engineering graduates inevitable career bottlenecks. How to stage at the university as a "money" passers-by ready to find the right career direction? Wood soil engineering in general can be divided into road and bridge engineering and construction of two different directions, in the career, the direction of these two positions both the unity of the whole as well as the details of the specific distinction. Generally speaking, the civil engineering direction of the main jobs are as follows: 1, the direction of engineering and technology On behalf of jobs: construction, and construction engineers, structural engineers, technical managers, project managers and so on. On behalf of the industry: construction companies, real estate development enterprises, such as road and bridge construction enterprises. Employment Prospects: Just like high-rise buildings we see around us is constantly where they stand, wide flat section of a road to continue to extend in all directions, the civil construction industry, engineering and technical personnel on demand also is growing. In 2004 to recruit the talent market to enter the various engineering and technical personnel to the enterprises involving a total of more than 100 industries, which in many cities in the talent market, the housing and civil engineering construction industry demand for talent has become the first. Along with economic development and transformation of the road network, urban infrastructure construction work in the deepening of civil engineering and technical personnel in the current and future demand for a certain period of time will continue to rise. In addition, road and bridge and upgrading of urban infrastructure, as long as the talent market is not over-saturated conditions, can be said to have a civil engineering and technical personnel has been a good employment prospects. Typical career path: Construction workers / technicians - Engineers / Foreman, Section Manager - Technical Manager - Project Manager / Chief Engineer. Annual salary of reference: Construction workers / technicians: 15,000 ~ million; foreman: 25000 ~ 4 million; technical quality control manager: 45000 ~ 7 million; Project Manager: 50000 ~ 10 million; Expert advice: As China's practice of constantly improving the certification system, civil engineering industry engineering and technical personnel not only need to master the professional knowledge and skill, but also need to obtain the necessary credentials to practice. Engineering and technical personnel of the relevant qualification to practice major national primary and secondary registered architect, registered civil engineer in the country, the national primary and secondary registered structural engineers. It should be noted that these qualifications are required to practice a certain number of years of relevant working experience can apply, so even if the civil engineering graduates took jobs to pay attention to the knowledge structure after the update, apply as soon as possible in order to obtain the relevant qualifications to practice. Want to pursue engineering and technical work of university students, in practice the choice of measurement on construction sites, building materials, geotechnical and road and bridge tenders of the roadbed, road, small bridge and culvert construction, surveying the work. 2, design, planning and budget direction The representative of position: Project Designer, structural audit, urban planners, budget posts, Budget engineers. Representatives of industry: engineering survey and design units, real estate development business, traffic or municipal engineering departments ** bodies, advisory bodies, such as project cost. Employment Prospects: Survey and Design Institute of the various members of the engineering design of the continued growth of demand in recent years, urban planning as a new career, with the deepening of urban construction, but also the need for more modern design and planning professionals. With the rise of consulting, engineering, construction industry, such as Budget and Final Accounts of the advisory service has also become the new construction industry employment growth. Typical career path: budget posts - budget Engineers - Senior Consultant. Annual salary of reference: budget posts: 15000 ~ 3 million; budget Engineer: 25000 ~ 6 million; Town Planner: 40,000 ~ 70,000 yuan Architect: 40000 ~ 10 million; total architect: 25 million yuan. Expert recommendations: the need for such posts should be well versed not only expertise, but also requires sufficient大局观and work experience. Under normal circumstances, its pay and work experience in direct proportion. As an example to architects, contemporary architecture also requires environmental protection and sustainable development, the architect needs to have a solid foundation and broad range of experience, at the same time learn and understand in practice. At present, the market for most of the architectural design professionals require more than 5 years of work experience, have a qualified registered architect, and served as a large residential development or construction project design. Such jobs also need to obtain the appropriate credentials to practice, such as construction engineers need to register through the national organization of professional architects to get the qualifying examination, "Registered Architect Qualification Certificate" to jobs, the budget cost engineers need to obtain registration of qualified engineers or budget . In addition, such procedures also need to engage in all aspects to enhance their own self-cultivation, such as the need to be familiar with computer operation and maintenance of proficiency in the use of CAD drawing to a variety of engineering drawings as well as P3, such as the preparation of construction production planning, and some jobs such as architects need to of anthropology, aesthetics, history, and different times in different countries have a deep architectural understanding of the essence, and to be together, forging their own style. These are the times from the students began to accumulate its own culture. Internship should be possible to select a number of units and work-related, such as real estate valuation, project budget, such as engineering drawing. 3, the quality of supervision and direction of project supervision The representative of position: Project Management Engineer On behalf of the industry: Construction, Road & Bridge Project Management Company, ** quality supervision departments works. Employment Prospects: The project supervision is emerging in recent years as a professional, with the construction, road and bridge construction quality control of the increasingly standardized, Commissioner of the industry since its birth on the face of unprecedented opportunities for development and project supervision system with the country's growing sound has a more broad space for development. Typical career path: Supervisor - Data members - who are directly responsible for the project - the professional supervision engineer - chief supervision engineer. Annual salary of reference: the site supervisors: 18,000 ~ million; projects were directly responsible for: 25,000 to 4 million; professional supervision engineer: 30,000 ~ 5 million; the overall supervision engineer: 40,000 ~ 80,000 yuan. Experts recommend: Project Management Industry is an emerging industry, it is also a licensing system with the combination of the industry very closely, their jobs and personal qualifications for promotion are closely related to the acquisition. In general, the supervisors need to obtain permits provincial supervisors posts, projects were directly responsible for supervision engineers need to obtain the province or permit Supervisor jobs, work experience, have a stronger ability to work. Supervision of professional engineers need to obtain permits induction provincial supervision engineers, supervision engineers need to obtain the total national registered supervision engineer professional qualification certification. Wood soil engineering college students want to enter the industry, during the school can take part in the provincial highway system, construction supervision system of organized training courses, pass the exam supervisors after induction card, then work experience with a corresponding increase in levels of practice to obtain qualification certificates. During the internship period, the option with the road and bridge construction and the direction of the direction of their school supervision in line company engaged in site supervision, measurement, data management and so on. 4, the civil service, teaching and research direction On behalf of jobs: civil servants, teachers Representatives of industries: transportation, municipal administration departments, colleges, scientific research and design units. Employment prospects: civil service reform as an ordinary university graduates to enter the open door ** organs, road and bridge construction industry brought about by the rapid development of the great civil engineering professionals need to make the demand for teachers resulting growth, but needs attention is that competition in these industries generally more intense, the need for job-seekers have a high professional level and overall quality. Annual salary of reference: University Teachers: 25,000 to million; secondary school teachers: 18,000 ~ 3 million; ordinary civil servants: 20,000 ~ 35,000 yuan. Expert advice: want to engage in such trades, on the one hand, during in-school courses to learn to make their own high professional standards, and the other direction with particular attention to theoretical knowledge of the overall quality of learning and personal development, so they have a higher Putonghua, foreign languages, computers and better adaptability.

优秀毕业论文预算概要

一篇完整的毕业论文必须要具备以下的常规部分,在此基础上可以根据论文需要作个性化的补充;1,摘要、2,绪论、3,文献综述、4,研究假设、5,论证过程、6,研究结论、7,总结与展望。 8、致谢。写好一篇论文其实就是在讲好一个故事,讲好一个有理有据、自圆其说的故事。每一个章节都有需要交代给读者需要的信息,章节间环环相扣,每一章既有前一站的佐证又是下一章的铺垫。论文正文包括五部分:前言、文献综述、研究设计、结果与分析、结论。当代,论文常用来指进行各个学术领域的研究和描述学术研究成果的文章,简称之为论文。它既是探讨问题进行学术研究的一种手段,又是描述学术研究成果进行学术交流的一种工具。它包括学年论文、毕业论文、学位论文、科技论文、成果论文等。

一篇完整一篇优秀的毕业论文必须要具备以下的常规部分,在此基础上可以根据论文需要作个性化的补充;1,摘要、2,绪论、3,文献综述、4,研究假设、5,论证过程、6,研究结论、7,总结与展望。写好一篇论文其实就是在讲好一个故事,讲好一个有理有据、自圆其说的故事。每一个章节都有需要交代给读者需要的信息,章节间环环相扣,每一章既有前一站的佐证又是下一章的铺垫。论文正文包括五部分:前言、文献综述、研究设计、结果与分析、结论。论文是一个汉语词语,拼音是lùnwén,古典文学常见论文一词,谓交谈辞章或交流思想。当代,论文常用来指进行各个学术领域的研究和描述学术研究成果的文章,简称之为论文。它既是探讨问题进行学术研究的一种手段,又是描述学术研究成果进行学术交流的一种工具。它包括学年论文、毕业论文、学位论文、科技论文、成果论文等。

一篇完整的论文包括论文标题,背景,研究目的和意义,参考文献,正文,主演的研究过程等。

硕士毕业论文提纲范例

有了一个好的提纲,就能纲举目张,提纲挚领,掌握全篇论文的基本骨架,使论文的结构完整统一;所以同学们在设计提纲时最好仔细地琢磨一下论文的概要,方便论文工作的进行。

摘要 4-5

Abstract 5-6

1 绪论 9-16

选题背景和研究目的及意义 9-10

选题背景 9

研究目的 9-10

研究意义 10

文献综述 10-14

关于舞弊的动因 10-11

针对舞弊的审计方法 11-12

关于审计失败的原因 12-14

研究思路和研究方法 14-16

2 财务舞弊的相关概念及理论基础 16-21

舞弊及相关概念界定 16-19

舞弊动因理论 19-21

3 案例描述 21-30

案例背景 21-23

证券市场背景 21-22

新大地企业概况 22-23

新大地财务舞弊过程 23-28

虚增收入 23-25

虚减成本 25

虚增资产 25-26

隐瞒关联方交易 26-28

新大地的舞弊后果 28-30

4 案例分析 30-42

舞弊动因分析 30-34

压力 30-32

机会 32-33

借口 33-34

CPA 审计失败分析 34-42

独立性缺失 34-35

缺少职业怀疑态度与应有的关注 35-36

未充分执行分析性复核 36-40

审计人员缺乏专业胜任能力 40-42

5 案例结论及对策 42-48

结论 42

财务舞弊的防范对策 42-44

减轻舞弊的压力 42-43

减少舞弊的机会 43-44

减少舞弊的'借口 44

审计失败的防范对策 44-48

改进审计独立性 44-45

保持职业怀疑态度与谨慎性 45-46

充分利用分析性复核 46

提高审计专业胜任能力 46

执行风险导向审计 46-48

参考文献 48-51

附录 51-53

后记 53

摘要 4-6

Abstract 6-7

第一章 绪论 11-32

第一节 研究的背景和意义 11-13

第二节 概念界定 13-18

第三节 理论基础 18-23

第四节 文献综述 23-29

第五节 研究设计 29-32

第二章 研究方法与研究过程 32-46

第一节 研究方法的选择 32-35

第二节 研究方法的实施过程 35-43

第三节 研究方法的反思 43-46

第三章 职业能力视角下的高校辅导员职业生涯 46-72

第一节 高校辅导员职业生涯现状 46-59

第二节 职业生涯发展中的影响因素 59-66

第三节 高校辅导员的职业能力观 66-72

第四章 S、A的职业生涯成长故事叙说 72-86

第一节 S辅导员:从单纯到成熟的职业历程 72-78

第二节 A辅导员:从茫然到专业的转变 78-86

第五章 研究体验 86-93

第一节 研究发现 86-91

第二节 研究反思 91-93

附录 93-97

附录1 受访邀请函 93-94

附录2 知情同意书 94-96

附录3 辅导员访谈提纲 96-97

参考文献 97-101

致谢 101-102

摘要 3-4

Abstract 4

目录 5-7

第一章 绪论 7-15

选题的国内外研究现状述评 7-9

国内研究现状述评 7-8

国外研究现状述评 8-9

选题的理论意义和现实意义 9-10

选题的理论意义 9

选题的现实意义 9-10

选题的基本内容 10-12

主要思想 10-11

重点和难点 11

创新或特色 11-12

选题的研究思路和方法 12-15

研究思路 12

研究方法 12-15

第二章 实证研究的基本情况 15-27

实证研究的信度和效度分析 15-16

信度和效度的统计分析 15-16

信度和效度的质量控制 16

实证研究样本的基本情况 16-17

高校类型 16-17

专业类型 17

年级 17

性别 17

无锡地区部分高校学生的食品安全基本情况 17-27

系统的《食品安全法》相关课程或宣传教育活动参加情况 17-19

对食品安全的关注程度 19-20

对我国当前食品安全状况的评价 20-21

对我国食品安全监管主体的选择 21-25

了解《食品安全法》及相关知识的途径 25-27

第三章 无锡地区部分高校学生食品安全知识态度行为状况及影响因素分析 27-43

食品安全知识条目分析 27-32

我国《食品安全法》施行时间 27

我国食品安全监管部门 27-28

食品添加剂使用原则 28

废除免检制度 28-29

十倍赔偿制度 29

有机食品的相关说法 29-30

食源性疾病的概念 30

我国新版QS标志的中文标注 30-31

近年来我国食品安全事件 31-32

食品安全态度行为条目分析 32-37

食品生产日期、保质期等标志的查看情况 32

购买保质期内食品最关注的方面 32-33

对疑似食物中毒症状的处理方式 33-34

最放心的食品 34-35

维权意识以及方式方法的选择 35

开设《食品安全法》相关课程或宣传教育活动的必要性 35-36

参加《食品安全法》相关课程或宣传教育活动 36

宣传《食品安全法》及相关知识 36

护法意识以及方式方法的选择 36-37

食品安全知识态度行为状况分析 37-38

食品安全知识态度行为总得分 37-38

食品安全知识条目得分 38

食品安全态度行为条目得分 38

食品安全知识态度行为的影响因素分析 38-43

高校类型 38-39

专业类型 39

年级 39-40

性别 40-43

第四章 实证研究反映的情况与问题及对策建议 43-49

实证研究反映的情况与问题 43-44

高校学生食品安全知识态度行为状况不容乐观 43

高校类型、专业类型的差异会对高校学生食品安全知识态度行为产生很大影响 43-44

髙校学生具有提髙自身食品安全知识态度行为水平的愿望,其获取知识的途径日趋多样化 44

提高高校学生食品安全知识态度行为水平的对策建议 44-49

充分利用现有资源和条件,稳步推进高校学生食品安全宣传教育的开展 44-45

充分考虑高校学生之间的差异,实行“因材施教” 45-46

结合高校学生食品安全知识获取途径的实际对高校学生食品安全知识态度行为进行正确引导 46-49

结语 49-50

致谢 50-51

参考文献 51-54

附录一:高校学生食品安全知识态度行为调查问卷 54-57

附录二:问卷评分标准 57-58

附录三:关于高校学生食品安全知识态度行为的访谈提纲 58-59

附录四:作者在攻读硕士学位期间发表的论文 59

预算管理优秀毕业论文

公共组织预算管理论文篇二 浅谈公共财政与预算管理改革 摘要:公共财政和预算管理是一个全新的概念,文章从管理层角度对预算管理改革的实践依据及 影响 做了较为深刻的阐述。随着改革的不断深入和 社会 主义市场 经济 体制的进一步完善,公共财政将在市场经济大潮中发挥越来越重要的作用,必将进一步推动 中国 现代 化建设的进程。 关键词:公共财政;预算;管理;财政改革 一、关于公共财政的基本认识 公共财政的概念是在最近几年才引起人们广泛注意的。较早时,从领导层的角度提出来的是在1994年前后,当时担任财政部常务副部长的项怀诚同志在一次财政改革的电视讲座里,就明确提出了“公共财政”这个概念。1998年上半年,项怀诚同志由国家税务总局局长转任财政部长后,又强调了这个概念。1998年12月15日在全国财政工作会议上,国务院副李岚清同志在讲话中提出积极创造条件,逐步建立公共财政基本框架的思路,同时还提出了四项原则:第一,把保证公共支出作为财政的主要任务,该管的管好,不该管的不要管;第二,要依法促进公平分配;第三,充分运用预算、税收、国债等经济手段参与宏观经济调控,并做好转移支付工作;第四,要调节市场配置资源偏差,体现国家的产业政策,同时对国有 企业 实行间接管理,做好国有资源管理工作。此后,国务院及财政部领导更多次在不同的场合谈到了公共财政 问题 。尤其是2000年在中央举办的两次省级领导干部财税研讨班上,李岚清副再次提出建立公共财政基本框架问题。公共财政这一概念是在转变政府职能,为实现政府职能而要求财政合理运筹帷幄和深化改革、促进 发展 这个大的战略背景下,由决策层提出来的,其意义是十分重大的。所谓公共财政是一个政府和财政职能调整的基本思路和导向。从我国现实出发,在传统体制向社会主义市场经济体制转变过程中,需要这样一个财政职能和财政形态调整的基本导向。在这种导向下,强调了财政必须顺应改革、体现政府职能和理财系统自力的深刻调整。 二、预算管理改革的 理论 与实践依据 (一)预算管理改革的理论依据 1、经济学依据:“效率优先、兼顾公平”是财政资源配置的最一般原则。资源配置效率分为两个层次。第一个层次是狭义上的效益概念,即“资源利用率”,指一个单位或部门如何组织并运用有限的财政资源,使之发挥出最大效用。第二个层次是“资源配置效率”,指如何在不同单位和部门之间分配有限的财政资源,使每一种资源能有效地配置于最适宜的使用方面和方向上。 在效率优先原则的基础上,预算的安排还需兼顾公平。要求预算分配主体必须立足于全局考虑问题,一切以国家和人民的整体利益为重,不折不扣地执行国家有关方针政策,要求分配主体对各部门各单位预算支出的安排应相应均等,避免因资源配置不公而造成部门和单位之间的不公平待遇。 2、 政治 学依据:依法理财、依法治国。江泽民在党的十四大报告中指出“依法治国”,把坚持党的领导,发扬人民民主和严格依法办事统一起来,从制度和 法律 上保证党的基本路线、方针的实施,保证党始终发挥总揽全局,协调各方的领导核心作用。“预算”作为体现国家意识,反映政府活动范围、规模和方向,对国民经济运行进行宏观调控的基本手段,必须严格按《预算法》办事,实现预算管理的 科学 化、规范化、制度化和法制化。 3、管理科学依据:将管理科学引入预算过程。现代社会早已步入管理 时代 ,理论家和实际部门的工作者一致主张国家预算制度应融合进更多的 分析 管理 方法 ,以便预算资源的使用具有更高的效率。因此,从管理角度讲,应强调预算过程的功能性,包含预算的控制、管理与规划等因素。例如:将预算编制形式由传统的收入按类别、支出,按功能的汇总预算改为部门和项目编制的部门预算,编制零基预算、综合预算、标准周期预算等,其最终目的在于将预算从被动地以资金支持政府行政改为积极地参与决定政府行政计划和活动,使预算成为理论决策的一项工具,提高政府公共决策的成效。 (二)预算管理改革的实践依据 1、社会主义市场经济的发展和财政职能转变,对预算管理方式提出了新的要求。社会主义市场经济的发展,促使政府职能由过去主要管理国有经济转变到管理国家宏观经济、社会公共事务和以国有资产所有者的身份对国有资产进行间接管理。相应地其财政职能和范围由过去的统收统支,包揽一切,逐步得以转变。这将有助于从根本上规范政府分配,完善政府职能,适应改革发展的客观要求。 2、 目前 的财政运行状况迫切要求提高预算管理水平。我国目前财政收支的矛盾比较尖锐,一个原因是我国正处于社会主义初级阶段,生产力水平不高,经济增长的税收贡献水平较低,财政收入的增长受到制约,财力增长的有限性和支出需求的迫切性构成了社会主义初级阶段财政基本特征。尤其是我国改革正进入关键时期,财政支出的压力空前加大,只有通过深化预算管理改革,优化支出结构,合理配置财力资源,才能使收支矛盾得到一定程度的缓解。 三。公共财政导向下预算管理改革的基本 内容 (一)预算编制改革 改革的主要内容是: 1、改革预算编制 方法 ,实行部门预算。与以往的预算编制方法相比,部门预算更适应监督管理的需要:一是使预算编制的时间大为提前;二是一个部门形成一本预算;三是预算编制方式由以前的部门替下属单位代编,改为从基层单位逐级编制逐级汇总;四是预算批复方式从原来的由财政部各业务司(局)及有预算分配权的部门各自独立地向各部门批复改为由财政部预算司统一批复预算。 2、改变传统的“基数加增长”的预算编制方法,推行零基预算。在部门收入预算中,根据 经济 发展 状况,按收入类别逐项核定。对部门组织的行政性收费和其他预算外收入要核定到单位和项目。部门支出预算按资金用途的不同,类别核定,汇总而成。 3、扩大预算编制的范围,实行综合财政预算。4、改进编制程序。保证编制预算的准备期间,使预算编制更为 科学 合理。此外,各地还实行了一系列其他预算编制的改革措施。如海南省实行的标准收入预算法,安徽省的预算加听证方法,四川省的复式预算制度等。虽然改革的深度不尽一致,但都卓有成效,丰富了预算编制改革的内容,为下一步全面推行预算编制各项改革奠定了一个良好的基础。 (二)完善政府采购制度 政府采购是指各级国家机关及实行预算管理的事业单位和 社会 团体采取竞争、择优、公正、公平的形式使用财政预算内外资金等财政性资金,以购买、租赁、委托或雇佣等方法获取货物、工程和服务的行为。近年来,各地财政部门及中央有关部门参照国际惯例,按照国务院有关精神和财政部有关文件规定,积极开展政府采购试点工作,在制度建设、机构建设以及组织实施政府采购等方面做出了大量的工作,取得了较为显著的成绩。 (三)改革财政资金缴拨方式逐步建立国库集中收付制度。 国库集中收付制度是与分散的国库收付制度相对的财政资金管理制度。这种制度具有三个基本特征:一是财政统一开设国库单一账户;二是所有财政收入直接缴入国库,主要财政支出由财政直接支付给商品和劳务的供应者;三是建立高效的预算执行机构,科学的信息管理系统和完善的监督检查机制。在这一制度下,财政收支实现了规范管理,收入不能任意退库,支出得到事前监督,资金使用效益也明显提高。 (四)提高预算执行的严密性和严肃性 在新的财政改革中,我们要强调一个 问题 ,即淡化决算、强化预算。可能以后决算就是一道审计旧档,而预算在各个具体项目的设置上事先经过了专门委员会的充分讨论、体现了公众意愿,是极其严肃的,执行起来也就非常严格,甚至基本上不留弹性。另外,在今后的预算执行上存在一个趋势,即更多的单位和项目将只见数字不见钱。比如,单位需要的设备、办公用品及服务纳入以招标为基本方式的政府公开采购的渠道。通过政府公开招标采购物品的好处是一目了然的。它使预算支出减少了中间环节,增强了透明度和规范化,以竞争求得“价廉物美质优”,也可以最大限度地减少“吃回扣”和权钱交易等腐败行为的滋生。 实行单一国库集中收付制度后,在技术上也为实现预算的完整性提供了保证。从发展前景看,实现预算的完整性经历两个阶段,从“三而一”到“二而一”,即第一阶段预算外和预算内两概念仍保留,但制度外的,包括人们称之为“小金库”的财力将清理整顿,纳入预算外的轨道。再往前发展,预算外的财力在加强管理的过程中会逐渐规范化,随着条件进一步成熟,也会分步纳入预算内,这就是第二阶段,达到“二而一”,从而最终达到预算的完整性。 在预算执行方面存在一个需要逐步探索的领域,即预算执行中总不可避免地要进行修改和调整。如何强化这方面的管理,值得 研究 。我们在强化预算、淡化决算这个大前提下,做了种种严格界定后,还必须承认,预算里仍需留有一个机动的余地,过去体现为预备类,以后不管叫什么,总还会有一个相机决策的弹性区间。这个区间如何掌握,资金管理形式和决策程序如何设置,还需进一步探讨。 四。预算改革的 影响 公共财政导向下预算改革的全面推开,会对财政部门及国家其他相关部门产生极其深刻的影响。 1、对财政部门来说,这是一场深刻的“革自己的命”的制度变革。经过改革使自己头上“财神爷”的光环暗淡下来,把理财中“分小钱”的弹性空间不断压缩,让其它方面和公众越来越自觉、有效地监督财政部门,这是革自己的命。这是一个必然的趋势,并且这种改革晚做不如早做,这是为适应全局与长远的要求,从压缩弹性空间和提高规范化程度入手革自己的命。 2、这也是革部门和预算单位既得利益的命。在今后为保证预算的完整性,提高透明度,提高整个预算管理的科学水平和资金的使用效益,会压缩某些政府和预算单位既得利益的空间。这虽然是一个痛苦的过程,但对整个社会成员和 中国 现代 化发展来说是十分必要的,是有好处的。 3、改革后,必然要求加快推进财政税收管理的现代化建设,随之也就对财政税收人员的素质提出了更高的要求。按过去的老办法做财税工作越来越难,同时国外一些先进的管理经验今后势必要引入到中国来运用。所以要求财税干部必须掌握一系列现代化管理知识和技能。 4、今后预算的编制、执行、监督三者会逐渐分离。管编制不管执行,管执行不管编制,相互之间形成一种制约。同时,还将建立和发展一套监督系统,独立地行使其监督职能。这样形成三套相互独立、相互制约的系统,体现了公共财政导向下规范的权力制衡,从而保证预算管理的透明度和公众意愿真正得以实现。 5、在机构调整方面必然有新的要求。体现在为社会公众和所有纳税人服务的意向,为所有相关部门的业务开展提供更为便利的服务,使各部门在办理事务时可以大幅提高工作效率。 可见,实行公共财政导向下的预算管理改革,对于发展社会主义市场经济具有重要意义。首先,在于它规范了政府行为,将有力地推进依法治国在理财系统中的贯彻落实。第二,它提高了政府资金的管理使用效率。第三,在反腐倡廉方面,依靠制度的建立,能减少腐败的滋生,使政府和财税工作人员真正归位到为人民服务的宗旨上来,从而减少权钱交易、舞弊等违法乱纪行为的空间。第四,它可以促进民主化进程,以理财的民主化推动整个社会的民主化。第五,它是一个显著促进社会经济发展和现代化进程的配套改革的组成部分。 看了“公共组织预算管理论文”的人还看: 1. 有关预算管理论文 2. 有关国家预算管理论文 3. 企业预算管理论文 4. 公共组织论文(2) 5. 浅谈企业全面预算管理论文

财务预算管理在企业中的作用研究论文

在现实的学习、工作中,大家都经常看到论文的身影吧,借助论文可以有效训练我们运用理论和技能解决实际问题的的能力。那么你知道一篇好的论文该怎么写吗?下面是我为大家收集的财务预算管理在企业中的作用研究论文,欢迎大家分享。

摘要:

随着我国社会经济的快速发展,各种类型的企业也得到了迅猛发展。就一个企业而言,要想最大限度地提升自身的经济效益,就一定要采用合理的生产管理方式,加强财务预算管理。由此可见,财务预算管理在企业中发挥着不容忽视的作用,因此,企业一定要采用合理有效的财务预算管理措施,以此来提升其经济效益和综合竞争实力。

关键词:

企业财务;预算管理;问题;解决对策;

引言:

财务问题是企业发展中的重中之重,一旦企业发生了经济危机,就一定会对其日后的发展趋势造成影响,甚至还可能引发破产,因此,十分有必要落实好企业的财务管理工作。另外,预算管理作为财务管理中的主要部分,与企业开展的多数业务活动方面的资金问题均息息相关,而且资金的多少还直接决定着企业的整体运行情况。基于此,为了推动企业的可持续发展,应该将其财务预算管理工作落实好。

一、企业财务预算管理中存在的一系列问题

(一)未对企业财务预算管理引起足够重视

企业在开展常规管理工作的过程中,由于有关管理者并未充分意识到管理工作的重要性,因此,造成其财务预算管理意识较低,从而导致了财务管理工作内容的不健全。另外,还由于有关人员未对各个部门之间的配合引起重视,因此,降低了企业内部财务预算管理工作效率。此外,在构建财务预算管理方案的过程中也存在着一系列的问题。由于一些财务部门未能充分了解预算管理工作内容,因此,在构建预算编制方案时,往往会出现各种各样的问题,例如:预算编制与实际发展需求不符合、构建完的预算编制方案无法有效地应用在实际工作当中等。从而严重地阻碍了企业的发展。

(二)企业内部预算管理工作未得到全面落实

目前,企业内部预算管理工作未得到全面落实也是阻碍企业发展的一个主要原因。企业在发展中应该建立健全相应的管理体系,并根据自身的实际发展情况,有效地规划和管理经济活动。然而,大部分企业在实际发展中并未对其预算管理工作的具体落实情况引起重视,而且也未能进一步分析和管理财务预算,从而影响到了预算管理工作的顺利开展,为此,在企业的发展中无法凸显出预算管理的成效。其次,由于受到了企业本身发展条件的制约,因此,导致了企业的预算编制工作难以得到全面落实,进而影响到了企业整体财务预算管理工作效率。

(三)企业缺乏战略思想

由于企业的有关领导未能立足于宏观层面构建出完善的发展规划,因此,在企业的发展和管理过程中无法实现科学管理。另外,在实际发展中,还会出现所构建的预算编制难以同企业的发展需求相符合的现象,从而造成了企业的内控和管理工作呈现出了无序性。此外,企业在构建预算编制方案的过程中,也未对其发展规划引起重视,一味地追求眼前利益,从而导致了既存的预算编制无法与市场的发展需求相适应,最终被市场所淘汰。由此可见,要想提高企业的综合竞争实力,就一定要采用合理的财务预算管理方法。

(四)财务预算缺乏监督

从企业的实际管理情景来看,现阶段企业的财务预算还缺少实际的监督管理,财务预算方案得不到有效的落实。由于一些外来因素干扰而出现的问题得不到有效的解决。所以,构建完善的财务预算监督机制是一项十分重要的任务,科学的财务预算监督机制可以降低因外来因素造成的预算方案执行错误的概率,将财务预算方案切实有效的落实到工作中。在落实财务预算监督工作时可以从以下两个方面入手:一是监督财务预算的制定过程,二是监督财务预算的实施过程。只有通过有效的监督管理,才能确保财务预算实施的真实性,促进企业的持续发展。

二、解决企业财务预算管理问题的有效措施

(一)加强对财务预算管理的重视,提倡全员参与

在规划财务管理工作的过程中,企业的相关管理工作者不仅要充分意识到财务预算管理工作的重要性,而且还应该提高自身的财务预算管理意识。基于意识的形成和认知程度的提高,达到通过财务预算管理进一步推动企业发展的目的。因此,企业全体干部员工在开展工作的过程中,应该充分了解预算管理工作内容,同时还应该重点注意其中的关键环节,严格把控财务预算的审批,以此来保证预算工作的顺利开展。

(二)加快实现企业的预算管理工作

随着社会经济的快速发展,市场对企业的发展和财务管理工作的开展所提出的要求变得越来越高。所以,企业管理者一定要从企业的角度出发来实现有关的财务管理工作,并根据企业的长远发展需求,在企业内部实施财务预算管理体系,基于对预算编制的构建来提高其抗干扰能力。另外,还应该将前期的预算管理工作同后续的生产经营活动进行有机结合,以此来促进财务部同其他部门之间的交流,从而能够确保企业财务预算工作的顺利开展。除此之外,有关工作人员还应该对企业发展信息与财务管理工作的.实际开展情况加以充分了解,进而确保预算编制的构建能够与企业的日后发展方向相符合。

(三)加快推进预算管理体系的全面实施

要想促进企业财务管理工作的有效开展,就应该加强提高企业财务预算管理工作效率。另外,在推动当代企业发展的过程中,还应该对企业管理工作的全员参与引起重视。除此之外,在开展预算管理工作时,企业的有关财务工作人员和各个部门的工作人员之间均应该形成良好的配合,以此来提高财务预算管理工作质量与效率,丰富企业财务预算管理工作内容。

三、财务预算的改革方式

(一)明确预算管理思想

企业在认识到财务预算的重要程度后,就可以展开一系列的培训课程,对企业的工作人员进行相应的职能培训,制定考核标准,完善奖惩制度,在提高财务人员工作参与度的同时,加强对企业财务预算管理的运用,以员工的自我约束力来规范保障财务预算管理制度。企业还要普及相关的法律法规,严禁出现违法行为。将知法守法作为企业财务预算的前提条件。

(二)进行科学的财务预算

财务预算的编制不是单一的参考某一元素,是要结合当下的市场经济行情、企业的实际状况、产品的前景、资金流动情况等因素来综合编制的。财务预算的编制既要创新大胆又要保证现有资产的稳固,在制定财务预算时,减轻预算差异性,使预算维持在一个平稳的水平线上,有助于企业的稳步发展。财务部门在制定完善财务预算后,要进行不定期的抽查,确保预算落实到每一位员工肩上,发现违反制度的行为要及时进行追责与惩罚,以确保企业的正常运作。财务部门每天都要接触大量的数据,就更应该运行科学的计算方式来进行数据分析,降低生产成本,以及库存积压。在进行产品清查时,要详细记录库存商品,依据市场需求提出改进措施,帮助企业获得更多的流动资金。有计划地将企业的产品进行收益比较,通过成本核算找出致使企业亏损的产品或是利润不大的产品,进行及时的止损操作。对于企业的项目预算,要进行细化分析,健全资金流动制度,降低企业资金风险。在运营过程中财务部门要严格把控资金的流动方向,减少出现盲目借贷的事件发生。

(三)建立长期的财务预算运行管理制度

在制定财务预算时稳定性与长期性是两个不可忽略的因素,当短期利益与长期目标出现矛盾时,财务部们要找到二者之间的平衡点,适当的割舍一些短期效益,要立足于企业的长远发展。财务部门预算管理工作不仅仅是简单的成本核算,还要考虑人工成本浮动因素,原材料价格浮动因素,市场经济等一些不可控因素,在制定成本预算时要着眼于企业的长久发展进程,避免出现朝令夕改的现象出现。在执行财务预算过程中要加大对投资项目的监管,加大对市场经济的数据收集分析,结合企业的实际运营情况以及发展战略制定切实有用的监管制度,以确保企业不会因为制度落后而出现被市场经济淘汰的情形。

四、结语

综上所述,财务预算管理工作的有效开展,不仅有利于提高企业的综合竞争实力,而且还能够推动其获得可持续发展。然而,我国的企业财务预算管理中却仍然存在着一些问题,所以,为了与市场变化的形势相适应,企业管理人员应该结合企业的实际发展情况构建出完善的财务管理体系,基于对财务管理预算工作的开展进行科学预测,并充分利用预算的辅助功能,做出科学决策。另外,还要通过分析和归纳企业的实际情况,合理投入资本。除此之外,财务预算管理工作也应该得到完善,从而为企业的发展提供相应的依据,并促进企业生产经营目标的快速实现。

参考文献

[1]张宪杰.浅析企业财务预算管理中存在的问题及解决对策[J].财经界(学术版),2016(5).

[2]谢瑛.企业财务预算管理中存在的问题及解决对策[J].企业改革与管理,2017(12).

电大工程决算毕业论文

电大毕业论文的写法步骤如下:

(一)电大论文选题。

1.选题应该在本专业范围内。电大毕业生选题必须与所学专业一致,要在本专业领域内开展,不允许从专业范围外选题。

2.选题要注重实效性,最好同自己从事的工作实践相结合,用来解决一些实际问题。

3.选题还要有新意、有特点、有个性。去探究别人很少研究的领域,这样容易引起别人的兴趣,在后续答辩时也容易通过。选题一定要避免与前人雷同,更不准抄袭他人。当然,学习借鉴和引用几篇优秀作者的文章,从中吸取他们的精髓和养分来丰富和完善自己的毕业论文也未尝不可。

(二)收集材料。

1.首先要明确主题。主题也称“主题思想”“中心思想”,是文章的“主旨”中心和基本意图。确定真实的主题是写好文章的关键,只有结合自己的写作目的、表现思想、专业特长,在确定好主题的前提下,才能为以后写作奠定理论基础导向。确定主题要符合正确、鲜明、集中、深化的基本要求。

2.要围绕主题来选材。主题是选材的依据,选材要力求充分表现主题,所有的选材都是为了表现主题服务的,离开材料表现的主题必定是空洞缺乏说服力的,与主题无关联的材料,必须坚决舍弃。

3.选题要力求典型新颖。电大毕业生的毕业论文要选用新颖,有代表性的,最能反映事物本质并表现主题的典型材料。去探索以前没人写过或很少写过的领域,避免老套与一般化,使读者研读后感到耳目一新,容易引起别人的兴趣。

(三)编写写作提纲。

提纲一般分简单提纲和详细提纲两种。对电大毕业生而言,毕业论文写作提纲多为简要提纲,只概括提示论文的要点、结构、层次,不必详细展开论述,但要特别注意把握以下几个原则:首先,要有写作全局观念,从论文整体出发去了解段落部分之间的地位与作用。其次,要从论文主题论点出发,去取舍材料。

另外,要考虑好论文各部分之间的基本架构和逻辑关系,努力做到论点明确,论据充分,论证得体,使毕业论文的文本形成一个有机整体。

(四)起草初稿。

电大毕业生在做好以上所有准备铺垫工作之后,就该正式着手起草毕业论文了。电大毕业生在写作的过程中,首先,应该紧紧围绕写作提纲的内容,把所有准备的材料进行重新组织和整理,用有价值的材料润色原来设计好的文章骨架,逐步完成毕业论文写作的基本雏形。

其次,努力做到观点与材料的统一,立意观点是材料的统帅和灵魂,材料的使用必须围绕观点开展服务。而且要观点鲜明有理有据,语言准确生动,切记华而不实,空洞枯燥。另外,还要注重写作过程的不断修改与完善。修改包括自我修改和指导老师指导下的修改。

反复修改毕业论文是提高电大毕业生写作质量和写作能力的重要环节,毕业生自我修改是掌握毕业论文写作的主动性与积极性的有力措施,也是毕业生发挥主观能动性的具体表现。一般情况下,教学部门对毕业生的修改也有具体要求,指导教师要特别注重毕业生写作过程的管理,比如,毕业生毕业论文要有一稿、二稿、三稿(定稿)。

以金融/会计为例一、关于选题1.与专业有关金融学专业可以选题的方向有:融资、信贷、保险、银行卡、中间业务、金融机构(信用社、商业银行等)内部经营风险与内部控制、金融支持(支持新农村建设、中小企业等)、票据风险与管理、银行不良资产等会计学专业选题方向可考虑:会计监督、审计、会计舞弊、内部会计控制、资产管理、投资与融资、成本控制与管理、税收筹划、财务管理、会计报表方面等2.选题要以具体的企业(类)为背景如:上市公司、民营企业、中小企业、商业银行等注意几个结合:在书写、举例中要体现与某(类)企业相结合,通过对某(类)企业的调研、分析来解决某个问题;与地方相结合,尽量用地方的数据;与工作相结合,用具体的例子来说明必须避免:“我国”、“研究”、“理论”等范围大,宏观性强、理论性强的内容二、体裁(样式)一般选用最简单的样式,即三段式:提出问题、分析问题、解决问题提出问题:作用、必要性、现状(可以列一些宏微观数据)分析问题:问题的存在与原因,逐一例示,可举一些具体的例子来说明解决问题:针对问题产生的原因,提出解决问题的方法(有些部分的做法可具体一些)注意:三部分的篇幅比例一般1:2:2为宜每部分分小点不超过5点,每点篇幅(字数)相对均衡每一独立部分(分段)一定要有讨论,不存在只有标题没有讨论的段落三、资料收集与参考文献渠道:工作中内容(总结、企业报表、内部通报等)、报纸、期刊(杂志)、书籍、网络等要求:新(近两年内)、实(作者、杂志或报刊名称、发行或出版日期、页码)参考文献:本科10篇以上、专科5篇以上,格式如例例:[1] 贾芳琳. 商业银行会计核算中存在的主要问题及对策. 经济研究导刊,2007,(1),103-105页.[1]武耕耘:上海银行卡产业发展提速,文汇报2005年4月15日第14版[1]胡玉成.浅谈审计风险的成因及对策.(中国大学吧).2007(03) [1]胡庆康:现代货币银行学教程(第二版),上海:复旦大学出版社,2006年版四、篇幅本科:正文字数6000-8000专科:正文字数4000-5000

1、论文题目:要求准确、简练、醒目、新颖。2、目录:目录是论文中主要段落的简表。(短篇论文不必列目录)3、提要:是文章主要内容的摘录,要求短、精、完整。字数少可几十字,多不超过三百字为宜。4、关键词或主题词:关键词是从论文的题名、提要和正文中选取出来的,是对表述论文的中心内容有实质意义的词汇。关键词是用作机系统标引论文内容特征的词语,便于信息系统汇集,以供读者检索。每篇论文一般选取3-8个词汇作为关键词,另起一行,排在“提要”的左下方。主题词是经过规范化的词,在确定主题词时,要对论文进行主题,依照标引和组配规则转换成主题词表中的规范词语。5、论文正文:(1)引言:引言又称前言、序言和导言,用在论文的开头。引言一般要概括地写出作者意图,说明选题的目的和意义,并指出论文写作的范围。引言要短小精悍、紧扣主题。〈2)论文正文:正文是论文的主体,正文应包括论点、论据、论证过程和结论。主体部分包括以下内容:a.提出-论点;b.分析问题-论据和论证;c.解决问题-论证与步骤;d.结论。6、一篇论文的参考文献是将论文在和写作中可参考或引证的主要文献资料,列于论文的末尾。参考文献应另起一页,标注方式按《GB7714-87文后参考文献著录规则》进行。中文:标题--作者--出版物信息(版地、版者、版期):作者--标题--出版物信息所列参考文献的要求是:(1)所列参考文献应是正式出版物,以便读者考证。(2)所列举的参考文献要标明序号、著作或文章的标题、作者、出版物信息。

电大毕业论文的写作格式、流程与写作技巧 广义来说,凡属论述科学技术内容的作品,都称作科学著述,如原始论著(论文)、简报、综合报告、进展报告、文献综述、述评、专著、汇编、教科书和科普读物等。但其中只有原始论著及其简报是原始的、主要的、第一性的、涉及到创造发明等知识产权的。其它的当然也很重要,但都是加工的、发展的、为特定应用目的和对象而撰写的。下面仅就论文的撰写谈一些体会。在讨论论文写作时也不准备谈有关稿件撰写的各种规定及细则。主要谈的是论文写作中容易发生的问题和经验,是论文写作道德和书写内容的规范问题。论文写作的要求下面按论文的结构顺序依次叙述。(一)论文——题目科学论文都有题目,不能“无题”。论文题目一般20字左右。题目大小应与内容符合,尽量不设副题,不用第1报、第2报之类。论文题目都用直叙口气,不用惊叹号或问号,也不能将科学论文题目写成广告语或新闻报道用语。(二)论文——署名科学论文应该署真名和真实的工作单位。主要体现责任、成果归属并便于后人追踪研究。严格意义上的论文作者是指对选题、论证、查阅文献、方案设计、建立方法、实验操作、整理资料、归纳总结、撰写成文等全过程负责的人,应该是能解答论文的有关问题者。现在往往把参加工作的人全部列上,那就应该以贡献大小依次排列。论文署名应征得本人同意。学术指导人根据实际情况既可以列为论文作者,也可以一般致谢。行政领导人一般不署名。(三)论文——引言 是论文引人入胜之言,很重要,要写好。一段好的论文引言常能使读者明白你这份工作的发展历程和在这一研究方向中的位置。要写出论文立题依据、基础、背景、研究目的。要复习必要的文献、写明问题的发展。文字要简练。(四)论文——材料和方法 按规定如实写出实验对象、器材、动物和试剂及其规格,写出实验方法、指标、判断标准等,写出实验设计、分组、统计方法等。这些按杂志 对论文投稿规定办即可。(五)论文——实验结果 应高度归纳,精心分析,合乎逻辑地铺述。应该去粗取精,去伪存真,但不能因不符合自己的意图而主观取舍,更不能弄虚作假。只有在技术不熟练或仪器不稳定时期所得的数据、在技术故障或操作错误时所得的数据和不符合实验条件时所得的数据才能废弃不用。而且必须在发现问题当时就在原始记录上注明原因,不能在总结处理时因不合常态而任意剔除。废弃这类数据时应将在同样条件下、同一时期的实验数据一并废弃,不能只废弃不合己意者。实验结果的整理应紧扣主题,删繁就简,有些数据不一定适合于这一篇论文,可留作它用,不要硬行拼凑到一篇论文中。论文行文应尽量采用专业术语。能用表的不要用图,可以不用图表的最好不要用图表,以免多占篇幅,增加排版困难。文、表、图互不重复。实验中的偶然现象和意外变故等特殊情况应作必要的交代,不要随意丢弃。(六)论文——讨论 是论文中比较重要,也是比较难写的一部分。应统观全局,抓住主要的有争议问题,从感性认识提高到理性认识进行论说。要对实验结果作出分析、推理,而不要重复叙述实验结果。应着重对国内外相关文献中的结果与观点作出讨论,表明自己的观点,尤其不应回避相对立的观点。 论文的讨论中可以提出假设,提出本题的发展设想,但分寸应该恰当,不能写成“科幻”或“畅想”。(七)论文——结语或结论 论文的结语应写出明确可靠的结果,写出确凿的结论。论文的文字应简洁,可逐条写出。不要用“小结”之类含糊其辞的词。(八)论文——参考义献 这是论文中很重要、也是存在问题较多的一部分。列出论文参考文献的目的是让读者了解论文研究命题的来龙去脉,便于查找,同时也是尊重前人劳动,对自己的工作有准确的定位。因此这里既有技术问题,也有科学道德问题。一篇论文中几乎自始至终都有需要引用参考文献之处。如论文引言中应引上对本题最重要、最直接有关的文献;在方法中应引上所采用或借鉴的方法;在结果中有时要引上与文献对比的资料;在讨论中更应引上与 论文有关的各种支持的或有矛盾的结果或观点等。一切粗心大意,不查文献;故意不引,自鸣创新;贬低别人,抬高自己;避重就轻,故作姿态的做法都是错误的。而这种现象现在在很多论文中还是时有所见的,这应该看成是利研工作者的大忌。其中,不查文献、漏掉重要文献、故意不引别人文献或有意贬损别人工作等错误是比较明显、容易发现的。有些做法则比较隐蔽,如将该引在引言中的,把它引到讨论中。这就将原本是你论文的基础或先导,放到和你论文平起平坐的位置。又如 科研工作总是逐渐深人发展的,你的工作总是在前人工作基石出上发展起来做成的。正确的写法应是,某年某人对本题做出了什么结果,某年某人在这基础上又做出了什么结果,现在我在他们基础上完成了这一研究。这是实事求是的态度,这样表述丝毫无损于你的贡献。有些论文作者却不这样表述,而是说,某年某人做过本题没有做成,某年某人又做过本题仍没有做成,现在我做成了。这就不是实事求是的态度。这样有时可以糊弄一些不明真相的外行人,但只需内行人一戳,纸老虎就破,结果弄巧成拙,丧失信誉。这种现象在现实生活中还是不少见的。(九)论文——致谢 论文的指导者、技术协助者、提供特殊试剂或器材者、经费资助者和提出过重要建议者都属于致谢对象。论文致谢应该是真诚的、实在的,不要庸俗化。不要泛泛地致谢、不要只谢教授不谢旁人。写论文致谢前应征得被致谢者的同意,不能拉大旗作虎皮。(十)论文——摘要或提要:以200字左右简要地概括论文全文。常放篇首。论文摘要需精心撰写,有吸引力。要让读者看了论文摘要就像看到了论文的缩影,或者看了论文摘要就想继续看论文的有关部分。此外,还应给出几个关键词,关键词应写出真正关键的学术词汇,不要硬凑一般性用词。

毕业论文工程概预算

从而建立了“国家宏观调控、市场竞争形成价格”的现行工程造价的确定原则。 2003年2月17日《建设工程工程量清单计价规范》(GB505002003)颁布,2003年7月1日开始施行。这是我国造价改革的重要里程碑。由国家建立起一套完善科学的工程量...

一、建设项目工程造价控制的重要意义 建设项目的造价控制贯穿于项目的全过程,即项目决策阶段、项目设计阶段、项目实施阶段和竣工阶段都关 系到建设项目的造价控制。统计资料显示,在项目决策阶段及设计阶段,影响建设项目造价的可能性为30%-75%,而在实施阶段影响建设项目造价的可能性仅 为5%-25%。显而易见,控制工程造价的关键就在于项目实施之前的项目决策和设计阶段,项目决策是决定因素,而设计则是关键因素。 控制工程造价不仅仅是防止投资突破限额,更积极的意义是要促进建设、工、设计单位加强管理,使人力、物力、财力有限的资源得到充分的利用,取得最佳的经济效益和社会效益。因此做好工程造价的控制工作,对保证和加速思经济发展具有一定意义。 二、控制建设项目工程造价的措施 建 设工程造价的有效控制就是在投资决策阶段、设计阶段、工程发包阶段、合同实施阶段把建设工程造价的发生额控制在批准的工程造价限额以内,随时纠正发生的偏 差,保证项目投资目标的实现,以求在各个建设项目中能够合理地使用人力、物力、财力取得较好的投资效益,最终实现使竣工决算控制在审定的概算额内,避免 “三超”现象的发生,为了有效控制工程造价,应做好以下几方面工作: (一)决策阶段工程造价的控制 工程造价的确定与控制贯穿 于项目建设全过程,但决策阶段各项技术经济决策,对该项目的工程造价有得大影响,特别是建设标准水平的确定、建设地点的选择、工艺的评选、设备选用等,直 接关系到工程造价的高低。据有关资料统计,在项目建设各大阶段中,投资决策阶段影响工程造价的程度最高,即达到80-90%。因此,决策阶段项目决策的内 容是决定工程造价的基础,直接影响着决策阶段之后的各个建设阶段工程造价的确定与控制是否科学、合理的问题。 1、编制投资估算的必要性 投 资估算是基本建设前期工作中的重要环节之一。是决策性的文件,它是研究、分析建设项目的经济效果的重要依据。在可靠性研究报告批准后,估算就作为设计任务 下达的投资限额,对初步设计概算起控制作用,并作为奖金筹措及向银行贷款的依据。因此,在经济工作中应该实事求是的反映设计内容,反映建设地区的经济状 况,从估算开始就要正确完整地反映工程项目的建设投资。 2、投资估算必须是设计的真实反映 在投资估算中,应该实事求是的反映 设计内容,这就要求设计人员从工程规模和项目内容上真实反映设计意图。主要工艺要进行多方案比较,方案要优化,设计方案不仅技术上可行,而且经济上更应合 理。所以工程经济人员从建设方案的优选开始,就应该渗透到设计的全过程中去,按照工程造价管理的原则,合理预测投资估算中各种动态因素的变化,尽可能打足 投资不留缺口,这是编制投资估算工作的关键,也是下阶段的重要依据。 (二)设计阶段工程造价的控制 工程设计是建设项目进行全面规划和具体描述实施意图的过程,是工程建设的灵魂,是处理技术与经济关系的关键性环节,是确定与控制工程造价的重点阶段。 1、优化设计方案,有效控制工程造价 设 计质量和尝试是否达到国家规定、功能是否满足使用要求,仅关系到建设项目一次性投资的满足使用要求,不仅关系到建设项目一次性投资的多少,而且在建成交付 使用后影响项目的经济效益。国外专家指出,虽然设计费用占工程总投资的比例很小,不到1%,但它对工程造价的影响程度达到75%。很显然,搞好工程设计阶 段的造价控制是有效控制工程造价的关键,重施工、轻设计的观念必须克服,控制工程费用应从设计抓起。因此,建设单位在审查设计单位的设计时,要重视设计方 案的优化,利用各种指标对厂区总平面图设计、工业建筑的空间平面设计进行分析比较,这两方面的设计不仅对工程造价产生重大影响,而且对施工及投产后的生 产、经营都有重大影响。在选择工艺技术方案时,应从我国的实际出发,以提高投资效益为前提,积极而稳妥地采用先进的技术方案和成熟的新技术、新工艺。一般 来说,先进的技术方案劳动生产率高、产品质量好,但是所需的投资较大,因此,要认真进行经济分析,根据我国国情和企业的经济实力,确定先进适用、经济合 理、切实可行的工艺技术方案。在工业建设项目中,设备投资约占建设投资的40%-50%,在设备设计与造型过程中应尽量采用标准化、通用化和系列化生产的 设备,尽量立足国内,对于需要进口的设备应注意与工艺流程相适应和与有关设备配套,不要重复引进。 2、对工程项目实行限额设计 控 制工程造价,在设计过程中采用限额设计。所谓限额设计就是按照批准的可行性研究报告的投资估算控制初步设计,按照批准的初步设计总概算控制技术设计和施工 图设计,同时各专业在保证达到使用功能的前提下,按分配的投资限额控制设计,严格控制不合理变更,保证总投资额不被突破。分解投资和工程量是实行限额设计 的有效途径和主要方法,它是将上阶段设计审定的投资额和工程量先分解到各个专业,然后再分解到各单位工程和各分部工程,通过层层分解,实现对投资限额的控 制和管理,也同时实现了对设计规范、设计标准、工程数量、与概预算指标等各方面的控制。初步设计阶段应按照批准的可行性研究阶段的投资估算进行限额设计,控制概算不超过投资估算,主要是对工程是和设备、材质的控制。为此,初步设计阶段 的限额设计工程量应以可行性研究阶段审定的设计工程量和设备、材质标准为依据,对可行性研究阶段不易确定的某些工程量,可参照设计和通用设计或类似已建工 程的实物工程量确定。在初步设计限额中,各专业设计人员要增强工程造价意识,严格按照限额设计所分解的投资额和控制工程量以及保证使用功能的条件下进行设 计,力求将工程造价和工程量控制在限额内。为鼓励、促进将工程造价和工程量控制在限额内。为鼓励、促进设计人员做好设计方案选择,要把竞争机制引入设计 中,实行设计招标,促进设计人员增强竞争意识,增加危机感和紧迫感,克服和杜绝方案比选中的片面性和局限性以及经验主义。 (三)实施阶段工程造价的控制 工 程项目的实施阶段是建筑物实体形成阶段,是人力、物力、财力消耗的主要阶段。工程量大,涉及面广,影响因素多,施工周期,政策性变化,材料设备价格,市场 供求波动大等等。要提高建设质量,控制工程造价,发挥投资效益,就要在工程实施阶段加强工程建设的管理和监督职能,从而加强了对工程项目建设的全方位、 全过程的造价控制。由于建设工程的复杂性,影响因素的多变性的特点,工程实施阶段往往会出现一些意想不到的费用。 1、有效控制工程变更和现场经济签证 在 工程建设项目中,工程变更和现场签证是不可避免的,但要进行有产的控制。为防止在施工图设计中产生漏洞,除在审核时把关外,还应在甲乙方的图纸会审、设计 院的技术咨询中消除,总之,应消灭在开工之前。设计变更应尽量提前,变更发生得越早,损失越小,反之就越大。为此,必须加强设计变更管理,尽可能把设计变 更控制在设计阶段初期,尤其对影响工程造价的重大设计变更,更要用先算帐后变更的办法解决,使工程造价得到有效控制。 2、严格审核工程施工图预算 根据施工图设计的进度计划和现场施工的实际进度,及时核定施工图预算。对于预算超出相应概算的施工图设计部分,要加以详细分析,找出原因,并及时与项目负责人通气,调整或修正控制目标,对工程造价实施动态控制。 3、择优确定专业分包单位,防止少数垄断性行业任意抬价。 在 工程建设中,有些特殊专业工种不得不委托专业施工单位承担,如变赔电所安装工程、通讯工程、绿化工程等,而这些行业往往又带有一定的垄断性质。如:每个建 设项目的变配电系统必须由供电部门所属的三产负责从设备采购到安装高度的总承包。而且价格是一口价。在这些项目中,首先应该尊重供电部门的“规定”,由他 们总承包变配电系统,另一方面要求允许另一家供货商参与竞争,最后终于了取得了较好的效果,设备采购价比借贷 电局原先指定厂商的报价降了20%左右。 4、深入现场,收集和掌握施工有关资料 在 工程施工过程,审价人员和费用控制人员经常深入施工现场,对照图纸察看施工情况,有时与监理、总承包方及施工人员进行座谈,了解、收集工程的有关资料,及 时掌握现场施工动态;协助业主及时审核因设计变更、现场签证等发生的费用,相应调整控制目标,并为最终的工程总结算提供依据和做好必要的准备工作。 三、结尾建设工程造价的确定与投资控制的实质就是运用科学技术原理和经济及法律手段,解决工程建设活动中的技术与经济、经营与管理等实际问题,只有在项目建设的各个阶段,采用科学的计价方法和切合实际的计价依据,合理确定投资估算、初步设计概算和施工图预算,才能提高投资效益。 我 国已加入WTO,正有逐步尝试实施国际通行的做法,有的地方开始工程量清单报价的试点工作,我们进入国际市场时不会手足无措。

浅议建筑工程造价预算控制摘要]本文分析了建筑工程造价超预算的原因,提出了建筑工程造价预算控制措施,以供借鉴。[关键词]建筑工程;工程预算;造价控制建筑工程造价预算是建设工程价值的货币表现,是以货币形式反映的建筑工程施工活动中耗用的费用总和。作为阶段性投资控制的重要依据,建筑工程造价预算在基本建设中起着承上启下的作用,在工程造价管理中具有举足轻重的地位。由于受到市场、人为等因素影响,先期的造价预算常出现偏差,超预算的现象屡见不鲜,这显然不利于对工程造价的控制。因此,探讨建筑工程造价预算控制问题,对造价预算进行有效控制,成为当前建筑业界所关注的焦点问题。1建筑工程造价超预算的原因分析建筑工程超预算一直以来都是工程建设中较为突出的问题,严重时还会导致工程造价失控,致使工程投资效益大大降低。经调查研究,笔者认为,当前建筑工程造价超预算的主要原因有几点。建筑工程概预算编制不合理某些预算编制人员对工程情况调查、研究得不够深入、详实,所编制出的造价预算出现缺项、漏项等差错,无法全面反映和正确预测工程实施的费用支出情况。由于缺乏科学性和合理性,造价预算在实际工程中丧失了应有的指导作用,为了确保工程质量和进度,超预算行为成为建设单位迫不得已的选择。工程造价受到环境、市场及其他因素的影响建筑工程项目的建设周期较长,所涉及的范围也非常广,工程之初所做的概预算虽然对材料价格波动、市场风险等情况作出了预测并对预算留有余地,但还是不能做到完全准确无误,当出现上述情况时,工程造价很可能出现超预算。建设单位忽视了工程实施阶段的造价控制不少建筑单位将工程造价预算控制看成孤立、静态的过程,仅仅重点对招投标阶段及竣工结算阶段的预算造价进行控制,从而忽视了施工阶段工程造价动态的控制,最后导致工程造价超预算。建设单位对工程管理不善建筑工程项目施工时间长、场面大、工序多,一旦管理不善,施工情况就得不到及时反馈,难以对工程实施阶段的工程造价进行监控及调整,容易造成资金浪费和工程造价超预算。2建筑工程造价预算的控制措施做好工程造价预算编制工程造价预算的编制工作非常重要,编制科学合理的工程造价概预算是对工程造价进行有效控制的基础。笔者认为,做好工程造价预算编制工作要重点把握几个方面。一是预算编制人员应掌握项目现场的具体情况,在综合考虑工程的施工组织特点的基础上进行预算编制。在编制之前先做好前期准备工作,收集工程勘查报告、地形测量图、施工设计图纸、各类标准图集等相关资料,深入现场勘察、调查施工环境并进行施工方案研究,了解现行建筑工程预算定额、取费标准、统一工程量计算规则及材料预算价格。二是要熟悉施工图纸,精确计算工程量及套用定额单价。在造价预算编制过程当中,反复阅读设计图纸直至深刻理解设计者的意图,将阅读图纸的过程与熟悉工程、审核图纸的过程有机结合起来,从而做出准确的预算编制分项,计算出相应工程量,熟练套用单价,最大限度地防止漏记、重记、错套等失误出现。三是客观分析价格因素,对价差调整留有余地。建筑工程建设所需要的设备与材料品种多、价格不一,购置设备材料的费用在造价构成中占有很大的比重(约占60%~70%),这就要求工程造价编制人员对设备材料的品种、规格、性能和价格做到心中有数。因为设备材料的价格水平是依市场价格确定的,还要对其进行差价调整和动态管理。为防止因价格波动影响预算对投资的控制效果,应该建立工程造价差价预测系统,对各项工程造价指标的变化趋势做出合理预测,以适时调整差价。重视项目实施阶段的预算控制建筑工程项目的实施阶段是资金投入最大的阶段,它既是招投标工作的延伸,同时也是合同的具体化过程。经研究表明,建筑工程的实施阶段对工程造价的影响约为10%,在这个阶段节约投资的可能性较小。因此,不少建设单位忽视了建筑工程项目实施阶段的造价预算控制。其实,在建设工程项目的实施阶段,施工浪费投资的可能性非常大,造成工程造价上升的原因主要有两个:一是受造价控制人员无法控制或较难控制的因素影响(如自然灾害、社会动荡等);二是受施工组织失误、技术限制、合同变更等人为因素影响(此类造价上升是可以得到控制的)。据悉,广西南宁市的某房地产建设项目,就曾经因为对现场施工的造价监控安排失当,导致不合理的开支费用得以通过审核,造成了不小的经济损失。可见,建筑单位必须重视建筑工程项目实施阶段的预算控制。在建筑工程的施工阶段,造价预算控制人员要切实落实合同造价预算的内容,将其作为控制的重要一环,并从经济、技术、合同等多方面采取措施,做好现场签证工作,对原合同价格中的主要费用进行正常计量,严格结算程序,派专人随时监督,保证各项费用如期、正常地发生,防止超前过量支付。当出现超支现象时,应及时向有关部门作出反馈,研究对策进行适当处理,力争把工程造价损失降到最低。应该说,通过实行工程有效签证监督、预结算审核等措施,是能够使建筑工程项目在保证工程质量的前提下,实现良好经济效益的。严格工程造价调整审批,最大限度减少项目变更的影响在工程的实施中,经常会出现项目的变更,包括设计缺陷引起的变更、业主意愿引起的变更、客观条件变化引起的变更等。我们十分清楚,项目的变更往往意味着以增加工程造价作为代价,因此工程造价预算控制人员应该最大限度地减少项目变更对造价带来的影响。造价预算控制人员要对变更部分进行技术经济论证,确认变更的必要性和可行性,尽量缩小因设计变更引起的造价超支。同时,在考虑项目变更对其它造价因素(如工期、工程质量等)影响的基础上,将项目变更朝向有利于节约造价的方向引导,还要严格工程造价调整审批,加强事前批准、事中监督和事后审查,对工程超量、超价部分从严控制,力争将项目变更对工程造价的影响降到最低。提高工程造价预算管理人员的素质建筑工程造价预算管理是集专门性、知识性、政策性于一体的工作,是一门多学科、综合性的工作。建筑工程造价预算管理对造价预算管理人员提出了较高的要求,它要求造价预算管理人员不但要掌握工程预算的专业知识及其相关的法律、法规和政策,还要了解设计、材料设备采购、施工工艺、工程基本结构、投资控制等相关的基础知识。同时,建筑工程造价预算管理又是一项艰苦、细致的工作,工程造价预算管理人员经常要深入工程第一线,从事资料收集(包括可行性研究、初步设计、施工图设计、工程施工等)工作,因此,工程造价预算管理人员不但要有过硬的专业基本功,还要具备良好的职业道德,要养成实事求是的工作作风,具有爱岗敬业、无私奉献的精神。要做好建筑工程造价预算管理工作,离不开高素质的造价预算管理人员。近年来,笔者所在的单位非常重视造价预算管理人才的培养,积极创造在职培训等再教育机会,为本单位造价预算管理人员的深造和提高搭建平台,同时关心造价预算管理人才的生活,为其解除生活上的后顾之忧,以情感留人才,通过各种措施,成功打造了一支专业过硬的造价预算管理人员队伍,大大提高了工程造价管理的能力。工程造价预算管理人员的素质直接关系到工程造价管理的水平,因此,建筑单位应该重视对造价预算管理人员的培养,使其专业技术和思想素质得到同步提高。3结语建筑工程造价预算控制是建筑工程项目造价管理的重要组成部分,对建筑工程造价预算进行有效控制,有利于控制工程造价,提高工程投资效益。这就要求从事建筑工程造价预算控制的相关人员高度重视建筑工程造价预算控制问题,理解其重要地位及影响,进而深入研究和探讨建筑工程造价预算控制问题,在具体的工作实践中不断探索和寻找建筑工程造价预算控制的新途径、新方法,切实解决建筑工程项目实施过程中所遇到的工程造价问题,从而推动建筑工程造价管理行业健康有序地发展,确保工程造价得到有效控制及工程建设目标能够顺利完成。参考文献[1]陈晓玉,由涛.建筑工程造价的合理有效控制与探索[J].陕西建筑,2006(,6).[2]王健.用施工预算控制工程成本[J].西部探矿工程,2006,(12).

信息时代工程造价管理 特别提示: 21世纪秘书网提供信息时代工程造价管理的原创文章定制和CSSCI核心、北大核心、国家级、省级刊物的投稿和发表服务,价格绝对优惠,每周还可以为客户提供工程造价论文最新动态。定制费用在同行业中非常公道,可无限制修改到客户满意为止;核心期刊的发表只收取最低500元定金,客户拿到录用通知书后,补足余款即可。欢迎大家咨询和了解。点击:立即免费咨询 关键词: 信息时代的工程造价管理 工程建筑论文 工学论文 内容预览: 1、信息时代工程造价管理的特点 社会的不断进步和发展,工程项目的规模扩大,工程造价管理的数据处理量也越来越多 以北京为例,奥运带来的项目投入,城市基础设施建设就有1800亿元人民币,体育设施建设有170亿元。其中奥运村项目占地80hm2,建筑面积47万m2,包括公寓、娱乐场所、餐厅、医疗等各种设施。如此庞大的项目,如此庞大的投入,无疑向工程造价管理工作提出了挑战,传统的被动式管理已无法满足日趋复杂的工程项目的需要。 工程造价信息对工程造价的确定和控制影响越来越大 工程造价形成的特性(如额大性、动态性、风险性等)决定了其在管理和控制上所受到的影响因素很是复杂,换言之,要想做好相应的管理和控制必然需要大量的信息作基础,也只有在充分掌握和详尽分析相关信息的前提下,实现工程造价的动态控制才有可能。同时,进入市场是工程造价形成的必然方向。现行的工程定额管理必然被量价分离的工程量清单报价法取代,也必然要建立起以市场竞争形成工程造价为主,以政府定额为指导的工程造价管理体制。一旦该机制形成,除工程中少量的政府性投资项目仍沿用有关定额外,大多数的工程项目将不再受定额的限制,而是以信息时代工程造价管理…… 本站提供原创文章定制和论文发表服务。为保护作者权益,浏览全文请在首页登录 ……信息时代工程造价管理着市场的变动。信息网与进度控制的整合也将成为必然。 固然,软件与信息网的整合比起信息网的建立有更大的难度,但这确是建筑业发展的必然趋势,同时也必将带来广阔的市场前景。 企业各级信息网的建立 施工企业内部的沟通与交流是很繁琐和必须的,而目前的会议、文件、电话等传统的方式很难达到随时互通的目的,建立相应的企业网站已迫在眉睫。首先企业要建立自己的局域网,构筑起合理的管理信息系统,做到人、财、物等各方面的计算机控制,其次,若有条件,则建立各项目的局域网,做到工程进度控制的信息化,同时与企业网站共同构筑沟通平台。只有如此,才能让企业先进的管理思想与理念得以顺利实施,同时也为工程造价的动态控制铺平道路。 工程造价管理的现状是其发展的必经之路,而Internet的发展将使之缩短到最小,同时,各种网站的建立与发展也必将给传统的密集型的建筑行业带来革命性的影响,为其适应信息时代的发展要求打好坚实的奠基。当然,工程造价的管理并非孤立的,它同时与合同、财务、材料等多个领域有着密切的关系。只有站在各方面的立场上,做出全局性是思考与探索,才能在实现企业信息化的基础上,彻底实现工程造价的动态控制。 详细见

相关百科

热门百科

首页
发表服务