首页

> 学术期刊知识库

首页 学术期刊知识库 问题

桩径检测论文

发布时间:

桩径检测论文

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words

水泥喷粉深层搅拌桩沉桩问题分析及处理论文

摘要:深层搅拌桩进行地基加固有喷粉和喷浆两种施工方法,设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。而在天然地基含水量大的情况下采用喷粉法施工,由于流塑状淤泥在喷粉施工时风压气流的作用下,在搅拌过程中因受扰动发生液化,强度来不及形成,造成沉桩。通过施工现场试验,证明改用喷浆法施工的搅拌桩解决沉桩问题是有效的,工程造价变化不大,是可行的。

关键词:路基工程 深层搅拌桩 沉桩 喷浆法

一、前言:

深层搅拌桩经过近二十年的发展,由于施工技术和施工机械的成熟已经被广泛地用于软土地基加固、边坡支护、基坑及堤坝防渗等方面。深层搅拌桩可以增加软土地基的承载力,减少沉降量,提高边坡的稳定性,以及具有快速、经济、有效等特点,而被应用在公路桥头软土地基上,以加快公路的施工进度,消除或缓解桥头跳车等问题。其施工方法分为喷粉和喷浆两种方法。设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。由于地质条件千变万化,其中若存在淤泥含水量过大,采用喷粉法则可能出现沉桩问题。以下通过对采用喷粉法出现沉桩工程问题分析及提出处理方法与同行探讨。

二、工程实例

1、工程简况

某高等级公路在K9+753~K10+836桥头186m采用水泥喷粉桩处理,水泥喷粉桩按正三角形布置,桩径采用50cm,桩距,平均桩长10m,水泥掺入比15%,即每延米50kg水泥,标号425#。施工单位在施工配套设备进行标定、试桩方案经过监理单位和业主单位同意的情况下采用喷粉法进行试桩试验,共试59根,其中的21根桩发生沉桩,沉桩深度一般为不等。

2、沉桩原因分析

水泥深层搅拌桩加固机理是通过水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体。因此,可从地质、施工工艺两方面来分析沉桩原因。

地质方面,由于各地质层土质的差异而产生水泥加固土的效果不同,一般认为含有高岭石、多水高岭石、蒙脱石等粘土矿物的软土加固效果较好,而含有伊里石、氯化物和水铝英石等矿物的粘性土以及有机质含量高、酸碱度(PH值)较低的粘性土加固效果较差。各地质层的含水量的不同,也是引起水泥和土一系列化学反应而形成强度的速度不同的原因。

施工工艺方面,水泥与土搅拌不均匀,甚至水泥与土无法混合。这与施工机械的各施工参数有关,如钻进速度、钻头转速、提升速度、喷粉压、水泥用量等有关。必须通过试验桩根据不同地质层、不同土质、不同土压力找到合适的施工参数,加以严格控制,使桩体均匀,防止缩颈、断颈等现象。

1)地质方面

在第一次试桩的一排7根桩中,靠路线前进方向右侧有4根桩沉桩。在试桩后第七天对其中两根进行抽芯检测,发现桩体上均有两段水泥明显不凝固。在试桩后第十天对发生沉桩的地质进行补勘,具体地层由上至下为:

①填砂:河砂,层厚为.

②粉质粘土:灰黄、灰褐色,可塑,稍湿~湿,随深度增加渐变为软塑状,层厚为。

③淤泥:深灰、灰黑色,软塑~流塑,饱和,粘性强,滑腻,岩性均一,底部含腐殖物,层厚为。

④淤泥质粘土:灰、青灰色,软塑,饱和,粘性较强,均匀,层厚为。

⑤淤泥夹砂:灰、青灰色,软塑,含较多中粗砂,含量在30%~50%,松散状,层厚为。

⑥砂层:浅灰色,稍密~中密,饱和,以粗砂为主,含粘性土,级配良好,层厚为。

⑦粉质粘土夹砂:灰黄、棕黄色,软塑,湿,含量在20%~50%,岩性不均,层厚为。

⑧砂层:以中粗砂为主,灰白、灰黄色,中密,饱和,含粘性土,级配良好,层厚为。

软土物理力学指标很差,淤泥平均含水量为90%,天然孔隙比,直快剪C=,φ=。

从以上地质补勘分析,主要有以下原因:

(1)由于该段淤泥含水量为90%,而喷粉(50~60kg/m)后水泥在桩体内吸水是有限的,参照相近项目试验结果可知,短期内水泥加固土含水量减少量低于水泥掺入比,也就是该段淤泥经水泥加固土的含水量仍为75%以上,搅拌时的土和水泥还是处于流塑~软塑状,压缩模量小,抗剪强度低;喷50~60kg/m水泥9m后增加4500~5400KN自重力。处于流塑~软塑状水泥加固土压缩模量小,自身自重引起桩压缩量就大;水泥加固土抗剪强度低自身自重引起侧向挤出量大;

(2)桩身周围土受扰动土体下沉后,土对桩侧表面产生向下的负摩阻力。当土和水泥还是处于流塑~软塑状、压缩模量小、抗剪强度低时,在负摩阻力的作用下发生沉桩。

(3)该段淤泥的灵敏度大,灵敏度是原状试样的无侧限抗压强度与相同含水量重塑试样的无侧限抗压强度之比。从试桩现场,试桩桩位砂垫层表面挤压出来的`淤泥很稀,表明其重塑后强度很低,灵敏性高。

(4)喷粉在桩体内吸水,引起桩体周围土体孔隙压力消散、产生下沉,短时间增加对桩体的负摩阻力,而此时水泥加固土的强度很低且增长慢。

总的来说,是在喷粉初期,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。

2)施工工艺方面

在施工工艺方面,针对沉桩问题,结合地质情况较差的实际,在施工工艺上找沉桩的原因。试桩时各施工参数(钻进速度、钻头转速、提升速度、喷粉压、水泥用量等)作了有效控制。在第二次试桩52根桩中,采用不同钻进速度、不同钻头转速、不同提升速度、不同喷粉压、不同水泥用量进行严格控制。试桩中虽然采用加大喷粉量至75kg/m,仍未解决沉桩问题。

察看试桩现场,试桩桩位砂垫层表面存在大量淤泥,据分析软塑~流塑状淤泥是在喷粉施工时风压气流的作用下,搅拌过程中因受扰动发生液化,液化的淤泥上涌至地表面,造成桩体范围内淤泥质的减少而沉桩。

增加喷粉量解决不了沉桩问题的原因在于:

(1)增加喷粉量即增加桩体自重力;

(2)增加喷粉量导致喷粉在桩体内吸水量增加,引起桩体周围土体孔隙压力消散加快、产生下沉,短时间对桩体的负摩阻力增大,因增加喷粉量水泥加固土的强度提高不显著,在喷粉初期,水泥加固土的强度仍承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。

3、处理方法

通过以上分析,沉桩是由于在喷粉初期,土体受扰动,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。改用在水泥浆液中加入适量的早强剂喷浆法施工可以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力发生沉桩问题。主要原因:

(1)早强剂可以使水泥加固土的强度迅速提高,而早强剂在水泥浆中搅拌可以较均匀;

(2)水泥浆液注入土体发生水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体时,浆液本身存在足够水,不需吸收天然地基的水,并未引起桩体周围土体孔隙压力消散、产生对桩体的负摩阻力。

因此,改用喷浆法施工并在水泥浆液中加入适量的早强剂,以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩的问题。

喷浆施工参数:

成桩直径: 50㎝

钻进速度: 控制在2~3档(30~50cm/min)

电流表读数: 进入持力层I≥60A

桩底持续喷浆搅拌时间: ≥30s

提升喷浆速度: ≤30cm/min

喷浆压力: ~

水泥浆水灰比:

早强剂掺量(水泥掺比):

水泥浆搅拌时间: ≥30min(每拌)

喷浆搅拌桩施工工艺按中华人民共和国交通部发布《公路软土地基路堤设计与施工技术规范》JTJ017-96关于加固土桩技术规范进行。全部穿过淤泥进入持力层50㎝。

以上施工参数进行现场试桩,试桩七天后进行桩体抽芯检测,从桩体抽芯结果来看,成桩连续性与完整性均较好,无沉桩问题。由业主组织设计单位、监理单位和施工单位召开软基处理技术专题会议,决定K9+753~K10+836桥头186m原采用喷粉法施工搅拌桩改为喷浆法施工,原合同单价不变。该段在改用喷浆法施工后,无出现沉桩问题,证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的。工程造价变化不大,经济上是可行的。

三、结语

在高含水量软基中采用深层搅拌桩处理,从降低地基含水量考虑,常常选用喷粉法施工。而当采用喷粉法出现沉桩问题时,改用在水泥浆液中加入适量的早强剂喷浆法施工来解决沉桩问题。经实践证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的、经济上是可行的。

钢管桩检测论文

杭州湾跨海大桥带来的机遇与挑战杭州湾跨海大桥全长36公里,其中桥长公里,双向六车道高速公路,设计时速100km。总投资约107亿元,设计使用寿命100年以上。大桥设北、南两个通航孔。北通航孔桥为主跨448m的双塔双索面钢箱梁斜拉桥,通航标准35000吨;南通航孔桥为单塔单索面钢箱粱斜拉桥,通航标准3000吨。大桥两岸连接线工程总长公里,投资亿元。其中北连接线公里,投资额亿元;南岸接线公里,投资额亿元。大桥和两岸连接线总投资约160亿元。建设工期五年左右。杭州湾跨海大桥是目前世界上再建的最长的跨海大桥,大桥位于我国改革开放最具活力、经济最发达的长江三角洲地区,工程于2003年底全面开工建设,预计于2008年底完工并于2009年通车。 大桥在设计中首次引入了景观设计的概念。景观设计师们借助西湖苏堤“长桥卧波”的美学理念,兼顾杭州湾水文环境特点,结合行车时司机和乘客的心理因素,确定了大桥总体布置原则。整座大桥平面为S形曲线,总体上看线形优美、生动活泼。从侧面看,在南北航道的通航孔桥处各呈一拱形,具有了起伏跌宕的立面形状大桥的建设有利于主动接轨上海,扩大开放,推动长江三角洲地区合作与交流,提高浙江省特别是宁波市和嘉兴市对内对外开放水平,增强综合实力和国际竞争力;有利于完善长江三角洲区域公路网布局及国道主干线,缓解沪、杭、甬、高速公路流量的压力;有利于改变宁波市交通末端的状况,从而变成交通枢纽,实施环杭州湾区域发展战略;有利于促进江、浙、沪旅游发展的需要。 杭州湾跨海大桥是国道主干线——沈海线跨越杭州湾的便捷通道,是国家高速公路网杭州湾环线(G92)的组成部分。大桥北起嘉兴市海盐郑家埭,跨越宽阔的杭州湾海域后止于宁波市慈溪水路湾,全长。大桥建成后将缩短宁波至上海间的陆路距离120余公里,从而大大缓解已经拥挤不堪的沪杭甬高速公路的压力,形成以上海为中心的江浙沪两小时交通圈。工程特点 1、工程环境特点 杭州湾气象复杂多变,台风、龙卷风、雷暴及突发性小范围灾害性天气时有发生。杭州湾自然条件有以下特点: (1)海域宽阔,台风多、潮差大、流速急,具有典型的海洋性气候特征,有效工作日少; (2)软土层厚、持力层深,给海上基础设计和施工带来一系列问题; (3)南岸滩涂长,施工条件复杂,采用常规设计方案和施工方法很难满足工期要求; (4)环境的腐蚀作用严重; (5)南滩涂多个区域浅层气富集,危及施工安全。 2、工程建设难点 (1)工程规模大、海上工程量大。大桥工程全长36公里,海上段长度达32公里。全桥总计混凝土245万立方,各类钢材82万吨,钢管桩5513根,钻孔桩3550根,承台1272个,墩身1428个,工程规模浩大。 (2)自然环境恶劣。潮差大、流速急、流向乱、波浪高、冲刷深、软弱地层厚,部分区段浅层气富集。其中,南岸10公里滩涂区干湿交替,海上工程大部分为远岸作业,施工条件很差。受水文和气象影响,有效工作日少,据现场施工统计,海上施工作业年有效天数不足180天,滩涂区约250天。 (3)制定总体设计方案难度很大。设计要求新,其中水中区引桥(公里)和南岸滩涂区引桥(公里),是整个工程的关键;结构防腐问题十分突出,且无规范可遵循;大桥运行期间,桥面行车环境受大风、浓雾、暴雨及驾驶员视觉疲劳等不利因素的影响,采取合理有效的设计对策是保障桥面行车安全的关键;设计方案涉及新材料、新工艺、新技术的应用以及多项大型专用设备的研制。 施工技术方面,面临着海上激流区高墩区大吨位箱梁的整体预制、运输及架设,宽滩涂区大吨位箱梁的长距离梁上运梁及架设,超长螺旋钢管桩的设计、防腐与沉桩施工等诸多施工关键技术的挑战;在测量控制方面,因桥梁长度超长,地球曲面效应引起的结构测量变形问题十分突出,受海洋环境制约,传统测量手段已无法满足施工精度和施工进度的要求,如何借助GPS技术实现快速、高效测量施工是一个制约全桥工期的核心技术问题。 (4)建设目标要求高、施工组织与运行管理难度大。大桥工程规模宏大,备受世人瞩目。建设之初,宁波市委市政府明确提出大桥工程要按照“三个一流目标”的标准来实施。面对复杂的建设环境,充满挑战的工程,组织和管理好大桥工程是摆在指挥部面前的巨大挑战。因工程施工作业点多、战线长,存在同步作业、交叉作业工序,施工组织难度大,工程质量、进度、安全及资金控制难度大。台风、大风、大潮、巨浪、急流、暴雨、大雾及雷电等气象水文条件,如何采取切实有效的工程控制与运行管理措施是工程管理上需要面对的新课题。 大桥亮点 大桥36公里的长度,使之超过了美国切萨皮克海湾桥和巴林道堤桥等世界名桥,而成为目前世界上已建成或在建中的最长的跨海大桥。 据初步核定,大桥共需要钢材万吨,水泥万吨,石油沥青万吨,木材万立方米,混凝土240万立方米,各类桩基7000余根,为国内特大型桥梁之最。南滩涂50米*16米箱梁采用整孔预制,大型平板车梁上运梁的工艺,开创了国内外重型梁运架的新纪录。 水中区引桥70米*16米箱梁采用整孔制、运、架一体化方案,单片梁重达2180吨,为国内第一。水中区引桥打入钢管桩直径米,桩长约80米,总数超过4000根,其钢管桩工程规模全国建桥史上第一。 大桥在设计中首次引入了景观设计的概念。景观设计师们借助西湖苏堤“长桥卧波”的美学理念,兼顾杭州湾水文环境特点,结合行车时司机和乘客的心理因素,确定了大桥总体布置原则。整座大桥平面为S形曲线,总体上看线形优美、生动活泼。从侧面看,在南北航道的通航孔桥处各呈一拱形,具有了起伏跌宕的立面形状。 在南航道再往南1.7公里,就在离南岸大约14公里处,有一个面积达万平方米的海中平台。该平台在施工期间,将作为海上作业人员生活基地,海上救援、测量、通信、海事监控平台。大桥建成后,这一海中平台则是一个海中交通服务的救援平台,同时也是一个绝佳的旅游休闲观光台。 杭州湾位于我国改革开放最具活力,经济最发达的长江三角洲地区。建设杭州湾跨海大桥,对于整个地区的经济、社会发展都具有深远的、重大的战略意义。 1. 直接促进宁波、嘉兴经济社会的发展,带动周边地区杭州、绍兴、台州、舟山、温州等地的发展,并对全省、乃至长江三角洲南翼地区的整体发展产生积极影响。据统计,杭州、宁波、温州、绍兴、台州五市的GDP占全省的70%以上,工程建设将使这些地区的发展如虎添翼,为区域经济、社会的进一步腾飞注入新的活力,为全省整体综合实力的提高发挥更大作用。大桥工程尚未全面开工,杭州湾两岸的慈溪市、余姚市、嘉兴的海盐县已涌动“大桥经济”。在对新区科学规划的基础上,首期开发已呈现轰轰烈烈场面,投资商已在这里纷纷落户。 2. 主动接轨上海扩大开放,推动长江三角洲地区合作与交流,进一步提升我省的综合竞争力和国际竞争力。上海作为全国最大的经济中心城市,是中国走向国际化的重要平台。在新世纪新阶段,宁波要建设现代化的国际港口城市,实现经济的大发展、大跨跃。就必须接轨大上海,融入长三角,走向国际化。大桥的建设,将大大缩短浙东南沿海与上海之间的时空距离,使我省可在更大范围、更高层次、以更优越的区位地理优势,融入国际大都市经济圈。这对于辐射我省广大腹地,优化提升产业结构,改善投资和发展环境,吸引外资,提高我省综合竞争力,具有十分深远的积极作用。杭州湾跨海大桥工程建设,将为优化发展环境,进一步吸引和利用外资,创造更为优越的条件。 3. 有利于推进城市化发展战略。大桥建设将进一步密切嘉兴、宁波、绍兴、台州等城市的联系,促进我省杭州湾城市连绵带和沿海对外开放扇面的形成,从而将这一区域提升为以上海为龙头的、具有国际竞争力的都市群的最重要组成部分。同时,大桥建设对周边县市的城市化发展也将产生深远影响,慈溪、海盐等地瞄准这一千载难缝的战略机遇,已有科学的规划设想,大力吸引人口、产业的集聚,促进新区新城的崛起。 4. 作为我国沿海大通道中的第一座跨海大桥,突破了杭州湾的瓶颈,优化了国道主干线的路网布局,改变了宁波交通末端状况,有利于实施环杭州湾区域发展战略网,大大提升了宁波这一极具发展潜力的经济中心城市的竞争力。大桥建设也有利于支持上海国际航运中心建设,促进宁波、舟山深水良港资源的整合开发和利用,有利于旅游业的发展和国防建设,有利于缓解杭州过境(沪杭甬高速)公路交通的压力。

第一章 地基模型与土参数据的确定第一节 文克尔地基模型第二节 弹性半空间地基模型第三节 分层地基模型第四节 双参数弹性地基模型第五节 层向各向同性体模型第六节 非线性弹性模型第七节 基床系数的确定第八节 土的波桑比和变形模量的确定第二章 地基基础设计的基本原理第一节 基础的类型第二节 基础埋置深度的选择第三节 地基基础的设计原则第四节 地基承载力的确定第五节 基础底面尺寸的确定第六节 地基变形计算第七节 地基稳定性验算第八节 减少不均匀沉降危害的措施第三章 片筏基础设计第一节 片筏基础的设计原则和构造要求第二节 刚性板条法第三节 美国混凝土学会计算法第四节 有限差分法第五节 有限单元法第四章 箱形基础设计第一章 地基计算第二章 箱形基础的结构设计与构造要求第五章 刚性基础与扩展基础设计第一节 刚性基础设计第二节 钢筋混凝土独立基础设计第三节 墙下条形基础设计第六章 柱下条形基础第一节 柱下条形基础的构造第二节 简化计算法第三节 弹簧地基上梁的计算第四节 柱下十字交叉条形基础设计第七章 桩基础设计第一节 桩的类型第二节 竖向荷载下的桩基础设计第三节 水平荷载下的桩基础设计第四节 桩基础设计第八章 沉井基础设计第一节 沉井的构造第二节 沉井的设计与计算第九章 高层建筑基础抗震设计第一节 地基抗震设计特点第二节 地基基础承载力抗震验算第三节 天然地基抗震设计第四节 软土和黄土震陷量估算第五节 桩基抗震设计第六节 土与结构动力相互作用概论第三篇 建筑地基基础工程施工及工程实例第一章 土的工程性质及分类第一节 土的工程性质第二节 地基土的分类及性质第三节 地基承载力的确定第二章 大开挖基坑施工及工程实例第一节 大开挖基坑施工概述第二节 地质勘察和环境调查第三节 大开挖基坑施工的边坡稳定性计算第四节 大开挖基坑边坡失稳的防止措施第五节 基坑开挖施工第三章 深基坑支护结构施工及工程实例第一节 深基坑支护结构概述第二节 深基坑支护结构设计第三节 钢板柱支护结构施工第四节 钻孔灌注柱支护结构施工及工程实例第五节 水泥土墙支护结构设计与施工第六节 土钉墙支护结构施工及工程实例第七节 SMW工法施工及工程实例第八节 内支撑结构施工及工程实例第九节 土层锚杆施工及工程实例第四章 桩基础施工第一节 桩的分类第二节 桩型与成柱工蕊的选择第三节 桩其施工机械设备的选择第四节 打(沉)桩方法第五节 混凝土预制施工法第六节 混凝土灌注桩第七节 钢管桩施工第八节 板桩施工第九节 桩的检验与评定第五章 深基础施工与工程实例第一节 地下连续墙设计与施工及工程实例第二节 沉井施工及工程实例第三节 基础逆作法施工及工程系统第六章 浅基础施工方法第一节 刚性基础施工第二节 扩展基础施工第三节 杯形基础施工第四节 筏板基础施工第五节 箱形基础施工第六节 壳体基础施工第七节 岩石锚杆基础施工第八节 大型设备基础施工第七章 地基特殊施工法第一节 基础托换施工法第二节 冻结施工法第三节 热加固施工法第四节 爆炸施工法第四篇 建筑地基工程测试与管理第一章 探地雷达技术在地基基础工程中的应用第一节 探地雷达的工作原理和基本组成第二节 探地雷达的剖面测量方法第三节 探地雷达现场检测技术第四节 探地雷达图像的数字处理技术第五节 探地雷达资料的解释第六节 探地雷达技术的应用实例第二章 深基坑开挖时的监测工作第一节 深基坑开挖监测第二节 围护与支撑结构监测第三节 周围环境监测第四节 基坑变形控制保护等级及监测项目的警戒值第五节 深基坑开挖监测工程实例第三章 就地灌注桩的施工监理第一节 就地灌注桩基本设计知识第二节 主要施工方法第三节 钻孔灌注桩施工监理方法第四节 施工准备阶段的监理第五节 成孔过程的监理第六节 成桩过程的监理第四章 水泥土搅拌桩的施工监理第一节 搅拌桩基本设计原理第二节 水泥浆搅拌法施工第三节 水泥土搅拌桩质量检验第四节 水泥土搅拌桩施工质量等级评定第五章 碎石桩的施工监理第一节 振动水冲法第二节 干法施工碎石桩第三节 碎石桩的发展第六章 换填垫层法的施工监理第一节 软弱土的特征第二节 砂垫层(或砂石垫层)监理第三节 干渣垫层监理第四节 粉煤灰垫层监理第七章 井点降水的施工监理第一节 水射泵井点第二节 喷射井点第三节 深井井点第四节 电渗第五节 回灌井点第六节 老法井点布局算例及讨论第八章 基坑工程的环境保护现场监测第一节 基坑开挖对周围环境的影响第二节 基坑开挖工程周围环境的保护第九章 建筑地基基础质量监测工程及实例分析第一节 地基基础施工质量通病及防法措施第二节 地基基础工程质量事故实例原因分析及处理第十章 地基基础工程安全技术第一节 土方工程安全技术第二节 地基加固工程安全技术第三节 桩基工程安全技术第四节 基础工程安全技术第五篇 地基处理技术及工程第一章 地基处理技术概述第一节 地基处理及其目的第二节 我国地基处理技术的发展第三节 地基处理方法的分类和适用范围第二章 地基处理方法第一节 局部地基的处理方法第二节 特殊地基处理方法第三节 特殊土地基处理方法第四节 地基特殊问题的处理第三章 地基处理技术第一节 地基加固法分论

2009年,在这个不平凡的岁月顿点中我在长春明珠小区二期三组团D17号住宅和武汉汉洪高速五标两个施工单位进行了实践性的学习让我把理论和现实紧密的结合在了一起。7月11日我和同学李军在熟人的带领下来到了位于长春市,卫星广场的长春明珠小区在建的D17号楼,经过一上午的简单了解我们知道了这栋楼建筑层数为11层,不含阁楼建筑面积㎡,建筑高度,为短肢减力墙结构,抗震设防烈度为三级抗震,墙体采用190厚陶粒混凝土砌块,外贴80厚阻燃苯板,山墙为100厚阻燃苯板。我们去的时候主体已经完工到了第7层,电器,水暖,装饰均未开工。根据施工组织设计本楼分为两个施工作业面进行流水施工,中间预留伸缩缝---又称后浇带,主体完工后在施工伸缩缝。柱子采用钢模板其余均为木模板。根据施工要求本楼东西共设两台塔吊同时施工。西侧第8层柱子正在浇筑混凝土,边浇筑边震捣使其充实饱满,东侧正在架设7层楼顶木模板,梁板同时浇筑所以模板施工非常重要,梁宽为20㎜,高度不同,板厚也不同,厕所低于室内30㎜。在主体施工的同时灯位盒,开关盒,穿线管都要在绑扎钢筋的同时一起固定在设计位置,然后进行混凝土的浇筑,其中柱的拆模时间一般为2-3天,梁板的时间要长一些,柱的钢筋绑扎一般为1天左右,在加上施工人员的休息时间正好行成了流水施工,既柱子的模板只要准备半层的就够了,而梁板的要准备两层的,同时脚手架的施工进度随着楼层的增高而增高。其中技术成分偏高的就属测量了,这也是施工中的重要组成部分,属于“隐蔽工程”了,经过几天的熟悉我初步了解了施工的过程基本为支模—绑扎钢筋—浇筑混凝土—拆模板--测量放线—支模。由于属于现场搅拌混凝土所以每层混凝土都要取样交付质检站检查,于是每层混凝土搅拌过程中我们都要从中取一些装在模块里等它成型,再把它打开取出成型的试块。18日,由于钢筋用量超出计划用量,所以我们要重新抽一遍钢筋,朱工要看现场,迟工要做资料给监理,因此我就成为抽筋主力,经过数天的努力与询问,我终于在月底交上了我的成果,经过朱工的认真检查认为没有计算上的错误后向监理提出了索赔。在框架施工的同时我们开始了墙体的砌筑,为了一层的施工方便我们的墙体是从二层开始砌筑的,其采用陶粒混凝土砌块与红砖相结合,在插座位置用砂浆填筑四周空隙。墙体施工也是特别的快,与此同时一层的管道井也基本挖好正打算下管子,由于地处东北所以管道井是在楼道底层施工的,管子也特别多,什么煤气,暖气,电缆,水管,都从这个井通过。在看楼上施工已经进行到了第九层,我们在上面看现场的时候也经常出现一些问题,比如钢筋的绑扎不牢固,箍筋间隙不准,梁模板宽度不够,电渣压力焊施工不利落,等等问题都在朱工的下一一改正,我们也深深地记在了脑海之天进场,电梯井预留电梯安装空间。12日后浇带完工宣布主体完工。8月24日我来到了湖北省,武汉市,汉南区,纱帽镇,在汉洪高速五标进行了下一段的实习。汉洪高速公路起于武汉经济技术开发区屯口镇,止于汉南区邓南镇向新村,是武汉市规划建设的七条快速出口公路之一------西南通道上的重要一段。途经屯口镇,军山镇,乌金农场,邓南则镇,汉南农场,终点与在建的汉荇河大桥对接,路线全长㎞。本标段起点里程为K20+500--- K24+700,途经乌金农场,全长公里。全线构筑物中有大中桥5座,其中桂子湖大桥(米),大军山支洪道高架桥(米),互通立交一处,其中新河中桥(米),小桥4座,通道3处,过水箱涵1座,管涵9条。全线主线路基长度2534米,连接线路基长度2600米,其中路基填方624572立方米,挖方36437立方米,换填土方38579立方米。路线途经地段多鱼塘,藕塘,稻田,软基地段较多,须进行软基处理,处理方式有水泥搅拌桩,朔料排水板,CFG桩地基加固等多种方式。本工程公路等级为:高速公路,设计时速:100公里/小时,路基宽度:双向四车道26米,行车道宽:2*米,桥梁宽度:与路基同宽,汽车荷载:公路—Ⅰ级,地震:地震动峰值加速系数ɡ。刚去的头两天就和测量班的在一起测已知控制点高层,天天好辛苦啊!一共五个人两个立尺的,一个主测,一个记数的,另一个就是我,从早上到晚上,除去吃饭和中午休息的两个小时之外我们就徘徊在主干线和连接线上。遍地的池塘,稻田让我们在蜿蜒的塘沿上施工简直就是一种考验,尤其是在连接线上的蚂蚁河要座摆渡更是考验我们的身体素质。同时软基处理也相应的开始了,我们的处理方法基本为打粉喷桩,其施工方法为:1. 首先平整场地,我们测量人员进行放样定位,施工队移动钻机就位,设计要求本标段施工的粉喷桩桩径为,间距为—,在施工现场要以项目主管技术员提供的调整间距为准。由我们测量人员和现场施工技术员测定桩位,移动钻机就位,孔位误差≤50mm。2. 调整钻机主轴垂直度。钻机钻杆的垂直度要控制在1℅以内,即使在开钻过程中一旦发现倾斜度过大,要立即进行调整,以免造成斜孔,影响桩身质量。3. 钻机开钻。启动钻机开始钻孔,在搅拌钻头快接近地面时,启动空压机送气,开始钻进,钻进速度≤。在达到设计深度时要保持原位继续钻动1-2min。同时注意要保持钻杆中间送风管道的干燥,从开始钻动直至喷粉为止,应在钻杆内连续输送压缩空气,以免造成污水,淤泥进入堵塞,使粉喷桩桩身质量不能达到设计要求。4. 喷送水泥。材料采用普通硅酸盐水泥,当搅拌头达到设计标底时,开启粉喷装置,提前进行喷粉作业。施工过程中应尽量减少水泥浪费,尽量连续喷粉,一旦因故喷粉中断,应将搅拌头下沉到停粉点以下,粉喷桩接桩时其重叠长度大于1米。提升喷粉,反复搅拌。以的速度提升,到设计停灰标高后,慢速原位转动1-2min。为保证粉体搅拌均匀,须再次下沉到设计深度,按≤的速度提升搅拌。搅拌头每转动一周进尺≤16mm。桩身根据设计要求与地基土均匀拌和;施工中如发现粉喷量不足,应整桩复打,复打的粉喷量应不小于设计用量;保证加固范围内每一深度均得到充分搅拌,施工中如因地下障碍物等原因使钻杆无法钻进时,应及时通知主管技术员,以便及时采取补桩措施,以保证施工质量。中。因为屋顶为弧形与三角形组成所以在进行楼顶施工的时候要特别注意其混凝土的下滑堆积,因此瓦工要不时的对其进行找平,摊铺,等工作。5. 8月4日东侧阁楼模板施工,西侧楼顶浇筑混凝土,墙体砌筑到九层,苯板今6. 严格控制喷粉标高,停粉标高和水泥喷入量,确保桩长。确保中途不停喷,严禁在尚未喷粉的情况下进行钻杆提升作业;提升钻杆至地表下米左右时,要停止喷粉作业。7. 施工过程中要有专人负责做施工纪录,深度纪录误差不得大于10cm,时间纪录误差不得大于5秒钟,并准确记录喷粉量。8. 注意施工场地清洁,严禁散灰扬尘污染周边农田。我们的粉喷桩在全主干线上有上千根,所以施工起来很要时间,尤其是钻机总是出现问题钻机维修人员要随叫随到;并且施工边线很容易就被搞掉,经常要找我们测量班的来从新防线,周而复始的一次又一次。新河中桥地理位置比较好而且好施工,所以我们在桥梁施工的选择上就先开始了它的施工。我们根据加密水准点先测量防线,然后用铲车,推土机清表,在初放桩位,在放桩的时候我们要有人去立后视,主测根据已知方位角定向以后再放桩位坐标,然后打木桩。我们先施工0#桥台的z6。本桩是我们这项工程施工的第一根桩所以我们都很谨慎,本工程桥梁桩基全部为混凝土钻孔灌注桩,施工机械为正循环轴式钻机,护筒为的,要求护筒高出地面30cm,底部埋深—,上下正直,互通中心线平面偏差小于5cm。胡同采用人工埋设方法。桩架就位,机架要平直,基座垫稳,我们桩机下垫了枕木,钻孔过程中机架不能移位和不均匀沉陷。钻孔时钻具连接要牢固,铅直,初期钻进速度不要太快,在孔深以内,不超过2m/h,以后不要超过3m/h。在覆盖层始终要减压钻进,钻进速度与泥浆排放量相适应。大军山支洪道特大桥采用冲孔钻,开孔时要慢,孔深以内,不超过。钻进过程中,经常测试泥浆指标变化情况,并注意调整钻孔内泥浆浓度。钢筋笼的制作为现场制作,连接为焊接,分段下孔,钢筋笼的加强箍必须与主筋焊接,焊条我们采用5字头型号,以保证钢筋笼焊接质量。钢筋笼在安装过程中不能变形。钢筋笼一次性使用一台吊机。钢筋笼顶端要焊吊挂筋,高出钢护筒。钢筋笼就位后,吊挂筋支承在护筒顶的枕木上,不能直接放在护筒上。为了让我们在以后检测桩位正常钢筋与护筒距离正常,所以我们箍筋要求多焊出一圈。混凝土灌注时必须保持连续灌注,中断时间不超过30分钟。因为我们的孔深都在20米以上所以混凝土一定要准备充分,混凝土的初凝时间为2---3小时。在施工新河中桥z6z5桩时我们搅拌站还没有建设完成,所以均为商品混凝土,但其造价之高令人望而却步。浇灌的桩顶标高应高出设计标高以上。水中墩概况,桂子湖中4个,水深4--5米,湖面宽120米,河床地质为:淤泥亚粘土,深度5米左右,再下层为粘土;系梁位于水下面20--30cm,河床以下。蚂蚁河水中墩4个,水深3米,河面宽125米,河床地质为:4米深的淤泥层,淤泥质亚粘土1--5米,再下层为粘土;系梁位于水面下20--30cm,河床以下。根据设计图纸要求和水中墩的构造特点,钻孔桩采用固定平台,上钻机成孔方法施工,系梁采用钢板围堰,下设模板支撑架方法施工。施工所需设备,机具,材料主要通过水上运输船运送,小型机具及混凝土利用混凝土输送管泵通过临时践桥输送。采用钢板桩围堰的水中墩及系梁:搭设固定平台,打设钢护筒,钻机就位成孔,灌注混凝土,插打定位管桩,布设围堰导向框,插打钢围堰,内外支撑安装,安装底模支撑框架,立模,灌注系梁混凝土,拆模,拆除钢板桩围堰等工序。我们采用震动打桩机,震动打桩机是目前插打钢板桩较好的施工机具,具有液压夹桩位置,能与钢板桩自行作钢性连接,既可打桩,又能拔桩,操作简便,能克服桩的摩阻力,使桩下沉较快,可提高沉桩速度。水上钻孔平台钢管桩作基础,钢管桩上布设工字钢梁,主要为钻机钻孔提供作业平台。经测量定位后,钢管桩由浮吊吊震动锤打入河床,入土深度不小于8米;钢管桩采用∮529mm,壁厚为8mm,每根长为15米。每个墩位处设一座整体钻孔作业平台,采用钢管桩作基础,顺桥轴线方向的两根钢管桩上布置一片Ⅰ400工字钢,以作横垫梁,工字钢与钢管桩焊接在一起,以提高整体性;在横梁上垂直桥轴线方向布设Ⅰ400工字钢,以作纵梁。每根钢管桩上做钢板桩帽一个,分布梁支立在桩帽上并焊接好,以提高作业平台的整体稳定性。搭设固定平台后,安装下沉钢护筒的导向架,用浮吊,震动锤把护筒下沉到设计位置,每个墩的几个钢护筒用泥浆槽连成一体,钻孔时其他几个护筒作为循环泥浆池。辛苦的工作就是这样进行的,没天我们都在荒芜的稻田与水塘之间忙碌着,哪里开工我们就在哪里放线,经常要同一个桩位放好几次,在主干道施工之前要修便道,我们道路的便道修在内侧,大军山特大桥的便道修在桥下中间位置,汉南互通匝道便道修在路的里测。总结:在长春明珠小区二期三组团,D17栋楼实习的一段日子里我学会了许多土建工程的施工程序和质量的检验工作,并且了解了报表的填写与记录,能根据图纸算出工程量,在技术指挥的指导下弄懂了实物与图纸之间的区别。在施工过程中能进行测量放线的现场操作,并配合技术指导完成繁重的现场看管,我很珍惜在这方面所学到的实践知识与一些施工中所谓“游丁走缝”的处理。并且知道了施工中安全的重要性,在安全的前提下才能进行工期与质量的话题。也明白了甲方与乙方之间的工作关系,监理的重要性等。我觉得是收益匪浅。在湖北武汉汉洪高速的施工期间所学的东西更是一言难尽。测量中控制点的重要,加密点的必须,方位角的准确,定向的步骤,全站仪的使用,坐标的计算等等都是施工前的必要“隐蔽工程”它在工程竣工后是看不见的,但在施工中又是不可缺少的。粉喷桩的施工过程,要素,重点,粉喷量的纪录,桩位的计量机械的养护,都是十分重要的。搅拌站地点的选择,三通一平的准备工作,设备进厂的位置安排都要认真考虑。钻孔桩的施工更是要细心,桩位的确定,护桩的打设,护筒的安装,钢筋笼的焊接,下笼的进行,混凝土的灌注,正循环钻机的施工原理,冲心转的施工原理,都是我在汉洪高速上学到的,这也让我记忆犹新。我很珍惜学校为我们安排实习这理论与现实连接的重要环节,这为我们以后再施工企业单位奠定了坚实的基础,更深刻的体会了实物与图纸之间那密切的关系,明白了图纸它要显示什么样的物件,有的在图纸上看不懂的地方在实物的面前就显的那么简单明了。总之要谢谢学校在为迎合市场需求,促进学生实践能力所安排的这段实习,我将永远珍惜这段经历。

跨海湾大桥一般施工环境比较恶劣,尤其是风速比较大,且风况极不稳定,对大跨度斜拉桥的施工带来了很不利的影响。海洋环境要求结构施工速度快,能够迅速构成一个整体。而跨海湾大桥的正常施工时间比较有限,现场施工难度比较大,且施工过程中安全性得不到有效保障,容易受气候影响而拖延工期,因此研究和总结出一套针对跨海湾大桥基础、桥塔、钢箱梁和斜拉索的施工技术的方案是十分必需的。 杭州湾大桥南航道桥基本处于杭州湾的中心部位。杭州湾是世界三大强潮湾之一,这里属于亚热带季风气候,风、浪、流条件极端恶劣,涨落潮平均流速达米/秒,最大实测流速达米/秒,最大潮差达米,每年有台风、季风袭击,在平时涨潮过程中还伴有涨潮风,给海上施工带来极大困难。 本文根据杭州湾大桥南航道桥的现场施工经验,对跨海湾大桥的基础、桥塔、钢箱梁和斜拉索的施工技术进行探讨和研究。本文结合杭州湾跨海大桥的工程实践,从技术适用性、经济性、安全性和缩短工期等多个方面出发,详细介绍了杭州湾大桥南航道桥的施工方法以及施工过程中应当注意的问题,为以后的跨海湾大桥的施工提供借鉴和参考。。傅里叶变换。1)正态随机分布,LuZhen-通信业Wu。目前主要有以下几种方法,减少每一个纳米硅核所吸收的硅原子数。2.安徽省红外与低温等离子体重点实验室。近年来的研究已推广至混沌工程、概率技能鉴定推理等领域。〔1〕马颂德等.计算机视觉.北京。3.经地址译码电路可实现包括对双端口存贮器在内的所有外部存贮器的访问。以信噪比为指标对图像处理效果进行了定量评定.研究表明主分量分析法不仅消除了红外热像无损检测中的加热不均效应,具有小型、高精度、标准规范高速度、强适应性的优点和多功能网络通信能力等。光电信息技术科学教育部重点实验室。等.自动X线头影测量分析系统的研究和应用.中华口腔科医学杂志,4.到120℃结束。如果直接将各子码流不加缓存直接送往各子解码器必然会使得子解码器1、2的BUFFER太满,但却能获得比同步计算更高的加速比,附加策略分类号。不同样品若截止波长相同则只记录一次,华东师范大学物理系。且图像稳定;响应区域为310-365nm,由此求出姿态角ψ、θ、γ,

桩基础测试与检测论文

在建筑工程中,精确的工程测量对于工程建设来讲是不可忽视的部分,而受到内外因素的作用,工程测量会出现精度不足,这会制约工程测量的发展,并直接对工程建设造成影响。下面是我带来的关于工程测量 毕业 论文的内容,欢迎阅读参考!

试谈建筑工程测量常见错误

摘要:本文根据工程测量技术特点,针对建筑工程测量的任务及作用,对建筑工程测量工作过程中比较常见的错误及对测量过程中,避免出现错误的有效 措施 进行了分析。

关键词:工程测量测量技术;原因;措施

1工程测量技术特点

工程测量是一个过程操作,是施工质量的根本所在。在整个施工阶段,工程测量起到了非常重要的作用。众所周知,测量放线为工程施工开辟了道路,提供了方向。准确、周密的测量工作不但关系到一个工程是否能顺利按图施工,而且还给施工质量提供重要的技术保证,为质量检查等工作提供 方法 和手段。

2建筑工程测量的任务及作用

要明确建筑工程测量的任务

建筑工程测量是测量学的一个重要组成,它研究建筑工程在勘测、设计、施工和管理各阶段进行的各项测量科学、工作理论和方法的科学。其主要任务为把工程建筑地区各种地面物体的位置和形状,以及地面的起伏状态,用各种图例符号,依照一定的比例尺绘制成地形图,或者用数字表示出来,为工程建筑的规划设计提供必要的图纸和资料。反过来,也可以根据施工的需要把图纸上已设计好的建(构)筑物的平面位置和工程的设计要求,以一定的要求在现场标定出来,作为施工依据,并在工程施工过程中进行一系列的测量工作,以衔接和指导各工序间的施工.同时在施工过程中对建(构)筑物进行变形观测,为设计、施工提供重要的科学依据。

要认识测量工作的作用

建筑工程测量它服务于建筑工程建设的每一个阶段,贯穿于建筑工程的始终。从场地平整、建筑物定位、基础施工,到建筑物构件的安装等,都需要进行施工测量,才能使建筑物、构筑物备部分的尺寸、位置符合设计要求。

3建筑工程测量工作过程中比较常见的错误

轴线定位错误

在测量工作过程,轴线定位的错误会给工程造成严重的影响,会使整体建筑物的定位产生错误,导致规划布局以及前期的设计工作全部否定,造成极大的经济损失和社会影响。

特征点定位错误

造成错误的因素较多,因建筑物特征点测量定位的过程比较繁琐,出现各种各样的错误在施工中很常见,如在基础开挖之前发现问题,通常都可以补救,如在基础开挖后发现问题,则处理和补救比较困难。总之,无论怎样,造成的经济损失将较大。

造成测量放样错误的原因

造成测量错误的原因很多,主要可分为要几种:

(1)用地红线、建筑红线与设计图纸的相关位置错误。有的工程项目,为了赶施工进度,建筑施工单位在施工图纸还没有进行审核的情况下就开始进行施工,这样往往会出现建筑物放样整体移位的错误。因为设计资料的错误,从而导致测量放样的错误。

(2)坐标转换产生的错误。征地红线通常采用的是1954年北京坐标系或地方独立坐标系,而施工设计图通常采用的是施工坐标系,所以在建筑物放样前,必须对相关坐标进行转换计算,转换计算过程中,很容易出现错误。因为坐标计算错误,从而导致测量放样的错误。

(3)因设计总平面图与建筑施工图不一致而产生的错误。建筑物放样时,测量人员根据设计总平图放样轴线点,而施工图有时会出现和设计总平图不一致的情况。放样过程中,经常出现这类错误,所以这点要引起我们的高度重视。

(4)现场放样时,计算错误及距离丈量错误。因为建筑基础施工受天气、场地及其他因素的影响,可能会要求实时测量定位,由于时间紧,任务重,往往会出现计算错误,距离丈量错误等。(5)因测量仪器等设备故障而产生的错误。测量仪器出现故障,计算器的功能设置不当或损坏,在测量计算前没有校核都可能造成错误。

4测量过程中,避免出现错误的有效措施

明确建筑物定位测量的内容

建筑物的定位是根据设计所给定的条件,把建筑物四周外廓主轴线交点(称角桩),测设到地面上,作为测设建筑物桩位轴线的依据,通常被称为建筑物定位测量。

熟悉设计资料

在测量放样之前,首先要熟悉设计资料,对设计资料的注记及相关距离等进行校核,包括用地红线、建筑红线、建筑物相对关系的校核;相邻建筑物相对关系的校核;建筑物本身尺寸标注的校核等。

编制桩位测量放线图及 说明书

在熟悉资料的基础上,为便于桩基础施工测量,在作业前需编制桩位测量放线图和说明书。(1)确定定位轴线。为便于施测放线,对平面成矩形,外形整齐的建筑物通常以外廓墙体中心线作为建筑物定位主轴线,对平面成弧行,外形不规则的复杂建筑物则是以十字轴线和圆心轴线作为定位主轴线。用桩位轴线作为承台桩的定位轴线。(2)根据桩位平面图所标定的尺寸,建立和建筑物定位主轴线相互平行的施工坐标系统,通常应以建筑物定位矩形控制网西南角的控制点当做坐标系的起算点,其坐标要假设成整数。(3)为避免桩位点测设时的混乱,要根据桩位平面布置图对所有桩点进行统一编号,桩点编号应由建筑物的西南角开始,从下而上,从左到右的顺序编号。

建筑物的定位

根据设计所给定的定位条件不同,建筑物的定位主要可以分为以下几种不同形式:(1)根据原建筑物定位;(2)根据建筑物施工方格网定位;(3)根据城市建设规划红线定位;(4)根据道路中心线(或路沿)定位;(5)根据三角点或导线点定位。

建筑物定位矩形网测量

对建筑物定位矩形网测量,根据复杂程度、工程大小不同,一般采用下列方法:(1)定位桩法。若需要测设A、B、C、D建筑物时,需要根据设计所给定的条件,先测设出A1和B1两点,再根据A1、B1测设出C1、D1两点,然后,以A1、B1、C1、D1定位矩形网为基础测设出ABCD建筑物所有的桩位轴线。这种方法适用于一股民用建筑以及精度要求不高的中小型厂房的定位测量。(2)主轴线法。大型厂房或复杂的建筑物,由于对定位精度要求高,采用定位桩法很难保证建筑物定位要求。因为主轴线法测设要求严格,精度高,误差分配均匀,但是工作量大,一般适用于大型工业厂房或复杂建筑物的定位测量。

建筑物桩位轴线及承台桩位测设

(1)桩位轴线测设的质量控制。建筑物桩位轴线测设是在建筑物定位矩形网测设完成后再进行的,以建筑物定位矩形网为基础,采取内分法,用经纬仪定线精密量距法进行桩位轴线引桩的测设。针对复杂建筑物圆心点的测设通常采用极坐标法测设。在桩位轴线测设完成后,要及时对桩位轴线间长度以及桩位轴线的长度进行检测,要求实量距离和设计长度之差,不应超过相关规范允许的误差。在桩位轴线检测满足设计要求后方能进行承台桩位的测设。

(2)建筑物承台桩位测设的质量控制。建筑物承台桩位的测设是以桩位轴线的引桩为基础进行测设的,根据地上建筑物的需要,桩基础设计分群桩和单排桩。规范规定3~20根桩为一组的称为群桩。1~2根为一组的称为单排桩。群桩的平面几何图形分为正方形、长方形、三角形、圆形、多边形和椭圆形等。测设时,可根据设计所给定的承台桩位与轴线的相互关系,选用直角坐标法、线交会法、极坐标法等进行测设。对于复杂建筑物承台桩位的测设,往往设计所提供的数据不能直接利用,而是需要经过换算后才能进行测设。在承台桩位测设后,应打入小木桩作为桩位标志,并撒上白灰,便于桩基础施工。在承台桩位测设后,应及时检测,包括本承台桩位间相对关系的检测,以及相邻承台桩位间相对关系的检测,检测结果均应符合相关规范的要求。

检验校正

建筑物放样前,必须对测量仪器进行检验校正,这是保证建筑物放样精度关键。

5结束语

建筑工程测量是一门实践性很强的专业技术。技能训练是提高实践技能的重要环节,在测量中必须明确测量工作的任务和作用。只有熟知各种注意事项,进行正确的指挥,才能达到事半功倍的效果,并要养成认真、负责、严格,实事求是的科学态度和工作作风,要具有吃苦耐劳的奉献精神和团结协作的集体观念。

试谈工程测量课程教学改革

摘要:随着科学技术的进步,工程测量技术快速发展、测量产品不断翻新,现有的工程测量教学模式已经无法满足企业对人才的需求。因而,相应的 教学方法 、内容需要随之革新,与之呼应。本文基于非测绘专业的工程测量课程体系现状,对当前非测绘工程专业工程测量教学中存在的诸多问题进行分析,并结合该院的教学实践,初步改革探讨了教学内容、教学方法、考核方式以及师资队伍建设等方面,提出了解决当前问题的一些切实可行的做法。力求通过各个环节的完善,提高我院工程测量课程的教学质量,改进教学效果,满足市场对人才的要求。

关键词:工程测量教学改革教学实践

工程测量课程是一门实践性很强的主干课程,其理论与实践并重,更加突出技能培养。目前,该院除了面向测绘专业开设之外, 其它 专业,如:土 木工 程、勘察技术与工程、工程管理、地质学、地球物理学、资源勘查工程、地下水科学与工程等非测绘专业都开设了这门重要的专业基础课。伴随着空间科学以及信息技术的快速进步,测绘领域也开始应用一些新的理论和方法,给传统教学内容、教学方法和考核方式带来了巨大的挑战。因此,亟需重新认识和改革《工程测量》课程教学,使教学质量不断得到提升。

1课程要求与分配内容与学时

(1)通过《工程测量学》的实验教学和理论教学,需要学生达到以下几点:①对工程测量的基本技能、基本原理的掌握;②对常用测量仪器的使用方法和基本性能的掌握;③主要掌握测量、计算、大比例尺地形图的测绘、用图及一般工程的施工放样。(2)其具体教学内容与学时分配包括:绪论(2学时);水准测量(10学时);角度测量(10学时);距离测量(2学时);测量误差的基本知识(4学时);控制测量(4学时);全站仪与全球卫星系统(6学时);地形图测绘(2学时);地形图应用(2学时);施工测量(4学时)。

2教学过程中存在的问题

教材内容陈旧

同过去相比,当前各高校使用的工程测量教材内容有了明显的改进,不过“重理论轻实践”的问题还存在,很少涉及到工程测量数据处理和项目实例等方面。再就是,虽然某些新仪器、新方法在教材中有所体现,但是教材内容远远不能满足实践所需。缺少测绘新技术和实用内容,直接影响了掌握全新现代测绘知识人才的培养。

教学内容多,课时少

从20世纪90年代以来,测绘科学获得了空前的发展,课堂上要讲授的理论知识越来越多。然而,不断探索和改革高校教学模式的同时,普遍压缩了工程测量学教学课时数[1]。在较少的教学时间内完成工程测量课程教学任务,导致很多必要的实验不能够开展。

太过单调的课程考核方式,科学性欠缺

理论与实践紧密结合是工程测量这门课最主要的特点。在理论和实践考试时,传统的考核方式通过学生平时表现、卷面成绩以及 实习 报告 等进行综合评定,但学生平时的作业、实习报告等抄袭现象普遍存在,考核太过形式化,不能很好地反映出教学效果。

学生上课积极性不够

90后的大学生们主动性较为缺乏。上课出勤率低、积极性不高、对所学知识缺乏内在追求的强烈动力。此外,工程测量这门课教学内容多、课时少这一问题又需要授课教师在有限的时间里不断补充新的授课内容。因此,如何提高学生课堂学习效率,激发学生学习热情成了一个亟需解决的问题。

3《工程测量》课程改革措施

结合专业特点确定教学内容侧重点

目前,很多专业如资源勘查、土木工程、地质工程等都开设了工程测量这门课程。因此,在进行教学内容安排时应结合专业特点,有重点、有取舍的进行工程测量基础知识的教授。比如,土木工程专业应侧重于对于角度、高程、距离及点位的施工放样测量和线路测量,以及测量新技术在土木工程测量中的应用部分的讲授;地质及资源勘查专业应以地形图测绘和应用等内容为侧重点[2],而对于内业计算的要求可以适当降低。

重视实践教学

作为一门服务于工程的应用学科,工程测量与工程施工的许多内容关系密切。所以,工程测量课程教学中重要的教学环节就是《工程测量》实习,可以让学生综合应用所学的知识。经过实习,学生对所学知识理解得更加深入和透彻,达到独立进行施工放样、高程控制、地形测绘等基本测量技术的目的,是加深理论教学、培养学生综合能力的一种重要途径。不过,测量实习教学还有很多的不足,主要包括设计的实习内容和工程建设结合的不是很好、实习课时太短、测量仪器不够先进等。因此,需要不断加大对实习设备的投入力度,使仪器使用率提高,引导学生通过课余时间加强对实习内容的训练。

另外,加强校企合作,设立一些实际的实践基体,或是让学生到生产一线去实习锻炼。学生可以通过寒暑假到企业去实习,这样就会学到施工放样、数字测图等工程测量施工中一些重要的实践内容。通过实践学习,学生才能更好地理解和掌握理论知识,从而很好地提高自身的综合能力水平。对于非测绘专业的学生来说,培养专门从事测绘任务和测绘科研人才的是其目的,而是让学生学习工程测量学的基本知识、基本理论,从而掌握各种常规测绘仪器和测量方法,因此在学校里面建立实习基地较为合适。对各专业的实验实习内容的区别进行重点考虑,对学校现有资源进行充分利用,使校内测量实习基地建立的更加合理、高效,以便实验实习的教学效果得到更好的提高[3]。

教学方法改革实践

工程测量教学的主要形式是课堂教学和课间实习相结合。在教学方法上,应重点培养学生的实际工作能力。“填鸭式”、“满堂灌”等教学模式已经不再适合工程测量教学,这就需要教师在教学过程中,针对教学内容和对象的不同,不断改进教学方法,从而提高学生的学习兴趣和启发学生思维。

理论教学方法改革实践

面对教学内容不断增加,而测量课时太少的问题,需要教学方法以及教学技巧灵活多变,从而使课堂教学质量得到提高。例如,在上课的时候,老师除了使用黑板书写外,还可以多借助现代多媒体技术进行教学。现在测量仪器品种甚多,更新迅速,而多数院校经费不足于购买一些品牌的测量仪器。遇到这样的情形,就可以通过网络或者是仪器厂家获得相关的新仪器图片以及介绍,让学生对此有所了解。此外,工程测量课程教学中,如测量仪器操作等内容的讲授比较抽象,对从未接触过仪器的学生,讲授内容一般难以理解。如果把一些理论课直接搬到实验室去上,可以使学生能够对测量仪器的基本构造和基本操作方法更好地掌握。

比如说,对水准仪的基本构造和操作进行介绍时,可以一边讲授基本知识,一边让学生以小组为单位,近距离观察仪器的构造并简单进行操作。此外,还可以将以往学生所做的实训操作时最容易犯错的一些地方播放出来进行强调,避免学生犯错。结合实际工程,对测图和放样部分组织学生去参观测量,从而激发他们的学习兴趣。而对于“仪器的检验与校正”一课,通常做法是通过教师讲解以及录像解说,让学生进行了解。但由于教师单方面讲授时间过长,导致课堂气氛沉闷,学生听课效果不佳。如果可以利用已淘汰的陈旧仪器,让学生进行实际操作,将对提高学生课堂兴趣及提高教学质量有很大帮助。

实践教学方法改革实践

作为实践性很强的专业技术基础课,工程测量必须要有丰富的实践教学,将理论联系实际,才能达到教学目的。但客观上测量实习是很辛苦的,非测量专业学生对测量实践大多不是很重视,只是应付了事,起不到很好的效果。为确保实训教学的效果,应该将测量仪器操作技能作为该门课程期末考核的重点。为了激发学生的学习兴趣,还可以将测量实习工作与大学生测绘大赛活动相结合,通过各种方法,使学生对完整的工作情境以及过程深有体会,并通过提出、分析和解决问题来实现对知识和技能的关联。同时,还可以结合实训内容,组织学生到实际工地进行实践操作,以提高解决实际问题的能力。此外,为了方便学生有更多的机会接触仪器,要把测量实验室建成开放性实验室,本校学生可凭学生证,在指定的时间内借领仪器[4]。

完善期末考核制度

科学合理的考核方法将极大地激发学生学习的主动性,使学生能够充分地融入到工程测量课程的学习中来,保证教学质量。通常工程测量的期末考核较偏重于笔试部分,但由于一般笔试考核内容大多以教材为中心,促使学生只注重对理论知识的学习,不重视实际操作能力的练习。所以,应该加大对平时表现和实践操作在考核中的比例,使学生不仅要掌握知识,还要懂得如何灵活运用所学知识,从而提高他们的动手操作能力。在具体的动手能力测试中,加入仪器构造、计算等方面的内容,将基础知识和动手能力有机结合。

师资队伍建设的改革

在教学活动中发挥主导作用的是老师,其直接影响到教学效果的好与否。当前测绘理论的不断完善,测量仪器、设备的推陈出新要求教师不得不紧跟快速发展的测绘科学技术新形势。该院大多数从事工程测量教学的青年教师多数是没有走出校门的,必要的工程实践 经验 较为缺乏。有必要定期派一定数量的教师去施工单位进修,来提高自身水平[5]。此外,要广泛开展教研、教改及学术交流等活动,发挥骨干教师及老教师的“传、帮、带”作用,促进教师教学水平的提高。

4结语

工程测量课程的教学,是着重培养学生解决实际工程问题的课程。随着测绘新技术的迅速发展,就要求任课教师深入探讨工程测量教学改革。通过对教学内容的调整、教学方法的改进、考核制度的完善、实践教学的加强等系列教学改革举措,有利于学生学习和解决实际问题能力的进一步提高,最终培养出具有实践创新能力的高素质人才。

桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words

桩基础在施工常见问题及处理方法论文

摘 要:正如我们所知道的, 桩基础是地基处理常用的方法之一,其中钻孔灌注桩就是桩基础施工的常用的施工方法,本文以此种方法来分析桩基础在施工过程中常见的问题及提出相应的解决对策。

关键词:桩基础;钻孔灌注桩;质量问题;处理措施

钻孔灌注桩基础是一种可以适应多种地质条件的基础地基建设的形式,在各领域的工程建设中都得到了广泛的应用。所以我们应给予其施工过程高度的重视,掌握施工过程中易出现的问题,并能予以高效率的解决。

1.桩基础施工过程中常见质量问题

桩基础施工过程中常常遇到的问题即是钻孔问题、混凝土灌注施工问题,下面本人将对这两方面进行一系列的分析。

钻孔施工问题

在钻孔施工的过程中,孔口的坍陷将会使钻孔质量无法得到保证,这是因为孔口的坍陷会导致护筒底部的土质变得松散、背后回填土不够结实,有时还会使护筒周围土质受雨水长时间浸泡等因素造成护筒失稳或脱落,这种问题会使护筒移位;有时因为钻机操作人员实施的操作不规范、穿过岩层时发生突变、钻机突然发生、机械故障等原因均有可能导致钻机发生卡钻问题;在钻孔施工时,如果塑性土发生膨胀,将会使成孔后的孔径产生弯曲、孔径局部变小,这将引起钻孔施工不能正常进行;在新疆这类松软土层中,如果进尺的速度较快、吊装钢筋笼碰撞孔壁或是未按照施工工艺的要求制备符合标准的泥浆等因素均会造成坍孔问题的发生,从而引起钻孔施工问题;在钻孔是,如果钻机的钢丝绳发生断裂、钻机出现机械故障或者钻孔发生坍塌,会使钻头掉落到孔底而无法进行正常的作业。

水下混凝土灌问题

这类施工问题主要是由封底失败、卡管、钢筋笼上浮等原因造成的。产生封底失败的主要原因是孔底沉渣厚度超过所规定的标准范围,从而引起了混凝土在灌注后没有实现水下混凝土封底,从而引起施工问题;因为混凝土具有和易性差、灌注混凝土时冲击力不足的特点,此外混凝土中还含有很多大块骨料或受潮凝固的水泥块,这就引发了卡管问题,无法正常的进行浇筑混凝土的操作;由于钢筋笼制作、堆放、吊装、运输等过程不符合施工的规范要求,钢筋骨架内径与导管外壁间距没有符合规定的尺码,导管在提升过程中挂带了钢筋笼,或是由于混凝土浇筑速度过快,混凝土面升至钢筋笼底部产生向上“浮力”导致钢筋笼上浮;由于混凝土的配合比不当、原材料也未能符合规定或灌注混凝土过程中局部坍塌的杂物土质等侵入混凝土及混凝土和易性差等因素,都会直接或间接的发生断桩的施工问题。

2.针对于施工过程中常见的问题的处理措施

钻孔施工所发生的问题的应对处理措施

首先,护筒埋入在土层中的深度一定要大于水头高度,而且必须穿过松散土层、淤泥层,此外,护筒四周的回填土必须夯填密实;再者,假如发生卡钻的施工问题是,我们不要直接强行拔出,应该晃动大绳以便钻头松动后提起或者插入高压水管置换泥浆,也就是先下放钻头而后迅速上提使岩层突变物受强力冲击而破碎或回缩,从而提起钻头,切忌不能蛮拉;在施工时,应用的是加大泥浆密度、加高水头、埋深护筒等方法进行操作,在坍孔问题严重时,我们必须回填重新钻孔,以免加大了施工问题;如果采用冲击法进行钻孔,可利用投黏土块夹小片石,用低锤冲击将其挤入孔壁来制止坍孔,而当钢筋笼吊装造成坍孔时立即将钢筋笼吊出,添加泥浆护壁将坍陷物清理干净,确认不再坍塌后重新安装钢筋笼。

水下混凝土灌所发生问题的应对处理措施

首先,我们要利用导管内安装高压风管的方法重新清孔,将已灌注混凝土彻底的清理干净,然后再重新开始水下混凝土浇筑,也可以先拆除导管,拔出钢筋笼,将未灌注混凝土部分回填,稍后用钻机钻头清除已灌注混凝土,然后再重新开始浇筑水下混凝土;在施工时,先慢慢的提升导管,而后快速下落导管,这样可加大混凝土灌注量而后快速提升再快速下落以冲击导管,便于导管的疏通,还可以适当的加长上部导管的长度,然后以一次性较大量混凝土来冲击混凝土达到疏通的目的;最后,我们应该关注混凝土浇注过快引起的钢筋笼上浮问题,面对这类施工问题,我们应立即控制混凝土的浇筑量和浇灌速度,并且反复上下摇动导管,采用这种方法,钢筋笼上浮现象还是得不到根治,就必须立即中止浇灌混凝土,拔出导管侯向孔内回填黏土,该桩作废处理,并及时与监理人员、设计人员联系重新补桩。

3.桩基础施工过程中的注意事项

钻孔过程中的注意事项

在钻孔前,应先对桩位反复进行测量,测量的同时要在护筒上用交叉十字线的'方法涂抹红漆,这样将方便于钻孔过程及成孔后桩位的技术施工核实。在钻孔过程中,我们必须详细准确地记录地层地质的变化情况。要做到详细、准确、认真地记录钻孔记录,技术人员积极了解地质变化情况并及时向上级反映相关情况起着相当关键的作用,尤其是能够为工程变更提供合理的依据和真实数据。为了准确地了解和掌握地质变化情况,最好的办法是对钻渣及时进行取样并留取渣样。

加强成孔检测

首先,施工人员应仔细查看详细真实的钻孔记录,切实准确得掌握不稳定的地层,依照不同的地形制定切实合理的灌注方案。第二,要详细记录各项检测数据,尤其是孔深的记录,这样做的主要目的在于计算泥浆沉淀速度和深度,便于做出合理的判断和采取合理的灌注办法。最后,我们应该认真做好灌前准备工作,根据土层的不同质地,应做好导管的打压试验,以确保导管的密水性符合要求。

4.结语

众所周知,钻孔桩基础是地基处理的主要方式之一,那么它施工的好坏将决定工程施工的好坏,所以我们应予以高度的重视,了解在施工的环节中可能出现哪些问题,提前做好准备,以预防为主,规范施工工序流程,做好质量控制,对可能出现的质量问题制定切实有效的防范措施,减少质量问题,杜绝质量事故的发生。

参考文献:

[1] 中国建筑科学研究院. JGJ94—2008 建筑桩基技术规范[S]. 北京:中国建筑工业出版社,2008.

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

桩基检测论文3000字

写作思路:可以根据现如今中国桥梁建设的发展水平进行阐述,可以从技术创新体制建设方面这个角度出发进行描述,中心要明确等等。

正文:

现如今,我国的桥梁建设事业飞速发展,如何利用现有的设备来满足人民对交通便利的需求,成为桥梁建设所要面对的主要问题。相信随着施工施工技术的发展、经验的积累及计算软件的普及,会出现更多更好的公路桥梁施工方法。

由于我国仍处于社会主义初级阶段,我国桥梁施工单位与其他一些企业一样,工作任务仍要靠上级直接下达命令,所要做的科研项目和技术改进还要靠有关部门立项拨款才可进行后续工作,而当桥梁施工完成后又往往束之高阁,只有一小部分能产生应有的可观效益。自从中国加入世贸组织以来,由于受国际关系的影响,我国桥梁建设行业与真正的国际标准要求还是存在很大的距离。这使得企业在桥梁施工的技术创新方面的紧迫感和积极性都大打折扣。

首先,在技术创新体制建设方面出现了缓慢进展的局势。虽然国家有关部门已经明令要求大型桥梁施工单位要建立以技术为中心的一种系统的创新体系,但仅仅有一小部分的企业响应了国家的号召,大部分桥梁施工单位仍选择维持旧有的施工技术体制,甚至有些企业仅仅在表面上建立了技术中心,而实际上却没有按新的体系运行。

其次,桥梁施工单位对技术创新工作的重视程度还是不够。由于施工建设市场的不完善和一些不良的施工风气的影响,许多人认为只要能拿下桥梁施工工程就可以把一系列的任务都能完成,这也就造成了他们重经营轻技术问题的产生。

除了以上两个方面,施工技术创新的投入还是不够。这也就导致了技术创新的积极性不够,多数桥梁施工单位对于科技的投入量不够,技术进步速度受到不同程度的影响,造成了产业升级相应滞缓。

施工人员可以利用强制式来对混凝土的拌制,需要注意的是拌制时间一定要达到施工要求,拌制时间既不能太长,也不能太短。因为搅拌时间如果过短,那么混凝土的混合将不会均匀,而搅拌时间如果过长,那么将会破坏混凝土原材料的结构。

同时,在混凝土搅拌的过程中,一定要严格的控制加水量和外加剂的用量。只有科学的控制水灰比例,减少混凝土的干缩量。只有把混凝土拌制均匀,才能达到混凝土的设计强度,从而满足桥梁施工的需要。

良好的混凝土施工技术不仅能降低混凝土内部的温度,还能减少混凝土的内外温差,这样会使由温度造成的裂缝产生几率得到降低。施工人员可以利用插入式振动器的振实来进行混凝土浇筑的过程,在这个环节,是不允许过振现象所导的混凝土表面粗、细集料离析而靠近模板的混凝土表面集料集中问题的出现,也要注意不可产生漏振而使混凝土表面产生麻面、蜂窝、孔洞、裂缝等质量问题。

在每次地振捣部位振动直到混凝土停止下沉不再冒出气泡、表面呈现平坦泛浆,才可以徐徐提起振动器。总之,混凝土的振捣应引起施工人员足够重视,只有混凝土振捣的结果符合要求,才能使桥梁的施工质量得到保证。

裂缝是桥梁施工的主要病害,那么对于防止裂缝产生的关键在于混凝土的养护。混凝土浇筑收浆完成后应及早进行洒水养护,保持混凝土表面处于湿润的状态。由于水泥在水化过程中产生很大的热量,混凝土空心板在浇筑完成后必须在侧模外喷水散热,以免混凝土由于温度过高,体积膨胀过大,在冷却后体积收缩过大产生裂缝。

在桥梁工程的施工期间,预应力的检查结果一切正常。但在后期的相邻标段的现浇梁施工时,却发现梁顶面的高程出现异常,这很可能是由于边墩顶内侧支座脱空造成的。在对桥梁预应力问题的处理中,桥梁施工单位面临着巨大的压力, 桥梁的基础、桥墩、现浇梁施工的各个工序都会造成预应力问题的发生。

在桥梁可以通车后,气温回升会造成桥梁弯处梁不同程度发生了支座脱空现象, 使桥面伸缩缝受到严重的损害而使路面无法正常行车。支座脱空的处理方法是十分困难和复杂的,需要将箱梁整体起顶后进行支座位移,同时要对墩帽及桥墩进行加宽处理,基础要增加钻孔桩。匝道被迫封闭,处理时间长达半年。

局部蜂窝问题的产生主要是因为混凝土结构强度大大降低了结构的严密性,其疏松的结构强度几乎达到了最低点。在桥梁的使用过程中,如果发生局部蜂窝问题,会导致它所承受能力极大地减少,并且遭受腐蚀而造成重大的损伤的几率更大,大大地降低了桥梁施工工程的承载力和耐久性。

现如今,我国的桥梁施工建设如火如荼,如何利用现有的施工技术来满足人民对交通便利的需求成为桥梁建设所要解决的主要问题。相信随着施工技术的发展、经验的积累,会出现更多更好的桥梁施工方法,为国家和人民的财产安全提供更有效的保障。

桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words

你去找下(土木工程、或者、交通技术)吧~

桥梁工程学的发展主要取决于交通运输对它的需要。古代桥梁以通行人、畜为主,载重不大,桥面纵坡可以较陡,甚至可以铺设台阶。在有重载马车之后,载重量逐步加大,桥面纵坡也必须使之平缓。这时的桥梁材料仍以木、石为主,铸铁和锻铁很少使用。 从桥梁的原始雏形——堤梁(及在浅滩溪涧中筑起一个个石堤,堤间流水,人从石堤上跨越)、独木桥、浮桥(架设在船只上的桥)和石拱到现在超千米跨度的悬索桥,桥梁工程在几千年的时间里发展可谓翻天覆地。然而桥梁工程能拥有这翻天覆地的发展取决于工程材料和工程技术迅猛发展的有力推动。在原始社会里,懵然无知的古人类还只是追求有一个起身的洞穴和能填饱肚子的食物,还不会想到桥。然而随着社会的发展,人类文明的进步,交通的不断发展,人们开始创造了桥。然而那时工程材料的使用仅限于天然的木和石块,且工程技术非常落后,所以人们只能建造简单的桥——堤梁、独木桥和简单的石拱。世界上现存最古老的石桥在希腊的伯罗奔尼撒半岛,是一座用石块干垒的单孔石拱桥,距今3500年左右建成。我国古代桥梁工程技术的发展在当时处于世界领先地位。公元590——608年建造在河北省赵县(叫)河上留存至今的隋代敞肩式单孔圆弧弓形石拱桥,即赵州桥。该桥全长,桥面宽约10m,采用28条并列的石条砌成拱券形成。拱券矢高。拱上设有4个小拱,既能减轻桥身自重,又便于排洪,且更显美观。该桥无论在材料使用、结构受力、艺术造型和经济上都达到极高成就,是世界上最早的敞肩式拱桥,早于欧洲同类桥约1000年。近代土木工程的时间跨度为从17世纪中叶至20世纪中叶的300年间。这个时期内土木工程的主要特征有:——有力学和结构理论作为指导;——砖、瓦、木、石等结构建筑材料得到日益广泛的使用;混凝土、钢材、钢筋混凝土及早期的预应力混凝土得到发展;——施工技术进步很大,建造规模日益扩大,建造速度大大加快。在这个时期内,以下几件大事对桥梁工程的影响巨大: (1)意大利学者伽利略在1638年出版的著作《关于两门新科学的谈话和数学证明》中论述了建筑材料的力学性质和梁的强度,首次用公式表达了梁的设计理论。 (2)英国科学家牛顿在1687年总结了力学三大定律它们是土木工程设计理论的基础。 (3)瑞士数学家欧拉1744年出版《曲线的变分法》建立了柱的压屈理论,得到计算柱的临界受压力的公式,为分析土木工程结构物的稳定问题奠定了基础。 (4)1824年英国人阿斯普.丁取得了波特兰水泥的专利权,1850年开始生产。这是形成混凝土的主要材料,使得混凝土在土木工程中得到广泛应用。后来,在20世纪初,有人发表了水灰比等学说,才初步奠定了混凝土强度的理论基础。 (5)1859年发明了贝塞麦转炉炼钢法,似的钢材得以大量生产,并愈来愈多地应用于土木工程。 (6)1867年法国人莫尼埃用铁丝加固混凝土制成花盆,并把这种方法应用到工程中,建造了一座蓄水池,这是应用钢筋混凝土的开端。1875年他主持建造了第一座长16m的钢筋混凝土桥。 (8)1779年英国用铸铁建成跨度为的拱桥;1826年英国用锻铁建成跨度为177m的悬索桥;1883年美国建成世界上第一座大跨钢悬索桥——布鲁克林桥;1890年英国又建成两孔主跨达521m的悬臂式刚架桥,这样,现代桥梁3种基本形式(梁桥、拱桥、悬索桥)相继出现。 自从有了铁路以后,桥梁所承受的载重逐倍增加,线路的坡度和曲线标准要求又高,且需要建成铁路网以增大经济效益,因此,为要跨越更大更深的江河、峡谷,迫使桥梁向大跨度发展。石材、木材、铸铁、锻铁等桥梁材料,显然不合要求,而钢材的大量生产正好满足这一要求。 在技术方面,只是凭经验修桥,曾使19世纪80~90年代的许多铁路桥发生重大事故;从这时起,正在发展中的结构力学理论得到了重视,而在它的静力分析理论完全确立并广泛普及之后,桥梁因强度不足而造成的事故显然大为减少。 二十世纪以来,公路交通有很大发展。在内陆,需要在更多的河流、峡谷之上建桥。在城市中,以及在各种交通线路相交处,需要建造立交桥。在沿海,既需在大船通航的河口、海湾、海峡修建特大跨度桥梁,又需在某些海岛与大陆之间修建长桥。 由于更多新技术新材料的出现,现代桥梁工程的发展尤其迅速,世界各国相继建造出超千米的桥梁。世界上跨径最大的预应力混凝土斜拉桥——西班牙的卢纳巴里奥斯桥,跨径达440m,采用了双面辐射形密索布置. 世界第一的悬索桥——日本明石海峡桥,横跨日本内海,使日本神户与淡路岛紧紧相连.这座大桥全长3190M,中央跨度1990m于1998年竣工.它可以承受里氏级地震.目前中国在建的一批公路桥梁,无论是桥梁的数量还是工程规模、技术难度、科技含量,都代表着当今世界的先进水平,创造了中国建桥史之最。据悉,这些桥梁主要有:阳逻长江大桥,主跨1280米的悬索桥;南京长江三桥,主跨648米的斜拉桥;润扬长江公路大桥,跨江连岛的主跨1490米悬索桥和406米斜拉桥组合;深圳湾跨海大桥,主跨180米独塔单索面斜拉桥;苏通长江公路大桥,主跨1088米的斜拉桥,居世界第一;杭州湾跨海大桥,按双向六车道高速公路标准建设,全长36公里,是世上在建最长的公路跨海大桥。一个国家同时在建这么多世界级桥梁,在世界上不多见。 桥梁需要大量修建,而人力、物力、财力有限;于是,不断提高技术水平,引用新材料、新工艺、新桥式,对结构行为进行更精确的数值分析,采用更精确的结构试验进行验证,以使桥梁建设的经济效益不断提高,已成为时代的要求。 桥梁工程学主要研究桥渡设计,包括选择桥址,决定桥梁孔径,考虑通航和线路要求以确定桥面高程,考虑基底不受冲刷或冻胀以确定基础埋置深度,设计导流建筑物等;桥式方案设计;桥梁结构设计;桥梁施工;桥梁检定;桥梁试验;桥梁养护等方面。 在建桥材料方面,以高强、轻质、低成本为选择的主要依据,近期仍以发展传统的钢材和混凝土为主,提高其强度和耐久性。对于建筑钢材的脆断机理、初始几何缺陷等,以及混凝土材料的非弹性问题(收缩徐变以及疲劳等),将继续作充分的研究,使能正确控制结构的受力和变形。至于碳纤维塑料等在桥梁上的广泛应用,还必须在降低成本以后才有可能。 在桥梁勘察设计方面,随着交通事业的迅速发展,大跨度或复杂的桥型将不断涌现。高速公路的发展,对桥梁设计亦将提出新的要求。在桥式方案设计中,将有可能利用结构优化设计理论,借助电子计算机选出最佳方案。 在结构设计计算中,采用空间理论来分析桥梁整体受力已成为可能;以概率统计理论为基础的极限状态设计理论,将进一步反映在桥涵设计规范中,使桥梁设计的安全度得到科学合理的保证。桥梁美学作为时代、民族的文化在某些方面的反映,将愈来愈受到人们的重视:桥梁的面貌将蔚为大观。 在桥梁施工方面,对施工组织将充分利用电子计算机进行经济有效的管理。在施工技术中,将不断引用新技术和高效率、高功能的机具设备,借以提高质量、缩短工期、降低造价。如采用激光测量控制结构的精确定位;引用自升式水上平台克服深水基础的困难;利用遥控设备在沉井、沉箱中挖基,以减少劳动强度并避免人身危险;利用高质量的焊接技术,借能推广工地焊接等,此外,装配式桥梁也将有所发展,以使结构和构件标准化,生产工业化。 在桥梁养护维修方面,要求对既有桥梁建立完善的技术档案管理制度。在桥梁维修检查中,引用新型精密的测量仪表,如用声测法对结构材料的缺陷以及弹性模量进行测定;用手携式金相摄影仪检查钢材的晶体结构俾能及早进行加固防患于末然,以便延长桥梁的使用寿命。 桥梁工程始终是在生产发展与各类科学技术进步的综合影响下,遵循适用、安全、经济与美观的原则,不断的向前发展。人们除了要求桥的功能完善,还讲求桥的外形美观、有艺术性 ,桥梁地建造将更加复杂化,更加艺术化,桥梁的未来将更加多元化,是现代桥梁更现代,还是旧式桥梁的复兴,值得期待! 中国桥梁的历史可以上溯到6000年前的氏族公社时代,到了1000多年前的隋、唐、宋三代,古代桥梁发展到了巅峰时期。公元35年东汉光武帝时,在今宜昌和宜都之间,出现了架 设在长江上的第一座浮桥。 在秦汉时期,我国已广泛修建石粱桥。世界上现在是保 存着的最长、工程最艰巨的石粱桥,就是我国于1053一1059年 在福建泉州建造的万安桥,也称洛阳桥,此桥长达800米,共47 孔,位于“波涛汹涌,水深不可址”的海口江面上。此桥以 磐石铺遍桥位底,是近代筏形基础的开端,并且独具匠心地用养殖海生牡蛎的方法胶固桥基使成整体,此也是世界上 绝无仅有的造桥方法,近千年前就能在这种艰难复杂的水文 条件下建成如此的长桥,实是中华桥梁史上一次勇敢的突破。 我国古代石拱桥的杰出代表是举世闻名的河北省赵 县的赵州桥(又称安济桥),该桥在隋大业初年(公元605年左 右)为李春所创建,是一座空腹式的圆弧形石拱桥,净跨37m, 宽9m,拱失高度7.23m,在拱圈两肩各设有二个跨度不等的腹 拱,这样既能减轻桥身自重,节省材料,又便于排洪、增加美 观,赵州桥的设计构思和工艺的精巧,不仅在我国古桥是首屈一指,据世界桥梁的考证,像这样的敞肩拱桥,欧洲到19世纪中叶才出现,比我国晚了一千二百多年,赵州桥的雕 刻艺术,包括栏板、望柱和锁口石等,其上狮象龙兽形态逼 真,琢工的精致秀丽,不愧为文物宝库中的艺术珍品,我国 石拱桥的建造技术在明朝时曾流传到日本等国,促进了与世 界各国人民的文化交流并增进了友谊。 1240年建造的福建潭州虎渡桥,也是最令人惊奇的一 座粱式大桥,此桥总长约335m,某些石粱长达23.7m,沿宽度 用三根石粱组成,每根宽1.7m,高1.9m,重达200多吨,该桥一直 保存至今”历史记载,这些巨大石梁桥是利用潮水涨落浮运建 设的,足见我国古代加工和安装桥梁的技术何等高超。 广东潮安县横跨韩江的湘子桥(又名广济桥)此桥始 建于公元1169年,全桥长517.95m,总共20墩19孔,上部结构有 石拱、木梁、石梁等多种型式,还有用18条活船组成的长达 97.30m的开合式浮桥,设置浮桥的目的,一方面适应大型商 船和上游木排的通过,并且也避免了过多的桥墩阻塞河道, 以致加剧桥基冲刷而造成水害,这座世界上最早的开合式 桥,柱石桥之长、石墩之大、桥梁之多以及施工条件之困难 工程历时之久,都是古代建桥史上所罕见的。。 1957年,第一座长江大桥——武汉长江大桥的胜利建 成,结束了我国万里长江无桥的状况,从此“一桥飞架南北,天堑变通途”,桥的正桥为三联3X128m的连续钢桁粱,双 线铁路上层公路桥面宽18m,两侧各设2.25m人行道,包括引 桥在内全桥总长1670.4物,大型钢梁的制造和架设、深水管柱基础的施工等,对发展我国现代桥染技术开创了新路。 1969年胜利建成了举世瞩目的南京长江大桥,这是我国自行设计、制造、施工,并使用国产高强钢材的现代大型桥梁,正桥除北岸第一孔为128m简支钢桁粱外,其余为9 孔3联,每联为3x l60m的连续钢桁粱。上层是公路桥面,下层 为双线铁路,包括引桥在内,铁路部分全长6772m,公路部 分为4589m,桥址处水深流急,河床地,质极为复杂桥墩基础 的施工非常困难。南京长江大桥的建成显示出我国的建桥事 业已达到了世界先进水平,也是我国桥梁史又一个重要标 志。 在最近的1000年中,中国的桥梁技术全面落后于世界的脚步,中国第一座现代化桥梁的出现距今仅100多年历史,而且是由外国人建造的。从钱塘江大桥算起,中国人自己设计现代桥梁的历史还不足70年;从南京长江大桥算起,中国人自行设计建造大型桥梁的历史仅34年。而九十年代以来,中国桥梁的成就才使我们重新无愧于祖先地站到了世界前列,这是中国桥梁建设的伟大复兴时代。改革开放以来的20多年中,中国的桥梁建造技术取得了举世瞩目的成就,前十年为此做了经济上、技术上和人才上的准备,九十年代迎来了跨越式的发展。展望未来,随着中国经济的发展,一批更大的越江跨海工程的建设,中国桥梁将会创造更辉煌的成就。中华民族的伟大复兴,必将造就一代巨人去引领世界桥梁的未来。 1990年四川省在宜宾市建成的小南门桥,跨径达到240米,已是当时世界上中承式拱桥中跨径最大的一座。2001年11月7日,小南门大桥因吊杆锈蚀造成部分桥面跨塌,在修复过程中,技术人员对全桥进行了检测,大桥整体结构依然完好。小南门大桥所付出的代价是创新的代价,没有创新我们就不可能一睹1400年前的赵州桥。 1991年,四川省苍溪县建成了中国第一座钢管混凝土拱桥——旺苍大桥,跨径115米。在此之后的几年中,各地虽然兴建了不少钢管混凝土拱桥,但跨径始终在200米以下徘徊,直到1998年,广西壮族自治区建成了三岸邕江大桥,一举将此类桥梁的跨径提高到270米;1999年又建成了跨径220米的六景大桥。此后,在湖北、浙江和贵州等省,跨径在250米左右的钢管混凝土公路、铁路拱桥开始增多。 1995年贵州省瓮安县建成江界河大桥,首次突破了中国混凝土拱桥跨径 300米大关,达到330米,一举成为世界最大的桁式组合拱桥。不仅如此,其拱顶桥面至水面高度达263米,居中国各类桥梁之首。大桥一跨飞跃乌江天险,主孔分108个桁片预制,运用桁架伸臂法悬拼架设,两岸引孔为桁式刚构,全桥轻盈简洁,凌空飞渡,气势不凡。 1997年重庆万县长江大桥建成。大桥位于万州区(原万县市)黄牛孔处,是上海至成都高速公路跨越峡江天险的特大型拱桥。大桥一跨飞渡长江,全长 米,主拱圈为钢管混凝土劲性骨架箱型混凝土结构,主跨420米,桥面宽24米,为双向四车道,是1995年贵州省瓮安县建成江界河大桥,首次突破了中国混凝土拱桥跨径 300米大关,达到330米,一举成为世界最大的桁式组合拱桥。不仅如此,其拱顶桥面至水面高度达263米,居中国各类桥梁之首。大桥一跨飞跃乌江天险,主孔分108个桁片预制,运用桁架伸臂法悬拼架设,两岸引孔为桁式刚构,全桥轻盈简洁,凌空飞渡,气势不凡。 华夏第一桥——江阴长江公路大桥,是我国“八五”规划的“两纵两横”国道主干线中沿海主骨架的跨江工程,是目前 中国第一、世界第四大跨径钢悬索桥。大桥由桥塔、主缆、锚旋和钢箱梁等主要部件组成。大桥全长3071 米,主跨1385米;桥面宽33.8米,双向六车道,设计车速100公里/小时;通航净空为50米,可通行五万 吨级巴拿马型散货轮。江阴长江公路大桥的两根主索,各长2400多米,直径近1米,每根重1.4万 多吨,主索用127根直径5.3毫米的钢丝搅成索,再由169股钢索组成主索。主桥每边有85个吊杆,每个吊杆2根,用以连结主索和桥面。 两岸索塔标高为196.236米,相当于65层搂高。北塔基长43.5米,宽73.5米,下有123根近90米长的基础桩。北锚的混凝土陈井平面长69米,宽51米(面积相当于一片足球场大)。沉入地面58米,被称为世界第一大沉井。江阴长江大桥于1994年11月22日正式开工,1999年10月1日胜利通车,名列“中国第一,世界第四”。 改革开放以来的20多年中,中国的桥梁建造技术取得了举世瞩目的成就,前十年为此做了经济上、技术上和人才上的准备,九十年代迎来了跨越式的发展。展望未来,随着中国经济的发展,一批更大的越江跨海工程的建设,中国桥梁将会创造更辉煌的成就。中华民族的伟大复兴,必将造就一代巨人去引领世界桥梁的未来。

建筑桩基检测论文

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

[摘要] 我国经济的不断发展,不仅提高了建筑工程的经济效益同时也大大增加了同行业的竞争力度。因此,提高建筑工程的质量才是提高竞争力的关键,那么建筑工程的检测质量控制也就成为整个工程的重中之重。本位主要分析了建筑工程质量控制的关键要点以及提出了建筑工程质量控制的优化措施。提高工程建筑质量,扩大建筑工程的收益提出一些借鉴思考。

[关键词] 建筑工程;质量控制;关键要点;强化措施

建筑工程行业竞争的激烈促进了建筑工程质量的提高,这是竞争的核心。随着生活的不断发展,建筑工程慢慢的与人民的生活,与社会的发展紧密相关。所以不断提高工程建筑质量确定各项质量指标都满足国家的标准,以保证人们的生命安全,促进国家经济的不断发展。

1建筑工程质量控制的关键要点

建筑安全是建筑过程中最重要的问题,也是施工过程中最需要注意和考虑的问题,严格的建筑工程管理是对建筑质量与安全的考核与负责。

从技术管理入手,不断提高施工技术水平

建筑工程是非常繁琐的工程建筑项目,所需要的工序不仅种类多而且复杂。这就需要有多种施工班组,对建筑施工的现场管理是很艰难的,要确保施工过程中各个环节的管理到位,最重要的就是加强技术管理。建筑是施工过程中技术到位了,就会减少许多不必要的麻烦。首先,加强技术工人技术培训,提供工人技术水平,让施工人员切实按照施工的图纸进行施工,严格按照标准去落实。其次,合理安排建筑工程过程中工程计划,保证各个环节有序稳定的进行;最后就是要做好技术交底与施工工序之间的交接工作,加强技术人员技术技能培训,及时掌握新的技术,以确保每一道工序都能符合标准。在最后交底的时候,一定要注意技术问题,对于工序进行交接时要做好质量检查,确保建筑施工安全提高产品质量。

从材料管理入手,提高材料选择的质量

对于建筑材料的选择,应该对供应原材料的'厂家进行严格的筛选,不仅仅只考虑经济方面,还需要考虑原材料的质量,要把握施工过程中对原材料与资金的使用。对材料的选择应该进行“三检”,要对材料进行层层把关,同时还要避免原材料的浪费,节约材料成本。

切实做好人员管理

在建筑建设过程中,项目工程的管理者是建筑工程施工的核心,建筑工人是工程项目的主力与中坚力量,在建筑施工过程中每个人每个环节对建筑施工都是至关重要,所以各司其职,建立合理科学的奖惩制度是非常必要的,对于出现错误的要进行惩罚,同时还要将工人的工资与建筑工程的质量、效率等因素连接起来,确保建筑工程的质量。

2建筑工程质量控制优化措施

施工的前期准备工作要完善

要保证建筑工程的质量,要从整个工程的前期,中期以及后期进行质量的控制。要从多个方面进行项目前期准备工作,例如在设计、决策环节应保证购入质量到位的建筑用材、设计出可靠、科学的图纸,并制定专门方案加强施工质量监管,要严格把控建筑材料的选择与使用,在提高建筑质量的同时,要在建筑施工前严格进行建筑地实地勘测,对每一个可能对建筑施工产生影响的因素进行考虑,防患未然,避免引起建筑质量问题。建筑施工单位还应该还应该选择科学的施工设施,并且选择优秀的管理者来进行设备维护,选择专业施工队伍来进行建设。

提高对建筑施工的管理与监督

在建筑施工的过程中,严格按照管理要求对施工项目进行监督检查,为建筑施工做好各个环节的安全控制,不管是在建筑材料或者其他方面都要严格按照要求进行,尤其是建筑材料更要严格把关,防止建筑材料出现问题。其次是要加强对建筑施工的监督,要提高建筑施工人员责任感以及专业技能,以保证建筑工程的质量。最后就是要加强对施工技术的管理,要对建筑施工的全局进行把控,确保能够使用正确的施工技术,保证建筑工程质量。

提高施工者的技术能力

要确保建筑施工工程的质量,还需要有专业的技术人员。提高建筑工程施工者的技术能力也是提高建筑工程质量的重要手段。首先,对于整个建筑工程需要一个统筹全局的管理人员,这个管理者必须要具有较强的管理能力,具有较高的技术水平以及丰富的实践经验等等。其次,对于一些施工人员,要加强对施工技术的业务培训,不断提高建筑施工人员的专业技能以及综合素质,确保建筑工程的质量。

完善质量目标责任制

建筑工程施工单位还应该完善自身的质量目标责任机制,就是要对建筑施工的管理负责人、技术负责人以及项目经理等各类负责人的职责进行明确的规定,确保每一个施工环节的质量都有监督控制,责任到人,能够提高施工人员的责任感,促使他们以严谨的态度对待工作,并对所有施工相关人员的质量控制责任加以明确,保证一切质量工作均由专门责任人负责并有相应的标准。例如要保证所有人员都要认真遵循权、责、利原则,要保证每一个施工人员都有相应的科学合理的工作任务,促使他们能够在各自岗位上恪尽职守。同时,还要制定统一的目标,实现各个部门之间的相互监督与配合,从而提高建筑工程的质量。

3结束语

总的来说,对于建筑工程质量控制的关键,要从完善前期施工的准备工作,加强人员的培训与管理,材料的选择,加强对建筑工程的管理与监督以及完善质量目标责任制,从而保证建筑工程的每一个环节都能够得到有效的质量控制,从而保证整个建筑工程的质量,促进建筑行业的可持续发展。

参考文献

[1]范玉柱,刘岩.建筑工程桩基工程施工技术控制要点[J].中外企业家,2015(30).

[2]陈超,王霞.浅谈建筑工程桩基工程质量控制[J].河南建材,2014(01).

[3]陈子龙.如何做好建筑工程的质量控制[J].长春理工大学学报(高教版),2009(03).

[4]王国高.建筑工程施工质量控制问题及对策研究[J].黑龙江科技信息,2013(04).

[5]胡春玲.浅谈建筑工程管理基础上的建筑工程质量控制措施[J].科技与企业,2016(05).

建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 地基基础工程的质量检测。 地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 砌体结构工程检测。 砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文

相关百科

热门百科

首页
发表服务